Você está na página 1de 33

Alcatel-Lucent GSM

Upgrade 9100 BTS with AN/SUM/TRE Evolution Modules

BTS Document Reconfiguration Method Release B10

3BK 17430 0803 RJZZA Ed.06

BLANK PAGE BREAK

Status Short title

RELEASED MPI80 / MDR3


All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent.

2 / 33

3BK 17430 0803 RJZZA Ed.06

Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.3 External Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Telecom/Supervision Outage and Operating Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.5.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scenario . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going Onsite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Scenario Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Initial Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Display BTS Characteristics and Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Shut Down Impacted Cells and Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Change Modules Inside BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Unlock Impacted Cells or Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.6 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.7 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Reverse Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Shut Down Impacted Cells and Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Change Modules Inside the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Unlock Impacted Cells or Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.4 Call Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.5 Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Move Rail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 7 8 8 8 9 9 10 10 10 10 11 13 15 15 15 16 17 18 19 19 19 20 20 20 21 22 24 27 27 28 28 29 30 31 31 32

3BK 17430 0803 RJZZA Ed.06

3 / 33

Contents

4 / 33

3BK 17430 0803 RJZZA Ed.06

Preface

Preface
Purpose Whats New
This document describes how to upgrade the 9100 BTS with Evolution modules. It is applicable to BSS at technical release level B10.

In Edition 06
In the entire document BTS Terminal was replaced with BTS NEM except the tasks referring to G2 BTS.

In Edition 05
Update in sections: Cases (Section 1.1.1) Applicable Documents (Section 1.5.3) Display BTS Characteristics and Settings (Section 2.3.2) Change Modules Inside BTS (Section 2.3.4) Update with the new equipment naming.

In Edition 04
Delivered in release. Update in section Unlock Impacted Cells or Modules (Section 2.3.5) The following sections have been updated due to system evolution: Applicable Documents (Section 1.5.3) Display BTS Characteristics and Settings (Section 2.3.2) Change Modules Inside BTS (Section 2.3.4) Unlock Impacted Cells or Modules (Section 2.3.5) Change Modules Inside the BTS (Section 2.4.2) Unlock Impacted Cells or Modules (Section 2.4.3) First official release of the document for B10 MR2.

In Edition 03

3BK 17430 0803 RJZZA Ed.06

5 / 33

Preface

The following sections were improved as a result of ystem evolution changes: Presentation (Section 1.1) Cases (Section 1.1.1) Change Modules Inside BTS (Section 2.3.4) Unlock Impacted Cells or Modules (Section 2.3.5) Change Modules Inside the BTS (Section 2.4.2) Unlock Impacted Cells or Modules (Section 2.4.3)

In Edition 02
Update in section Unlock Impacted Cells or Modules (Section 2.3.5)

In Edition 01
Update in sections: Scheduling (Section 1.3)and Telecom/Supervision Outage and Operating Impact (Section 1.4) Update in section 2.3.4 Change Modules Inside BTS (Section 2.3.4) Overall document quality was improved following an editorial review. Shut Down Impacted Cells and Modules (Section 2.3.3), Change Modules Inside BTS (Section 2.3.4) and Unlock Impacted Cells or Modules (Section 2.3.5) were updated due to modifications in system behavior. The following sections were modified due to system evolution: Options (Section 1.1.2) Prerequisites (Section 1.2.1) Unlock Impacted Cells or Modules (Section 2.3.5). First official release of the document for B10.

Audience

This document is intended for: Field service technicians Specialists Project managers Foremen.

Assumed Knowledge

The reader must have a general knowledge of: Planning: Network architecture and reshuffling principles Scheduling. Implementation: Alcatel-Lucent operations and maintenance concepts for the BSS 9153 OMC-R operation Equipment (BSC, BTS) hardware configurations Windows environment.

6 / 33

3BK 17430 0803 RJZZA Ed.06

1 Overview

1 Overview
This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning.

3BK 17430 0803 RJZZA Ed.06

7 / 33

1 Overview

1.1 Presentation
This scenario is applicable if: There is no change in the BTS configuration (e.g. no TRE, sector, GPRS addition/removal during the operation) When the type of TRE is changed, the TRE frequency band remains unchanged When the ANX is changed to ANC, ANB, AGX, AGY, AGC and AGC9P, the sector frequency band remains unchanged The ANB boards can only be used for reduced configurations.

