Risk management is activity directed towards the assessing, mitigating (to an acceptable level) and monitoring of risks. In some cases the acceptable risk may be near zero. Risks can come from accidents, natural causes and disasters as well as deliberate attacks from an adversary. The main ISO standards on risk management include. In businesses, risk management entails organized activity to manage uncertainty and threats and involves people following procedures and using tools in order to ensure conformance with risk-management policies. The strategies include transferring the risk to another party, avoiding the risk, reducing the negative effect of the risk, and accepting some or all of the consequences of a particular risk. Some traditional risk management programs (e.g., health risk assessment) are focused on risks stemming from physical or legal causes (e.g. natural disasters or fires, accidents, ergonomics, death and lawsuits). Financial risk management, on the other hand, focuses on risks that can be managed using traded financial instruments.
In ideal risk management, a prioritization process is followed whereby the risks with the greatest loss and the greatest probability of occurring are handled first, and risks with lower probability of occurrence and lower loss are handled in descending order. In practice the process can be very difficult, and balancing between risks with a high probability of occurrence but lower loss versus a risk with high loss but lower probability of occurrence can often be mishandled. Intangible risk management identifies a new type of risk a risk that has a 100% probability of occurring but is ignored by the organization due to a lack of identification ability. For example, when deficient knowledge is applied to a situation, a knowledge risk materialises. Relationship risk appears when ineffective collaboration occurs. Processengagement risk may be an issue when ineffective operational procedures are applied. These risks directly reduce the productivity of knowledge workers, decrease cost effectiveness, profitability, service, quality, reputation, brand value, and earnings quality. Intangible risk management allows risk management to create immediate value from the identification and reduction of risks that reduce productivity. Risk management also faces difficulties allocating resources. This is the idea of opportunity cost. Resources spent on risk management could have been spent on more profitable activities. Again, ideal risk management minimizes spending while maximizing the reduction of the negative effects of risks.
Risk management should create value. Risk management should be an integral part of organizational processes. Risk management should be part of decision making. Risk management should explicitly address uncertainty. Risk management should be systematic and structured. Risk management should be based on the best available information. Risk management should be tailored. Risk management should take into account human factors. Risk management should be transparent and inclusive. Risk management should be dynamic, iterative and responsive to change. Risk management should be capable of continual improvement and enhancement.
PROCESS
According to the standard ISO/DIS 31000 "Risk management -- Principles and guidelines on implementation" [2], the process of risk management consists of several steps as follows: Establishing the context 1. Identification of risk in a selected domain of interest 2. Planning the remainder of the process. 3. Mapping out the following:
o o o
the social scope of risk management the identity and objectives of stakeholders the basis upon which risks will be evaluated, constraints.
4. Defining a framework for the activity and an agenda for identification. 5. Developing an analysis of risks involved in the process. 6. Mitigation of risks using available technological, human and organizational resources. Identification After establishing the context, the next step in the process of managing risk is to identify potential risks. Risks are about events that, when triggered, cause problems. Hence, risk identification can start with the source of problems, or with the problem itself.
Source analysis Risk sources may be internal or external to the system that is the target of risk management. Examples of risk sources are: stakeholders of a project, employees of a company or the weather over an airport.
Problem analysis Risks are related to identified threats. For example: the threat of losing money, the threat of abuse of privacy information or the threat of accidents and casualties. The threats may exist with various entities, most important with shareholders, customers and legislative bodies such as the government.
When either source or problem is known, the events that a source may trigger or the events that can lead to a problem can be investigated. For example: stakeholders withdrawing during a project may endanger funding of the project; privacy information may be stolen by employees even within a closed network; lightning striking a Boeing 747 during takeoff may make all people onboard immediate casualties. The chosen method of identifying risks may depend on culture, industry practice and compliance. The identification methods are formed by templates or the development of templates for identifying source, problem or event. Common risk identification methods are:
Objectives-based risk identification Organizations and project teams have objectives. Any event that may endanger achieving an objective partly or completely is identified as risk.
Scenario-based risk identification In scenario analysis different scenarios are created. The scenarios may be the alternative ways to achieve an objective, or an
analysis of the interaction of forces in, for example, a market or battle. Any event that triggers an undesired scenario alternative is identified as risk - see Futures Studies for methodology used by Futurists.
Taxonomy-based risk identification The taxonomy in taxonomy-based risk identification is a breakdown of possible risk sources. Based on the taxonomy and knowledge of best practices, a questionnaire is compiled. The answers to the questions reveal risks. Taxonomy-based risk identification in software industry can be found in CMU/SEI-93-TR-6.
Common-risk checking In several industries lists with known risks are available. Each risk in the list can be checked for application to a particular situation. An example of known risks in the software industry is the Common Vulnerability and Exposures list found at http://cve.mitre.org.
