Você está na página 1de 36

Savu Developers Pvt. Ltd.

A/1 Chintamani Complex, B.K. Road,


Mulund East, Mumbai-400081

To
,

M/s. Neptune Realtors Pvt Ltd,


Neptune House, Karma Stambh,
Opp: MTNL Office, L.B.S.Road,
Vikhroli (West), Mumbai 400083.
Kind Attn:Turner Project Management India Pvt. Ltd.

Date : 01/10/2011
Invoice No.: RB/ Var. 002/ NRPL/ SDPL/11-12
W.O. no. 23000628
TAX INVOICE ( 2nd R.A. BILL / Variation 2)
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr.
No.

Sub.
No.

Description

Carrying out temporary works like marking


of footing locations, dressing of ground
surface level, cleaning the ground surface,
pipe alignments etc. including marking
00 10a
with white powder, tools and tackles,
loading, unloading of the client supplied
material if any etc. as directed by Project
Manager all complete.

Prev. Qty.

Currt.
Qty.

Total Qty.

Unit

325.00

389.00

714.00

No.

350.00

249,900.00

Rate

Amount

Mason

1.00

1.00

2.00

No.

850.00

1,700.00

Mukadam (for labour supervision) Total


labour supply to NRPL is Unskilled labour
=714 Nos., Mason =2 (Total salary Rs.
251600.00). The charge for the Mukadam
will be @ 10% of the total Departmental
supply of the labour

1.00

1.00

2.00

Job

25,160.00

50,320.00

JCB Hrs.

71.00

128.00

199.00

Hrs.

750.00

149,250.00

Providing & laying (RMC) plain cement


concrete
(PCC) of M-15 grade below the raft,
footings etc.The rate to include for
compacting, curing, dewatering, cleaning,
00 20 preparing surfaces, junctions etc complete
at all heights, and depths as per the
drawing and directed by Project Manager.
Size of aggregate to be 20 mm or as
directed by consultant for intended
thickness.( For shuttering rate)

430.35

134.77

565.12

Cum

700.00

395,583.30

Providing & laying (RMC) plain cement


concrete
(PCC) of M-15 grade below the raft,
footings etc.The rate to include for
compacting, curing, dewatering, cleaning,
00 30 preparing surfaces, junctions etc complete
at all heights, and depths as per the
drawing and directed by Project Manager.
Size of aggregate to be 20 mm or as
directed by consultant for intended
thickness.( For patra finish rate)

3230.11

1059.58

4289.69

Sq. Mtr.

100.00

428,969.00

Total Pge 1

1,275,722.30

Page 2
Sr.
No.

Sub.
No.

Description

Qty.

Unit

Rate

C. F. from Page 1..

00 40

00 50

00 60

00 70

1
2

Providing & laying (RMC) plain


cement 70 :30 plum concrete
(PCC) of M-15 grade below the raft,
footings & around the footings
etc.The rate to include for
compacting, curing, required
shuttering and its removal,
dewatering, cleaning, preparing
surfaces, junctions etc complete at
all heights, and depths as per the
drawing and directed by Project
Manager. Size of aggregate to be 20
mm or as &
directed
by consultant
Providing
laying (RMC)
plain for
cement concrete (PCC) of M-25
grade with Plums below the retaining
wall footing. The rate to include for
compacting, curing, providing
necessary stoppers, dewatering,
cleaning, preparing surfaces,
junctions etc complete at all heights,
and depths as per the drawing and
directed by Project Manager. Size of
aggregate to be 20 mm or as directed
Rate Increase-Providing and laying
100mm dia approved make
perforated pipes as per provided
specifications with geotextile
membrane of 130 micron thickness
as per design, drawings and
specifications provided by consultant
with all lead, lift at all height including
placing, making in required slope,
joints & bends etc all complete.
Specifications of perforated pipe:
Type - Unplasticized Polyvinyl
Chloride (UPVC) single wall
corrugated pipes as per IS9271:2004.
Nominal outside diameter - 100mm
0.5mm
Inside diameter - 88mm0.5mm.
Perforation size width - 1.7mm to
2.0mm.
Perforation size length - 8.0mm to
Supplying and errecting dewatering
pumps, providing suction pipes and
delivery pipes, electrical cables, panel
boards etc. with the pump on daily
hire basis including providing
manpower for shifting the same
assembly from place to place. The
supply includes necessary
maintainance and repairs of the
3 HP
10 HP

134.50

0.00

Amount

1,275,722.30

134.50

Cum

5,946.00

799,732.84

24.71

0.00

24.71

Cum

5,557.00

137,313.47

416.00

68.00

484.00

Rmt.

92.00

44,528.00

4.53
1.03

0.00
1.00

4.53
2.03

9,000.00
15,000.00

40,770.00
30,450.00

Total Pge 2

2,328,516.61

Months
Months

Page 3
Sr.
Sub.
No
No.
.

Description

Qty.

Unit

Rate

C. F. from Page 2..


Providing & laying (RMC) plain
cement concrete (PCC) of M-15
8 00 80
15.50
grade for bunding, retaining strata in
heavy rain
9 00 90 Escallation
Escallation for Rubble
1245.83
Escallation for aggregate
678.36
Escallation for polythene sheet
2833.03
Providing Rubble Stone to MIC as per
10
0.00
sheet attached
Providing 500 micron PVC sheets to
11
0.00
MIC

0.00

257.97
156.65
869.36

15.50

Cum

1503.80
Cum
835.01
Cum
3702.39 Sq. Mtr.

31.87

31.87

Brass

74.30

74.30

Sq. Mtr.

