RA Bill 11 - 25.09.

2011
Station Building

1-10196-400-0729 (Sheet 1 & 2 of 2 Rev R2)


Drawing No - 1-10196-400-0730 (Sheet 1 Rev R2; Sheet 2 Rev R1, Sheet 3 Rev R3,
and Sheet 4)

Item No B-3 - Supplying and laying reinforced cement concrete in all foundations and super structures in roof slabs, beams, floor
slabs, footings, columns, walls, channels, etc. at all heights and depths above and below plinth level as per drawings,
specifications, directions of the Engineer and as defined by IS:456 including curing but excluding cost of shuttering and steel
reinforcements, all materials, tools, plant and labour complete.

S.No

Nos

TG Unit 04 Columns

1.500

1.500

BFP

3.017

BFP Pedestals

2.770

BFP Pedestals

BFP Pedestals

BFP Pedestals

Description

Qty

3.300

59.400

9.686

2.750

80.362

3.300

0.770

21.116

2.770

1.042

0.700

6.061

1.980

0.274

0.700

1.139

2.430

3.600

0.100

2.624

Total Qtys (Cum) =

from +5.200 to
8.500

170.702

TG Deck Slab - Unit 03


S.No

Description

Nos

L
25.350

Qty

10.000

Deck Slab

2.000

507.000

Less Openings - 650 Dia

0.332

0.910

-0.604

Less Level difference (10.50 to 10.07)

8.375

0.430

-3.601

Less Level difference (9.160 to 8.50)

0.660

-0.756

Less Openings

2.000

-27.926

Less Openings

2.000

-11.558

Less Turbine Openings (10.07 to 8.50)

30.929

1.570

-48.558

Less Turbine Level difference (10.50


to 10.07)

58.230

0.430

-25.039

Less Openings - (Generator Portion)

2.740

6.760

0.710

-13.151

10

Less Openings - (Generator Portion)

3.040

7.060

1.190

-25.540

11

Less Level difference (10.50 to 10.40)

0.100

-0.997

12

Less Level difference (10.50 to 10.40)

2.250

3.957

0.100

-0.890

13

Less Air Openings (10.40 to 8.50)

0.800

0.300

1.900

-0.912

14

Less Trench (500mm depth)

3.875

0.600

0.500

-1.163

15

Less Trench (500mm depth)

3.480

0.500

0.500

-0.870

16

Less Trench (900mm depth)

4.020

0.800

0.900

-2.894

17

Less Trench (900mm depth)

0.900

-1.700

18

Slab

15.350

1.800

0.200

5.526

19

Less of Pockets

0.200

0.200

1.140

-0.365

20

Less of Pockets

0.200

0.300

0.550

-0.264

1.450

0.790
13.963

3.325

0.869

4.987

1.889

Total Qtys (Cum) =

For Srinivasa Reddy Constructions

For Madhucon Projects Limited

345.738

1 of 5

RA Bill 11 - 25.09.2011
Station Building

1-10196-400-0729 (Sheet 1 & 2 of 2 Rev R2)


Drawing No - 1-10196-400-0730 (Sheet 1 Rev R2; Sheet 2 Rev R1, Sheet 3 Rev R3,
and Sheet 4)

TG Unit 04 - Columns Concrete Qtys from Level 3.000 to 6.000 (Cum) =


TG Unit 04 - Columns Concrete Qtys from Level 6.000 to 9.000 (Cum) =
TG Unit 03 Deck from Level 3.000 to 6.000 (Cum) =

14.400
45.000
345.738

Item No D-1 - Supplying, fabricating,erecting and fixing in positions as per drawingss, specifitions and instructions of the
Engineer,MS inserts, foundation bolts, anchor bolts,nuts,washers,curb angles, channels,pipes,pipe sleeves, rungs,etc. for
embedding in permanent concrete work at all heights and depths above and below plinth level including all connected works and
adjuestments in shuttering and reinforcement,all materils,tools, plant and labour complete

Edge Angles & Insert Plates for TG Columns Unit 04

SL No

Description

Nos per
Columns

Length

Total Qtys for 8


Nos Columns

Unit

Unit Wt
(Kgs)

Total Wt
(MT)

100 x 100 x 8mm MS Angle at the edge


of Columns from Level 0.250 to 8.500
level

8.25

264

Rm

12.100

3.194

10mm dia MS Rod fixing to Edge Angle

440

0.26

915.2

Rm

0.616

0.564

400 x 400 x 16mm MS Insert Plates at


Verious Levels

16

128

Nos

20.096

2.572

50 x 50 x 6 mm MS Angle as leg for


Insert Plate (4 nos 0.400m length
each)

64

204.8

Rm

4.500

0.922

0.4

Total wt (Mts) =

7.252

Edge Angles, Insert Plates, MS Sleeves, Opening & Circular Shuttering for TG Deck Slab Unit 03

SL No

Description

Qtys

Unit

Unit Wt (Kgs)

Total Wt
(MT)

