Você está na página 1de 2

Format for Excellent Executive of Eastern Region (XLER)Award 2010

Name of Sitel HQ Departn 2x210 MW Bakreswar TPP, Mp-3. Month : JULY' 2010 Total Score Achievable (with
1. Reconciliation

Name: Shri MIHIR SARKAR,Staff No.: 2980630. Details of achievement document, if any)
Pvt. Ltd.)

Measurement (% achieved)

Score Achieved

Executive Grade

Recommended

Reviewed

supporting

(%x20)

(JE-E4)

By(CM/HOD)

by (GM)

of Electrical Package ( Vendor: package.

PRV Construction unit!PEM

including supply and erection 3. Around vendors,units

2. As-built drawing made and sent it to concerned as well as site engineering

for distribbution. chasing up from local

200 pending points reduced to 4 only, by continuos and procuring materials

Targets Achieved W.r.t Plan/BSe

market. 4.99.2%

customer billing done.


portion) submitted. activities to respectively. & Jojobera : Associated with commissioning

S. Final bill of Sub-contrator(supply 6. At Snathaldih

achieve boiler EDTA cleaning & synchronisation

1. Commissioning implementing customer modified

of Main & Standby DG set by modifying

the design of Auto designing & MCC taking

start logic at site level replacing NB2 relay. Conceptualising, the synchronising into confidence. as per requirement. protection feature has been implemented All the protection

scheme of DG with emergency

circuit of DG was ana lysed and in DG protection of

2. Over frequency Emergency drives.

Ckt which was not available in the protection 3. Erection & Commissioning (OSGI procuring additinal developing DCS interface of extension

scheme for the protection

panel of unit-3 station HT SWGR as well of scheme.

material from MU as per site engineering and synchronising

HQjSite related special work/Breakthrough Improvement done

4. Developing the protection

all the synchronising

schemes of HT SWGRs. Implementation

AC/DC power cut feature in check synchro relays of whole HT/l T sWGRs for of the said relay at normal condition. of HT/lT SWGR protection logic of Ash Handling Package of HT power cable S. Establishment through PlC. of TAC HT motors by site modification for identification 6. Commissioning box. 7. Visited BHEl/Bhopal transport of critical materials and subsequent of the same to site. Also discussed and sorted out HT SWGR

pending issues of customer.

1. During the course of E&C of HT & LT SWGR, cable package & illumination pkg

etc. human

safety

aspect

was very strongly

implemented. was cautioned.

Implementation was adopted

of safety eqpt. like half body harness to full body harness and when ensured ever a defaulter was found work, proper earthing of working goggles was strictly

2. During half section SWGR bus shutdown bus was strictly 3. Mandatory ensured. use of safety helmets,

to avoid any fatal accident. Shoes & welding

4. Till date not a single case of lTI has been reported area of work.

by Bakreswar site in his

1. A huge quantity long deliberation supply.

of modules

have been upgraded

as well as new modules after a

added in all BOP LT SWGRs after procuring

the modules/components

with PEM and a long chase up to vendor M/s l& T for its after a long chase up wth as per site of power of

2. ESPPMCCs have been made DCS compatible engineering

unit/Rani pet and engaging additinal vendor for modification

Promtness in accepting challenges

which was a long pending issue since around one and half years. by diverting huge quantity

3. Silo area MCC could be commissioned cables, fixing up of a transporter 4. Has spearheaded various activites.

& control cables from Korba site. Diversion job involved identifiction & obtaing clearance from customer. in spreading of "Hindi" among employees

of site by

1. Power Plant presentation 2. Technical write-up

on Earth leackage Circuit Breaker scheme modification 3/4 new enlranls

I ElCB)

on synchronising

in HT/LT

Knowledge sharing through Training/Write Up/Paper Presentation etc carried out

SWGRs.

3. Developing

in lhe field of E&C of HT/l T & vendor billing, local etc.

SWGR, Dry type transformer, purchase & construction

Cabling, customer

power management

G: GOOD:Upto 40% (from 0 to 8) VG: VERYGOOD:Upto 70% (from 9 to 14) EX: EXCEllENT:UPTO 100% (from 15 to 20)