Amount
2,328,516.61

5,475.00

84,862.50

63.60
81.27
1.08

95,647.91
67,863.41
3,998.58

1,900.00

60,553.00

48.42

3,597.51

SUB TOTAL (A) (excluding taxes)


Add Service Tax on A
4.12%
Add VAT on A
5.00%
GRAND TOTAL (including taxes)
I.e. Rs Twenty eight lacs eighty six thousand nine hundred nighty nine paise seventy two only.
For Savu Developers Pvt. Ltd.

2,645,039.51
108,975.63
132,251.98
2,886,267.11

Director
VAT TIN No. :27620385279V
PAN NO. :AAICS9219E
STC No. :AAICS9219EST001
I/We hereby certify our Registration Certification under the Maharashtra Value Added Tax Act, 2002 is in force on
the date on which Sale of Goods specified in this Tax Invoice is made by me / us and that the transaction of sale
convered by this Bill / Cash Memorandum has been effected by me and it shall be accounted for in the turnover of
sales while filing my return.

Savu Developers Pvt. Ltd.


A/1 CHINTAMANI COMPLEX, B. K. ROAD,
MULUND (E), MUMBAI-400081

To,

M/s. Neptune Realtors Pvt Ltd,


Neptune House, Karma Stambh,
Opp: MTNL Office, L.B.S.Road,
Vikhroli (West), Mumbai 400083.

Date : 01/10/2011

SUMMARY SHEET FOR RA2 and VARIATION RA2


for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla,
Mumbai.
Sr. No.

Description

Submitted Amount (Rs.)

Additions
1
1

Actual work done RA2 (as per tender approved


items and rates)
Variation work done RA2
Total Addition Amount (A).

7,417,282.27
2,886,267.11
10,303,549.38

Deductions
1
2

5% Retention Amount as per conditions on actual


work done amount for RA 2 and variation RA 2

496,331.40

Payment Received
Total Deduction Amount..B

3,696,269.00
4,192,600.40

Due Payment.A-B

6,110,948.98

Thanking you,
Yours faithfully,

Director.
VAT TIN No. :27620385279V
PAN NO. :AAICS9219E
STC No. :AAICS9219EST001

Approved Amount (Rs.)

u Developers Pvt. Ltd.

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 1 (Variation 1)
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr.
No.

Item Description

Carrying out temporary works like marking of


footing locations, dressing of ground surface
level, cleaning the ground surface, pipe
00 10 alignments etc. including marking with white
powder, tools and tackles, loading, unloading of
the client supplied material if any etc. as
directed by Project Manager all complete.
1

Mason
Mukadam (for labour supervision) Total labour
supply to NRPL is Unskilled labour =389 Nos.,
Mason =1 (Total salary Rs. 137000.00). The
charge for the Mukadam will be @ 10% of the
total Departmental supply of the labour ie. Rs.
13700.00
JCB Hrs.

Nos.

Qty.

Total Qty

389.00

389.00

389.00

1.00

1.00

1.00

1.00

1.00

1.00

128.00

128.00

128.00

Providing & laying (RMC) plain cement concrete


(PCC) of M-15 grade below the raft, footings
etc.The rate to include for compacting, curing,
dewatering, cleaning, preparing surfaces,
00 20 junctions etc complete at all heights, and
depths as per the drawing and directed by
Project Manager. Size of aggregate to be 20
mm or as directed by consultant for intended
thickness.( For shuttering rate)
pour1
Less PCC below footing
C89
pour2
pour 3
pour5(a)
Less PCC below footing
c-55
pour5(b)
pour6
Less PCC below footing
c40
c41
c49
c50
pour7
less PCC below footing
c71
c72
c61A
c62A
pour8
Less PCC below footing
c81
pour9
less PCC below footing
c83
c84
c93
c94
c91
c92
c82

1.00

73.62

0.15

11.04

-1.00
1.00
1.00
1.00

22.82
57.69
45.00
42.67

0.15
0.15
0.15
0.15

-3.42
8.65
6.75
6.40

-1.00
1.00
1.00

2.10
2.10
24.78
154.81

0.15
0.15
0.15

-0.32
3.72
23.22

-1.00
-1.00
-1.00
-1.00
1.00

2.70
2.70
2.70
2.70
154.91

2.70
2.70
2.70
2.70

0.15
0.15
0.15
0.15
0.15

-0.41
-0.41
-0.41
-0.41
23.24

-1.00
-1.00
-1.00
-1.00
1.00

21.41
16.71
1.50
1.70
1.50
1.70
116.60

0.15
0.15
0.15
0.15
0.15

-3.21
-2.51
-0.23
-0.23
17.49

-1.00
1.00

2.70
2.70
376.91

0.15
0.15

-1.09
56.54

-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00

3.30
3.30
3.30
3.30
2.50
2.70
2.70

0.15
0.15
0.15
0.15
0.15
0.15
0.15

-1.63
-1.63
-1.63
-1.63
-0.94
-1.09
-1.09

3.30
3.30
3.30
3.30
2.50
2.70
2.70

134.77

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 2 (Variation 1)
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr.
No.

Item Description

Nos.

Qty.

