SUBSTANTIAL SAVINGS BY
PLANNED CRANK WASHING Reference
OF GAS TURBINE Installation
BP NETHERLANDS Oil & Gas
• Machine reliability
improvement from
97 to 98%
• Machine availability
improvement from
96 to 98%
• NPV several
Million Euro
• ROI within 1 year
The challenge for every company is 10 hours downtime (needed for the
to assess its future performance of wash) was earned back after 120 hours
operation. Therefore OPENpredictor™ improved operation. The days, weeks
incorporates an automated strategy to and months after the wash, the improved
forecast reduction in performance of operation resulted in a considerable
critical machines. increased profit.
The above curves demonstrate and Executing the wash only when it is
validate the forecasting function for the economically justified optimizes the
anticipated production reduction of a gas operation.
turbine driven compressor. As the causes
of the reduction are also available, the
organization can plan the appropriate
actions well in advance before a certain
reduction will be reached. This results
in optimised capacity, reduced fuel
consumption and better planning of the
activities.
is typically very reliable, manual “The potential within the and AutoDiagnosis™. Engineers
analysis and monitoring of data group for this type of efficiently use their time to
is cumbersome and ineffective application is for any site validate conclusions from the
due to large amounts of unusable operating critical machines, system by having fast access to
and repetitive data. Hence, high where there is a desire information from machines that
emphasis was placed on automated to increase operation need attention.
diagnosis and forecasting in order to efficiency and cut on
• ROI was achieved in less than a
minimise operational risks and costs. maintenance costs.”
year.
Rotating Equipment Engineer
Marthijn Kort (BP Netherlands)
is typically very reliable, manual “The potential within the and AutoDiagnosis™. Engineers
analysis and monitoring of data group for this type of efficiently use their time to
is cumbersome and ineffective application is for any site validate conclusions from the
due to large amounts of unusable operating critical machines, system by having fast access to
and repetitive data. Hence, high where there is a desire information from machines that
emphasis was placed on automated to increase operation need attention.
diagnosis and forecasting in order to efficiency and cut on
• ROI was achieved in less than a
minimise operational risks and costs. maintenance costs.”
year.
Rotating Equipment Engineer
Marthijn Kort (BP Netherlands)
• Machine reliability
improvement from
97 to 98%
• Machine availability
improvement from
96 to 98%
• NPV several
Million Euro
• ROI within 1 year
The challenge for every company is 10 hours downtime (needed for the
to assess its future performance of wash) was earned back after 120 hours
operation. Therefore OPENpredictor™ improved operation. The days, weeks
incorporates an automated strategy to and months after the wash, the improved
forecast reduction in performance of operation resulted in a considerable
critical machines. increased profit.
The above curves demonstrate and Executing the wash only when it is
validate the forecasting function for the economically justified optimizes the
anticipated production reduction of a gas operation.
turbine driven compressor. As the causes
of the reduction are also available, the
organization can plan the appropriate
actions well in advance before a certain
reduction will be reached. This results
in optimised capacity, reduced fuel
consumption and better planning of the
activities.