Approved Project List Highway Safety Improvement Program (HSIP)

Federal Funds $733,400

Agency Name Alameda

2 3 4

Alameda Anaheim Artesia

Location of Work Shoreline Dr. between Westline Dr. and Broadway; Westline Dr. between Otis Dr. and Shoreline Dr.; Broadway between Shoreline Dr. and Bayview Dr. Park St. between Park St. Draw Br. and Encinal Ave. (SR 61) S Douglass Rd., from S of E Katella Ave. to N of the RR grade crossing 166th St.; 183rd St.; Gridley Rd.; Artesia Blvd.; Pioneer Blvd.; Norwalk Blvd.; South St. Various locations throughout the city Big Bear Blvd. (SR 18) between Edgemoor Rd. and Talmadge Rd. Verdugo Ave. between Flower St. and Clybourn Skyway Rd. between the city limits of Chico and Paradise Murphys Grade Rd., approximately 4.5 miles E of SR 49 Redwood Blvd./Hacienda Blvd.

Description of Work Reduce traveled lanes from four to two; install bike lanes, bike racks, and crosswalks; construct bus pad, shelter, and drainage improvements Install left-turn phasing and advance flashing beacons; upgrade signal operations Install dynamic message signs Upgrade signs, sign supports, delineation, pavement markings and curb ramps; install speed feedback signs Install pedestrian countdown heads Construct curb, gutter, sidewalks and curb ramps Add protected left turn phasing; extend bike lanes; construct sidewalks Install edgeline rumble strips, concrete median barrier, and speed feedback signs Install guardrail Reconfigure intersection; construct curb, gutter, and raised median islands; upgrade signs, striping, and pavement markings Install speed feedback signs

$416,400 $300,000 $378,000

5 6 7 8 9

Bakersfield Big Bear Lake Burbank Butte County Calaveras County

$113,400 $458,600 $744,900 $640,000 $742,500 $370,000

10 California City

11 Campbell

12 Cathedral City

Apricot Ave.; Campbell Ave.; Hacienda Ave.; Harriet Ave.; Hazel Ave.; Leigh Ave.; San Tomas Aquino Rd.; Sunnyoaks Ave.; Union Ave.; Westmont Ave.; Winchester Blvd. E Palm Canyon Dr. between Canyon Plaza Dr. and Perez Rd. Oxford St. between Broadway and Fifth Ave.

$198,000

13 Chula Vista

Widen roadway and add bike lanes; construct curb, gutter, and sidewalks; upgrade traffic signals; install signs and striping Construct curb, gutter, sidewalks, driveways, and curb ramps; install signs, striping, and pavement markings

$900,000

$290,600

14 Chula Vista 15 Citrus Heights 16 Citrus Heights

"K" St./Third Ave.

Upgrade traffic signals; install safety lighting and pavement markings; construct curb ramps Sunrise Blvd./Sungarden Dr. Install traffic signals and sidewalks Old Auburn Rd. between Fair Oaks Blvd. and Wachtel Way Widen shoulders; construct Class 1 multi-use trail; install Class II bike lanes

$282,200 $900,000 $644,400

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $24,500 $171,900 $503,400

Agency Name 17 Clovis 18 Coalinga 19 Commerce

Location of Work Helm Ave./Gettysburg Ave.; Villa Ave./Gettysburg Ave. Elm Ave. (SR 33/SR 198) between Phelps Ave. and Gale Ave. Washington Blvd./Garfield Ave.; Washington Blvd./Yates Ave.; Garfield Ave./ Yates Ave.; and Garfield Ave./Malt Ave. Alhambra Valley Rd., from 300' W to 2500' E of Bear Creek Rd. Marsh Creek Rd., W of Deer Valley Rd. Camino Tassajara Rd., from approximately 1 mile S of Highland Rd. to 0.2 miles N of Windemere Pkwy. 19th St. between Harbor Blvd. and Placentia Ave.