Risk charting (risk mapping) This method combines the above approaches by listing Resources at risk, Threats to those resources Modifying Factors which may increase or decrease the risk and Consequences it is wished to avoid. Creating a matrix under these headings enables a variety of approaches. One can begin with resources and consider the threats they are exposed to and the consequences of each. Alternatively one can start with the threats and examine which resources they would affect, or one can begin with the consequences and determine which combination of threats and resources would be involved to bring them about.
Assessment Once risks have been identified, they must then be assessed as to their potential severity of loss and to the probability of occurrence. These quantities can be either simple to measure, in the case of the value of a lost building, or impossible to know for sure in the case of the probability of an unlikely event occurring. Therefore, in the assessment process it is critical to make the best educated guesses possible in order to properly prioritize the implementation of the risk management plan. The fundamental difficulty in risk assessment is determining the rate of occurrence since statistical information is not available on all kinds of past incidents. Furthermore, evaluating the severity of the consequences (impact) is often quite difficult for immaterial assets. Asset valuation is another question that needs to be addressed. Thus, best educated opinions and available statistics are the primary sources of information. Nevertheless, risk assessment should produce such information for the management of the organization that the primary risks are easy to understand and that the risk management decisions may be prioritized. Thus, there have been several theories and attempts to quantify risks. Numerous different risk formulae exist, but perhaps the most widely accepted formula for risk quantification is: Rate of occurrence multiplied by the impact of the event equals risk Later research has shown that the financial benefits of risk management are less dependent on the formula used but are more dependent on the frequency and how risk assessment is performed.
In business it is imperative to be able to present the findings of risk assessments in financial terms. Robert Courtney Jr. (IBM, 1970) proposed a formula for presenting risks in financial terms. The Courtney formula was accepted as the official risk analysis method for the US governmental agencies. The formula proposes calculation of ALE (annualised loss expectancy) and compares the expected loss value to the security control implementation costs (cost-benefit analysis). Potential risk treatments Once risks have been identified and assessed, all techniques to manage the risk fall into one or more of these four major categories: [2]
Avoidance (eliminate) Reduction (mitigate) Transfer (outsource or insure) Retention (accept and budget)
Ideal use of these strategies may not be possible. Some of them may involve trade-offs that are not acceptable to the organization or person making the risk management decisions. Another source, from the US Department of Defense, Defense Acquisition University, calls these categories ACAT, for Avoid, Control, Accept, or Transfer. This use of the ACAT acronym is reminiscent of another ACAT (for Acquisition Category) used in US Defense industry procurements, in which Risk Management figures prominently in decision making and planning.
Risk avoidance Includes not performing an activity that could carry risk. An example would be not buying a property or business in order to not take on the liability that comes with it. Another would be not flying in order to not take the risk that the airplane were to be hijacked. Avoidance may seem the answer to all risks, but avoiding risks also means losing out on the potential gain that accepting (retaining) the risk may have allowed. Not entering a business to avoid the risk of loss also avoids the possibility of earning profits. Risk reduction Involves methods that reduce the severity of the loss or the likelihood of the loss from occurring. For example, sprinklers are designed to put out a fire to reduce the risk of loss by fire. This method may cause a greater loss by water damage and therefore may not be suitable. Halon fire suppression systems may mitigate that risk, but the cost may be prohibitive as a strategy. Modern software development methodologies reduce risk by developing and delivering software incrementally. Early methodologies suffered from the fact that they only delivered software in the final phase of development; any problems encountered in earlier phases meant costly rework and often jeopardized the whole project. By developing in iterations, software projects can limit effort wasted to a single iteration. Outsourcing could be an example of risk reduction if the outsourcer can demonstrate higher capability at managing or reducing risks.
