Jan-09 Work Order No. WK081231.0010 Equipment No.

8FW-P-100A Equipment Description TD BOILER FEEDWATER PUMP 8A

WK090109.0223 WK090109.0235 WK090128.0017 Feb-09 Work Order No.

8FW-P-100A 8FW-P-100A 8FW-P-100A

TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

Equipment No.

Equipment Description

WK090202.0014

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090206.0136

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090130.0126

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090206.0143 WK090217.0019

8FW-P-100A 8FW-P-100A

TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

WK090224.0060

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090219.0269 Mar-09 Apr-09 Work Order No.

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Equipment No.

Equipment Description

WK090327.0115

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090327.0123

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090327.0051

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090403.0090

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090420.0079 May-09

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Work Order No.

Equipment No.

Equipment Description

WK090501.0155

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090507.0106

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090518.0236

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090522.0101 Jun-09 Work Order No. WK090605.0112 WK090615.0059

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Equipment No. 8FW-P-100A 8FW-P-100A

Equipment Description TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

WK090619.0110 Jul-09 Aug-09 Work Order No. WK090724.0259 WK090803.0016 WK090814.0053 WK090821.0078 WK090819.0209

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Equipment No. 8FW-P-100A 8FW-P-100A 8FW-P-100A 8FW-P-100A 8FW-P-100A

Equipment Description TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

WK090909.0352

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK090909.0356

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Oct-09 Work Order No. WK090928.0084 WK090918.0132 WK091005.0107 Equipment No. 8FW-P-100A 8FW-P-100A 8FW-P-100A Equipment Description TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

WK091005.0114

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK091007.0341

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK091013.0024

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

Nov-09 Work Order No. Equipment No. Equipment Description

WK091102.0055

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK091027.0207 WK091118.0021 Dec-09 Work Order No.

8FW-P-100A 8FW-P-100A

TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

Equipment No.

Equipment Description

WK091120.0025

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK091130.0074

8FW-P-100A

TD BOILER FEEDWATER PUMP 8A

WK091125.0144 WK091208.0048

8FW-P-100A 8FW-P-100A

TD BOILER FEEDWATER PUMP 8A TD BOILER FEEDWATER PUMP 8A

Work.Description 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Routine Bentley 2 Route Vibration Monitoring 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Work.Description 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Work.Description 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Work.Description 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

2 Weekly - Routine Bentley 2 Route Vibration Monitoring 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Routine Bentley 2 Route Vibration Monitoring

3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Routine Bentley 2 Route Vibration Monitoring

Work.Description

Work.Description

3 Monthly- Do oil check visually through sight glass, check 4 Monthly- Do oil check visually through sight L/O temperature and pressure, check filter differential glass, check L/O temperature and pressure, check pressure (if >80kPad, change over the filter, clean the old filter differential pressure (if >80kPad, change over filter), Do oil sampling for checking oil condition (CBM the filter, clean the old filter), Do oil sampling for engineer) checking oil condition (CBM engineer)

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Routine Bentley 2 Route Vibration Monitoring

1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Routine Bentley 2 Route Vibration Monitoring

2 Weekly - Routine Bentley 2 Route Vibration Monitoring

Work.Description

Work.Description 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

2 Weekly - Routine Bentley 2 Route Vibration Monitoring

1 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

Work.Description 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

Work.Description 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

Work.Description 2 Weekly - Routine Bentley 2 Route Vibration Monitoring 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 1 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Routine Bentley 2 Route Vibration Monitoring

Work.Description 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 2 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Routine Bentley 2 Route Vibration Monitoring

3 Monthly- Do oil check visually through sight glass, check 4 Monthly- Do oil check visually through sight L/O temperature and pressure, check filter differential glass, check L/O temperature and pressure, check pressure (if >80kPad, change over the filter, clean the old filter differential pressure (if >80kPad, change over filter), Do oil sampling for checking oil condition (CBM the filter, clean the old filter), Do oil sampling for engineer) checking oil condition (CBM engineer)

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Work.Description 1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 2 Weekly - Routine Bentley 2 Route Vibration Monitoring 1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