Description of Work Install solar-powered LED Stop signs Install left-turn pocket, safety lighting, signs, and striping Upgrade RR preemption; construct sidewalk

20 Contra Costa County 21 Contra Costa County 22 Contra Costa County

23 Costa Mesa

Widen roadway and pave shoulders; improve alignment and superelevation Widen roadway and pave shoulders; improve alignment; relocate utilities; improve signing Widen roadway and pave shoulders; install signs, striping, and curve warning flashers; relocate roadside obstacles; flatten side slopes Install crosswalks, pedestrian countdown heads, advance warning signs, speed feedback signs, and safety lighting

$900,000 $620,000 $900,000

$237,000

24 Costa Mesa 25 Costa Mesa 26 Daly City 27 Del Norte County

Anton Blvd./Sunflower Ave.

Install protected left-turn phasing, pedestrian countdown heads, and CCTV; upgrade traffic signals Harbor Blvd./Wilson St. Construct right-turn lane and raised median; upgrade traffic signals Hickey Blvd./Callan Blvd. Install protected left-turn phasing; upgrade traffic signals; construct curb ramps Pebble Beach Dr. between Hemlock Ave. and the city limits Resurface existing pavement and pave shoulders; remove of Crescent City right-turn lane; construct curb, gutter, and sidewalks Imperial Hwy./Columbia Way Various locations throughout the city Various locations throughout the city Main St./Jamacha Rd. (2nd St.) Install left-turn phasing Install pedestrian countdown heads Upgrade regulatory and warning signs Upgrade traffic signals with protected left-turn phasing; remove shared left-through lane; improve channelization; install pedestrian countdown heads Upgrade traffic signals with protected left-turn phasing Modify super-elevation; widen shoulders; install signs and striping

$232,500 $216,000 $252,000 $817,700

28 29 30 31

Downey Downey El Cajon El Cajon

$181,000 $75,000 $263,800 $214,200

32 El Cajon 33 El Dorado County

Broadway/Third St. Cold Springs Rd. between Fox Print Ct. and Skyview Ln.

$101,900 $445,500

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $632,300 $338,500

Agency Name 34 Encinitas 35 Eureka

36 Farmersville 37 Fowler

Location of Work Description of Work Santa Fe Dr. between I-5 and Nardo Rd. (Mackinnon Ave.) Construct curb, gutter, sidewalks, and curb ramps; install signs, striping, and pavement markings West Ave. between Myrtle Ave. and 6th St. Construct bulb-outs and curb ramps; install in-pavement crosswalk lights, safety lighting, striping, pavement markings Noble Ave./North Farmersville Blvd., near on/off-ramp Construct roundabout connections from EB SR 198 Adams Ave./Golden State Blvd.; Merced Ave./Golden State Install battery back-up system at signalized intersections Blvd.; Manning Ave./Golden State Blvd.; Manning Ave./Vineyard Pl.; San Antonio Dr./Golden State Blvd. Fremont Blvd./Alder Ave. Remove free right-turn lanes; install pedestrian countdown heads; construct curb ramps and bulb-outs Upgrade traffic signals; install pedestrian countdown heads and safety lighting; widen sidewalks; construct bulb-outs Install protected left-turn phasing Install protected left-turn phasing Install traffic signals Install turn lanes at intersection Install left-turn phasing Construct raised median Install traffic signals, curb ramps, and safety lighting; modify striping and pavement markings Install protected left-turn phasing Install left-turn lane Upgrade traffic signals and safety lighting Restripe for bike lanes and two-way left-turn lane; install inpavement crosswalk lights, advance warning lights and signs, and pedestrian countdown heads; construct curb ramps Construct raised median; reconfigure driveway access; install in-pavement crosswalk lights and pedestrian countdown heads

$608,100 $34,200

38 Fremont

$391,400

39 Fremont

Fremont Blvd./Eggers Dr.

$316,200

40 41 42 43 44 45 46

Fresno Fresno Fresno County Fresno County Fresno County Garden Grove Gardena

Palm Ave./Sierra Ave. Millbrook Ave./Shields Ave. Millerton Rd. (Friant Rd.)/North Fork Rd. (Mono St.) Nees Ave./Washoe Ave. Alta Ave./Manning Ave. Lampson Ave. between Manley St. and Knott St. Rosecrans Ave./Purche Ave. Amelia Ave./SR 66 Fargo Ave./Fitzgerald Ln. Inglewood Ave. between Imperial Hwy. and El Segundo Blvd. 9th St. between Del Rosa Dr. and Palm Ave.