1.1.1 Cases
The following cases apply: C1: Replace TRE modules: C1.1: Replace one or several TREs with Evolution TREs (EDGE compatible) C1.2: Replace one TRE/TRA with a TWIN TRA (1 TRX, Non-TX-Div, 2 RX-Div) C1.3: Replace two TRE/TRA with a TWIN TRA (2 TRX, Non-TX-Div, 2 RX-Div). C2: Replace an old SUM board with a new SUM board, where old SUM board can be SUMP or SUMA and new SUM board can be SUMA or SUMX. C3: Replace one or several ANx (ANX, ANC, ANB) modules with ANC, ANB, AGX, AGY, AGC or AGC9P modules, without SUM board move C4: Replace one or several ANx (ANX, ANC, ANB) modules with ANC, ANB or AGX, AGY, AGC or AGC9P modules, with SUM board move.

Note:

Several cases can be combined at the same time. For the reduced configurations, the ANX modules can be replaced by the ANB boards.

1.1.2 Options
None.

8 / 33

3BK 17430 0803 RJZZA Ed.06

1 Overview

1.1.3 Restrictions
The following restrictions apply to 9100 BTS: For 9100 BTS Mini 3x1 TRE (indoor and outdoor), ANX cannot be replaced with ANC (even if all ANX are replaced with ANC) With the old subrack version (STASR 3BK 07193 AAxx), ANX must not be replaced with ANC or with ANB (no holes for ANC or ANB screws).

1.1.4 Grouped Task Sequence


The following figure shows the grouped task sequence for this scenario.

OMCR site

BTS site

Initial Checks

Display BTS Characteristics and Settings Shut Down Impacted Cells or Modules Unlock Impacted Cells or Modules Change Modules Inside the BTS

CAll Tests

Final Checks

Figure 1: Upgrade 9100 BTS with AN / SUM / TRE Evolution Modules

3BK 17430 0803 RJZZA Ed.06

9 / 33

1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: For cases C1.2 and C1.3, the BTS must be equipped with SUMA The BTS must not contain any G3 TREs for a configuration with more than 12 TREs.

1.2.2 Site Specific Information


You must have the following specific information to complete the scenario: At the OMC-R, availability of a workstation, with the server User Name and Password, allowing network configuration Input: customer reports about the final Alcatel-Lucent 9100 BTS configuration (which modules must be replaced).

1.2.3 External Tasks


None.

10 / 33

3BK 17430 0803 RJZZA Ed.06

1 Overview

1.3 Scheduling
Note:
Time based on technical constraints In the following table, the number of resources shown does not take into account individual customer or safety requirements. Grouped Task Initial Checks. OMC-R 1 ope. 20 min. Display BTS Characteristics and Settings. 1 ope. C2: 2 min. C4: 2 min. Shut Down Impacted Cells and Modules. 1 ope. C1: 6 min. C2: 5 min. C3: 6 min. C4: 6 min. Change Modules Inside the BTS. C2: 2 min. C4: 2 min. 1 Com Team C1: 2 min. + 4 min. x TRE + 3 min./ board + 7 min.xTRE C2: 10 min. C3: 16 min. to 41 min. C4: 33 min. to 58 min. Unlock Impacted Cells or Modules. 1 ope. C1: 2 min. C2: 17 min. C3: 1 min. C4: 10 min. 1 Com Team 1 min./TRE + 2 min./TRE + 2 min./TRE + 2 min. + C1: 4 min. + 2min. /TRE C2: C3: 5 min. C4: 6 min. Call Tests. 1 ope. 5 min./cell 1 Com Team 5 min./cell 5 min. /cell + 5 min. /cell 1 Com Team 1 min./TRE + 2 min./TRE + 2 min./TRE + 2 min C1: 6 min. + 2min. /TRE C2: 17 min. C3: 6 min. C4: 16 min. C1: 2 min. + 4 min. x TRE + 3 min./ board + 7 min.xTRE C2: 12 min. C3: 16 min. to 41 min. C4: 2 min. + 33 min. to 58 min. C1: 6 min. C2: 5 min. C3: 6 min. C4: 6 min. 1 Com Team C2: 2 min. C2: 4 min. C4: 2 min BTS Time / Task 20 min.