Providing & laying (RMC) plain cement concrete


(PCC) of M-15 grade below the raft, footings
etc.The rate to include for compacting, curing,
dewatering, cleaning, preparing surfaces,
00 30 junctions etc complete at all heights, and
depths as per the drawing and directed by
Project Manager. Size of aggregate to be 20
mm or as directed by consultant for intended
thickness.( For patra finish rate)
pour1
Less PCC below footing
C89
pour2
pour 3
pour5(a)
Less PCC below footing
c-55
pour5(b)
pour6
Less PCC below footing
c40
c41
c49
c50
pour7
less PCC below footing
c71
c72
c61A
c62A
pour8
Less PCC below footing
c81
pour9
less PCC below footing
c83
c84
c93
c94
c91
c92
c82

1.00

73.62

-1.00
1.00
1.00
1.00

22.82
57.69
45.00
42.67

73.62
0.00
-22.82
57.69
45.00
42.67

-1.00
1.00
1.00

2.10
2.10
24.78
154.81

-4.41
24.78
154.81

-1.00
-1.00
-1.00
-1.00
1.00

2.70
2.70
2.70
2.70
154.91

2.70
2.70
2.70
2.70

-7.29
-7.29
-7.29
-7.29
154.91

-1.00
-1.00
-1.00
-1.00
1.00

21.41
16.71
1.50
1.70
1.50
1.70
116.60

-21.41
-16.71
-2.55
-2.55
116.60

-1.00
1.00

2.70
2.70
376.91

-7.29
376.91

-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00

3.30
3.30
3.30
3.30
2.50
2.70
2.70

-10.89
-10.89
-10.89
-10.89
-6.25
-7.29
-7.29

3.30
3.30
3.30
3.30
2.50
2.70
2.70

SAVU DEVELOPERS PVT. LTD.

Total Qty

Measurement Sheet 3 (Variation 1)


for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr.
No.

Item Description

Nos.

Qty.

Footing P.C.C.-89

1.00

2.70

2.70

7.29

C90

1.00

2.50

2.50

6.25

c55

1.00

2.70

2.70

7.29

c57

1.00

2.10

2.10

4.41

c49

1.00

2.70

2.70

7.29

c50

1.00

2.70

2.70

7.29

c40

1.00

2.70

2.70

7.29

c41

1.00

2.70

2.70

7.29

c61

1.00

2.70

2.70

7.29

c62

1.00

c71

1.00

2.70
2.70
21.41

21.41

c72

1.00

16.71

16.71

61A

1.00

1.50

1.70

2.55

62A

1.00

1.50

1.70

2.55

c91

1.00

2.50

2.50

6.25

c92

1.00

2.70

2.70

7.29

c81

1.00

2.70

2.70

7.29

c82

1.00

2.70

2.70

7.29

c83

1.00

3.30

3.30

10.89

c84

1.00

3.30

3.30

10.89

c93

1.00

3.30

3.30

10.89

c94

1.00

3.30

3.30

10.89

Total Qty

Providing & laying (RMC) plain cement concrete


(PCC) of M-15 grade below the raft, footings &
around the footings etc.The rate to include for
compacting, curing, required shuttering and its
removal, dewatering, cleaning, preparing
00 40
surfaces, junctions etc complete at all heights,
and depths as per the drawing and directed by
Project Manager. Size of aggregate to be 20
mm or as directed by consultant for intended
thickness.
Footing P.C.C.

7.29

1059.58

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 4 (Variation 1)

for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr.No

Item Description
Providing & laying (RMC) plain cement concrete
(PCC) of M-25 grade with Plums below the
retaining wall footing. The rate to include for
compacting, curing, providing necessary
00 50 stoppers, dewatering, cleaning, preparing
surfaces, junctions etc complete at all heights,
and depths as per the drawing and directed by
Project Manager. Size of aggregate to be 20
mm or as directed by consultant for intended
Perforated Pipe :
Providing and laying 100mm dia approved make
perforated pipes as per provided specifications
with geotextile membrane of 130 micron
thickness as per design, drawings and
specifications provided by consultant with all
lead, lift at all height including placing, making in
required slope, joints & bends etc all complete.
Specifications of perforated pipe:
Type - Unplasticized Polyvinyl Chloride (UPVC)
00 60 single wall corrugated pipes as per
IS9271:2004.
Nominal outside diameter - 100mm 0.5mm
Inside diameter - 88mm0.5mm.
Perforation size width - 1.7mm to 2.0mm.
Perforation size length - 8.0mm to 15.0mm.
Water inlet area - 21 cm2/m.
Minimum pipe stiffness - 330 kPa at 5%
deflection and 280 kPa at 10%deflection.
( for over and above rate)
a
With supply & installation by contractor.
As per sheet attached

Nos.

68.00

Qty.

Total Qty

68.00

68.00

1.00

1.00

Supplying and errecting dewatering pumps,


providing suction pipes and delivery pipes,
electrical cables, panel boards etc. with the
00 70 pump on daily hire basis including providing
manpower for shifting the same assembly from
place to place. The supply includes necessary
maintainance and repairs of the pumps.
1

10 HP
30/7/2011 to 1/9/2011
Providing & laying (RMC) plain cement concrete
00 80 (PCC) of M-15 grade for bunding, retaining
strata in heavy rain

0.00
00 90
1
Escallation for Rubble
From Item no 00 20 main bill
From Item 00 40 Variation RA1 (30%)
2
Escallation for aggregate
From Item no 00 30 main bill
3
Polythene Sheet
From item no.00 70 main bill
Providing Rubble Stone to MIC as per sheet
00 100
attached
00 110 Providing 500 micron PVC sheets to MIC
to Soil nailing contractor
to Neptune R. P. L.

