Você está na página 1de 13

UTN - FRBA

Dpto Ing Qca


Proyecto Final

PRODUCCIN DE CO2

2010-CO2-E-LC-001

Pgina

Rev A

1/5

LISTA DE CARGAS ELECTRICAS

A
Rev

6-Dec-10
Fecha

Para Aprobacin
Descripcin

CO2
Por

AHA / NSG
Revis

JMP
Aprob

77673372.xls.ms_office

UTN - FRBA
Dpto Ing Qca
Proyecto Final

PRODUCCIN DE CO2

2010-CO2-E-LC-001

Pgina

Rev A

2/5

LISTA DE CARGAS ELECTRICAS


1
2
3

Indice

4
5
6
8
9
10
11

Motor Control Center (MCC)


Low Voltage Power Supply (LVPS)
Uninterruptible Power Supply

3
4
5

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

77673372.xls.ms_office

UTN - FRBA
Dpto Ing Qca
Proyecto Final

PRODUCCIN DE CO2

2010-CO2-E-LC-001

Pgina

Rev A

3/5

LISTA DE CARGAS ELECTRICAS


Rev

TAG

A
A
A
A
A
A
A
A
A

MP-201 A
MP-201 B
MP-202 A
MP-202 B
MP-203 A
MP-203 B
K-101
R1
R2

Simult Pot.
Pot.
Volts / Fases / Fact.
P&ID Alimentac Opera
Efic.
Cos f
aneid Absorb. Nominal
in
cin
Hz
#
Carga
Equipo
Equipo
(kW)
ad
(bkW)
034
MCC
C
1.00
41
60
380
3 50
0.68
0.93
0.9
034
MCC
E
0.00
41
60
380
3 50
0.68
0.93
0.9
033
MCC
C
1.00
107
175
380
3 50
0.61
0.95
0.91
033
MCC
E
0.00
107
175
380
3 50
0.61
0.95
0.91
035
MCC
C
1.00
37.5
50
380
3 50
0.85
0.93
0.82
035
MCC
E
0.00
37.5
50
380
3 50
0.85
0.93
0.82
032
MCC
C
1.00
42.5
75
380
3 50
0.85
0.94
0.9
MCC
R
1.00
50
50
380
3 50
1.00
0.98
0.88
MCC
R
1.00
50
50
380
3 50
1.00
0.98
0.88

Sub-Total

MCC

Total

MCC

C
R
Darr

1.00
1.00

P
(kW)

S
(kVA)

44.1
44.1
112.6
112.6
40.3
40.3
45.2
51.0
51.0

49.0
49.0
123.8
123.8
49.2
49.2
50.2
58.0
58.0

21.4
21.4
51.3
51.3
28.1
28.1
21.9
27.5
27.5

272
116
284
388

123
55

228
100

360
100

0.63
1.00

0.94
0.98

0.89
0.88

242
102

328

460

0.71

0.95

0.89

344

Q
Tpico Arran Iarr /
Notas
(kVAr) Inst. que
In
2
2
2
2
2
2
1
2
2

SS
SS
VFD
VFD
D
D
SS
D
D

2.0
2.0
1.0
1.0
2.0
2.0
2.0
6.0
6.0

0.73
178

Notas
1.
2.
3.
4.

77673372.xls.ms_office

Inom= 81,5
Inom= 81,5
Inom= 232
Inom= 232
Inom= 73,6
Inom= 73,6
Inom= 99,2

77673372.xls.ms_office

UTN - FRBA
Dpto Ing Qca
Proyecto Final

PRODUCCIN DE CO2
LISTA DE CARGAS ELECTRICAS

Rev

TAG

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

P-201 A
P-201 B
T-201
K-101
V-201
Trace R1
Z. descarga
Estacionam.
Unidad proc.
Pt. Tto. Agua
Ilum R1
Depsito
Talleres
Laboratorio
Comedor
Edificio adm.
Calderas y
Saln usos
Vigilancia
Edif R1

Notas
1.
2.
3.
4.