3BK 17430 0803 RJZZA Ed.06

11 / 33

1 Overview

Grouped Task Final Checks.

OMC-R 1 ope. 20 min.

BTS -

Time / Task 20 min.

TOTAL

40 min. + 5 min. / cell + C1: 8 min. +C2: 26 min. + C3: 7 min. + C4: 20 min.

1 min./TRE + 2 min./TRE + 2 min./TRE + 2 min + 5 min. / cell + C1: 6 min. + 4 min. x TRE + 3 min./ board + 7 min.xTRE + + 2min. /TRE +C2: 12 min. + C3: 16 min. to 41 min. + 5 min. + C4: 33 min. to 58 min. + 6 min

40 min. + 1 min./TRE + 2 min./TRE + 2 min./TRE + 2 min + 5 min. / cell + 5 min. / cell +C1: 14 min. + 4 min. x TRE + 3 min./ board + 7 min.xTRE + + 2min. /TRE + C2: 38 min. + C3: 12 min. + 16 min. to 41 min. + C4: 26 + 33 min. to 58 min

ope. Com Team

: OMC-R operator : Commissioning Team

Note:

Durations are given in minutes.

12 / 33

3BK 17430 0803 RJZZA Ed.06

1 Overview

1.4 Telecom/Supervision Outage and Operating Impact


The following table describes the traffic outage and loss of supervision caused by each grouped task. Out.Grouped Task Ref. Initial Checks. Display BTS Characteristics and Settings. Shut Down Impacted Cells and Modules. Change Modules Inside the BTS. Tel. Out Tel. Red Sup. Out Oper. Impact Impacts ... -

1, 2

C2: 5 min. C3: 6 min. C4: 6 min.

C1: 6 min.

1, 2

C2: 12 min. C3: 16 min. to 41 min. C4: 35 min. to 60 min.

C1: 2 min. + 4 min.xTRE + 3 min. / board + 7 min. x TRE

C2: 8 min. C4: 17 min.

C2 or C4: supervision outage on upgraded BTS and downstream BTSs

C2, C3 or C4: traffic outage on upgraded sector / BTS (from Lock cell to Unlock cell) (2) C1: Traffic reduction or outage on upgraded cell (from Lock RSL to Unlock RSL) (1)

1, 2

Unlock Impacted Cells or Modules.

C2: 3 min. C4: 3 min.

2 min. + 1 min. /TRE + 2 min. / TRE + 2 min. /TRE + C1: 6 min. + 2 min. / TRE.

C2: 2 min. C4: 2 min.

Call Tests.

3BK 17430 0803 RJZZA Ed.06

13 / 33

1 Overview

Out.Grouped Task Ref. Final Checks. TOTAL

Tel. Out C2: 20 min. C3: 22 min. to 47 min. C4: 44 min. to 69 min.

Tel. Red 2 min. + 1 min. /TRE + 2 min. / TRE + 2 min. /TRE +C1: 14 min. + 4 min.xTRE + 3 min. / board + 7 min. x TRE + 2 min. / TRE.

Sup. Out C2: 10 min. C4: 19 min.

Oper. Impact -

Impacts ... -

Note:

Duration is given in minutes. Telecom outage particularities: C1: Only telecom reduction, except if an impacted TRE/TRA supports BCCH: related cell has 2 min. telecom outage (during BCCH recovery). If all TREs of a cell are impacted: telecom Outage1 C2 and C4: Telecom Outage1 on all cells of the BTS + telecom Outage2 (13 min. to 39 min.) on all cells of downstream BTSs (if any). On Slave BTSs, short telecom outage (all ongoing calls stopped) when the master clock comes back C3: Telecom Outage1 on the impacted cell only (only telecom reduction in the case of secondary sector).