$356,000 $356,000 $696,100 $636,500 $277,100 $900,000 $567,000 $85,500 $147,700 $730,000 $490,000

47 Glendora 48 Hanford 49 Hawthorne 50 Highland

51 Highland

Base Line between Cole Ave. and SR 210

$300,000

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $795,600 $900,000 $275,500 $442,700 $191,000 $87,700

Agency Name 52 Imperial 53 54 55 56 Imperial County Inglewood Irvine Kern County

Location of Work Neckel Rd./SR 86 SR 78 (SR 86)/S Marina Dr. Various locations throughout the city Warner Ave./Jamboree Rd. NB on-ramp Mount Vernon Ave. between Kentucky St. and Niles Pt. In the School zones of: El Portal Dr., Cajon Dr. (Briercliff Dr.), Schoolwood Dr., Hillside St., and Brookdale Ave. University Ave./Harbinson Ave. (Marian St.) Lakeshore Blvd. between Ashe St. and Lange St. Various locations throughout the city Various locations throughout the city Ave. "L"/Challenger Way (10th St. East) Manhattan Beach Blvd./Firmona Ave. Chestnut Ave. between "G" St. and "O" St. Martin Luther King Jr. Ave. between Seventh St. and Sixth St.; Alamitos Ave./Seventh St.

Description of Work Install traffic signals; construct intersection improvements Install traffic signals; extend turning lanes Upgrade signs Install traffic signals Modify raised medians; relocate crosswalk; construct curb ramps Install speed feedback signs

57 La Habra

58 La Mesa 59 Lakeport 60 61 62 63 Lancaster Lancaster Lancaster Lawndale

64 Lompoc 65 Long Beach

66 Los Altos

Homestead Rd. between Belleville Way and Foothill Expressway Anaheim St., W of McFarland Ave. at the RR grade crossing 48th St. between Normandie Ave. and the W city limits of Los Angeles Entrada Ave. between Amalfi Ave. and Kingman Ave.; E. Channel Ave./Sage Ln. Gaffey St. between 11th St. and 15th St. Roxford St./Foothill (I-210) on/off-ramps 64th St./Main St.

Install protected left-turn phasing and pedestrian countdown heads; upgrade pedestrian facilities Install colored AC in the bike lanes; upgrade edgelines; construct small traffic circle Upgrade signs, striping, and pavement markings Install solar-powered LED Stop signs Convert traffic signal to roundabout Modify traffic signals; upgrade curb ramps; install signs and pavement markings Construct sidewalk and curb ramps Reduce traveled lanes from 4 to 2; construct curb extensions and curb ramps; install crosswalks and protected left-turn lanes; remove signals; improve signal timing Install traffic signals, crosswalks, turning islands, and pedestrian/bike pathway; construct drainage improvements Construct medians and RR safety features; upgrade traffic control devices Install traffic signals; upgrade and modify existing traffic signals; install left-turn and bike lanes Construct sidewalks and bulb-outs; improve crosswalks; install pedestrian warning device Install traffic signals Install traffic signals; modify signal operations; improve channelization Install traffic signals

$211,300 $132,400 $690,300 $393,200 $210,000 $212,600 $134,200 $900,000

$609,000

67 Los Angeles 68 Los Angeles 69 Los Angeles 70 Los Angeles 71 Los Angeles 72 Los Angeles

$900,000 $675,000 $630,000 $405,000 $360,000 $270,000

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $270,000 $198,000 $183,400 $171,000 $171,000 $119,300 $117,000 $112,500 $96,800 $96,500 $96,300 $96,300 $24,300 $248,700

73 74 75 76

Agency Name Los Angeles Los Angeles Los Angeles Los Angeles

Location of Work 49th St./Avalon Blvd. Pacific Ave./Santa Cruz St. Cohasset St./Tujunga Ave. La Brea Ave./Olympic Blvd.; La Brea Ave./23rd St.