Simult Pot.
Pot.
Volts / Fases / Fact.
P&ID Alimentac Opera
Efic.
aneid Absorb. Nominal
in
cin
Hz
#
Carga
Equipo
(kW)
ad
(bkW)
LVSP
C
1.00
50
50
220
1 50
1.00
1.00
LVSP
E
0.00
50
50
220
1 50
1.00
1.00
LVSP
C
1.00
50
50
220
1 50
1.00
1.00
LVSP
C
1.00
50
50
220
1 50
1.00
1.00
LVSP
C
1.00
50
50
220
1 50
1.00
1.00
LVSP
R
0.50
50
50
220
1 50
1.00
1.00
LVSP
I
0.50
10
10
220
1 50
1.00
1.00
LVPS
I
0.50
10
10
220
1 50
1.00
1.00
LVSP
C
1.00
10
10
220
1 50
1.00
1.00
LVSP
I
0.50
10
10
220
1 50
1.00
1.00
LVSP
R
0.50
10
10
220
1 50
1.00
1.00
LVSP
I
0.50
20
20
220
1 50
1.00
1.00
LVSP
C
1.00
20
20
220
1 50
1.00
1.00
LVSP
C
1.00
20
20
220
1 50
1.00
1.00
LVSP
I
0.50
20
20
220
1 50
1.00
1.00
LVSP
I
0.50
20
20
220
1 50
1.00
1.00
LVSP
C
1.00
20
20
220
1 50
1.00
1.00
LVSP
I
0.50
20
20
220
1 50
1.00
1.00
LVSP
I
0.50
20
20
220
1 50
1.00
1.00
LVSP
R
0.50
20
20
220
1 50
1.00
1.00

Sub-Total

LVSP

Total

LVSP

C
I
R
Darr

1.00
0.50
0.50

270
65
40

270
130
80

1.00
0.50
0.50

1.00
1.00
1.00

375

480

0.78

1.00

DE CO2

2010-CO2-E-LC-001

Pgina

Rev A

5/5

GAS ELECTRICAS
Cos f
Equipo

P
(kW)

S
(kVA)

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

50.0
50.0
50.0
50.0
50.0
50.0
10.0
10.0
10.0
10.0
10.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0
20.0

55.6
55.6
55.6
55.6
55.6
55.6
11.1
11.1
11.1
11.1
11.1
22.2
22.2
22.2
22.2
22.2
22.2
22.2
22.2
22.2

24.2
24.2
24.2
24.2
24.2
24.2
4.8
4.8
4.8
4.8
4.8
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7

0.90
0.90
0.90

270
65
40

131
31
19

0.90

375

300
72
44
0
417

Q
Tpico Arran Iarr /
Notas
(kVAr) Inst. que
In
-

D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

0.00
182

UTN - FRBA
Dpto Ing Qca
Proyecto Final

PRODUCCIN DE CO2
LISTA DE CARGAS ELECTRICAS
Simult

Rev

TAG

A
A
A
A
A
A
A
A
A
A
A

SDV-101
SDV-104
SDV-118
SDV-155
SDV-128
SDV-129
SDV-144
SDV-169
Sala de
Edif.
Iluminacin de

Notas
1.
2.
3.
4.

Pot.

Pot.
Volts / Fases / Fact.
P&ID Alimentac Opera
Efic.
Cos f
aneid Absorb. Nominal
in
cin
Hz
#
Carga
Equipo
Equipo
(kW)
ad
(bkW)

UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS
UPS

C
C
C
C
C
C
C
C
C
C
c

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Sub-Total

UPS

C
I
R
Darr

#####
#####
#####

Total

UPS

380
380
380
380
380
380
380
380
380
220
220

3
3
3
3
3
3
3
3
3
1
1

50
50
50
50
50
50
50
50
50
50
50

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0
0
0

0
0
0

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

2010-CO2-E-LC-001

Pgina

Rev A

5/5

TRICAS
P
(kW)

S
(kVA)

Q
Tpico Arran Iarr /
Notas
(kVAr) Inst. que
In

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

0
0
0
0

#DIV/0! #DIV/0!
0
0
0
0
0
#DIV/0! #DIV/0!