14 / 33

3BK 17430 0803 RJZZA Ed.06

1 Overview

1.5 Resources
1.5.1 Tools
1.5.1.1 Hardware Tools
Item Installation tools (for modules and radio cables installation). Trace bi-band mobiles equipped with SIM cards. BTS NEM (PC with CD-ROM drive and cables). Part Number Use at ... BTS

BTS

BTS

1.5.1.2 Software Tools


Item BTS Terminal B10 software for G1/ G2 BTS, BTS NEM B10 software for 9100 / 9110 BTS. Customer Documentation CD with the version associated with the current document edition. Remember that the document you are reading cannot be used as a paper version. It is online documentation using hypertext links which take you to other parts of a document on the same CD-ROM. All words in italics are hypertext links. Part Number Use at ... BTS

BTS, OMC-R

1.5.1.3 Forms
None.

1.5.2 Supplies
The following table describes the necessary supplies. Item Topology regarding operation. Evolution modules. Part Number Contents Must be provided by customer. Modules only, cables are reused. Use at ... BTS, OMC-R BTS

3BK 17430 0803 RJZZA Ed.06

15 / 33

1 Overview

1.5.3 Applicable Documents


You must have the following documents or have electronic access to the following documents: B10 BSS Methods Handbook BSS Configuration Handbook BSS Surveillance Handbook Network Reconfiguration Recommendations 9100 BTS Hardware Description BTS NEM User Guide.

16 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

2 Scenario
This Scenario presents all checks needed before beginning the scenario, and all detailed tasks to be performed on each site.

3BK 17430 0803 RJZZA Ed.06

17 / 33

2 Scenario

2.1 Before Going Onsite


Before going onsite, you must check that the following information and supplies are available: All Prerequisites (Section 1.2.1) are met The customer has been informed of the: Date and time Site name and address Purpose of operation. Personnel are available (refer to Scheduling (Section 1.3)) Site Specific Information (Section 1.2.2) is available Tools (Section 1.5.1) are available and ready for operation Supplies (Section 1.5.2) are available and ready for operation Applicable Documents (Section 1.5.3) are available. Ensure that the technical release level of the delivered board is in accordance with the BSS hardware technical release document. Ensure that the method used at the BSS site is at the same level as at the OMC-R.

18 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

2.2 Before You Start


2.2.1 Checks
Perform the following operations: Check that all Prerequisites (Section 1.2.1) are met Check the availability of all necessary Tools (Section 1.5.1) and Supplies (Section 1.5.2) Inform the operator. Among the cases described in Cases (Section 1.1.1) and the options described in Options (Section 1.1.2), identify which cases and options apply to you.

2.2.2 Required Knowledge


You must be familiar with the following: Safety Rules and Precautions Telecom/Supervision Outage and Operating Impact (Section 1.4) Reverse Procedure Grouped Task Sequence (Section 1.1.4) Operating Hints How to document Faults and Anomalies.

3BK 17430 0803 RJZZA Ed.06

19 / 33

2 Scenario

2.3 Scenario Description


This section describes how to upgrade an Alcatel-Lucent 9100 BTS with Evolution modules, in front of an Alcatel-Lucent BSC.

2.3.1 Initial Checks


Note Task Description Perform an Audit Alarm State for the BSS. View Status of Managed Objects and Alarms for the impacted BTS. Display Cell Report for the impacted cells. Site OMC-R To do 10 min. Outage None.

OMC-R

10 min.

None.

Print the list for Final Checks (Section 2.3.7).

2.3.2 Display BTS Characteristics and Settings


Note C2 C4 C2 Task Description Display BTS Characteristics and take note of all downstream and Slave BTSs (if any). Connect the BTS NEM to the old SUM of the selected BTS. Display BTS General View window to note the Q1address , displayed in General Information panel. Display SUM Board Configuration to note the BTS position (middle or end of chain). Display SUM Board - OMU Mapping to note the OMU1 time slot value displayed. Display SUM Initial Settings to note the Line Impedance value (75 / 120 Ohms). Site OMC-R To do 2 min. Outage None.

BTS

2 min. (parallel task)

None.