77 Los Angeles 78 Los Angeles 79 Los Angeles 80 Los Angeles 81 Los Angeles 82 Los Angeles 83 Los Angeles 84 Los Angeles 85 Los Angeles 86 Madera

Description of Work Install traffic signals Install flashing beacon and left-turn lane Install traffic signals Install protected left-turn phasing; upgrade traffic signal hardware; install curb ramps Hobart Blvd./Hollywood Blvd. Install pedestrian-activated warning device Laurel Canyon Blvd./Ventura Pl. Modify traffic signal phasing Crenshaw Blvd./Adams Blvd.; Crenshaw Blvd./Venice Blvd. Construct left-turn lanes Fletcher Dr./Riverside Dr. Upgrade traffic signals; install left-turn phasing; install curb ramps Woodman Ave./Cantara St. (Lanark Ave.) Install protected left-turn phasing Rinaldi St./Sepulveda Blvd. Modify traffic signal phasing 6th St./Union Ave. Upgrade traffic signals; install left-turn phasing; install curb ramps Hoover St./Venice Blvd. Upgrade traffic signals; install left-turn phasing; install curb ramps Arleta Ave./Sheldon St. Install left-turn phasing 4th St./Flume St.; Sunset Ave./Liberty Ln.; Ave. 13/Barnett Install in-pavement crosswalk lights, flashing beacons, and Ave.; Ellis Ave./Jericho Dr.; Olive Ave./Roosevelt St.; Olive barricades Ave. between Martin St. and Santa Cruz St. Children's Blvd. between Crocket Way and Lanes Bridge Dr. Redwood Hwy. Frontage Rd./US 101 (DeSilva Island Dr.) Oak Grove Ave./Merrill St. Huntinton Dr./5th Ave.; Duarte Rd./Peck Rd.; Foothill Blvd./Sunset Pl.; Foothill Blvd./California Ave. Alessandro Blvd. from 500' E of Perris Blvd. to Indian St. Install shoulder rumble strip Install protected left-turn phasing; modify intersection channelization Install in-pavement crosswalk lights Install pedestrian safety devices and crosswalk lighting system; upgrade traffic signals Construct raised median island with left-turn pockets; install new traffic signals (Covey Quail Ln.); modify traffic signals (Perris Blvd.); install signs and striping Upgrade median islands; install striping and pavement markings

87 Madera County 88 Marin County 89 Menlo Park 90 Monrovia

$26,700 $388,200 $49,500 $657,000

91 Moreno Valley

$900,000

92 Mountain View

Middlefield Rd. between Easy St. and Shoreline Blvd.

$652,500

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $76,200

Agency Name 93 Murrieta

Location of Work Jackson Ave. between California Oaks Rd. and the entrance to The Arbors at California Oaks (Apartments)/California Oaks Center (Shopping Center) Highland Ave. between Division St. and E 8th St.

Description of Work Construct raised median; install signs and striping

94 National City

95 Nevada County 96 Oakland 97 Oakland 98 Oakland

Construct bulb-outs, curb ramps, left-turn pockets, and raised medians; reduce travel lanes from four to two; install signs, striping, and pavement markings Various locations throughout the county Install striping and pavement markings San Pablo Ave./West St.; San Pablo Ave./W Grand Ave. Install protected left-turn phasing; modify intersection geometry Bancroft Ave./94th Ave. Install traffic signals; construct curb ramps Hegenberger Rd./Edes Ave.; Hegenberger Rd./Baldwin St.; Upgrade traffic signal; install flashing beacons Hegenberger Rd./Hamilton St.; Hegenberger Rd./73rd Ave. Lincoln Ave. between Orange Olive Rd. and Orange Ave. Construct sidewalk gap closure