Work.Description 2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

2 Weekly - Routine Bentley 2 Route Vibration Monitoring

3 Weekly - Routine Bentley 2 Route Vibration Monitoring

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

Work.Description

Work.Description

1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

2 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Routine Bentley 2 Route Vibration Monitoring

3 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Routine Bentley 2 Route Vibration Monitoring

Work.Description

Work.Description

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 2 Weekly - Routine Bentley 2 Route Vibration Monitoring 1 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 3 Weekly - Routine Bentley 2 Route Vibration Monitoring 2 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

Work.Description 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Close Date 01/Jan/2009

Pending Reason

Source PM

Work Nature 1

15/Jan/2009 15/Jan/2009 29/Jan/2009

PM PM PM

1 1 1

Work.Description 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

Close Date

Pending Reason

Source

Work Nature

05/Feb/2009

PM

3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online

12/Feb/2009

PM

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

13/Feb/2009

PM

4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 4 Weekly - Routine Bentley 2 Route Vibration Monitoring

13/Feb/2009 20/Feb/2009 Waiting Resources

PM PM

1 1

26/Feb/2009

PM

27/Feb/2009

PM

Work.Description

Close Date

Pending Reason

Source

Work Nature

5 Monthly- Do oil check visually through sight glass, check L/O temperature and pressure, check filter differential pressure (if >80kPad, change over the filter, clean the old filter), Do oil sampling for checking oil condition (CBM engineer)

08/Apr/2009

PM

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 4 Weekly - Routine Bentley 2 Route Vibration Monitoring

08/Apr/2009

PM

10/Apr/2009

PM

14/Apr/2009

PM

30/Apr/2009

PM

Work.Description 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Simulation Turbine BFP A and B Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

Close Date

Pending Reason

Source

Work Nature

11/May/2009

PM

14/May/2009

PM

21/May/2009

PM

28/May/2009

PM

Work.Description 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online

Close Date 11/Jun/2009 18/Jun/2009

Pending Reason

Source PM PM

Work Nature 1 1

25/Jun/2009

PM

Work.Description 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 3 Weekly - Simulation Turbine BFP Primary/Emergency Overspeed Trip Online 4 Weekly - Routine Bentley 2 Route Vibration Monitoring

Close Date 03/Aug/2009 06/Aug/2009 20/Aug/2009 27/Aug/2009 28/Aug/2009

Pending Reason

Source PM PM PM PM PM

Work Nature 1 1 1 1 1

5 Monthly- Do oil check visually through sight glass, check L/O temperature and pressure, check filter differential pressure (if >80kPad, change over the filter, clean the old filter), Do oil sampling for checking oil condition (CBM engineer)

29/Sep/2009

PM

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

29/Sep/2009

PM

Work.Description 3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

Close Date 01/Oct/2009 02/Oct/2009 08/Oct/2009

Pending Reason

Source PM PM PM

Work Nature 1 1 1

4 Weekly - Routine Bentley 2 Route Vibration Monitoring

09/Oct/2009

PM

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

19/Oct/2009

PM

3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

29/Oct/2009

PM

Work.Description

Close Date

Pending Reason

Source

Work Nature

3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 4 Weekly - Routine Bentley 2 Route Vibration Monitoring

05/Nov/2009

PM

06/Nov/2009 24/Nov/2009

PM PM

1 1

Work.Description

Close Date

Pending Reason

Source

Work Nature

Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min

01/Dec/2009

PM

3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test 4 Weekly - Routine Bentley 2 Route Vibration Monitoring 3 Weekly - Feed Water Pumps Lube Oil Pump Test, Stop Valve Test & Simulated Over Speed Test

03/Dec/2009

PM

10/Dec/2009 10/Dec/2009

PM PM

1 1

WorkDone DONE

Work Group PROD-AS

Team Code PROD-OPR

Schedule Date 01/Jan/2009

DONE RPT AS PROCEDURE TAKE VIBRATION DATA RPT

PROD-AS P-ENG PROD-AS

PROD-OPR ENG-CBM PROD-OPR

15/Jan/2009 15/Jan/2009 29/Jan/2009

WorkDone

Work Group

Team Code

Schedule Date

RPT

PROD-AS

PROD-OPR

05/Feb/2009

Perform simulation of over speed test

PROD-AS

PROD-OPR

12/Feb/2009

1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 52 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : small oil leaks from outboard bearing gasket, containment with plastic bin 10 Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19313 kpag 14. Discharge temperature 173 deg C 15. Barrel top temperature = 179 deg C 16. Barrel down temperature = 180 deg C