20mm Thk Insert Plates

44.150

Sqm

157.000

6.932

10mm Thk Insert Plates

9.420

Sqm

78.500

0.739

30mm Thk Insert Plates

0.825

Sqm

235.500

0.194

Legs - ISA - 75x75x6

268.800

Rm

6.800

1.828

Legs - ISA - 50x50x6

198.900

Rm

4.500

0.895

Edge Angle - 100x100x10

181.100

Rm

16.500

2.988

Flat for Edge Angle - 25x5

135.750

Rm

0.981

0.133

150mm Sleeves - 34 Nos - 2.00m


Length

68.000

Rm

11.542

0.785

130mm Sleeves - 24 Nos - 1.60m


Length

38.400

Rm

10.062

0.386

10

650mm Sleeves - 02 Nos - 1.80m


Length (6mm thk)

7.352

Sqm

47.100

0.346

11

700 Half Circle - 02 Nos - 2.20m


Length (6mm thk)

7.989

Sqm

47.100

0.376

Total wt (Mts) =

15.602

For Srinivasa Reddy Constructions

For Madhucon Projects Limited

2 of 5

RA Bill 11 - 25.09.2011
Station Building

1-10196-400-0729 (Sheet 1 & 2 of 2 Rev R2)


Drawing No - 1-10196-400-0730 (Sheet 1 Rev R2; Sheet 2 Rev R1, Sheet 3 Rev R3,
and Sheet 4)

Item No E-1 - Providing and fixing shuttering (formwork) in position with necessary centerings, bracings, proppings, etc. and
removing the same after the specified periods for all types of shuttering for all plain and reinforced cement concrete works
including all chamfers, splays, keys, wedges, nails, brackets, cutting holes for embedded steel/pipes and applying waste oil on
shuttering surfaces in contact with concrete, all materials, tools, plant and labour complete.

S.No

Description

Nos

Perimeter

Qty

9.686

2.750

25.406

69.867

Pile Caps
1

BFP - Pile Caps

3.017

Total Qtys (Sqm) =

69.867

Shuttering above FFL


S.No

Nos

Perimeter

Qty

TG Unit 04 Columns - 5.200m to


8.500m level

Description

1.500

1.500

3.300

6.000

158.400

BFP Pedestals

2.770

3.300

0.770

12.140

28.043

BFP Pedestals

2.770

1.042

0.700

7.624

16.010

BFP Pedestals

1.980

0.274

0.700

4.508

9.467

BFP Pedestals

2.430

3.600

0.100

12.060

3.618

TG Deck Unit 03 - Cantilever Slab


Bottom

15.350

1.800

Deck Slab

25.350

10.000

Level difference (10.50 to 10.07)

Level difference (9.160 to 8.50)

1.450

0.790

10

Level difference (9.160 to 8.50) - Top


& Bottom

1.450

0.790

11

Openings

12

Openings

3.325

0.869

13

Turbine Openings (10.07 to 8.50)

27.630
2.000

70.700

141.400

0.430

9.972

4.288

0.660

4.480

2.957
2.291

2.000

18.753

37.506

2.000

8.388

33.552

1.570

22.800

35.796

14

Turbine Level difference (10.50 to


10.07)

0.430

30.800

13.244

15

Openings - (Generator Portion)

2.740

6.760

0.710

19.000

13.490

16

Openings - (Generator Portion)

3.040

7.060

1.190

20.200

24.038

17

Level difference (10.50 to 10.40)

0.100

8.994

1.799

18

Level difference (10.50 to 10.40)

2.250

3.957

0.100

10.164

1.016

19

Air Openings (10.40 to 8.50)

0.800

0.300

1.900

2.200

8.360

20

Trench (500mm depth)

3.875

0.600

0.500

8.350

4.175

21

Trench (500mm depth)

3.480

0.500

0.500

7.460

3.730

22

Trench (900mm depth)

4.020

0.800

0.900

8.840

7.956

23

Trench (900mm depth)

0.900

7.250

6.525

24

Slab

0.200

18.950

3.790

15.350

1.800

Total Qtys (Sqm) = 589.082


Shuttering From 3.000 to 6.000
S.No

Description

Nos

Perimeter

Qty

TG Unit 04 Columns - 5.200 to 6.000m


level

1.500

1.500

0.800

6.000

38.400

Total Qtys (Sqm) =

For Srinivasa Reddy Constructions

For Madhucon Projects Limited

38.400

3 of 5

RA Bill 11 - 25.09.2011
Station Building

1-10196-400-0729 (Sheet 1 & 2 of 2 Rev R2)


Drawing No - 1-10196-400-0730 (Sheet 1 Rev R2; Sheet 2 Rev R1, Sheet 3 Rev R3,
and Sheet 4)

Shuttering From 6.000 to 9.000


S.No

Description

Nos

Perimeter

Qty

TG Unit 04 Columns - 6.00 to 8.500m


level

1.500

1.500

2.500

6.000

120.000

Deck Slab

25.350

10.000

0.500

70.700

35.350

Level difference (9.160 to 8.50)