[3]
some of their departmental needs. For example, a company may outsource only its
software development, the manufacturing of hard goods, or customer support needs to another company, while handling the business management itself. This way, the company can concentrate more on business development without having to worry as much about the manufacturing process, managing the development team, or finding a physical location for a call center. Risk retention Involves accepting the loss when it occurs. True self insurance falls in this category. Risk retention is a viable strategy for small risks where the cost of insuring against the risk would be greater over time than the total losses sustained. All risks that are not avoided or transferred are retained by default. This includes risks that are so large or catastrophic that they either cannot be insured against or the premiums would be infeasible. War is an example since most property and risks are not insured against war, so the loss attributed by war is retained by the insured. Also any amounts of potential loss (risk) over the amount insured is retained risk. This may also be acceptable if the chance of a very large loss is small or if the cost to insure for greater coverage amounts is so great it would hinder the goals of the organization too much. Risk transfer In the terminology of practitioners and scholars alike, the purchase of an insurance contract is often described as a "transfer of risk." However, technically speaking, the buyer of the contract generally retains legal responsibility for the losses "transferred", meaning that insurance may be described more accurately as a post-event compensatory
mechanism. For example, a personal injuries insurance policy does not transfer the risk of a car accident to the insurance company. The risk still lies with the policy holder namely the person who has been in the accident. The insurance policy simply provides that if an accident (the event) occurs involving the policy holder then some compensation may be payable to the policy holder that is commensurate to the suffering/damage. Some ways of managing risk fall into multiple categories. Risk retention pools are technically retaining the risk for the group, but spreading it over the whole group involves transfer among individual members of the group. This is different from traditional insurance, in that no premium is exchanged between members of the group up front, but instead losses are assessed to all members of the group. Create a risk-management plan Select appropriate controls or countermeasures to measure each risk. Risk mitigation needs to be approved by the appropriate level of management. For example, a risk concerning the image of the organization should have top management decision behind it whereas IT management would have the authority to decide on computer virus risks. The risk management plan should propose applicable and effective security controls for managing the risks. For example, an observed high risk of computer viruses could be mitigated by acquiring and implementing antivirus software. A good risk management plan should contain a schedule for control implementation and responsible persons for those actions.
According to ISO/IEC 27001, the stage immediately after completion of the Risk Assessment phase consists of preparing a Risk Treatment Plan, which should document the decisions about how each of the identified risks should be handled. Mitigation of risks often means selection of security controls, which should be documented in a Statement of Applicability, which identifies which particular control objectives and controls from the standard have been selected, and why. Implementation Follow all of the planned methods for mitigating the effect of the risks. Purchase insurance policies for the risks that have been decided to be transferred to an insurer, avoid all risks that can be avoided without sacrificing the entity's goals, reduce others, and retain the rest. Review and evaluation of the plan Initial risk management plans will never be perfect. Practice, experience, and actual loss results will necessitate changes in the plan and contribute information to allow possible different decisions to be made in dealing with the risks being faced. Risk analysis results and management plans should be updated periodically. There are two primary reasons for this: 1. to evaluate whether the previously selected security controls are still applicable and effective, and
2. to evaluate the possible risk level changes in the business environment. For example, information risks are a good example of rapidly changing business environment.
Step 1: Prepare
1a. Obtain Buy-In from Program Manager 1b. Identify and Notify Stakeholders 1c. Identify and Distribute Objectives and Requirements 1d. Identify Risk/Hazard Taxonomies
2a. Assemble Stakeholders for Risk Assessment 2b. Review Objectives, Taxonomies, and Process 2c. Conduct Risk Identification 2d. Group-Related Risks 2e. Consolidate Related Risks and Write
3a. Identify and Get Consensus on Impact/Severity 3b. Identify and Get Consensus on Probability 3c. Identify Time Window when Risk Could Occur 3d. Reassess Any Existing Risks in Database 3e. Prioritize Risks by Impact, Probability, and Time 3f. Identify Handling Bands
4a. Identify Handling Options Within Each Risk Band 4b. Identify Risks to be Assumed or Watched 4c. Identify Risks to be Avoided, Transferred, or Mitigated 4d. Assign Plan OPRs for Avoided, Transferred, or Mitigated 4e. Establish or Update Risk Database
5a. Develop Draft Handling Plans and Resources 5b. Manager Review and Approval of Handling Plans 5c. Handling Plan Funded, Directed, and Integrated
6a. Finalize Risk Management Plan and Management Infrastructure 6b. Mechanism to Monitor Triggers, Cues, and Handling 6c. Implement Handling as Authorized, Funded, and Scheduled 6d. Provide Reporting on Handling Results and Progress
7a. Periodically Review Handling Plan Results 7b. Stop or Modify Handling Plans and Resources 7c. Retire Risks When Handling Plans Completed 7d. Update Risk Database for Handling Process and Retirement
Step 8 - Institutionalize The Process 8a. Establish an Organizational Policy 8b. Plan the Process 8c. Provide Resources 8d. Assign Responsibility 8e. Train People
8f. Manage Configurations 8g. Identify and Involve Relevant Stakeholders 8h. Monitor and Control the Process 8i. Objectively Evaluate Adherence 8j. Review Status with Higher Level Management Self Assessment RiskManagementProcessSelf-Assessment: If your organization or project has implemented a risk management process, this survey can help you decide how well the process meets the CMMI goals and specific practices. The first part of the survey deals with specific goals and their associated specific practices. Your process must meet all of these specific goals and practices. The second part of the survey deals with generic goals and their associated generic practices. The extent to which your process meets these generic goals and practices indicates your level of process capability. CMMI Risk Management Goals Specific Goals and Practices:
SP 1.1: Determine Risk Sources and Categories SP 1.2: Define Risks Parameters SP 1.3: Establish a Risk Management Strategy
SG 3: Mitigate Risks
o o
SP 3.1: Develop Risk Mitigation Plans SP 3.2: Implement Risk Mitigation Plans
GP 2.1: Establish an Organizational Policy GP 2.2: Plan the Process GP 2.3: Provide Resources GP 2.4: Assign Responsibility GP 2.5: Train People GP 2.6: Manage Configurations GP 2.7: Identify and Involve Relevant Stakeholders GP 2.8: Monitor and Control the Process GP 2.9: Objectively Evaluate Adherence GP 2.10: Review Status with Higher Level Management
Establish Quantitative Objectives for the Process Stabilize Sub process Performance
Risk Management identifies potential problems before they occur so that risk-handling activities may be planned and invoked as needed across the life of the product or project to mitigate adverse impacts on achieving objectives.