MTECH

M8

09/Feb/2009

TAKE VIBRATION DATA DONE RPT AS PROCEDURE

P-ENG PROD-AS

ENG-CBM PROD-OPR

13/Feb/2009 19/Feb/2009

DONE RPT AS PROCEDURE

PROD-AS

PROD-OPR

26/Feb/2009

TAKE VIBRATION DATA

P-ENG

ENG-CBM

27/Feb/2009

tidak ada data

WorkDone

Work Group

Team Code

Schedule Date

1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 52 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : small oil leaks from outboard bearing gasket, containment with plastic bin 10 Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19313 kpag 14. Discharge temperature 173 deg C 15. DCS Barrel top temperature = 179 deg C 16. DCS Barrel down temperature = 180 deg C NV = NORMAL VALUE 1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C CARRY OUT ON LINE SIMULATION OVER SPEED TEST

MTECH

M8

06/Apr/2009

MTECH

M8

06/Apr/2009

PROD-AS

PROD-OPR

09/Apr/2009

TAKE VIBRATION DATA

P-ENG

ENG-CBM

10/Apr/2009

TAKE VIBRATION DATA

P-ENG

ENG-CBM

24/Apr/2009

WorkDone

Work Group

Team Code

Schedule Date

TAKE VIBRATION DATA

P-ENG

ENG-CBM

08/May/2009

RPT

PROD-AS

PROD-OPR

14/May/2009

RPT FOR OVERSPEED ON LINE

PROD-AS

PROD-OPR

21/May/2009

RPT

PROD-AS

PROD-OPR

28/May/2009

WorkDone SIMULATION OVER SPEED TEST ON LINE RPT

Work Group PROD-AS PROD-AS

Team Code PROD-OPR PROD-OPR

Schedule Date 11/Jun/2009 18/Jun/2009

DONE

PROD-AS

PROD-OPR

25/Jun/2009

tidak ada data


WorkDone TAKE VIBRATION DATA DONE AS PROCEDURE CARRY OUT RPT OF EMERGENCY OVER SPEED TEST ON LINE DONE THE RPT. The manual records available on Production office (service by 4th floor) TAKE VIBRATION DATA Work Group P-ENG PROD-AS PROD-AS PROD-AS P-ENG Team Code ENG-CBM PROD-OPR PROD-OPR PROD-OPR ENG-CBM Schedule Date 31/Jul/2009 06/Aug/2009 20/Aug/2009 27/Aug/2009 28/Aug/2009

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 51 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 51 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19302 kpag 14. Discharge temperature 172 deg C 15. DCS Barrel top temperature = 177 deg C 16. DCS Barrel down temperature = 178 deg C

MTECH

M8

28/Sep/2009

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 51 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 51 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19302 kpag 14. Discharge temperature 172 deg C 15. DCS Barrel top temperature = 177 deg C 16. DCS Barrel down temperature = 178 deg C

MTECH

M8

28/Sep/2009

WorkDone DONE THE RPT. SEE ELO FOR DETAILS RESULT TAKE VIBRATION DATA RPT AS PER PROCEDURE RPT-8FW-01

Work Group PROD-DS MTECH PROD-DS

Team Code PROD-OPR ENG-CBM PROD-OPR

Schedule Date 01/Oct/2009 25/Sep/2009 08/Oct/2009

TAKE VIBRATION DATA

MTECH

ENG-CBM

09/Oct/2009

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 56 DEG C 5. 8FW-TISH-163 = 52 DEG C 6. 8FW-TI-165 = 52 DEG C 7. 8LT-PI-561 = 150 kPa 8. 8FW-PDISH-128 = 20 kPa 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal RUNNING TEST AUTOMATICALLY PUMP A TO PUMP B AND OPPOSITE. PRESSURE NORMAL 6.3 BAR. SIMULATION OVER SPEED TEST AT 5844/5843/5847 RPM. NO TESTING FOR HP/LP VALVE STROKING DUE TO LOAD BELOW 500 MW.