2.00
1.00
2.00

6.09
6.09
6.09

2.44
2.44
2.44

257.97
0.00

257.97

156.65

156.65

869.36

869.36

31.87

31.87

29.72
14.86
29.72

74.30

S PVT. LTD.

1 (Variation 1)

eptune Realtors Pvt. Ltd., Kurla, Mumbai.


Unit

Nos.

Nos.

Job

155600

Hrs.

15560

Cub. Mtr.

S PVT. LTD.

2 (Variation 1)

eptune Realtors Pvt. Ltd., Kurla, Mumbai.

S PVT. LTD.

Unit

3 (Variation 1)

eptune Realtors Pvt. Ltd., Kurla, Mumbai.

S PVT. LTD.

4 (Variation 1)

Unit

Sq. Mtr.

eptune Realtors Pvt. Ltd., Kurla, Mumbai.


Unit

Rmtr.

Months

Cub. Mtr.

Cum
Cum
Sq. Mtr.
Brass

Sq. Mtr.

Register for R.M.C. M15 Received at Site


Sr. No.

Date

Supplliers Name

Challan No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

18/04/2011
18/04/2011
18/04/2011
19/04/2011
19/04/2011
22/04/2011
22/04/2011
22/04/2011
23/04/2011
23/04/2011
23/04/2011
27/04/2011
27/04/2011
27/04/2011
28/04/2011
28/04/2011
28/04/2011
28/04/2011
28/04/2011
29/04/2011
30/04/2011
30/04/2011
30/04/2011
30/04/2011
30/04/2011
3/5/2011
3/5/2011
3/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011
9/5/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

95108
95113
95123
95155
95169
73953
73975
73988
94026
94046
74051
95616
95618
95628
95680
95685
95692
95698
95708
95758
95820
95823
95829
95834
74510
95954
95966
95960
18768
18771
18773
18774
18785
18792
18798
18803
18811
18813
18814
18817
18821
18822

Quantity
( Cub.
Mtr.)
5.0
4.0
3.5
5.0
3.0
4.5
5.0
4.0
5.0
4.0
2.5
5.0
5.0
4.0
5.0
5.0
4.0
5.0
4.5
4.5
5.0
5.0
5.0
5.0
4.0
4.0
5.0
5.0
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5

Cummulative
Quantity
5.0
9.0
12.5
17.5
20.5
25.0
30.0
34.0
39.0
43.0
45.5
50.5
55.5
59.5
64.5
69.5
73.5
78.5
83.0
87.5
92.5
97.5
102.5
107.5
111.5
115.5
120.5
125.5
131.0
136.5
142.0
147.5
153.0
158.5
164.0
169.5
175.0
180.5
186.0
191.5
197.0
202.5

Register for R.M.C. M15 Received at Site


Sr. No.

Date

Supplliers Name

Challan No.

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

10/5/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
25/05/2011
25/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
27/05/2011
1/6/2011
1/6/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Skyway RMC
Skyway RMC

18828
19550
19555
19559
19562
19568
19572
19575
19578
19579
19584
19615
19614
19623
19624
19626
19631
19839
19843
19924
19930
19932
19934
19935
19936
19940
19914
19965
19967
19969
19971
19973
19979
19982
19984
19987
19988
19989
19990
20089
131531
131532

Quantity
( Cub.
Mtr.)
4.0
5.0
4.0
5.5
5.5
5.5
5.5
5.5
5.5
5.5
3.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.0
5.0

Cummulative
Quantity
206.5
211.5
215.5
221.0
226.5
232.0
237.5
243.0
248.5
254.0
257.5
263.0
268.5
274.0
279.5
285.0
290.5
296.0
301.5
307.0
312.5
318.0
323.5
329.0
334.5
340.0
345.5
351.0
356.5
362.0
367.5
373.0
378.5
384.0
389.5
395.0
400.5
406.0
411.5
417.0
422.0
427.0

85

1/6/2011

Skyway RMC

131537

5.0

432.0

Register for R.M.C. M15 Received at Site


Sr. No.

Date

Supplliers Name

Challan No.

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

1/6/2011
1/6/2011
1/6/2011
1/6/2011
1/6/2011
3/6/2011
3/6/2011
3/6/2011
3/6/2011
3/6/2011
3/6/2011
3/6/2011
6/6/2011
10/6/2011
11/6/2011

Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

131538
131539
131541
5413
5414
131582
131584
131592
131595
131597
131598
182293
131642
6011
920698

Quantity
( Cub.
Mtr.)
8.0
6.0
5.0
6.0
6.0
8.0
7.0
8.0
8.0
8.0
7.0
8.0
5.0
5.0
5.5

Cummulative
Quantity
440.0
446.0
451.0
457.0
463.0
471.0
478.0
486.0
494.0
502.0
509.0
517.0
522.0
527.0
532.5

Register for R.M.C. M15 Received at Site - Part A


101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

30/07/2011
30/07/2011
2/8/2011
3/8/2011
9/8/2011
9/8/2011
25/08/2011
25/08/2011
25/08/2011
25/08/2011
25/08/2011
5/9/2011
5/9/2011
7/9/2011
7/9/2011
7/9/2011
8/9/2011
8/9/2011
8/9/2011
8/9/2011
14/9/2011
14/9/2011
14/9/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