PROCEDURES
Procedures of Risk Management:
1. Affinity Diagrams An affinity diagram is a technique for organizing verbal information into a visual pattern. An affinity diagram starts with specific ideas and helps you work toward broad categories. This is the opposite of a cause and effect diagram, which starts with the broad causes and works toward specifics. You can use either technique to explore all aspects of an issue. Affinity diagrams can help you:
Organize and give structure to a list of factors that contribute to a problem. Identify key areas where improvement is most needed.
How to use it Identify the problem. Write the problem or issue on a blackboard or flipchart. Generate ideas. Use an idea-generation technique to identify all facets of the problem. Use index cards or sticky-back notes to record the ideas.
Cluster your ideas (on cards or paper) into related groups. Use questions like "Which other ideas are similar?" and "Is this idea somehow connected to any others?" to help you group the ideas together. Create affinity cards. For each group, create an affinity card, a card that has a short statement describing the entire group of ideas. Cluster related affinity cards. Put all of the individual ideas in a group under their affinity card. Now try to group the affinity cards under even broader groups. You can continue to group the cards until your definition of "group" becomes too broad to have any meaning. Create an affinity diagram. Lay out all of the ideas and affinity cards on a single piece of paper or a blackboard. Draw outlines of the groups with the affinity cards at the top of each group. The resulting hierarchical structure will give you valuable insight into the problem. Affinity Diagram Example A publication team wanted to reduce the number of typographical errors in their program's documentation. As part of a first step, they conducted a brainstorming session that produced the following list of factors that influenced errors.
Computers Printers Lighting Comfort Font Grammar Draft Copy Technical Jargon Computer Skill
No Feedback Typing Skill Typewriters Desk Height Interruptions Slang Punctuation Final Copy Unreasonable Deadlines
Noise Proofreading Skill Chair Height Time of Day Handwriting Spelling Distribution Editing Skill No Measurement
The following diagram helped them to focus on areas for further analysis. Typographical Errors
2. Brainstorming Brainstorming is used solely for generating ideas; it does not involve analysis.
Generate a variety of ideas in a short time Produce new and creative ideas
How to do it The goal of brainstorming is to generate ideas. Before you start, make sure everyone in your group understands the importance of postponing judgements until after the brainstorming session is completed.
Write the problem or topic on a blackboard or flipchart where all participants can see it
Write all ideas on the board and do as little editing as possible Number each idea for future reference Use one of the following brainstorming techniques: structured brainstorming freeform brainstorming, or silent brainstorming.
In structured brainstorming
Solicit one idea from each person in sequence Participants who don't have an idea at the moment may say "pass." A complete round of passes ends the brainstorming session The advantage of structured brainstorming is that each person has an equal chance to participate, regardless of rank or personality
The disadvantage of strucutred brainstorming is that it lacks spontaneity and can be somwhat rigid.
The advantage of free-form brainstorming is that participants can build off each other's ideas. The atmosphere is very relaxed.
The disadvantage of free-form brainstorming is that the less assertive or lowranking participants may not contribute.
An ideal approach is to combine these two methods. Begin the session with a few rounds of structured brainstorming and finish up with a period of unstructured brainstorming. In silent brainstorming
Have participants write ideas individually on sticky-back notes or small slips of paper.
Collect the papers and post them for all to see. The advantage of silent brainstorming is that it prevents individuals from making disruptive "analysis" comments during the brainstorming session.
The disadvantage of silent brainstorming is that the group loses the synergy that comes from an open session.
Silent brainstorming is best used in combination with other brainstorming techniques. The result of a brainstorming session is a list of ideas. If this list is too long, the group can boil it down using one of the decision-making tools such as an affinity diagram.