20 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

2.3.3 Shut Down Impacted Cells and Modules


Note C1 INPUT Task Description Shut Down RSL Resource (WTC = 3 min.) of each selected TRE/TRA. Site OMC-R To do 4 min. Outage START1

If all TREs/TRAs of a cell are impacted, replace Shut Down RSL Resource with Shut Down Cell Traffic . Lock BSC or BTS Function (TRE/TRA) of each selected TRE/TRA. OMC-R 1 min. Outage1

C1 INPUT

If all TREs/TRAs of a cell are impacted, replace "Lock TRE with Lock BSC or BTS Function (RA). Shut Down Cell Traffic (WTC = 3 min.). C2 and C4: For all cells mapped on the selected BTS, and for all cells mapped on its downstream BTSs (if any). C3: For each cell mapped on the selected sectors. Lock BSC or BTS Functions (RA) for the selected sector(s). OMC-R 4 min. START1 + 2

C2 C3 C4 INPUT

For C3: For each cell where only the secondary sector is impacted, replace "Shut Down Cell Traffic" with Shut Down RSL Resource (WTC = 3 min.) on each TRE of this sector (cell traffic is still supported by the main sector). OMC-R 1 min. Outage1 + 2

C3 C4 INPUT EXCH

Inform BTS site team that they can start modules upgrade.

OMC-R / BTS 1 min.

Outage1 + 2

3BK 17430 0803 RJZZA Ed.06

21 / 33

2 Scenario

2.3.4 Change Modules Inside BTS


Note C1 C3 C4 C3 C4 Remove cables and extract ANXs (and ANYs, if necessary). Reconfiguration of other ANYs may be necessary (uncabling / recabling). BTS 5 min. to 30 min. C4: add 3 min. Outage1 + 2 Task Description When it becomes possible, from the BTS NEM, Start HW Modification. Site BTS To do 1 min. Outage Outage1

Use the 9100 BTS Hardware Description to define which hardware change to do. C3 C4 Perform Move Rail (Section 2.5) if the configuration of a sector is changed (AGx instead of ANx, or the position of an antenna module belonging to this sector). In this case, extract all involved ANXs, ANBs, ANCs, AGCs and AGC9Ps of this sector from the backplane. Use the BTS NEM to select Remove Module(s) and remove the involved sector. C1.1 C1.2 C1.3 INPUT C1.1 C1.2 C1.3 INPUT C2 C4 If a HW Configuration Modification is running perform: Remove HW for all unplugged AN Stop HW Modification Wait for the Hardware and Alarm Audit at the OMC-R to finish. C2 C4 C2 C4 Lock BTS O&M Capability of the selected BTS, and of downstream BTSs (if any). OMC-R 1 min. Outage1 + 2 Outage1 + 2 BTS 4 min. Outage1 For the selected TREs perform: Remove HW BTS 1 min. Outage 1+ 2 Remove cables and extract old TREs. BTS 4 min.x TRE Outage 1 + 2 BTS 5 min. Outage1 + 2

Note: If the BTS has no AN modules left in the cabinet, ignore the Hardware Audit Alarm at the OMC-R

Inhibit Alarm Reporting on Abis TP of the selected BTS.

OMC-R

1 min.

22 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

Note C2

Task Description Remove cables and extract the old SUM.

Site BTS

To do 3 min.

Outage Outage1 + 2

INPUT Install the new SUM and connect cables (BTS NEM and BTSCA), except the PCM (Abis) cable.

Use the 9100 BTS Hardware Description to define which hardware change to perform. C4 Remove cables, move SUM board, and reconnect all cables. BTS 10 min. Outage1 + 2 Outage1 + 2

C3 C4

Next, install and cable ANCs, ANBs or AGX / AGY / AGCs / AGC9Ps (disconnect bridges if necessary) to antennas, and to TREs or ANYs. Reconnect all modules (ANXs, ANBs, ANCs or AGCs, AGC9Ps) which should be part of the final configuration.

BTS

5 min.

Note: If bridges are not used, keep them on the ANC / AGX / AGY / AGC / AGC9P (screwed on the TXxOUT connectors) for future use. BTS 3 min./board Outage 1 + 2

C1.2 C1.3 INPUT

Install and cable the TWIN TRA

Note:Use the required configuration for the TWIN TRA for each case. C1.1 INPUT Install and cable Evolution TREs (TRAs). BTS 7 min.xTRE Outage 1 + 2

