Você está na página 1de 2

CCRI Networking Technology IV

Instructor Telephone E-mail Office Hours Class Sections John Mowry 401-825-2138 jmowry@ccri.edu By Appointment 001 Tuesday / Thursday

CSCO-1880

Spring 2011

9:00AM-12:50PM, starts 3/29, ends 5/13

Instructional Material and Web Sites


1 2 3 CCRI Lesson Web Site Internal CCRI Lesson Web Site External Cisco Academy Assessment Web Site 10.19.114.9 Exploration 4 Ver. 4.0 216.19.115.212 Exploration 4 Ver. 4.0 http://cisco.netacad.net/

Grading Policies
Skills: Journal-Entries Labs and Class Participation Case Study and Presentation Research Paper Practical Final Academic: Quizzes Final 5% 10% 10% 10% Due April 28, 2011 9:00 AM 30% 15% 20%

Other Policies
1. The student expected to complete the On-Line lessons outside of class time. 2. All quizzes must be taken in class and will not be available from the student web site 3. Late assignments will be penalized 20 points. 4. Assignments late more than one class period will not be accepted. 5. All assignments must be completed using a word processor. 6. Students are responsible to see the instructor about any work missed due to absence. 7. Students who miss a quiz must take the quiz within two classes of the original quiz date. 8. Students are expected to participate as a member of teams 9. Students must pass both the Skills based portion in addition to the Academic portion of the curriculum to pass the course. 10. Students final grade can only raise one letter grade above the on-line final exam score based on other class assignments. 11. Students are allowed a maximum of three (3) re-takes of chapter quizzes per the semester. 12. All re-takes must be completed prior to the final exam, without exception.

Cisco 4 Course Outline Spring 2011 Week TR.docx

Networking Technology IV Syllabus Spring 2011


Class March 29 Lesson 1 Exam Subjects Introduction to WANs 1.1 Providing Integrated Services to the Enterprise 1.2 WAN Technology Concepts 1.3 WAN Connection Options PPP 2.1 Serial Point to Point Links 2.2 PPP Concepts 2.3 Configuring PPP 2.4 Configuring PPP with Authentication Frame Relay 3.1 Basic Frame Relay Concepts 3.2 Configuring Frame Relay 3.3 Advanced Frame Relay Concepts 3.4 Configuring Advanced Frame Relay Network Security 4.1 Introduction to Network Security 4.2 Securing Cisco Routers 4.3 Secure Router Network services 4.4 Using Cisco SDM 4.5 Secure Router Management ACLs 5.1 Using ACLs to Secure Networks 5.2 Configuring Standard ACLs 5.3 Configuring Extended ACLs 5.4 Configuring Complex ACLs Teleworker Services 6.1 Business Requirements for Teleworker Services 6.2 Broadband Services 6.3 VPN Technology IP Addressing Services 7.1 DHCP 7.2 Scaling Networks with NAT 7.3 IPv6 Network Troubleshooting 8.1 Establishing the Network Performance Baseline 8.2 Troubleshooting Methodologies and Tools 8.3 Common WAN Implementation Issues 8.4 Network Troubleshooting Project Presentations One Hour Network Setup / Final Exam One Hour Network Setup /Final Exam One Hour Network Setup / Final Exam Lab 4.6.1, Lab 4.6.2, Lab 4.6.3 Lab 5.5.1, Lab 5.5.2, Lab 5.5.3 Labs/Projects Lab 1.4.1

March 31

Project Assigned, Groups Formed Lab 2.5.1, Lab 2.5.2, Lab 2.5.3

April 5

April 7 April 12

Lab 3.5.1, Lab 3.5.2, Lab 3.5.3 4 3

April 14 April 19

April 21

April 26

Lab 7.4.1, Lab 7.4.2, Lab 7.4.3

April 28

Lab 8.5.1, Lab 8.5.2, Lab 8.5.3 Research Paper Due!!!!!!

May 3 May 5 *May 10 *May 12

Open Lab Final Skills Assessment Final Skills Assessment Final Skills Assessment

* May be rescheduled.

Cisco 4 Course Outline Spring 2011 Week TR.docx

Você também pode gostar