MTECH

M8

19/Oct/2009

PROD-DS

PROD-OPR

29/Oct/2009

WorkDone CHANGED OVER LUBE OIL PUMP 1 AND 2. PRESSURE ABOUT 620 KPA. NO LEAKAGE FOUND. TESTED EMERGENCY OVER SPEED SIMULATION. CHANNEL A/B/C = 5844/5850/5839 RPM. TAKE VIBRATION DATA TAKE VIBRATION DATA

Work Group

Team Code

Schedule Date

PROD-DS

PROD-OPR

05/Nov/2009

MTECH MTECH

ENG-CBM ENG-CBM

06/Nov/2009 20/Nov/2009

WorkDone

Work Group

Team Code

Schedule Date

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 17KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54DEG C 5. 8FW-TISH-163 = 54 DEG C 6. 8FW-TI-165 = 50 DEG C 7. 8LT-PI-561 = 165 kPa 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal Changed over lube oil pump from A to B and B to A. Pressure for AC pump was 610 kPa and DC pump about 210 kPa. Stroke test HP and LP stop valve, OK. Simulation over speed test on line : 5841/5846/5848 rpm TAKE VIBRATION DATA DONE AS PROCEDURE, RESULT OK, SEE OLE

MTECH

M8

28/Nov/2009

PROD-DS

PROD-OPR

03/Dec/2009

MTECH PROD-DS

ENG-CBM PROD-OPR

04/Dec/2009 10/Dec/2009

Comitted Date 01/Jan/2009

Duration Completion Date 0.50 01/Jan/2009

Completion Time 17:00:00

Failure Type NA

Equipment Type P

15/Jan/2009 15/Jan/2009 29/Jan/2009

0.50 0.50 0.50

15/Jan/2009 15/Jan/2009 29/Jan/2009

17:00:00 14:25:00 16:00:00

P P P

Comitted Date

Duration Completion Date

Completion Time

Failure Type

Equipment Type

05/Feb/2009

0.50

05/Feb/2009

17:00:00

12/Feb/2009

0.50

12/Feb/2009

21:20:00

NA

09/Feb/2009

2.00

09/Feb/2009

10:12:00

NA

13/Feb/2009 19/Feb/2009

0.50 0.50

13/Feb/2009 19/Feb/2009

13:21:00 21:00:00 NA

P P

26/Feb/2009

0.50

26/Feb/2009

16:00:00

27/Feb/2009

0.50

27/Feb/2009

15:17:00

tidak ada data

Comitted Date

Duration Completion Date

Completion Time

Failure Type

Equipment Type

06/Apr/2009

0.50

06/Apr/2009

11:45:00

NA

06/Apr/2009

2.00

06/Apr/2009

11:45:00

NA

09/Apr/2009

0.50

09/Apr/2009

19:00:00

NA

10/Apr/2009

0.50

10/Apr/2009

14:50:00

24/Apr/2009

0.50

24/Apr/2009

14:55:00

Comitted Date

Duration Completion Date

Completion Time

Failure Type

Equipment Type

08/May/2009

0.50

08/May/2009

14:50:00

14/May/2009

0.50

14/May/2009

16:00:00

21/May/2009

0.50

21/May/2009

19:30:00

NA

28/May/2009

0.50

28/May/2009

16:00:00

Comitted Date 11/Jun/2009 18/Jun/2009

Duration Completion Date 0.50 0.50 11/Jun/2009 18/Jun/2009

Completion Time 19:50:00 16:00:00

Failure Type NA

Equipment Type P P

25/Jun/2009

0.50

25/Jun/2009

18:00:00

NA

tidak ada data


Comitted Date 31/Jul/2009 06/Aug/2009 20/Aug/2009 27/Aug/2009 28/Aug/2009 Duration Completion Date 0.50 0.50 0.50 0.50 0.50 31/Jul/2009 06/Aug/2009 20/Aug/2009 27/Aug/2009 28/Aug/2009 Completion Time 14:49:00 16:00:00 17:00:00 16:30:00 14:22:00 NA NA Failure Type Equipment Type P P P P P