Use the 9100 BTS Hardware Description to define which hardware change to perform. C2 Update the new SUM parameters: Open Edit Q1 Address window to update the Q1 address Open SUM Initial Settings window to update the Line Impedance value (75 / 120 Ohms) of the BTS Open SUM Board Configuration window to update the BTS position (middle or end of chain). OpenSUM Board - OMU Mapping window to update the OMU1 time slot value. C2 Connect the PCM cable to the new SUM BTS 1 min. Outage1 + 2 BTS 2 min. Outage1 + 2

3BK 17430 0803 RJZZA Ed.06

23 / 33

2 Scenario

2.3.5 Unlock Impacted Cells or Modules


Note C2 C4 C2 C4 C2 C4 Task Description Allow Alarm Reporting on Abis TP of the selected BTS (if not already the case), and acknowledge the alarms of Abis and downstream BTSs (if any). When the Abis connection is done (Abis link no longer in alarm state), Unlock BTS O&M Capability of the selected BTS, and of the downstream BTSs (if any). Unlock Cell Traffic for cells of downstream BTSs (if any). Site OMC-R To do 1 min. Outage Outage1 + 2 Outage1 + 2 Outage1 END2 (downstream BTSs) Wait for end of software downloading into the selected BTS, and OMC-R automatic Hardware and Alarm Audit. BSS Equipment View is updated with new and moved modules. During this, acknowledge alarm (MCL-XCLK) on Slave BTSs, if any. C2: up Outage1 to 13 min. C4: 6 min. Note:There is a short outage (ongoing calls stopped) on the Slave BTSs, when the synchronization clock from the Master BTS comes back. C2 C4 C3 C4 INPUT If a HW Configuration Modification was done, perform: Start HW Modification. When new ANCs and/or ANBs and/or AGX / AGY / AGCs / AGC9Ps are detected by the BTS, Edit Sector Mapping and update the table. Then, click on [ SAVE ]. Wait for the EEPROM update and cabling detection to finish. BTS 1 min. Outage1

OMC-R

1 min.

OMC-R

1 min.

C2 C4

BTS

1 min.

Outage1

Note: For ANC / AGX / AGY / AGC / AGC9P, select bridge if it is used for this antenna If the removed ANXs are still displayed, do not change their sector values. BTS 2 Outage1 min./TRE

C1.1

Init Single TRE for each new TRE.

If all TREs of a cell are impacted, replace "Initialize Single TRE" with Init Single Sector. C1.1 End Commissioning BTS 2 min. Outage1

24 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

Note C1 C3 C4

Task Description Stop HW Modification

Site BTS

To do 1 min.

Outage Outage1

Note:The "TWIN TRE Mode Configuration" window automatically opens if the BTS is equipped with a TWIN TRA module. Twin - TRA Settings BTS 1 min. Outage 1 Outage1

C1.2 C1.3 C1 C3 C4

The OMC-R automatically triggers a Hardware and Alarm Audit. The BSS Equipment View is updated with new and moved modules.

4 min. - 10 min.

On the: BTS site, wait for the config result:


success / Boot source: Abis message and "SBL

Module States" window update OMC-R site, wait for the Hardware Audit to end and new hardware to be displayed in BSSUSM Main View (Equipment View). For TWIN TRAs, from the BTS NEM, Disable SBLs Other Than BTS_TEL. Init Single TRE for each new TRE/TWIN TRA. BTS 1 min./ TRE Outage 1

BTS

2 Outage1 min./TRE 2 min. 2 min. / TRE 3 min. Outage1 Outage1

End Commissioning For TWIN TRAs, from the BTS NEM, Init.

BTS BTS

C3 C4 C2 C3 C4

Unlock BSC or BTS Function (RA) for the disabled sector if necessary. Unlock Cell Traffic for disabled cells of the selected BTS. If the BTS has secondary sectors, replace "Unlock Cell Traffic" with Unlock RSL Resources for the disabled TREs. Acknowledge the alarm (loss of TCH) on linked cells.

BTS

Outage1

OMC-R

1 min.

Outage1

Note: If a TRE is also changed (C1), a "loss of TCH " alarm will be displayed at the OMC-R. This will disappear after TREs initialization (C2 was not performed.)

3BK 17430 0803 RJZZA Ed.06

25 / 33

2 Scenario

Note C1.1

Task Description When the HW audit is finished,Unlock BSC and BTS Function (TRE) for each selected TRE.