22648
22650
132620
132646
132724
132732
34820
53829
34810
34817
34826
23918
23919
24012
24014
24016
35668
35677
35686
35687
36058
36063
36071

5.0
5.0
8.0
6.0
8.0
4.0
5.0
5.0
5.0
5.5
5.0
3.5
3.0
5.5
5.5
5.5
5.5
5.0
5.0
5.0
5.0
5.0
4.5

537.5
542.5
550.5
556.5
564.5
568.5
573.5
578.5
583.5
589.0
594.0
597.5
600.5
606.0
611.5
617.0
622.5
627.5
632.5
637.5
642.5
647.5
652.0

124
125
126
127
128
129
130
131

14/9/2011
14/9/2011
14/9/2011
14/9/2011
14/9/2011
14/9/2011
14/9/2011
14/9/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

36072
36076
36078
36081
36085
36087
36090
36092

5.0
5.0
5.0
5.0
5.0
5.0
4.0
5.0

657.0
662.0
667.0
672.0
677.0
682.0
686.0
691.0

5.0
5.0
168.5

696.0
701.0

Register for R.M.C. M25 Received at Site


132
133

9/8/2011
9/8/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

22892
22893

Register for R.M.C. M15 Received at Site - Part B


Sr. No.

Date

Supplliers Name

132
133
134
135
136
137
138
139
140
141
142
143

21/09/2011
21/09/2011
26/09/2011
26/09/2011
26/09/2011
26/09/2011
26/09/2011
28/09/2011
28/09/2011
28/09/2011
28/09/2011
28/09/2011

Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Skyway RMC
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

Challan No.
133273
184898
10299
133325
133326
133328
133330
37099
37100
37102
37111
37119

Quantity
Cummulative
( Cub.
Quantity
Mtr.)
5.0
696.0
7.5
703.5
7.0
710.5
6.0
716.5
8.0
724.5
8.0
732.5
8.0
740.5
5.5
746.0
5.0
751.0
5.0
756.0
4.0
760.0
3.0
763.0

Register for R.M.C. M 25 Received at Site


Sr. No.

Date

Supplliers Name

Challan No.

Quantity
( Cub.
Mtr.)

Cummulative
Quantity

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

8/4/2011
8/4/2011
8/4/2011
8/4/2011
9/4/2011
9/4/2011
11/4/2011
11/4/2011
12/4/2011
12/4/2011
12/4/2011
12/4/2011
12/4/2011
12/4/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
13/04/2011
16/05/2011
16/05/2011
16/05/2011

Lafarge Aggregate & Concrete Ind. Pvt. Ltd.


Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.
Lafarge Aggregate & Concrete Ind. Pvt. Ltd.

94542
94543
94545
94548
73193
73303
73398
73403
94752
94757
94761
94779
94781
73463
94826
73507
73510
73511
73512
94835
73514
94838
94844
94849
919299
919295
919291

5.0
5.0
5.0
5.0
5.0
3.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0

5.0
10.0
15.0
20.0
25.0
28.0
33.0
38.0
43.0
48.0
53.0
58.0
63.0
68.0
73.0
78.0
83.0
88.0
93.0
98.0
103.0
108.0
113.0
118.0
123.0
128.0
133.0

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 1
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.
Item Description
Nos.
Area
L
B
D
Carrying out temporary works like marking
of footing locations, dressing of ground
surface level, cleaning the ground surface,
pipe alignments etc. including marking with
00 10
389.00
white powder, tools and tackles, loading,
unloading of the client supplied material if
any etc. as directed by Project Manager all
complete.

Qty.

389.00

Soling & Aggregate Filling:


Providing & laying soling of 230mm thk
using rubble and chips all around the
perforated pipe and below the PCC
00 20 including watering at all height with lead and
lift etc as per detail drawings and as
directed by Project Manager etc all
complete.
As per the sheet attached
pour1
1.00
Less PCC below footing
C89
-1.00
pour2
1.00
pour 3
1.00
pour5(a)
1.00
c-57
-1
c-55
-1.00
pour5(b)
1.00
pour6
1.00
Less PCC below footing
c40
-1.00
c41
-1.00
c49
-1.00
c50
-1.00

pour8
Less PCC below footing
c81
pour9
less PCC below footing
c83
c84
c93
c94
c91
c92
c82

1.00
-1.00
1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00
-1.00

73.62

0.105
7.29
0.110
57.69
0.38
45.00
0.40
42.67
0.40
2.7
2.7
0.4
2.10
2.10 0.40
24.78
0.28
154.81
0.14
2.70
2.70
2.70
2.70

2.70
2.70
2.70
2.70

116.60
2.70

2.70

376.91
3.30
3.30
3.30
3.30
2.50
2.70
2.70

3.30
3.30
3.30
3.30
2.50
2.70
2.70

7.73
0.00
-0.80
21.92
18.00
17.07
-2.916
-1.764
6.94
20.90

0.14
0.14
0.14
0.14

-0.98415
-0.98415
-0.98415
-0.98415

0.37

43.14

0.37

-2.6973

0.43

162.07

0.43
0.43
0.43
0.43
0.43
0.43
0.43

-4.68
-4.68
-4.68
-4.68
-2.69
-3.13
-3.13

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 2
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description

Nos.