28/Sep/2009

0.50

28/Sep/2009

11:12:00

NA

28/Sep/2009

2.00

28/Sep/2009

11:12:00

NA

Comitted Date 01/Oct/2009 25/Sep/2009 08/Oct/2009

Duration Completion Date 1.75 0.50 1.75 01/Oct/2009 25/Sep/2009 08/Oct/2009

Completion Time 18:30:00 15:06:00 17:00:00

Failure Type NA

Equipment Type P P P

09/Oct/2009

0.50

09/Oct/2009

14:01:00

19/Oct/2009

2.00

19/Oct/2009

10:45:00

NA

29/Oct/2009

1.75

29/Oct/2009

18:45:00

NA

Comitted Date

Duration Completion Date

Completion Time

Failure Type

Equipment Type

05/Nov/2009

1.75

05/Nov/2009

19:30:00

NA

06/Nov/2009 20/Nov/2009

0.50 0.50

06/Nov/2009 20/Nov/2009

15:01:00 14:11:00

P P

Comitted Date

Duration Completion Date

Completion Time

Failure Type

Equipment Type

28/Nov/2009

2.00

28/Nov/2009

11:12:00

NA

03/Dec/2009

1.75

03/Dec/2009

18:00:00

NA

12/Apr/2009 10/Dec/2009

0.50 1.75

12/Apr/2009 10/Dec/2009

15:00:00 16:00:00

P P

Working Hours 0.00

Total Duration Hours 1.00

Total Cost 0.00

Raised Date 31/Dec/2008

Stock Required

Manhours Cost 0.00

Contract Cost 0.00

0.00 0.00 0.00

0.30 1.00 1.00

0.00 0.00 0.00

09/Jan/2009 09/Jan/2009 28/Jan/2009

0.00 0.00 0.00

0.00 0.00 0.00

Working Hours

Total Duration Hours 1.00

Total Cost

Raised Date

Stock Required

Manhours Cost 0.00

Contract Cost

0.00

0.00

02/Feb/2009

0.00

0.00

2.00

0.00

06/Feb/2009

0.00

0.00

0.00

2.00

0.00

30/Jan/2009

0.00

0.00

0.00 0.00

1.00 0.30

0.00 0.00

06/Feb/2009 17/Feb/2009

0.00 0.00

0.00 0.00

0.00

0.30

0.00

24/Feb/2009

0.00

0.00

0.00

1.00

0.00

19/Feb/2009

0.00

0.00

Working Hours

Total Duration Hours

Total Cost

Raised Date

Stock Required

Manhours Cost

Contract Cost

0.00

2.00

28.65

27/Mar/2009

28.65

0.00

0.00

2.00

28.65

27/Mar/2009

28.65

0.00

0.00

1.00

0.00

27/Mar/2009

0.00

0.00

0.00

1.00

0.00

03/Apr/2009

0.00

0.00

0.00

1.00

0.00

20/Apr/2009

0.00

0.00

Working Hours

Total Duration Hours 1.00

Total Cost

Raised Date

Stock Required

Manhours Cost 0.00

Contract Cost

0.00

0.00

01/May/2009

0.00

0.00

1.00

0.00

07/May/2009

0.00

0.00

0.00

1.00

0.00

18/May/2009

0.00

0.00

0.00

1.00

0.00

22/May/2009

0.00

0.00

Working Hours 0.00 0.00

Total Duration Hours 0.50 1.00

Total Cost 0.00 0.00

Raised Date 05/Jun/2009 15/Jun/2009

Stock Required

Manhours Cost 0.00 0.00

Contract Cost 0.00 0.00

0.00

1.00

0.00

19/Jun/2009

0.00

0.00

Working Hours 0.00 0.00 0.00 0.00 0.00

Total Duration Hours 1.00 0.30 0.25 1.00 1.00

Total Cost 0.00 0.00 0.00 0.00 0.00

Raised Date 24/Jul/2009 03/Aug/2009 14/Aug/2009 21/Aug/2009 19/Aug/2009

Stock Required

Manhours Cost 0.00 0.00 0.00 0.00 0.00

Contract Cost 0.00 0.00 0.00 0.00 0.00

2.00

2.00

102.63

09/Sep/2009

NA(0/1)

