Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev.

. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 01

GAMMON INDIA LIMITED

Introduction The Environmental Management System formed to protect the environment and to implement, mitigate, monitor and provide remedial measures during the activities of construction work at OCT, Mb.P.T. project, Mumbai. Proper procedures and records shall be maintained for maintaining the requirements related to protection of environment. Environmental training and awareness to all employees in a regular basis shall be provided on the project. Objectives The main objectives are to: Ensure compliance with regulatory requirements that are applicable to the activities. Provide timely indication if any environmental control measures fails to achieve acceptable standard. Access the environmental condition of the area where the construction work is carried out. Monitor effectiveness of environmental mitigation measures. Purpose and scope To be aware of the environmental concerns of the construction work and the application of environmental control during the construction phase of the project. To facilitate construction program while ensuring fulfillment of environmental commitment by minimizing and monitoring environmental upset, which may be arise from construction activities. To supervise compliance with environmental criteria reviewing the collected data. Prepare Contingency plan.

Method for promoting environmental awareness We will provide environmental awareness training to our employees. All personnel being absorbed at site would be made to attend an environmental awareness program. Environmental Awareness Program include environmental policy, on site emergencies, environmental aspects, environmental impacts, rules and regulation

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 02

GAMMON INDIA LIMITED

Location of Plant and Equipments: Plants and equipments are the potential sources of pollutants, so it is important to be concerned of the locations and role of the plant equipped. Piling with piling booms mounted on gantry with winchs on 4YDA Engine, 6 YDA Engines, Bailor, Chisel and driving hammer. Storage tank, setting tank, mixing tank, water pumps, water tank, etc. Diesel Generators of different capacities for power Supply Cranes Earth Moving Equipments Welding Machines Standby Concrete Mixer Concrete Batching Plant Store Administrative Office Location of Construction site: The project consists of Jetty construction at 12 VD, Mb.P.T. premises that includes Fabrication yard, Administrative Office, Store, Workshop, Q. C. Laboratory, Batching plant, labor rest rooms and canteen. Also provision of residential complex for staff and labors outside the port premises at Hey Bunder and Darukhana location at Sewri railway station has done.

Ambient Air Monitoring We shall undertake environmental monitoring in term of Ambient Air Monitoring for the determination of suspended particulate matter. The air quality monitoring procedure shall be establish to monitor the impact on air quality and measures to control air pollution including dust suppression of activities that will cause degradation in air quality, environmental procedures to manage pollutants, monitoring program, record keeping and reporting. The main pollutants, which will come out from different construction activities, would be Suspended Particulate Matter (SPM), Noise pollution from different earth moving equipments and generator sets.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 03

GAMMON INDIA LIMITED

Mitigation Measures Transport of material from one place to another creates air pollution, which degrades the atmosphere of the area. To minimize, pollution precaution are taken to minimize visible particulate matter from being deposited. It includes removal of particulate matter from equipment and cleaning of dust / mud and deposit of material at cleaning place by routine sweeping work everyday. Control requirement at road construction site: The dumping material shall be place in a manner that will minimize dust production. Material shall be stabilized by watering or other accepted dust suppression techniques (Water sprinkling at site). The height from which material dropped shall be the minimum practical height to limit the fugitive dust emission. Stock piled, sand and aggregates use in concrete manufacturing and construction work should be piled with suitable slopes and if required it will be enclosed on three sides with suitable barricading. Cement will be stored separately in cement godown. Provide water sprinklers that are required to control and suppress dust during handling of excavation, debris and or during demolition. During dry weather, dust control methods must be use daily especially on windy, dry days to prevent any dust from blowing. Monitoring of SPM: The impacts of fugitive dust as ambient air pollution depends on quantity generated as well as drift potential of dust particles injected into atmosphere. Larger particles will settle down but smaller particles will drift away. SPM levels will be monitored to check dust impact during construction phase. Methodology: The samples will be collected with the help of High Volume Dust Sampler using standard methods on pre weighted GFA filter paper at a rate of 1:1 m3/minute for 24 hours and SPM will be monitored by suitable placement of High Volume Sampler at various required locations at the site. Air monitoring shall be carried out as per the requirement of site at each location.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 04