3. Risk Plotting - Establish probability scale on y-axis - Establish impact scale on x-axis - Priority regions are set by the risk assessors Red - Highest Priority Yellow - Medium Priority Green - Low Priority
Requirement reads: "Use Common Operational Picture (COP) in DII COE Release 1.5"
Risk statement:
IF DII COE version 1.5 is more than 1 month late, THEN Program xyz release 1 will experience a day for day schedule slip
Condition Present and Associated Risk Event Risk Statement Writing the Risk Statement: Identified risks are described and communicated to management in the form of risk statements. A risk statement provides the clarity and descriptive information required for a reasoned and defensible assessment of the risk's occurrence probability and areas of impact. A well-written risk statement contains two components. They are a statement of the Condition Present and the Associated Risk Event (or events). Example 1: Risk Statement
"A large part of the software must now be written in C++; the time required to train the development team in C++ will extend the project's schedule by 3 months".
Here, the Condition Present is {A large part of the software must now be written in C++}; the Associated Risk Event is {the time required to train the development team in this language will extend the project's schedule by 3 months}.
In a risk statement, the Condition Present is itself an event; it is an event that has occurred or is presently occurring. Associated Risk Events are future events that might occur because of the Condition Present.
The Condition Present acts as the departure point from which one or more Associated Risk Events may originate. Example 2 illustrates how three risk events A1, A2, and A3 originate from a single condition. Example 2: Condition Present
{Version 1.0 (v1.0) of the enterprise system architecture is not yet defined; furthermore, the schedule required to deliver the architecture is highly compressed and not synchronized to the major funding and review milestones of the systems being upgraded to comply to this architecture.}
Risk Events:
A1 = {Milestone funding and review schedules for each system being upgraded will slip by more than 3 months due to the time required for them to properly apply and demonstrate compliance to the v1.0 architecture.}
A2 = {Once v1.0 is delivered, the current designs of the systems being upgraded may be inadequate to support the interoperability requirements of users.}
A3 = {The systems being upgraded may design functionality that is significantly less in scope than v1.0 will require.}
RiskNav is a well-tested tool developed by MITRE to facilitate the risk process and help program managers manage their risk space. RiskNav lets you collect, analyze, prioritize, monitor, and visualize risk information in a collaborative fashion. This tool provides three dimensions of information graphically (risk priority, probability, and the mitigation/management status). RiskNav, originally produced for the U.S. government, is designed to capture, analyze, and display risks at a project or enterprise level. RiskNav is currently deployed throughout the intelligence community, ESC, FAA, and other MITRE sponsors.
RiskNav uses a weighted average model that computes an overall score for each identified risk. The risk priority is a weighted average of the timeframe (how soon the risk will occur), probability of occurrence, and the impact (cost, schedule, technical). This score provides a most-to-least critical rank order of the risks. Formally, this scoring model originates from the concept of linear utility, where the more important risks get higher numbers and the gaps between the numbers correspond to the relative strengths of the differences.
<> 2. Risk Matrix Risk Matrix is a software application that can help you identify, prioritize, and manage key risks on your program. MITRE created it a few years ago to support a risk assessment process developed by the Air Force's Electronic Systems Center (ESC). MITRE and ESC have expanded and improved the original process, creating what is known as the Baseline Risk Assessment Process.
Although the process and application were developed for use at ESC, the basic principles can be applied to any project that needs to manage risks.
3. Risk Radar
Risk Radar is a risk management database to help project managers identify, prioritize, and communicate project risks in a flexible and easy-to-use form. Risk Radar provides standard database functions to add and delete risks, as well as specialized functions for prioritizing and retiring project risks. Each risk can have a user-defined risk management plan and a log of historical events. A set of standard short- and long-form reports can be easily generated to share project risk information with all members of the development team. The number of risks in each
probability/impact category by time frame can be displayed, which allows the user to drill down through the data to uncover increasing levels of detail. Risk Radar allows the user the flexibility of using automatic sorting in addition to manually moving risks up and down in setting priority rank.
LIMITATIONS
If risks are improperly assessed and prioritized, time can be wasted in dealing with risk of losses that are not likely to occur. Spending too much time assessing and managing unlikely risks can divert resources that could be used more profitably. Unlikely events do occur but if the risk is unlikely enough to occur it may be better to simply retain the risk and deal with the result if the loss does in fact occur. Prioritizing too highly the risk management processes could keep an organization from ever completing a project or even getting started. This is especially true if other work is suspended until the risk management process is considered complete. It is also important to keep in mind the distinction between risk and uncertainty. Risk can be measured by impacts x probability.
the cost associated with the risk if it arises, estimated by multiplying employee costs per unit time by the estimated time lost (cost impact, C where C = cost accrual ratio * S).
the probable increase in time associated with a risk (schedule variance due to risk, Rs where Rs = P * S):
o
Sorting on this value puts the highest risks to the schedule first. This is intended to cause the greatest risks to the project to be attempted first so that risk is minimized as quickly as possible.