2.63

0.00

2.00

2.00

102.63

09/Sep/2009

NA(0/1)

2.63

0.00

Working Hours 0.00 0.00 0.00

Total Duration Hours 1.00 1.00 1.00

Total Cost 0.00 0.00 0.00

Raised Date 28/Sep/2009 18/Sep/2009 05/Oct/2009

Stock Required

Manhours Cost 0.00 0.00 0.00

Contract Cost 0.00 0.00 0.00

0.00

1.00

0.00

05/Oct/2009

0.00

0.00

1.50

1.50

0.49

07/Oct/2009

0.49

0.00

0.00

1.00

0.00

13/Oct/2009

0.00

0.00

Working Hours

Total Duration Hours

Total Cost

Raised Date

Stock Required

Manhours Cost

Contract Cost

0.00

1.00

8.00

02/Nov/2009

8.00

0.00

0.00 0.00

1.00 1.00

0.00 0.00

27/Oct/2009 18/Nov/2009

0.00 0.00

0.00 0.00

Working Hours

Total Duration Hours

Total Cost

Raised Date

Stock Required

Manhours Cost

Contract Cost

2.00

2.00

1.20

20/Nov/2009

1.20

0.00

0.00

1.00

8.00

30/Nov/2009

8.00

0.00

0.00 0.00

1.00 2.00

0.00 0.00

25/Nov/2009 08/Dec/2009

0.00 0.00

0.00 0.00

Miscelaneous Cost 0.00

Parts Cost 0.00

PO Cost 0.00

What was Found NONE

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

I/S NONE NONE

Miscelaneous Cost

Parts Cost

PO Cost

What was Found

0.00

0.00

0.00

NONE

0.00

0.00

0.00

TD BFP A is in service

0.00

0.00

0.00

PM

0.00 0.00

0.00 0.00

0.00 0.00

NONE I/S

0.00

0.00

0.00

I/S

0.00

0.00

0.00

NONE

Miscelaneous Cost

Parts Cost

PO Cost

What was Found

0.00

0.00

0.00

PM

0.00

0.00

0.00

PM

0.00

0.00

0.00

BFP-A IN SERVICE

0.00

0.00

0.00

NONE

0.00

0.00

0.00

NONE

Miscelaneous Cost

Parts Cost

PO Cost

What was Found

0.00

0.00

0.00

NONE

0.00

0.00

0.00

NONE BFPT-A IS IN SERVICE NONE

0.00

0.00

0.00

0.00

0.00

0.00

Miscelaneous Cost 0.00 0.00

Parts Cost 0.00 0.00

PO Cost 0.00 0.00

What was Found BFPT-A IN SERVICE NONE

0.00

0.00

0.00

NONE

Miscelaneous Cost 0.00 0.00 0.00 0.00 0.00

Parts Cost 0.00 0.00 0.00 0.00 0.00

PO Cost 0.00 0.00 0.00 0.00 0.00

What was Found NONE I/S BFPT A INSERVICE NONE NONE

0.00

100.00

0.00

Pump in service

0.00

100.00

0.00

Pump in service

Miscelaneous Cost 0.00 0.00 0.00

Parts Cost 0.00 0.00 0.00

PO Cost 0.00 0.00 0.00

What was Found NONE BFPT WAS RUNNING INSERVICE

0.00

0.00

0.00

BFPT WAS RUNNING

0.00

0.00

0.00

PM

0.00

0.00

0.00

LUBE OIL PUMP A ON DUTY AND PUMP B ON STANDBY.

