Assuming that Licensed capacity has been installed is adequate area provision made for future growth.
3. Can any future needs be incorporated which are not known or thought of now.
5. Is it an advantage to have only one entrance & main road only on one side of plot.
7. Assuming that plot is level and drain outlet is near entrance is layout such that water logging will not occur.
10. Is location of raw material & finished goods (BSR) godowns ideal.
11. Is location of power, DG sets & water storage tanks suitable for operation.
12. Comment on location of effluent treatment plant & tank farms, solvent & oil yard.
13. Assuming raw materials are powers and if wind direction is from east, will there be any effect on layout and surrounding areas.
14. Can adequate control be exercised on movement of people to premises or within plot.
15. What do you think is the effect on architectural frontage & dispatch from the BSR (Finished Goods) godown in this layout.
16. Do you think used layout is proper. Is the present layout likely to pose any problems in electrical & piping cross over across roads to various plant building.
17. In case of major fire is escape easy for personnel from plants or other building.
18. Is it possible to interconnect all plant buildings to get more floor space for future expansion.
19. Assuming that you are permitted to have two entrances where do you think you would provide the second gate & why?
20. Is location of substation ideal if incoming power lines are running parallel to 300 meter side wall.
21. What is the effect if this plot is surrounded on three sides except north side by: A) Crop or Fields
B)
Adjacent Industries
C)
D) E)
Hills If this is last plot with river on east side and railway line on south side.
22. Since the plot is almost squarish do you think Layout could have been planned better if: A) Plot was Rectangular
B)
23. Assuming that a borewell has to be sunk for water requirements, which is the ideal location in this layout for the same from operation point view.
24. Is location of solvent Godown, Barrel Yard, Scrap Yard & Workshop in this layout ideal from operation point of view.
26. Is any important aspect missed in this layout which has not been catered to. Please specify if so.