Qty.

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 3
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description

Nos.

Qty.

Providing & laying aggregate of 100mm


down aggregates below the area of PCC
and as directed by the Project Manager
00 30
including watering at all height with lead and
lift etc as per detail drawings etc all
complete.
As per the sheet attached
1.00

73.62

0.10

7.36

C89

-1.00

7.29

0.10

-0.73

pour2

1.00

57.69

0.10

5.77

pour 3

1.00

45.00

0.10

4.50

pour5(a)

1.00

42.67

0.10

4.27

pour1
Less PCC below footing

c-57

-1

2.7

2.7

0.10

-0.729

2.10

2.10

0.10

-0.441

c-55

-1.00

pour5(b)

1.00

24.78

0.10

2.48

pour6

1.00

154.81

0.10

15.48

Less PCC below footing


c40

-1.00

2.70

2.70

0.10

-0.729

c41

-1.00

2.70

2.70

0.10

-0.729

c49

-1.00

2.70

2.70

0.10

-0.729

c50

-1.00

2.70

2.70

0.10

-0.729

pour7

1.00

154.91

0.20

30.21

c71

-1.00

21.41

0.20

-4.17

c72

-1.00

16.71

0.20

-3.26

c61
c62

-1.00
-1.00

2.70
2.70

2.70
2.70

0.20
0.20

-1.458
-1.458

c61A

-1.00

1.50

1.70

0.20

-0.497

c62A

-1.00

1.50

1.70

0.20

-0.497

pour8

1.00

less PCC below footing

Less PCC below footing

116.60

0.10

11.66

c81

-1.00

pour9

1.00

2.70

2.70

376.91

0.10

-0.73

0.10

37.69

0.10

-1.09

less PCC below footing


c83

-1.00

3.30

3.30

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 4
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description

Nos.

Qty.

c84

-1.00

3.30

3.30

0.10

-1.09

c93

-1.00

3.30

3.30

0.10

-1.09

c94

-1.00

3.30

3.30

0.10

-1.09

c91

-1.00

2.50

2.50

0.10

-0.63

c92

-1.00

2.70

2.70

0.10

-0.73

c82

-1.00

2.70

2.70

0.10

-0.73

aggregates in trenches for pipes


T2

1.00

24.00

2.10

0.36

18.14

T3

1.00

24.00

2.10

0.39

19.45

T4

1.00

0.52

22.97

20

2.2

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 5
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.
Item Description
Nos.
L
B
D

Qty.

Providing & laying (RMC) plain cement


concrete
(PCC) of M-15 grade below the raft,
footings etc.The rate to include for
compacting, curing, dewatering, cleaning,
00 40 preparing surfaces, junctions etc complete
at all heights, and depths as per the
drawing and directed by Project Manager.
Size of aggregate to be 20 mm or as
directed by consultant for intended
thickness.
pour1

1.00

73.62

0.15

11.04

-1.00

7.29

0.15

-1.09

1.00

57.69

0.15

8.65

1.00

45.00

0.15

6.75

1.00

42.67

0.15

6.40

Less PCC below footing


C89
pour2
pour 3
pour5(a)
c-57
c-55
pour5(b)
pour6

-1
-1.00

2.7

2.7

0.15

-1.0935

2.10

2.10

0.15

-0.6615

1.00

24.78

0.15

3.72

1.00

154.81

0.15

23.22

0.15

-1.0935

Less PCC below footing


c40

-1.00

2.70

2.70

c41

-1.00

2.70

2.70

0.15

-1.0935

c49

-1.00

2.70

2.70

0.15

-1.0935

c50

-1.00

2.70

2.70

0.15

-1.0935

pour7

1.00

154.91

0.15

23.24

c71

-1.00

21.41

0.15

-3.21

c72

-1.00

16.71

0.15

-2.51

c61
c62

-1.00
-1.00

2.70
2.70

2.70
2.70

0.15
0.15

-1.0935
-1.0935

c61A

-1.00

1.50

1.70

0.15

-0.3825

c62A

-1.00

1.50

1.70

0.15

-0.3825

less PCC below footing

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 6
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description
pour8

Nos.

B
116.60

1.00

Qty.

0.15

17.49

0.15

-1.09

0.15

56.54

Less PCC below footing


c81

-1.00

pour9

1.00

2.70

2.70

376.91

less PCC below footing


c83

-1.00

3.30

3.30

0.15

-1.63

c84

-1.00

3.30

3.30

0.15

-1.63

c93

-1.00

3.30

3.30

0.15

-1.63

c94

-1.00

3.30

3.30

0.15

-1.63

c91

-1.00

2.50

2.50

0.15

-0.94

c92

-1.00

2.70

2.70

0.15

-1.09

c82

-1.00

2.70

2.70

0.15

-1.09

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 7
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

00 50

Item Description

Nos.

Qty.

Providing & laying (RMC) plain cement


concrete
Footing P.C.C.