This is slightly misleading as schedule variances with a large P and small S and vice versa are not equivalent. (The risk of the RMS Titanic sinking vs. the passengers' meals being served at slightly the wrong time).
the probable increase in cost associated with a risk (cost variance due to risk, Rc where Rc = P*C = P*CAR*S = P*S*CAR)
o o
sorting on this value puts the highest risks to the budget first. see concerns about schedule variance as this is a function of it, as illustrated in the equation above.
Risk in a project or process can be due either to Special Cause Variation or Common Cause Variation and requires appropriate treatment. That is to re-iterate the concern about external cases not being equivalent in the list immediately above. Risk-management activities as applied to project management In project management, risk management includes the following activities:
Planning how risk will be managed in the particular project. Plan should include risk management tasks, responsibilities, activities and budget.
Assigning a risk officer - a team member other than a project manager who is responsible for foreseeing potential project problems. Typical characteristic of risk officer is a healthy skepticism.
Maintaining live project risk database. Each risk should have the following attributes: opening date, title, short description, probability and importance. Optionally a risk may have an assigned person responsible for its resolution and a date by which the risk must be resolved.
Creating anonymous risk reporting channel. Each team member should have possibility to report risk that he foresees in the project.
Preparing mitigation plans for risks that are chosen to be mitigated. The purpose of the mitigation plan is to describe how this particular risk will be handled what, when, by who and how will it be done to avoid it or minimize consequences if it becomes a liability.
Summarizing planned and faced risks, effectiveness of mitigation activities, and effort spent for the risk management.
All these risk management processes play a significant role behind the growth of an organization in the long term. Commercial enterprises apply various forms of risk management procedures to handle different risks because they face a variety of risks while carrying out their business operations. Effective handling of risk ensures the successful growth of an organization.
Various types of risk management can be categorized into the following: 1. Operational risk management: Operational risk management deals with technical failures and human errors 2. Financial risk management: Financial risk management handles non-payment of clients and increased rate of interest 3. Market risk management: Deals with different types of market risk, such as interest rate risk, equity risk, commodity risk, and currency risk. 4. Credit risk management: Deals with the risk related to the probability of nonpayment from the debtors 5. Quantitative risk management: In quantitative risk management, an effort is carried out to numerically ascertain the possibilities of the different adverse financial circumstances to handle the degree of loss that might occur from those circumstances
6. Commodity risk management: Handles different types of commodity risks, such as price risk, political risk, quantity risk and cost risk 7. Bank risk management: Deals with the handling of different types of risks faced by the banks, for example, market risk, credit risk, liquidity risk, legal risk, operational risk and reputational risk 8. Nonprofit risk management: This is a process where risk management companies offer risk management services on a non-profit seeking basis 9. Currency risk management: Deals with changes in currency prices 10. Enterprise risk management: Handles the risks faced by enterprises in accomplishing their goals 11. Project risk management: Deals with particular risks associated with the undertaking of a project 12. Integrated risk management: Integrated risk management refers to integrating risk data into the strategic decision making of a company and taking decisions, which take into account the set risk tolerance degrees of a department. In other words, it is the supervision of market, credit, and liquidity risk at the same time or on a simultaneous basis. 13. Technology risk management: It is the process of managing the risks associated with implementation of new technology
14. Software risk management: Deals with different types of risks associated with implementation of new softwares
Need for Bank Risk Management Repeated financial disasters faced by financial, non-financial and government bodies have created the need for bank risk management policies. Apart from regulatory requirements, bank risk management is needed by the bank managers for the following reasons: Creation of benchmarks for calculation of reward-risk ratios. Investment of capital is then directed to options with high reward risk ratios. Estimation of the probable losses. This leads to wise risk taking decision by investors as the risk monitoring part is already put in place. Banks also learn to handle their available liquidity well. The risks encountered in Bank Risk Management
Performance risk-This occurs in case where employees are not properly monitored.
Credit risk-Sometimes the associates are unable to honor their payment obligations. This leads to a change in the net value of assets of the bank
Operational risk-This arises due to the failure of banks to properly execute their various operational procedures. Untimely collection of revenues, inability in meeting the set guidelines and the like fall in this category.
Market risk-Change in market conditions leads to change in the net asset value of banks. The factors here are mostly changes in prices of finished products, fluctuation in exchange rates, equity rates change as also oscillating interest rates
Characteristics of Bank Risk Management Policies One of the characteristics of bank risk management policies is that it needs to be updated on a regular basis. Banks that are involved in trading go in for
Intra day risk management on selective areas Regular measurement of the overall risks faced by the bank
Regulators are however, more interested at knowing the overall risks as compared to the individual portfolio items. Another characteristic of bank risk management policy is that it is usually not carried out in a decentralized fashion. The economic theory of risk management states that the risk of a particular portfolio is usually not determined by a simple addition of the component risks. Bank risk management policies despite their worthiness are resource intensive. They demand considerable time and money. But violation of prescribed regulations in the capital market attracts heavy penalty. So managers do a cost benefit analysis whenever portfolio composition changes.