$900,000

$409,900 $900,000 $485,100 $415,800

99 Orange 100 Orange

$679,000 $196,500

Cannon St. between Via Escola and Santiago Canyon Rd.; Install speed feedback signs Santiago Canyon Rd. between Jamboree Rd. and SR 241; Collins Ave. between Tustin St. and Shaffer St.; Serrano Ave. between Cannon St. and Kendra Way Cannon St. between Santiago Canyon Rd. and Chapman Install speed feedback signs Ave.; La Veta Ave. between Yorba St. and Esplanade St.; Chapman Ave. between Orange Park Blvd. and Cannon St. Tustin St./Palm Ave. Pleasant Valley Rd./Rose Ave. Ventura Rd./Ninth St. Fred Waring Dr./San Pascual Ave. Fair Oaks Ave./Colorado Blvd.; Lake Ave./Mountain St. Install protected left-turn phasing Modify median for left-turn lane; modify traffic signals Modify traffic signals Modify intersection geometry; upgrade traffic signals Install pedestrian bulb-outs and curb ramps; enhance striping SR 134 on/off-ramp at Colorado Blvd./Orange Grove Blvd.; Modify traffic signal phasing SR 210 on/off-ramp at Holly St./Orange Grove Blvd. Pasadena Ave./SR 210 WB on-ramp at Walnut St. Crinella Dr./Casa Grande Rd.; Ely Blvd./Spoonbill Ave. Upgrade traffic signals; install flashing beacons Install in-pavement crosswalk lights, curb ramps, signs, striping, and pavement markings

101 Orange

$176,900

102 103 104 105 106

Orange Oxnard Oxnard Palm Desert Pasadena

$167,600 $220,100 $139,600 $195,500 $407,700 $227,700

107 Pasadena

108 Pasadena 109 Petaluma

$98,000 $173,200

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $899,100 $581,200 $533,000

Agency Name 110 Pico Rivera 111 Placer County 112 Pleasant Hill

Location of Work Various locations throughout the city King Rd. between Auburn Folsom Rd. and Sudor Ln. Contra Costa Blvd./Viking Dr.

Description of Work Install left-turn phasing, pedestrian countdown heads, and speed feedback signs Widen traveled lanes; construct drainage improvements Upgrade traffic signals; install bike lanes; construct curb, gutter, sidewalks, and curb ramps; modify raised median Construct raised median islands, curb ramps and right-turn lanes; install speed feedback signs and pedestrian countdown heads; modify traffic signals, signs, and striping

113 Pomona

Mission Blvd. between Park Ave. and E city limits of Pomona; Mission Blvd./Reservoir Rd.

$900,000

114 Pomona 115 Rancho Cordova 116 Rancho Mirage 117 Rancho Palos Verdes

Phillips Blvd.; La Verne Ave.; Hamilton Blvd.; Lexington Ave. White Rock Rd., W of Zinfandel Dr. Frank Sinatra Dr./SR 111

Construct sidewalk; modify traffic signals; install crosswalk improvements and speed feedback signs Install sidewalks, bike lanes, and crosswalks Upgrade traffic signals and safety lighting; add turn lanes; construct curb and gutter Hawthorne Blvd./Highridge Rd.; Hawthorne Blvd./Gran Via Install pedestrian countdown heads; synchronize traffic Altamira (Ridgegate Dr.); Hawthorne Blvd./Eddinghill signals (Seamount Dr.); Hawthorne Blvd./Crest Rd.; Hawthorne Blvd./Dupre Dr.; Hawthorne Blvd./Vallon Dr.; Hawthorne Blvd./Palos Verdes Dr. West Robinson Ranch Rd./Pennington Ln.; Robinson Ranch Rd./Winchester Dr.; Robinson Ranch Rd./Cimmaron Ln.; Robinson Ranch Rd./Shadow Rock Dr.; Robinson Ranch Rd./Morningside Dr. Buenaventura Blvd. between Placer St. and Lakeside Dr. Construct bulb-outs

$900,000 $358,100 $900,000 $707,000

118 Rancho Santa Margarita

$311,400

119 Redding 120 Redding 121 Redlands 122 Rialto 123 Ridgecrest 124 Riverside

Install left-turn lane, signs, and striping; construct paved shoulders Lake Blvd. between SR 299 and Northpoint Dr. Construct raised median; install striping and pavement markings; reconfigure traffic lanes Various locations throughout the city Upgrade crosswalks; install advance warning lights and signs; modify striping to narrow traffic lanes Various locations throughout the city Install pedestrian countdown heads China Lake Blvd./Upjohn Ave.; China Lake Blvd. between Install traffic signals and interconnect communications Rader Ave. and Ridgecrest Blvd. cable; construct curb ramps Canyon Crest Dr./Ransom Rd.; Canyon Crest Dr./Via Vista Install traffic signals, signs, and striping Dr.; Canyon Crest Dr./Mission Grove Pkwy.