Footing P.C.C.-89

1.00

2.70

2.70

0.15

1.09

C90

1.00

2.50

2.50

0.15

0.94

c55

1.00

2.70

2.70

0.15

1.09

c57

1.00

2.10

2.10

0.15

0.66

c49

1.00

2.70

2.70

0.15

1.09

c50

1.00

2.70

2.70

0.15

1.09

c40

1.00

2.70

2.70

0.15

1.09

c41

1.00

2.70

2.70

0.15

1.09

c61

1.00

2.70

2.70

0.15

1.09

10

c62

1.00

2.70

2.70

0.15

1.09

11

c71

1.00

21.41

0.15

3.21

12

c72

1.00

16.71

0.15

2.51

13

61A

1.00

1.50

1.70

0.15

0.38

14

62A

1.00

1.50

1.70

0.15

0.38

15

c91

1.00

2.50

2.50

0.15

0.94

16

c92

1.00

2.70

2.70

0.15

1.09

17

c81

1.00

2.70

2.70

0.15

1.09

18

c82

1.00

2.70

2.70

0.15

1.09

19

c83

1.00

3.30

3.30

0.15

1.63

20

c84

1.00

3.30

3.30

0.15

1.63

21

c93

1.00

3.30

3.30

0.15

1.63

22

c94

1.00

3.30

3.30

0.15

1.63

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 8
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description

Nos.

Qty.

1.00

17.50

3.20

0.18

10.08

Providing & laying (RMC) plain cement


concrete (PCC) of M-25 grade below the
retaining wall footing. The rate to include for
compacting, curing, providing necessary
stoppers, dewatering, cleaning, preparing
00 60
surfaces, junctions etc complete at all
heights, and depths as per the drawing and
directed by Project Manager. Size of
aggregate to be 20 mm or as directed by
consultant for intended thickness.
AS PER DRAWING SHEET ATTACHED

RW pour4

Providing and laying approved make 500


micron polythene sheet below PCC with
minimum 300mm overlapping at each
00 70
junction of sheet as per design and as
directed b y Project Manager etc. all
complete.

material supplied by contractor

quantity as per PCC below raft


pour1

1.00

73.62

Less PCC below footing

73.62
0.00

C89

-1.00

7.29

-7.29

pour2

1.00

57.69

57.69

pour 3

1.00

45.00

45.00

pour5(a)

1.00

42.67

42.67

Less PCC below footing

0.00

C-57

-1.00

2.70

2.70

-7.29

c-55

-1.00

2.10

2.10

-4.41

pour5(b)

1.00

24.78

24.78

pour6

1.00

154.81

154.81

Less PCC below footing


c40

-1.00

2.70

2.70

-7.29

c41

-1.00

2.70

2.70

-7.29

c49

-1.00

2.70

2.70

-7.29

c50

-1.00

2.70

2.70

-7.29

pour7

1.00

154.91

154.91

c71

-1.00

21.41

-21.41

c72

-1.00

16.71

-16.71

c61

-1.00

2.70

2.70

-7.29

c62

-1.00

2.70

2.70

-7.29

c61A

-1.00

1.50

1.70

-2.55

c62A

-1.00

1.50

1.70

-2.55

less PCC below footing

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 9
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.

Item Description
pour8

Nos.
1.00

116.60

Qty.
116.60

Less PCC below footing


c81

-1.00

pour9

1.00

2.70

2.70

376.91

-7.29
376.91

less PCC below footing


c83

-1.00

3.30

3.30

-10.89

c84

-1.00

3.30

3.30

-10.89

c93

-1.00

3.30

3.30

-10.89

c94

-1.00

3.30

3.30

-10.89

c91

-1.00

2.50

2.50

-6.25

c92

-1.00

2.70

2.70

-7.29

c82

-1.00

2.70

2.70

-7.29

SAVU DEVELOPERS PVT. LTD.


Measurement Sheet 10
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sr. No.
Item Description
Nos.
L
B
D

Perforated Pipe :

Qty.

Providing and laying 100mm dia approved


make perforated pipes as per provided
specifications with geotextile membrane of
130 micron thickness as per design,
drawings and specifications provided by
consultant with all lead, lift at all height
including placing, making in required slope,
joints & bends etc all complete.
Specifications of perforated pipe:
Type - Unplasticized Polyvinyl Chloride
00 80
(UPVC) single wall corrugated pipes as per
IS9271:2004.
Nominal outside diameter - 100mm 0.5mm
Inside diameter - 88mm0.5mm.
Perforation size width - 1.7mm to 2.0mm.
Perforation size length - 8.0mm to 15.0mm.
Water inlet area - 21 cm2/m.
Minimum pipe stiffness - 330 kPa at 5%
deflection and 280 kPa at 10%deflection.

With supply & installation by contractor.

As per sheet and drawing attached


T2
T3
T4

1.00
1.00
1.00

24.00
24.00
20.00

24.00
24.00
20.00

VT. LTD.

t1

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

389.00

Nos.

257.97

VT. LTD.

t2

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

VT. LTD.

t3

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

VT. LTD.

t4

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

156.65

VT. LTD.

t5

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

VT. LTD.

t6

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

130.40

Cub. Mtr.

Total Qty

Unit

VT. LTD.

t7

Pvt. Ltd., Kurla, Mumbai.

26.278
24.648
24.653
24.668

24.678
#REF!

24.658

24.325

24.788

24.788
24.325
4.865

27.58 cum

VT. LTD.

t8

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

10.08 Cub. Mtr.

4.9576

VT. LTD.

t9

Pvt. Ltd., Kurla, Mumbai.


Total Qty

Unit

``

869.36

sqm

Total Qty

Unit

VT. LTD.
10

Pvt. Ltd., Kurla, Mumbai.