Value at risk analysis: Here we use the distribution on asset return for the purpose of estimation.
Scenario analysis: A prediction is made regarding the change in the value of a portfolio. The resultant estimated figure is the estimated loss. A detailed analysis of the types of risk measurement approaches entails description of intricate analytical methods, avoided here.
Project risks can be minimized with the help of eliminating or decreasing them. There are
two main phases of project risk management and they are risk assessment and control of risk.
Assessment of risk may be carried out at any point of time within the duration of the project. However, the earlier it is performed, the better it is for the organization. Risk control is always dependent on a proper risk assessment. On the other hand, if risk control measures are not undertaken, there is no use of performing a risk assessment. Process of Project Risk Management The process of project risk management can be elaborated as follows: 1. Project Risk Assessment The process of project risk assessment can be further categorized into the following:
Identification of risk: The project risks are identified by examining the whole project plan.
Analysis of risk: Risk analysis can be quantitative or qualitative in nature. In this process, the manner in which the project risks may influence the project performance in terms of expenses, time period or satisfaction of the necessity of the customer is ascertained.
Prioritization of risk: According to this process, it is determined that which risks require total elimination, which risks require continuous supervision and monitoring and which risks are not so important to supervise.
2. Project Risk Control Project risk control involves the following steps: Avoidance of risk: A plan is chalked out as to how project risks can be eliminated or avoided. Risk transfer: In this way, risk is transferred by buying insurance policies. Risk mitigation: A number of measures are taken beforehand for minimizing the impact of risk. Contingency plan: For risks that are regarded as important, a contingency plan is prepared in advance before those risks occur. Risk acceptance: Certain risks are accepted because they are regarded as small and do not influence the performance of the company to a significant degree. Measure and control: Observing the outcomes of the risks that have been detected and handling them to a favorable or productive end.
The SRP is frequently delineated in the form of a probability/impact matrix. Every risk usually has a figure or any other indicator and substantiating details. The location of the risk tolerance line is dependent on the company and the project.
Application of Risk Management Strategy The risk management strategy can be utilized to analyze a company's preparation for handling risk. Components of Risk Management Strategy Following are the principal components of Risk Management Strategy:
Risk Analysis: This process includes the detection and description of risks along with the analysis of influence and resultant action.
Risk Management: This involves the functions of formulating, supervising, and regulating the operations that would deal with the risks.
These two stages should be handled distinctly to assure that decisions are taken prudently on the basis of crucial details. However, risk management and risk analysis are interconnected and accomplished repetitively. The official documentation of details is a significant factor in risk management strategy. This offers the base that backs up the risk management process.
The law does not expect you to eliminate all risk, but you are required to protect people as far as reasonably practicable. This guide tells you how to achieve that with a minimum of fuss.
This is not the only way to do a risk assessment, there are other methods that work well, particularly for more complex risks and circumstances. However, we believe this method is the most straightforward for most organisations. What is risk assessment? A risk assessment is simply a careful examination of what, in your work, could cause harm to people, so that you can weigh up whether you have taken enough precautions or should do more to prevent harm. Workers and others have a right to be protected from harm caused by a failure to take reasonable control measures.
Accidents and ill health can ruin lives and affect your business too if output is lost, machinery is damaged, insurance costs increase or you have to go to court. You are legally required to assess the risks in your workplace so that you put in place a plan to control the risks. How to assess the risks in your workplace Follow the five steps in this leaflet:
1. 2. 3. 4. 5.
Identify the hazards Decide who might be harmed and how Evaluate the risks and decide on precaution Record your findings and implement them Review your assessment and update if necessary
Dont overcomplicate the process. In many organisations, the risks are well known and the necessary control measures are easy to apply. You probably already know whether, for example, you have employees who move heavy loads and so could harm their backs, or where people are most likely to slip or trip. If so, check that you have taken reasonable precautions to avoid injury.
If you run a small organisation and you are confident you understand whats involved, you can do the assessment yourself. You dont have to be a health and safety expert.
If you work in a larger organisation, you could ask a health and safety adviser to help you. If you are not confident, get help from someone who is competent. In all cases, you
should make sure that you involve your staff or their representatives in the process. They will have useful information about how the work is done that will make your assessment of the risk more thorough and effective. But remember, you are responsible for seeing that the assessment is carried out properly.
a hazard is anything that may cause harm, such as chemicals, electricity, working from ladders, an open drawer etc;
the risk is the chance, high or low, that somebody could be harmed by these and other hazards, together with an indication of how serious the harm could be.
1.