Site OMC-R

To do 1 min.

Outage Outage1

If all TREs of a cell are impacted, replace "Unlock TRE" with Unlock BSC and BTS Function (RA). C1.1 Unlock RSL Resources of impacted TREs. OMC-R 1 min. END1 (C1)

If all the TREs of a cell are impacted, replace Unlock RSL with Unlock Cell Traffic (when RA is initialized).

26 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

2.3.6 Call Tests


Note Task Description Call Test on the BTS. Site BTS To do 5 min./ cell Outage None.

This task must done in parallel with the OMC-R tasks in order to save time. Unlock Cell from Call Test is not required. CHECK Display USD Detailed Cell Information to check if calls are made on impacted cells. OMC-R 5 min./ cell None.

Note:From this point, if the call tests failed, perform the Reverse Procedure (Section 2.4).

2.3.7 Final Checks


Note Task Description Perform an Audit/Alarm State for the BSS. View Status of Managed Objects and Alarms for the impacted BTS. Display Cell Report for the impacted cells. Site OMC-R To do 10 min. Outage None.

OMC-R

10 min.

None.

Note:Compare the status of Managed Objects and alarms with the results printed in the Initial Checks (Section 2.3.1).

3BK 17430 0803 RJZZA Ed.06

27 / 33

2 Scenario

2.4 Reverse Procedure


The reverse procedure describes how to return to the initial BTS configuration. Once the "Sector Mapping" table exists inside the BTS, it cannot be deleted. ANX rotary switches are no longer effective. The "Sector Mapping" table in the BTS Remote Inventory must be updated with the initial configuration parameters.

2.4.1 Shut Down Impacted Cells and Modules


Note C1 INPUT Task Description When possible, from the BTS, Shut Down RSL Resource (WTC = 3 min.) of each selected TRE/TWIN TRA. Site OMC-R To do 4 min. Outage

If all TREs/TWIN TRAs of a cell are impacted, replace Shut Down RSL Resource with Shut Down Cell Traffic. OMC-R 1 min. -

C1 INPUT

Lock BSC or BTS Functions (TRE) for each selected TRE/TWIN TRA.

If all TREs/TWIN TRAs of a cell are impacted, replace "Lock TRE" with Lock BSC or BTS Functions (RA). Shut Down Cell Traffic (WTC = 3 min.) C2 and C4: For all cells mapped on the selected BTS, and for all cells mapped on its downstream BTSs (if any). C3: For each cell mapped on the selected sectors. Lock BSC or BTS Functions (RA) for the selected sector(s). OMC-R 4 min. -

C2 C3 INPUT C4

For each cell where only the secondary sector is impacted, replace Shut Down Cell Traffic with Shut Down RSL Resource (WTC = 3 min.) on each TRE of this sector (cell traffic is still supported by the main sector). OMC-R 1 min. -

C3 C4 INPUT C2 C4 EXCH

Lock BTS O&M Capability of the selected BTS and of downstream BTSs (if any). Inform BTS site team they can start modules change.

OMC-R

1 min.

OMC-R / BTS

1 min.

28 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

2.4.2 Change Modules Inside the BTS


Note C1 C3 C4 C1 Remove cables and extract Evolution TREs (TRAs)/TWIN TRAs. Install and cable previous TREs. BTS 4 min.xTRE Task Description When possible, from the BTS NEM, Start HW Modification. Site BTS To do 1 min. Outage -

C1

BTS

3 min./board

Restore initial configuration. C2 Remove cables and extract the new SUM. Install previous SUM and reconnect all cables. C3 C4 Remove cables and extract ANCs or/ and ANBs and/or AGX / AGY / AGCs / AGC9Ps. Remove cables, move SUM board, and connect all cables again (if C3). Perform Move Rail (Section 2.5), if needed, then install and cable previous ANXs (and previous ANYs, if necessary) to antennas, and to TREs or ANYs. BTS 4 min. -

Restore initial configuration.

BTS

5 min. to 30 min. C4: add 3 min.

Restore initial configuration.