$461,600 $299,700 $553,700 $334,800 $361,900 $614,900

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $343,400

Agency Name 125 Riverside

126 Riverside County 127 Riverside County 128 Rosemead 129 Rosemead 130 Sacramento County 131 San Benito County 132 San Bernardino 133 San Bernardino 134 San Bernardino County 135 San Bernardino County 136 San Clemente 137 San Diego County 138 San Francisco Municipal Transportation Agency

Location of Work Description of Work Third St. (Blaine St.) between Mulberry St. and Watkins Dr. Widen roadway; restripe to narrow traffic lanes and widen Class II bike lanes; install detection systems, signs, and pavement markings Gilman Springs Rd., from 1 to 2.5 miles SE of Alessandro Realign horizontal curves Blvd. Cajalco Rd./Alexander St. Install traffic signals, signs, striping, and pavement markings; construct left-turn lanes SR 19 (Rosemead Blvd.) between Valley Blvd. and the RR Construct sidewalks; install safety lighting and bike lanes; grade crossing at Grand Ave. upgrade traffic signals Garvey Blvd.; Walnut Grove Ave. between Hellman Ave. Install left-turn phasing, signs, and striping; upgrade traffic and Marshall St. signals; construct raised medians Fair Oaks Blvd. between San Ramon Way and Eastern Install median barrier Ave. Union Rd., E of Union Heights Rd. Widen shoulders Ninth St./Sierra Way Install protected/permissive left-turn phasing and pedestrian countdown heads; construct curb ramps Ninth St./Arrowhead Ave. Upgrade traffic signals; install protected left-turn phasing Valley Blvd. between Locust Ave. and Linden Ave. Beech Ave., near Beech Ave. Elementary School N El Camino Real between Camino Capistrano and Avenida Estacion Mission Rd./Aviation Rd.; Mission Rd. between Ammunition Rd. and Fallbrook St. Masonic Ave. between Geary Blvd. and Fell St. Construct raised median Install in-pavement crosswalk lights Contruct Class I bike path, K-rail barrier, sidewalk and curb ramps; upgrade traffic signals and striping Install traffic signals with interconnect communications cable Upgrade traffic signals (includes controllers and cabinets, mast arms, transit signal priority, pedestrian countdown heads, and larger signal heads) Install advance yield lines, warning signs, crosswalks, and No Parking zones Construct left-turn and right-turn lanes; install protected leftturn phasing and RR preemption Install protected left-turn phasing; upgrade traffic signals, signs and pavement markings Widen roadway and pave shoulders; improve horizontal alignment; flatten side slopes

$685,800 $311,400 $430,900 $339,500 $682,700 $390,000 $154,000 $151,700 $645,300 $46,800 $665,900 $678,100 $900,000

139 San Francisco Municipal Transportation Agency 140 San Joaquin County 141 San Leandro 142 San Luis Obispo County

Various locations throughout the city Wilson Way/Newton Rd. (McAllen Rd.) Washington Ave./Monterey Blvd. (Bradrick Dr.) La Panza Rd. between Ryan Rd. and Hord Valley Rd.

$386,100 $900,000 $373,300 $900,000

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $490,200

Agency Name 143 San Marcos

144 145 146 147 148 149

San Marcos Santa Ana Santa Ana Santa Ana Santa Ana Santa Barbara

Location of Work Mission Rd. between San Marcos Blvd. and Nordahl Rd.; Woodland Pkwy. between Mission Rd. and Borden (El Norte Pkwy.); Nordahl Rd. between Mission Rd. and Montiel Rd. Various locations throughout the city Fairview St./Edna Dr. Raitt St./Adams St. McFadden Ave./Lyon St. McFadden Ave./Euclid St. De La Vina St./Figueroa St.