Miscelaneous Cost

Parts Cost

PO Cost

What was Found LUBE OIL PUMP 1 AS DUTY AND PUMP 2 AS STANDBY. BFPT WAS RUNNING BFPT WAS RUNNING

0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

Miscelaneous Cost

Parts Cost

PO Cost

What was Found

0.00

0.00

0.00

# Monthly- Check pump seal water temp and press, check strainer through dP (change strainer if press >=150kPad). Check mech seal leakage, replace it if leakage > 10cc/min # 8FW-P-100A In service

0.00

0.00

0.00

TD-BFP A is in service PUMP WAS RUNNING NORMAL

0.00 0.00

0.00 0.00

0.00 0.00

What was Completed DONE

DONE RPT AS PROCEDURE TAKE VIBRATION DATA RPT

What was Completed

RPT

Perform simulation of over speed test

1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 52 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : small oil leaks from outboard bearing gasket, containment with plastic bin 10 Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19313 kpag 14. Discharge temperature 173 deg C 15. Barrel top temperature = 179 deg C 16. Barrel down temperature = 180 deg C NV = NORMAL VALUE

TAKE VIBRATION DATA DONE RPT AS PROCEDURE

DONE RPT AS PROCEDURE

TAKE VIBRATION DATA

What was Completed

1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 52 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : small oil leaks from outboard bearing gasket, containment with plastic bin 10 Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19313 kpag 14. Discharge temperature 173 deg C 15. DCS Barrel top temperature = 179 deg C 16. DCS Barrel down temperature = 180 deg C NV = NORMAL VALUE

1. Inspect oil level = HIGH (AT SIGHT GLASS), 2. 8FW-PDISH-128 = 20 KPA 3. Clean area with lint cloth 4. 8FW-TISH-162 = 52 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 52 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 52 DEG C (NV < 80 DEG C ) CARRY OUT ON LINE SIMULATION OVER SPEED TEST

TAKE VIBRATION DATA

TAKE VIBRATION DATA

What was Completed

TAKE VIBRATION DATA

RPT

RPT FOR OVERSPEED ON LINE

RPT

What was Completed SIMULATION OVER SPEED TEST ON LINE RPT

DONE

What was Completed TAKE VIBRATION DATA DONE AS PROCEDURE CARRY OUT RPT OF EMERGENCY OVER SPEED TEST ON LINE DONE THE RPT. The manual records available on Production office (service by 4th floor) TAKE VIBRATION DATA

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 51 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 51 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19302 kpag 14. Discharge temperature 172 deg C 15. DCS Barrel top temperature = 177 deg C 16. DCS Barrel down temperature = 178 deg C

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54 DEG C ( NV < 80 DEG C ) 5. 8FW-TISH-163 = 51 DEG C ( NV < 80 DEG C ) 6. 8FW-TI-165 = 51 DEG C (NV < 80 DEG C ) 7. 8LT-PI-561 = 150 KPA (NV < 200 KPA ) 8. 8FW-PDISH-128 = 20 KPA ( NV < 80 KPA ) 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal 13. Discharge pressure = 19302 kpag 14. Discharge temperature 172 deg C 15. DCS Barrel top temperature = 177 deg C 16. DCS Barrel down temperature = 178 deg C

What was Completed DONE THE RPT. SEE ELO FOR DETAILS RESULT TAKE VIBRATION DATA RPT AS PER PROCEDURE RPT-8FW-01

TAKE VIBRATION DATA

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 20 KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 56 DEG C 5. 8FW-TISH-163 = 52 DEG C 6. 8FW-TI-165 = 52 DEG C 7. 8LT-PI-561 = 150 kPa 8. 8FW-PDISH-128 = 20 kPa 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal

RUNNING TEST AUTOMATICALLY PUMP A TO PUMP B AND OPPOSITE. PRESSURE NORMAL 6.3 BAR. SIMULATION OVER SPEED TEST AT 5844/5843/5847 RPM. NO TESTING FOR HP/LP VALVE STROKING DUE TO LOAD BELOW 500 MW.

What was Completed

CHANGED OVER LUBE OIL PUMP 1 AND 2. PRESSURE ABOUT 620 KPA. NO LEAKAGE FOUND. TESTED EMERGENCY OVER SPEED SIMULATION. CHANNEL A/B/C = 5844/5850/5839 RPM.

