Você está na página 1de 23

* CareNet 11

Mid term presentation CSD Fall 2011 Project owner Bjrn Pehrson Project coaches Bruce Zamaere Erik Eliasson Herv Ntareme Siraj Rathore Team Members Bowei Dai Elis Kullberg Vasily Prokopov Hannes Junnila Nur Mohammed Rashed 1 Siddharth Madan Gurpreet S Sambhy
1

Team member overview

Elis Kullberg

Hannes Junnila

Bowei Dai

Siddharth Madan

Gurpreet Singh Sambhy

Nur Mohammad Rashed

Vasily Prokopov

CareNet 11

Agenda

Introduction to CareNet fall 11 NOC report Gateway report Field testing report Management report

CareNet 11

Introduction: CareNet-SE

Gateway improvement

Gateway field testing

Collaboration

Media / Bifrost wiki

Infrastructure operation Primary objectives:


Successful take-over, operation and hand-over of the CareNet network and services. Development and field testing of the CareNet Home Extension, including residential gateways, HDVC clients, sensor gateways, health portal access and associated usecases.

CareNet 11

NOC: Overview
SSVL KTH LAN CSC Edge Router 1 Edge Router 2

.9

.1

.1

19
eth7 .35 vr

Edge Switch Edge Network

Media Converter

CWDM mux
192.16.124.8/30

CWDM mux

Media Converter

eth3 .4 eth5 .10 eth2 .1

2.3

6.2

Core Network
eth0 .2

192.16.126.0/30 eth1 .5

192.16.126.4/30 eth0 .6

kr eth2 .65

Bifrost router @ Kista


5. 17 7

hr

eth

Access Network Kista


192.16.126.64/26 acc_kst

Access Switch

Access Network Huddinge


192.16.126.128/26

HA Cluster
.72 .71 .80 .126

HDVIPER Tandberg client 1 IP phone 1

eth4

.161

HDVIPER Tandberg client 2 IP phone 2

...

Host 1

Host 2

Clients

50 .0/ 2
/29

Bifrost router @ Valhallavagen

Bifrost router @ Huddinge


9 12 2. eth .145 eth3

5
13 0.2 37 0 .0.

NOC: Done so far


Smooth network takeover accomplished Schemes updated and structured Automatic backup script developed
60% ready Only for routers now Issues with starting/stopping VMs

VM host 2 re-installed IPv6 allocation scheme developed

CareNet 11

NOC: IPv6 allocation


Server network
Public: Private: 2001:6b0:32:0::/64 192.16.126.64/26 2001:6b0:32:8::/64 192.168.0.0/24 2001:6b0:32::70/64 192.16.126.70/26 2001 :6 192.1 b0:32:8::4 68.0.4 /64 /24 2001:6b0:32::66/64 192.16.126.66/26 2001:6b 0:32:8:: 3/64 192.168 .0.3/24 2001:6b0:32::94/64 192.16.126.94/26 2001:6b 0:32:8:: 7/64 192.168 .0.7/24 2001:6b0:32::69/64 192.16.126.69/26 2001:6b 0:32:8:: 5/64 192.168 .0.5/24 2001:6b0:32::112/64 192.16.126.112/26 2001:6b 0:32:8:: 9/64 192.168 .0.9/24 2001:6b0:32::70/64 192.16.126.91/26 2001:6b 0:32:8:: 8/64 192.168 .0.8/24 2001:6b0:32::84/64 192.16.126.84/26 2001:6b 0:32:8:: 1/64 192.168 .0.1/24

Residential Gateways
Private network: 2001:6b0:32:9:X::/64 192.168.X.0/24

NMS

NS

IS P

2001:6b0:32:9:1::1/64 192.168.1.1/24

IP v4

fro

RG1
ISP
2001:6b0:32:9:2::1/64 192.168.2.1/24

Log

Bifrost router @ Kista


2001:6b0:32::1/64 192.16.126.65/26

4 IPv

m fro

RG2

INTERNET kr

SIP

IPv 4

fro m

ISP

2001:6b0:32:9:9::1/64 192.168.9.1/24

v4 IP

OMRS

RG9
P IS
2001:6b0:32:9:10::1/64 192.168.10.1/24

fro m

Portal

RG10

VPN

NOC: Future
Deploy RADIUS for centralized cridential management Update Proxmox on both VM hosting servers
Re-enable clustering Distribute the load Manual vs. DHCPv6 vs. IPv6 stateless autoconfiguration