GAMMON INDIA LIMITED

Presentation and Interpretation of results: The results will be reported on the basis of 24 hours and will be presented as g/m3. These results will be compared with National Ambient Air Quality standards. The results will be recorded and mitigation measures will be taken for control of air pollution. National Ambient Air Quality Standards CONCENTRATION IN AMBIENT AIR SENSITIVE AREA 15 g/m3 30g/ m3 15 g/m3 30g/m3 70 g/m3 100g/m3 INDUSTRIAL AREA 80g/m3 150g/m3 80 g/m3 120 g/m3 360 g/m3 500 g/m3 RESIDENTIAL, RURAL AND OTHER AREAS 60g/m3 80g/m3 60 j.ug/m3 80 g/m3 140 g/m3 200 g/m3

POLLUTANTS

TIME WEIGHTED AVERAGE Annual average 24 hours Annual average 24 hours Annual average 24 hours

Sulphur Dioxide (SO2) Oxides of Nitrogen as (NO2) Suspended particulate matter (SPM)

Noise Monitoring and Control Plan The noise monitoring and control plan shall contain the sources of noise pollution at the construction site. It also contains the mitigation measures to be taken. Noise Control Required measures will be taken so as to minimize noise impact on the employee & community. Provision of necessary silencers and mufflers on construction equipments, which will properly fitted and maintained. Also PPEs like ear plugs and ear muffs will be provided. Canopy type generator sets will be provided at required locations and open type generators will be in housed in sheds.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 05

GAMMON INDIA LIMITED

Sources Of Noise Pollution: Noise generated during operating of the different Earth Moving Equipments. Noise generated at gantry location from winches used for piling. Noise generated during any other construction activity. Noise generated during truck, tipper loading, unloading and handling activities. Noise generated from Batching Plant and workshop activities. Allowable Noise Emission Levels LAND USED Residential Commercial Industrial MAXIMUM NOISE LEVEL Lmax dB (A) Day time 75dBA and Night time 65dBA

85dBA(At all times) 90dBA (At all times)

Mitigation Measures To the extent required meeting the noise limits adequate efforts will be taken to reduce the construction noise emissions level. Scheduling the Tipper, Truck and Earth Moving Equipments for loading, unloading and hauling operations so as to minimize noise impact on surrounding. Locating stationery equipments as to minimize noise impact on the employee and community. Put off Plants and Equipments when not in use or idle. Use only well maintained plants and Equipments, which should be serviced regularly. Maintain equipments such that parts of vehicles and load are secure against vibration and rattling. Silencers and mufflers on construction equipment shall be properly fitted and maintained. Maximize physical isolation between noise generators and noise receptors.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 06

GAMMON INDIA LIMITED

Grading of surfaced irregularities on construction sites to prevent the generation of impact noise and ground vibration by passing vehicles. Schedule work to avoid simultaneous activities that both generate high noise level. Construction of temporary physical barriers.

Monitoring Noise level will be measured at various locations with calibrated Noise meter at different times during the operation of equipments used for construction of the project. Noise monitoring and control plan, results submitted will include duration of measurement distance of monitoring from activity and construction equipment working during monitoring period. Presentation and Interpretation Noise level during the construction activities will be measured and presented as Leq, L10, L90 and Lmax in decibel (dB) units. The measured value will be compared with the standards values. Contingency Plan If the noise level exceeds of limiting value (either accidentally or through inadequate implementation of mitigation measures) does occur, the cause will be quickly identified and remedial measures will be taken with professional expertise. Water Pollution Control: We will provide a drainage system to drain off all surface water from the work site into suitable drain outlet. We will collect all cement slurry, add mixture slurry or other grouts used in jetty construction and disposed off safely at the nearest landfill site, which will be provided by the authority. Oil Spills Prevention Control Plan, Storage and Handling of Inflammable Materials: Various types of oils at construction site, like Diesel, Petrol, Engine oil, Grease, Hydraulic oil, Transmission oil, etc; is used as fuel and for Hydraulic operations and for