TAKE VIBRATION DATA TAKE VIBRATION DATA

What was Completed

1. Inspect oil level = HIGH (SIGHT GLASS) 2. 8FW-PDISH-128 = 17KPA 3. Clean pump with lint cloth 4. 8FW-TISH-162 = 54DEG C 5. 8FW-TISH-163 = 54 DEG C 6. 8FW-TI-165 = 50 DEG C 7. 8LT-PI-561 = 165 kPa 9. Inspect for any leakage : not found leakage at OB and IB bearing 10. Inspect nuts and fitting for looseness : no looseness 11. Inspect consistency of reading pressure and temperature : normal 12. Back flow lube oil , normal

Changed over lube oil pump from A to B and B to A. Pressure for AC pump was 610 kPa and DC pump about 210 kPa. Stroke test HP and LP stop valve, OK. Simulation over speed test on line : 5841/5846/5848 rpm TAKE VIBRATION DATA DONE AS PROCEDURE, RESULT OK, SEE OLE

What was Condition INSERVICE

What was Supervisor Comment NONE

Total cost

Unit

System

Down Time

NORMAL OK NO0RMAL

OK NONE NONE

What was Condition

What was Supervisor Comment

Total cost

Unit

System

Down Time 0.5

NORMAL

NONE

8FW

The result is OK

OK

8FW

0.5

NORMAL RUNNING

NA

8FW

OK NORMAL

NONE OK

0 0

8 8

8FW 8FW

0.5 0.5

NORMAL

OK

8FW

0.5

OK

NONE

8FW

0.5

What was Condition

What was Supervisor Comment

Total cost

Unit

System

Down Time

NORMAL RUNNING

Done

28.65

8FW

0.5

NORMAL RUNNING

Done

28.65

8FW

NO ABNORMALITY

THE RESULT WAS OK

8FW

0.5

OK

NONE

8FW

0.5

OK

NONE

8FW

0.5

What was Condition

What was Supervisor Comment

Total cost

Unit

System

Down Time 0.5

OK

NONE

0.00

8FW

NORMAL

NONE

0.00

8FW

0.5

NO ABNORMAL CONDITION

OK

0.00

8FW

0.5

NORMAL

NONE

0.00

8FW

0.5

What was Condition NO ABNORMAL CONDITION NORMAL

What was Supervisor Comment OK NONE

Total cost

Unit

System

Down Time

0.00

8FW

0.5

NORMAL IN SERVICE

NONE

0.00

8FW

0.5

What was Condition OK NORMAL AVAILABLE, MORE DETAIL SEE OLE NO ABNORMAL CONDITION BACK TO NORMAL OPERATION OK

What was Supervisor Comment NONE AVAILABLE FOR DETAIL INFO SEE OLE ATTACHMENT NONE NONE

Total cost 0.00 0.00 0.00 0.00 0.00

Unit 8 8 8 8 8

System 8FW 8FW 8FW 8FW 8FW

Down Time 0.5 0.5 0.5 0.5 0.5

Pump normal in service

Done..

102.63

8FW

0.5

Pump normal in service

Done..

102.63

8FW

What was Condition NORMAL OPERATION OK NORMAL

What was Supervisor Comment NONE NONE see ole attachment for detail

Total cost 0.00 0.00 0.00

Unit 8 8 8

System 8FW 8FW 8FW

Down Time 1.75 0.5 1.75

OK

NONE

0.00

8FW

0.5

Equipment in service

VRF

0.49

8FW

PUT BACK PUMP A AS DUTY PUMP.

FOR DETAIL INFO PLEASE SEE THE ATTACHED OLE

0.00

8FW

1.75

What was Condition

What was Supervisor Comment

Total cost

Unit

System

Down Time

PUT BACK LUBE OIL PUMP 1 AS FOR DETAIL INFO PLEASE SEE DUTY AND PUMP 2 AS STANDBY THE ATTACHED OLE.

8.00

8FW

1.75

OK `OK

NONE NONE

0.00 0.00

8 8

8FW 8FW

0.5 0.5

What was Condition

What was Supervisor Comment

Total cost

Unit

System

Down Time

# 8FW-P-100A In service

VRF

1.20

8FW

Put back lube oil pump to the original pump OK IN SERVICE

For detail info please see OLE

8.00

8FW

1.75

NONE NONE

0.00 0.00

8 8

8FW 8FW

0.5 1.75