Description of Work Upgrade traffic signals; install interconnect communications cable and CCTV cameras

Upgrade regulatory and warning signs Install traffic signals; upgrade signing Install traffic signals; upgrade signing Install left-turn phasing; upgrade signing Install left-turn phasing; upgrade signing Install all-way Stop, pedestrian crossing, and safety lighting

$322,200 $401,000 $401,000 $343,800 $343,800 $326,300 $135,000 $77,600 $504,000 $101,700 $310,000 $83,200 $81,600

150 Santa Clarita 151 Santa Clarita 152 Santa Cruz County 153 Santa Cruz County 154 Santa Maria 155 Santee 156 Santee

Various locations throughout the city Upgrade signs, crosswalks, and pavement markings Sand Canyon Rd., within 400' N and S of Silver Saddles Dr. Install guardrail Felton Empire Rd., 0.8 mile E of Empire Grade Install approximately 200' of guardrail; stabilize embankment Granite Creek Rd., 0.2 mile S of Lauren Ct. Install approximately 200' of guardrail SR 135 (Broadway) between PM 10.93 and 17.79; SR 166 Upgrade safety lighting (Main St.) between PM 6.50 and 8.93 Magnolia Ave./Palm Glen Dr. Construct raised medians Magnolia Ave. between the San Diego River and Prospect Install speed feedback signs Ave.; Mast Blvd. between Carlton Hills Blvd. and Cuyamaca St. SR 9 (Saratoga-Los Gatos Rd.) between Fruitvale Ave. and Construct pedestrian pathway, curbs, and curb ramps; Lexington Dr. install crosswalks, signs, and striping Lerdo Hwy. between Cherry Ave. and Driver Rd. Install median guardrail, signs, striping, and pavement markings Dry Creek Rd., from 800' S of Sagebrush Trail to 3000' N of Pave shoulders; replace guardrail Elk Trail East Cherry Ave./20th St. Install traffic signals; construct curb ramps Various locations throughout the city Upgrade signs Grand Ave./Magnolia Ave. Install traffic signals; construct curb ramps; improve drainage Firestone Blvd./State St.; Tweedy Blvd./California Ave. Install protected left-turn signals, pedestrian countdown heads, curb ramps, signs, and striping Central Ave., within 1,500' of W. Taylor Rd. Widen shoulders; realign roadway Various locations throughout the city Install speed feedback signs

157 Saratoga 158 Shafter 159 Shasta County 160 Signal Hill 161 Simi Valley 162 South San Francisco 163 Southgate 164 Stanislaus County 165 Stockton

$900,000 $900,000 $685,800 $301,000 $198,000 $374,200 $531,000 $719,900 $360,000

Approved Project List Highway Safety Improvement Program (HSIP)


Federal Funds $626,600 $802,800 $340,000

Agency Name 166 Sunnyvale 167 Tehama County 168 Temple City

Location of Work Bernardo Ave./Remington Dr. South Ave. between Woodson Br. and SR 99

Description of Work Install traffic signals, signs, striping, and curb ramps Widen shoulders; upgrade striping and pavement markings

169 Tuolumne County 170 Ventura County 171 Ventura County 172 Vernon 173 Victorville 174 Vista

175 Watsonville 176 West Covina 177 Wildomar 178 Woodland 179 Woodside

Rosemead Blvd./Longden Ave.; Rosemead Blvd./Garibaldi Install traffic signals and speed feedback signs Ave.; Rosemead Blvd./Las Tunas Dr.; Rosemead Blvd./Emperor Ave. Various locations throughout the city Upgrade regulatory and warning signs Rice Ave./Channel Islands Blvd. Construct left-turn lane; lengthen right-turn lane and acceleration lanes; upgrade traffic signals Rose Ave. and Central Ave. near Rio Mesa High School Install new bus stop; construct sidewalk and curb ramps; install crosswalk Various locations throughout the city Install pedestrian countdown heads Amethyst Rd./Hook Blvd. Install traffic signal, signs, striping, and pavement markings; construct curb ramp E Vista Way/Taylor St. Install traffic signals with interconnect, bike lanes, signs, striping, and pavement markings; construct curb, gutter, and sidewalks Various locations throughout the city Install pedestrian countdown heads and curb ramps Lark Ellen Ave./Puente Ave. Install left-turn phasing Clinton Keith Rd./Hidden Springs Rd. Install protected left-turn phasing and pedestrian improvements Main St./Cleveland St. Upgrade traffic signals Woodside Rd. (SR 84), near Albion Way at Woodside Upgrade crosswalks, school area signs, and flashing Elementary School beacons

$692,000 $900,000 $162,000 $93,100 $345,600 $900,000

$305,400 $133,600 $99,000 $252,200 $194,000 $74,539,600