Deploy IPv6

Add home extensions to Nagios Finalize automatic backup system

CareNet 11

Gateway: Roadmap
Server Bifrost Linux
Multihoming fully implemented Fully tested during October

WEB GUI

Multihoming Server

Update Server

Gateway status check

Update management

Gateway Admin User Multihoming Client Update Client

Push updates implemented Needs thorough testing during October

WEB GUI

Bifrost Linux

WebGUI to be implemented in November To be tested in December

CareNet 11

Gateway: Updates

Residential Gateway

Residential Gateway

Update server

Residential Gateway

Updates based on rsync

Automatically synced every night


Residential Gateway

11

CareNet 11

Gateway: WebGui, gateway side

12

CareNet 11

Gateway: WebGui, server side

13

CareNet 11

Field testing: Roadmap


Stakeholder Meeting Stakeholder Meeting Documentation Evaluation of documentation and possible bugs (if any) Analyse and test bug fixes (if any) Stakeholder Meeting Stakeholder Meeting

September
Study of existing system and field testing and KT from summer team.

October
Testing/retesting the existing E2E setup Testing of auto updates for bifrost sticks. Analysis and TESTCASE design of 3G & IPV6 packages. Testing the 3G package. Reevaluation of HDVC rollover with backup ISP(3G).

November
Scripting a solution for the 3G rollover issue (Continued). Testing multi-homing using independent ISPs Analysis and test case design for modified 3G package. Testing of Modified 3G package. Study and analysis of sensors and sensors.

December
Analysis and design of database & front end portal for users Analysis and test case design for the database & front end portal Development of database & front end portal for users Analysis and test case design for RG power management. Testing the RG power management.

Analysis and test case design of auto updates for bifrost sticks. Analysis of existing sensor devices . 3G package analysis wrt HDVC rollover. Analysis of the existing test cases for all systems.

Scripting a solution for the 3G rollover issue.

Analysis of database for data storage from


Analysis and design of database & front end portal for users.

14

CareNet 11

Gateway: Bandwidth issue

15

CareNet 11

Field testing: 3G benchmark


Latency (ms) as a function of time (s) during a Ehternet to 3G rollover
10000

1000

Latency (ms)

100

10

1 0 20 40 60 80 100

Time (s)

16

CareNet 11

Field testing: future tests

Test name

Date

Status

IPv6

October

Scripting

Dual ISP

Nov

Analyzing

HDVC 3G rollover

Nov

Analyzing

Power testing

Dec

Not started

17

CareNet 11

Gateway: Sensor Gateway Possibilities

Laptop

Laptop

HDVC Residential Gateway Display Residential Gateway Tablet Sensor

HDVC

Sensor

18

CareNet 11

Media: Bifrost wiki

bifrost.slu.se

CSD course documentation

Mailing list

19

CareNet 11

Management
250

Time overview per member

200

Hours spent vs hours co,mitted

150

Hours spent

100

Hours Committed

50

0 Boewi Dai Elis Kullberg Gurpreet Singh Hannes Junnila Siddharth Madan Nur Mohammad Vasily Prokopov Rashed

20

CareNet 11

EVERYONE IS ON TRACK!

Management
160

Time per member and work package

140

120

100 MonAMI Media 80 Field Testing NOC 60

Gateway
Management

40

20

0 Boewi Dai Elis Kullberg Gurpreet Singh Hannes Junnila Siddharth Madan Nur Mohammad Rashed Vasily Prokopov

22

CareNet 11

Overall work progress


WBS
NOC

Completion

Status
On track

Hours allocated
500

Gateway

Ahead

1000

Field Testing

Behind

1000

MomAMI

Complete

220

23

CareNet 11

Question and Answer

24

CareNet 11

Você também pode gostar