A1-With effect from 07.30 hours on Sunday, 26th July, new signalling will be commissioned in the Baker Street and Lords area, and a new interlocking machine room designated'MB'will be brought into use at Baker Street (Metropolitan Line).
A2-All
movements in the area will be controlled for the time being from a new key-operated panel located in Balier Street (Met.) signal box. Eventually this local control will be transferred to Baker Street Signalling Control Centre.
B_TRACK AND SIGNALLING B1-All signal and point numbers in the area will
be changed. Full details of the new arrangements are shown on the diagrams included in this Supplement. N.B. These diagrams show the final arrangement but, after commissioning, certain temporary speed restrictions will be in force pending completion of the Permanent Way work.
B2-The track layout will be revised so that the route from the southbound main line into Baker Street platform l, currently via the scissors crossover and double slip, will now be via a new crossover further north ofthe station. B3-Signal MBI/4A will clear if the speed of an approaching train is controlled in accordance with the 25 m.p.h. permanent speed restriction sign. B4-Signal MB4B will clear for route I if the speed of an approaching train is controlled in accordance with the 25 m.p.h. permanent sign. Signal MB4B is approach lit and is extinguished until signal MBL/4A has cleared for a route with No. 7 points normal. Bs-Signal MB5 will clear if the speed of an approaching train is controlled in accordance with the 25 m.p.h. permanent MB5 is approach lit and is extinguished until signal MB4B has cleared for the route to platform 3.
B6-Operation of Draw-Up Signals
(a) Signal
speed
restriction
speed restriction
sign. Signal
MBl00 will clear by the operation oflever No.l, or by the operation ofdelta track 887" for
seconds, or (iii) by the occupation of track (b) Signal MB140 will clear (i) with signal MBl4 clear, or (ii) by the occupation of track circuitsWH,WM,orWN,providedthatclearanceofsignalMBl40doesnotconflictwithclearanceofsignalMBlT. Providedthereisnosuchconflict, Nos. 30 and 32 points will, if not already normal, be normalised automatically and will be locked for approximately 15 seconds. (c) Signal MB 160
4[ circuit WN for 4[
seconds.
4[
4[
16,
4[
seconds.
4[
seconds.
(/) Signal MB260 will clear (i) with signal MB26 clear, or (ii) by the operation ofdelta track UQ for UQ/UT, or (iii) by the occupation of track circuit UT for 4[ seconds.
4[
(g) Signal MB35./340 will clear (i) by the operation of lever No. 35, or (ii) by the operation of delta track UA for normal and platform 6 occupied, by the occupation oftrack circuit 188'for 4[ seconds.
4[
87.-
(a) Signal MB34 (route 2) will clear when the preceding train is clear of blockjoint
U'I/UU.
of
(b) Signal A900 will clear when the same preceding train is clear of blockjoint UU,/UX, but the trainstop at this signal witl NOT lower unless the speed the next approaching train is controlled in accordance with the 15 m.p.h. permanent speed restriction sign.
4.
(b) If a train exceeding 1 15 metres in length is required to reverse in platform 6, signal MB28 must be cleared to allow the train to draw forward in order to reverse at signal MBl8. (It will not be backtripped at signal MB28). (c) Reversal of long trains from the Outer Rail to the northbound Metropolitan Line may only be done via platform 2.
(/)Ifatrainexceedingl33metresinlengthisrequiredtoreverseatsignalMB33,thetrainmustfirstdrawpastsignalAl83. (Itwillnotbebacktrippedat
signal A183).
B10-All trains
must draw well up to signals at Danger to ensure the prompt operation of any route releasing or speed control arrangement. Where a delta track (rail circuit) is provided, its position is indicated by a metal triangle fixed to the sleeper.
Bll-Traction
Cunent Arrangements
Existing traction cuffent sections in the Baker Street area will remain unchanged.
SIGNAL
POSITION OF POINTS
Reverse
Reverse
MBI4 MBI5
MB17
MBI8
Baker Street to Chalton Street Outer Rail or Chalton Street to Baker Street
Inner Rail
MB24 MB25 MB33
Chalton Street to Baker Street Inner Rail or Baker Street to Bouverie Place
Inner Rail
MB33 Reverse and 32 Reverse
Chalton Street to Baker Street Inner Rail or Baker Street to Finchlev Road Northbound Metropolitan
32 Normal
3l 3l
Normal
Reverse
will be replaced by a new diagram showing the altered signalling and track layout.