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 07

GAMMON INDIA LIMITED

transformers, Oil, Grease and similar material will be stored on a paved surface. Diesel as a fuel for all lifting equipments, Earth Moving Equipments and other vehicles will be transported in separate diesel tanks of suitable capacity to different locations. All other oily material will be transported in a suitable container. To avoid oil spill drip pans () will be provided during handling of oil / diesel, etc. Even minor leaks from mobile equipments and generator will be effectively arrested. Fixed generator sets will be provided with trays below them. Inflammable material like paints, turpentine and thinner will be stored separately. Also Inflammable material like LPG cylinders and DA cylinders were used at site for gas cutting jobs. These we are storing at our store yard in a specially designated area. We are keeping a bare numbers of cylinders as per our work requirement. We will strictly adhere to statutory Gas Cylinders Rules while storing and handling these cylinders at our site. Event Contingency Plan: We shall provide adequate number of fire extinguishers and fire buckets at site to control the fire due to inflammable materials. We shall contact to nearest fire station and police station immediately to handle such situation. We shall call to nearest hospital if any emergency occurs.

Site Hygiene: Site hygiene will be maintained at highest standards to keep the good healthy working environment at our work site. Proper longitudinal and C/S profile should be maintained so as to drain off storm water as well as waste discharge during the course of construction activities. A septic tank for our sewage system is already constructed.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 08

GAMMON INDIA LIMITED

WASTE HANDLING, STORAGE AND DISPOSAL The waste generated from any activity of construction work will be handled mechanically by JCB and tippers to transport the same to the approved designated place for proper disposal. Any other waste generated from our activities will be collected properly in waste bins placed in the designated places and to the possible extent they are disposed off by auction to the waste buyers. Till that time it will be carefully stored in an area specifically marked for the purpose. HAZARDOUS CHEMICALS & WASTES All hazards material must be stored in approved containers/cabinets and storage area. Containers cabinets and storage area will have proper Labeling. Material must not be transferred to unapproved unlabeled containers. Safe procedures will be used for transferring material from bulk. 1. All the hazardous chemicals must be labeled properly. 2. All storage facility must be equipped with eyewash and splash goggles. 3. Temporary and permanent storage of all hazardous material must be neat and orderly. Stored must not obstruct fire extinguishers where electrical panels exists. 4. All storage must ensure that incompatible chemicals do not come in contact with one another. 5. Hazardous Chemicals flat away from the sun dump. Surface must be clear and dry. HANDLING Hazardous material handled with proper care under responsible person. Use proper PPEs in manual handling of hazardous chemical.

Date: 07.04.2010 Doc. No. : PROJECT OFFSHORE CONTAINER TERMINAL GIL/8611/HSE/15 (Mb.P.T) Rev. no: 00 ENVIRONMENTAL MANAGEMENT SYSTEM Page: 09

GAMMON INDIA LIMITED

An approved device carrying hazardous material will be used whenever chemicals are taken from stock area. Hands get contaminated while handling hazardous chemicals and should be washed and cleaned. In handling flammable substances all type of ignition sources are avoided. Supervisor will ensure that the staff who works with such hazard product will be trained in the use, storage and handling of controlled product. The training programme must include instruction of the following: 1. Type of labels 2. MSDS Sheet 3. Procedure for safe use, storage and handling. 4. Emergency procedures. DISPOSAL Empty containers of hazardous chemicals may itself a hazard waste. Empty containers and hazardous waste will be given to authorized dealer. In encountered or generated as a result of our activities, then waste classified as hazardous under Hazardous wastes (Management and Handling) rules 1989 and chemicals classified as hazardous chemicals under manufacturer, storage and import of Hazardous Chemicals 1989 of Environment Protection Act (1986) shall be disposed off in a manner in compliance with procedure given in the rules under the aforesaid acts. Hazardous waste at site: 1. Scrap Batteries. 2. Waste Oil. 3. Wastes add mixture.