D
D
D
D
D
D
D
D
D
D
D

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

#####

Mtodo Lumen para iluminacin


Local
ancho (a)
largo (b)
alto (h')
altura plano trabajo
h
ndice del local (k)
k

Depsito
33
50
4
0.85
2.52
K=a*b/h *(a+b)
7.888697648

techo
pared
piso
factor de utiliz.(n) tablas
factor de manten. (fm)
flujo luminosos total
Gt
Iluminancia media deseada
N luminarias
N
N lmp. x luminaria (Nlp)
Flujo luminoso de 1 lmpara (Gl)
Nfinal (n luminarias final)
Rto. Luminoso
50/90Lm/W lmparas fluorescentes
18/22Lm/W lmparas incandescentes
12/18Lm/W lmparas halgenas

0.5
0.3
0.1
0.67
0.6
Gt=E*S/n*fm
1231343.284
300
N= Gt/Nlp*Gl
410.4477612
3
1000
410

Datos de entrada
Talleres
Laboratorio
32
23
50
40
3
2.5
0.85
0.85
1.72
1.32
11.3442995 11.0630111
Coeficientes de reflexin
0.5
0.5
0.3
0.3
0.1
0.1
0.7
0.7
0.6
0.8

Comedor
23
60
2.5
0.85
1.32
12.5958379
0.5
0.3
0.1
0.7
0.6

1714285.71
450

903571.429
550

657142.857
200

75.1879699
3
7600
75

100.396825
3
3000
100

219.047619
3
1000
219

Potencia nominal (Watts)


25
40
60
100
150
200

Lmparas incandescentes
flujo luminoso (Lm)
220
350
630
1250
2090
2920

eficiencia luminosa (Lm/W)


8.8
8.8
10.5
12.5
14
14.6

Potencia nominal (Watts)


22

Lmparas fluorescentes
flujo luminoso (Lm)
980

eficiencia luminosa (Lm/W)


44.55

Lmparas de vapor de sodio de baja presin


Potencia nominal (Watts)
flujo luminoso (Lm)
35
4600
55
7600
90
12500
135
21500
180
31000

eficiencia luminosa (Lm/W)


82
100
110
123
140

Potencia nominal (Watts)


80
125
250
400
1000
2000

Lmparas de vapor de mercurio


flujo luminoso (Lm)
3800
6300
13700
23100
55000
100000

eficiencia luminosa (Lm/W)


43
46
52
54
53
63

nacin
Edif. Adminsitrativo
47
60
2.5
0.85
1.32

Vigilancia
10
20
2.5
0.85
1.32

19.96601529

5.05050505

0.5
0.3
0.1
0.7
0.8

0.5
0.3
0.1
0.6
0.7

2014285.714
400

95238.0952
200

671.4285714
3
1000
671

31.7460317
3
1000
32

Clculo para un sistema de energa ininter


Alimentacin
Factor de potencia

Departamento
Administracin
Produccin

tipo
aire acondicionado
computadoras
vlvulas SDV

220V de ca
0.85

Tensin
220
127
380

Capacidad del sitema UPS (KVAs)


KVA=KW/cosfi
KVA

186.2117647

Se instalan bateras de 2,4 Volts


Cantidad de baterias necesarias=KVA/2,4 Volts
n baterias
77.58823529

78 bateras

cantidad Potencia (P/U)


10
30
8

2 x 5HP
800w
10HP

a de energa ininterruptible industrial

Total (W)
74600
24000
59680
158280

total

Você também pode gostar