3BK 17430 0803 RJZZA Ed.06

29 / 33

2 Scenario

2.4.3 Unlock Impacted Cells or Modules


Note Task Description C2 C4 C2 C4 C2 C4 C2 C4 Wait for end of software downloading into the selected BTS, and automatic Hardware and Alarm Audit. The BSS Equipment View is updated with previous and moved modules. Acknowledge alarms (MCL-XCLK) on Slave BTSs, if any. C3 C4 INPUT When previous ANXs (just reinstalled) are detected by the BTS, Edit Sector Mapping and update the table. Then, click on [ SAVE ]. Wait for the EEPROM update and cabling detection to finish. C1 C3 C4 C1 C3 C4 The OMC-R automatically triggers a Hardware and Alarm Audit.. The BSS Equipment View is updated with previous and moved modules. On the: BTS site, wait for the config result:
success / Boot source: Abis

Site OMC-R

To do 1 min.

Outage -

Check Alarm Reporting on Abis TP of the selected BTS, and acknowledge the alarms of Abis and downstream BTSs (if any). When the Abis connection is done (Abis link no longer in alarm state), Unlock BTS O&M Capability of the selected BTS, and of the downstream BTSs (if any). Unlock Cell Traffic for cells of downstream BTSs (if any).

OMC-R

1 min.

OMC-R

1 min.

OMC-R

6 min.

Note:There is a short outage (ongoing calls stopped) on Slave BTSs, when the synchronization clock from the Master BTS comes back. BTS 1 min. -

Note:If the removed ANCs or / and ANBs or/and AGX / AGY / AGCs / AGC9Ps are still displayed, do not change their sector values. BTS 1 min. -

Stop HW Modification.

Note:Perform this task only if C2 was not performed. 4 min. -

message and "SBL Module States" window update OMC-R site, wait for Hardware Audit to end and previous hardware to be displayed on the BSSUSM Main View (Equipment View). C3 C4 Unlock BSC or BTS Function (RA) for the disabled sector. OMC-R 3 min. -

30 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

Note Task Description C1 Init (TRE) for disabled TREs.

Site BTS

To do 1 min.

Outage -

If all TREs of a cell are impacted, replace "Initialize TRE" with Init (RA). C1 When TRE initialization is finished in BSSUSM Functional, View, Unlock RSL Resources of the disabled TREs. OMC-R 1 min. -

If all TREs of a cell are impacted, replace Unlock RSL with Unlock Cell Traffic (when RA is initialized). OMC-R 1 min. -

Unlock Cell Traffic for disabled cells of the selected BTS.

If the BTS has secondary sectors, replace Unlock Cell Traffic with Unlock RSL Resources of the disabled TREs. Acknowledge alarms (loss of TCH) on linked cells.

2.4.4 Call Tests


Note Task Description Call Test on the BTS. Site BTS To do 5 min./ cell Outage -

This task must be done in parallel with the OMC-R tasks to save time. Unlock Cell from Call Test is not required. CHECK Display USD Detailed Cell Information to check if calls are made on impacted cells. OMC-R 5 min./ cell -

2.4.5 Final Checks


Note CHECK Task Description Perform an Audit/Alarm State for the BSS. View Status of Managed Objects and Alarms for the impacted BTS. Site OMC-R OMC-R To do 10 min. 10 min. Outage -

Compare the status of Managed Objects and alarms with the results printed in Initial Checks.

3BK 17430 0803 RJZZA Ed.06

31 / 33

2 Scenario

2.5 Move Rail


For the STASR 3BK 07193 ABxx subrack, rails must be moved before the ANC or ANB installation. The ANC and ANB must not be installed into the STASR 3BK 07193 AAxx subrack (no holes for ANC and ANB screws). If the ANC is to be plugged in: On the left, in the subrack: The previous ANX uses slot number 4 The new ANC or ANB uses slot number 3 Action: Move second pair of rails (bottom and top), counting from left to right, in one step.

Note:

If the SUM module must be moved, it goes from slot 1 to slot 7. On the right, in the subrack: The previous ANX uses slot number 10 The new ANC or ANB uses slot number 11 Action: Move the two pairs of rails (bottom and top), counting from right to left, in one step.

32 / 33

3BK 17430 0803 RJZZA Ed.06

2 Scenario

BLANK PAGE BREAK

3BK 17430 0803 RJZZA Ed.06

33 / 33

Você também pode gostar