68.00 Rmtr.

Savu Developers Pvt. Ltd.


A/1 Chintamani Complex, B.K. Road,
Mulund East, Mumbai-400081

M/s. Neptune Realtors Pvt Ltd,


Neptune House, Karma Stambh,
Opp: MTNL Office, L.B.S.Road,
Vikhroli (West),
Mumbai: 400 083.

Date : 01/10/2011
Invoice No.: RB002/ NRPL/ SDPL/11-12
W.O. no. 23000628
TAX INVOICE ( 2nd R.A. BILL)
for Site: Evolution Business Park- Phase 1 Early Works for M/s. Neptune Realtors Pvt. Ltd., Kurla, Mumbai.
Sub.
No.

00 10

00 20

00 30

00 40

Sub.
No.

Description

Pre. Qty.

Carrying out temporary works like


marking of footing locations, dressing of
ground surface level, cleaning the
ground surface, pipe alignments etc.
including marking with white powder,
400.00
tools and tackles, loading, unloading of
the client supplied material if any etc. as
directed by Project Manager all
complete.
Providing & laying soling of 230mm thk
using rubble and chips all around the
perforated pipe and below the PCC
including watering at all height with lead 1205.48
and lift etc as per detail drawings and as
directed by Project Manager etc all
complete.
Providing & laying aggregate of 100mm
down aggregates below the area of PCC
and as directed by the Project Manager
678.36
including watering at all height with lead
and lift etc as per detail drawings etc all
complete.
Providing & laying (RMC) plain cement
concrete
(PCC) of M-15 grade below the raft,
footings etc.The rate to include for
compacting, curing, dewatering,
cleaning, preparing surfaces, junctions
430.35
etc complete at all heights, and depths
as per the drawing and directed by
Project Manager. Size of aggregate to
be 20 mm or as directed by consultant
for intended thickness.
Description

Pre. Qty.

Curt.
Qty.

Total
Qty.

Unit

0.00

400.00

L.S.

350.00

140,000.00

257.97

1463.45

Cum

934.29

1,367,284.69

156.65

835.01

Cum

1,500.00

1,252,522.43

130.40

560.75

Cum

5,475.00

3,070,128.15

Total page 1

5,829,935.27

Curt.
Qty.

Total
Qty.

Unit

Rate

Rate

C.F. from page 1.

Amount

Amount
5,829,935.27

Providing & laying (RMC) plain cement


concrete
(PCC) of M-15 grade below the raft,
footings & around the footings etc.The
rate to include for compacting, curing,
required shuttering and its removal,
00 50
dewatering, cleaning, preparing
surfaces, junctions etc complete at all
heights, and depths as per the drawing
and directed by Project Manager. Size
of aggregate to be 20 mm or as directed
by consultant for intended thickness.

42.43

27.58

70.01

Cum

6,275.00

439,325.30

Providing & laying (RMC) plain cement


concrete (PCC) of M-25 grade below
the retaining wall footing. The rate to
include for compacting, curing, providing
necessary stoppers, dewatering,
00 60 cleaning, preparing surfaces, junctions
etc complete at all heights, and depths
as per the drawing and directed by
Project Manager. Size of aggregate to
be 20 mm or as directed by consultant
for intended thickness.

118.00

10.08

128.08

Cum

5,940.00

760,776.19

Providing and laying approved make


500 micron polythene sheet below PCC
with minimum 300mm overlapping at
00 70
2833.03
each junction of sheet as per design and
as directed b y Project Manager etc. all
complete.

869.36

3702.39 Sq.mt.

35.00

129,583.65

Total page 2

7,159,620.41

Page 3
Sub.
No.

Description

Pre. Qty.

Curt.
Qty.

Total
Qty.

Unit

Rate

C.F. from page 2.

Amount
7,159,620.41

Providing and laying 100mm dia


approved make perforated pipes as per
provided specifications with geotextile
membrane of 130 micron thickness as
00 80 per design, drawings and specifications
provided by consultant with all lead, lift
at all height including placing, making in
required slope, joints & bends etc all
complete.
Specifications of perforated pipe:
Type - Unplasticized Polyvinyl Chloride
(UPVC) single wall corrugated pipes as
per IS9271:2004.
Nominal outside diameter - 100mm
0.5mm
Inside diameter - 88mm0.5mm.
Perforation size width - 1.7mm to
2.0mm.
Perforation size length - 8.0mm to
15.0mm.
Water inlet area - 21 cm2/m.
Minimum pipe stiffness - 330 kPa at 5%
deflection and 280 kPa at
10%deflection.

416.00

68.00

484.00

Rmt.

252.00

121,968.00

SUB TOTAL (A) (excluding taxes)

7,281,588.41

Discount overall @ 6.65%


Total After Discount
Add Service Tax on A
Add VAT on A

-484,225.63
6,797,362.78
280,051.35
339,868.14

4.12%
5.00%

GRAND TOTAL (including taxes)

7,417,282.27

I.e. Rs Seventy four lac fifty three thousand two hundred twenty eight paise fourty seven only.

I/We hereby certify our Registration Certification under the Maharashtra Value Added Tax Act, 2002 is in force on the date
on which Sale of Goods specified in this Tax Invoice is made by me / us and that the transaction of sale convered by this
Bill / Cash Memorandum has been effected by me and it shall be accounted for in the turnover of sales while filing my
return.

Você também pode gostar