C2-The power frame levers will be taken out of commission. The new interlocking machine will be controlled from a key panel installed in the signal box power frame. Keys provided for route-setting are of the non-locking, spring-loaded, centre-off type. To select a route, the key must be depressed and held until the associated visual is illuminated. The route will be cancelled when the train accepts the route or when it is manually cancelled by the Signalman lifting the key.
keys of the single-throw locking type areprovided to introduce "Full Auto" or "Auto with Starting Signals Held" working on the Circle Line. In the latter mode, signals MB17 and MB28 are selected by using the appropriate route-setting keys. Returning from "Full Auto" or "Auto with Starting Signals Held" modes to normal mode does not cancel individual routes. Ifrequired, these may be cancelled by lifting the relevant route-setting
C3-Two
key.
C4-Route-Setting Keys
KEY
l(l) l(2).4(1).5 l(3).4(2) 1(4).4(3) 14 15 16* 17 18 24 25 26 2'7 28 33(1) 33(2) 33(3) 34(1).35 34(2).35** 36
OFF
DESCRIPTION Southbound Junction Signal to Platform 4 Southbound Junction Signals to Platform 3 Southbound Junction Signals to Platform 2 Southbound Junction Signals to Platform 1 Southbound Starting Signal from Platform 3 Southbound Starting Signal from Platform 2 Outer Rail Inner Home Signal Outer Rail Starting Signal Inner Rail Starting Signal to Outer Rail Platform 4 Starting Signal to Northbound Line Platform 3 Starting Signal to Northbound Line Platform 2 Starting Signal to Northbound Line Platform I Starting Signal to Northbound Line Inner Rail Starting Signal to Edgware Road Outer Rail Shunt to Inner Rail Outer Rail Shunt to Platform 2 Outer Rail Shunt to Platform 3 Inner Rail Junction Signal to Platform 6 and Inner Junction Home Signal Inner Rail Junction Signal to Platform 2 and Inner Junction Home Signal
FULL AUTO
OFF
AUTO
WITH
STARTING SIGNALS
HELD
I Cir"t" Line I
* - This route is selected automatically if other train movements will not thereby be delayed ++ - To allow a train to draw up to signal MB34 as quickly as possible, key 34(2).35 should be operated even though the route may not be immediately available. CS-Emergency Release Facility (a) An emergency release will operate only on the approach lock of signal levers. The exception is signal MB5, which has no release.
(6) To take an emergency release the Signalman must
(c) The release
lift the appropriate route key long enough to replace the signal to Danger.
is no approach
will then commence automatically and after one minute the Signalman will be able to obtain another route. There
lock on
A f'acility
E2-The existing train description facilities in the signal box will be retained.
E3-Telephones will be installed at signals as indicated on the diagrams included in this Supplement and will connect with Baker Street signal box.
E4-Automatic telephone No. 21072 will be installed in Baker Street (Met.) interlocking machine room.
I 700
STANDARD SYMBOLS
DESCRIPTION
SYMBOL
SEMI-AUTOI4ATIC
AUTOMATIC
SIGNAL.
LIT
SIGNAL
SIGNAL.
SEMI-AUTOMATIC
LIGHT SIGNAL
r0 P
rl
TRAINSTOP
EXTERNALLY ILLUMINATED TUNNEL SPEED RESTRICTION SIGN (SPEED IN M.P.H. ARROW, IF PRESENT, INDICATES ROUTE APPLICABLE) EXTERNALI,Y ILLUMINATED OPEI'I SECTION SPEED RESTRICTION SIGN (SPEED IN M.P.H. ARROW, IF PRESENT, INDICATES ROUTE APPLICABI,E) DELTA TRACK
b'LAG
IN
BOTH DIRECTIONS
?
-
POINTS FITTED WITH FACING POINT LOCK POINTS FITTED WtrTH FACING POINT LOCK
&
GROUND LOCK
-f