1.450

0.790

0.500

4.480

2.240

Level difference (9.160 to 8.50) - Top


& Bottom

1.450

0.790

Openings

Openings

3.325

0.869

Turbine Openings (10.07 to 8.50)

Openings - (Generator Portion)

2.740

Air Openings (10.40 to 8.50)

0.800

1.146
0.500

18.753

0.500

8.388

9.377
8.388

0.500

22.800

11.400

6.760

0.500

19.000

9.500

0.300

0.500

2.200

2.200

Total Qtys (Sqm) = 199.600


Shuttering From 9.000 to 12.000m level
S.No

Description

Nos

TG Deck Unit 03 - Cantilever Slab


Bottom

15.350

1.800

Deck Slab

25.350

10.000

Level difference (10.50 to 10.07)

Level difference (9.160 to 8.50)

1.450

0.790

Level difference (9.160 to 8.50) - Top


& Bottom

1.450

0.790

Openings

Openings

3.325

0.869

Turbine Openings (10.07 to 8.50)

Perimeter

Qty
27.630

1.500

70.700

106.050

0.430

9.972

4.288

0.160

4.480

0.717
1.146

1.500

18.753

28.130

1.500

8.388

25.164

1.070

22.800

24.396

Turbine Level difference (10.50 to


10.07)

0.430

30.800

13.244

10

Openings - (Generator Portion)

2.740

6.760

0.210

19.000

3.990

11

Openings - (Generator Portion)

3.040

7.060

1.190

20.200

24.038

12

Level difference (10.50 to 10.40)

0.100

8.994

1.799

13

Level difference (10.50 to 10.40)

2.250

3.957

0.100

10.164

1.016

14

Air Openings (10.40 to 8.50)

0.800

0.300

1.400

2.200

6.160

15

Trench (500mm depth)

3.875

0.600

0.500

8.350

4.175

16

Trench (500mm depth)

3.480

0.500

0.500

7.460

3.730

17

Trench (900mm depth)

4.020

0.800

0.900

8.840

7.956

18

Trench (900mm depth)

0.900

7.250

6.525

19

Slab

0.200

18.950

3.790

15.350

1.800

Total Qtys (Sqm) = 293.943


Circular Shuttering
S.No
1

Description
650 Dia openings

Nos

Perimeter

Qty

0.910

2.042

3.717

Total Qtys (Sqm) =

For Srinivasa Reddy Constructions

For Madhucon Projects Limited

3.717

4 of 5

RA Bill 11 - 25.09.2011
Station Building

1-10196-400-0729 (Sheet 1 & 2 of 2 Rev R2)


Drawing No - 1-10196-400-0730 (Sheet 1 Rev R2; Sheet 2 Rev R1, Sheet 3 Rev R3,
and Sheet 4)

Circular Shuttering From 9.000 to 12.000m level


S.No
1

Description
650 Dia openings

Nos

Perimeter

Qty

0.910

2.042

3.717

Total Qtys (Sqm) =

3.717

Item No E-1 [C] - TG deck shuttering structure(cribs)


S.No

Nos

TG Deck Unit 03 - Staging

Description

26.550

11.200

Perimeter

297.360

Qty

TG Deck Unit 03 - Staging - Cantilever


Portion

16.550

1.800

29.790

Total Qtys (Sqm) = 327.150


Less qtys already paid (Sqm) = 253.500
Balance to be paid (Sqm) =

73.650

Item No E-2 - Providing, fixing in position and removing shuttering as specified for core holes and pockets as per drawings,
specifications and directions of the Engineer including applying waste oil on shuttering surfaces in contact with concrete and
cleaning of core holes and pockets, all materials, tools, plant and labour complete.

Sl No

Nos

Perimeter

Qtys

Pockets

Description

0.200

0.200

1.140

0.800

7.296

Pockets

0.200

0.330

0.550

1.060

4.664

Total Qtys (Sqm) =

11.960

Abstract of Quantities
Sl No
B-3

Description

Qtys

Total Qty

Unit

516.440

Cum

22.854

MT

Remarks

M30 Concrete
a

Tg columns & BFP Pile Caps 170.702

TG Deck Slab Unit 03 345.738

D-1

fabrication for Insert Plates & Kerb


Angles
TG Unit 04 - Columns

7.252

TG Deck Slab Unit 03 15.602


E-1

Shuttering Below FFL

69.867

69.867

Sqm

E-1

Shuttering Above FFL

589.082

589.082

Sqm

E*

3.000 to 6.000 level 38.400

38.400

Sqm

E**

6.000 to 9.000 level 199.600

199.600

Sqm

E***

9.000 to 12.000 level 293.943

293.943

Sqm

3.717

3.717

Sqm

3.717

3.717

Sqm

E-1

Circular Shuttering

E***

9.000 to 12.000 level

E-1
[C]

Staging

73.650

73.650

Sqm

E-2

Pockets

11.960

11.960

Sqm