Ensuring that workers and the public are properly protected Providing overall benefit to society by balancing benefits and risks, with a focus on reducing real risks both those which arise more often and those with serious consequences
o o
Enabling innovation and learning not stifling them Ensuring that those who create risks manage them responsibly and understand that failure to manage real risks responsibly is likely to lead to robust action
Enabling individuals to understand that as well as the right to protection, they also have to exercise responsibility
2.
Creating a totally risk free society Generating useless paperwork mountains Scaring people by exaggerating or publicising trivial risks Stopping important recreational and learning activities for individuals where the risks are managed
Reducing protection of people from risks that cause real harm and suffering
Hazard: Negating the possibility of an exposure from turning into a financial loss and
Here, we also note that, risk appetite means an organization's decision of risk acceptance in the path of attainment of its set goals.
Purpose of Risk Management Policy The purpose of risk management policy is manifold. Some of them are listed below.
Improved decision making, on account of risk management policy implementation, minimizes the probable losses of the Improved decision organization. making process It also leads to a better management of the prevailing uncertainties. Risk management policy teaches how to make a cost benefit Prudent acceptance of analysis. So, while accepting new opportunities, one can make a new opportunities well-informed and well-balanced choice. Resources are scarce and can be put to alternative uses. Risk Optimization of use of management policy devices techniques for the optimum use of available resources this resource.
Accountability Leadership Reinforcement Strategy Effective communication and Risk management framework
The above-mentioned characteristics are required for the establishment and also for the smooth execution of risk management policies. Risk Management Policy is put in place by organizations to ensure their smooth march to success. The management policy begins by identifying the problem areas or risks faced by an organization. It then formulates strategies or plans to effectively face them. Since risks are unforeseen events, they may lead to disruptions in the day to day working of the organization. The idea is to predict the risks and formulate an action plan beforehand. Now comes the implementation stage of the policies formulated. Implementation requires smooth coordination among the different departments of an organization. Proper implementation demands that the process is carried out on a shared responsibility basis. Last but not the least, the Risk Management Policy program is the process of continuous evaluation. Continuous evaluation keeps the process updated. The policy is thus kept flexible and can adjust to changing market conditions. Financial risk management also comes under the purview of Risk Management Policy.
2. ESC Risk Management Process Tool Training: This training provides an overview of the use of productivity tools in support of the ESC Risk Management Process. This training is intended for: Members of Risk Management IPTs, Members of Program Teams, Program Functional Leads (Engineering, Testing, Configuration, etc.), and Others that are designated by the Program Manager. The training provides a working an overview of tool use and demonstration of the following productivity tools: Risk Matrix, Risk Radar, and RiskNav. Facilitator Training 1. Facilitation: A facilitator brings prior program experience and environment knowledge to risk assessments.
A subject matter expert with domain knowledge gains the ability to effectively communicate that experience to others with facilitation training and participation in risk assessments.
A trained facilitator with experience gains domain knowledge from subject matter experts through participation in risk assessments.
A new employee can obtain on-the-job training in facilitation, program and domain expertise through participation in risk assessments.
2. ESC Risk Management Process Facilitator Training: This training is intended for individuals who are to provide Risk Management implementation/facilitation at the SPO/Program level. The training will provide these individuals with an overview of training and facilitization techniques, a sample implementation approach, and a detailed exercise in facilitating risk assessment and risk review meetings. 3. Negotiation: Training in Negotiation and Dispute Resolution is also recommended.
By virtue of being able to deal with the diverse risk-related problems with a certain degree of efficiency the services of the risk management companies are highly sought after by most of the enterprises that are into some kind of commercial activity or the other. Client Groups of Risk Management Companies The risk management companies normally provide their services to the following entities:
Services provided by the Risk Management Companies The following services are provided by the risk management companies that are operating in the global market:
Security services Technology services, electronic evidence and data recovery Business intelligence and investigations Forensic accounting and litigation consulting Background screening
The risk management companies are well known for providing top quality services to the clients. The services of the risk management companies enable their clients to perform their functions in a smoother manner. There are certain risk management companies that are able to provide all the necessary services by themselves in contrast to those risk management companies that deal with only specific services. However, these companies have specific strengths, which means that there are certain services at which they are the best of the lot. Risk Management Companies
Professional Risk Management Services Inc. Key Risk Management Services Inc. Risk Management Services Company Risk Management Services, LLC The Risk Management Association
Public Risk Management Association Public Agency Risk Managers Association Corporate Risk Management Inc Risk Management Strategies LLC Diversified Risk Management Inc. Atlantic Risk Management Risk and Insurance Management Society
Cardinal Risk Management Alternatives Global Risk Management Global Risk Management Group The Risk Management Group Information Risk Management Plc KPMG Neural Technologies Limited Pinnacle Risk Management, Inc. IRIS Integrated Risk Management Risk Management Associates, Inc.