Escolar Documentos
Profissional Documentos
Cultura Documentos
News Index
01 February 2012 07:51:59
Pusri Patok Produksi Pupuk 11,95 Juta Ton Link URL APPI IFA Indonesia Kementerian BUMN
Continuous ship unloader, capable of unloading material in bulk, at a capacity of 1,000 tons per hour. Multiple loading crane, capable of loading various kinds of end products in bulk at a capacity of 120 tons per hour as well as in 50kg sacks at a capacity of 120 tons per hour. 2 Kangaroo cranes, each capable of unloading bulk material at a capacity of 350 tons per hour. Belt Conveyor; the Corporation has a system of belt conveyor, made up of 3 units with a total length of some 22 kilometers. These three belt conveyor units are, one for filling product into sacks at a capacity of 120 tons per hour and the other two for unloading raw material in bulk at a capacity of 1,000 tons per hour each.
II. Power Station In order to ensure the supply of electrical power required for its production process and all other activities within its industrial compound, PT PETROKIMIA GRESIK has 2 units of power station at its disposal :
l
Gas turbine generator, located at the nitrogen fertilizer production unit and capable of generating power 33 MW. Steam turbine generator, located at the phosphoric acid production unit and capable of generating power 20 MW. In addition to these two units of power station, the Corporation also receives power supply from the State-owned electricity company PLN, amounting to 15 MW, for some of its joint venture companies, lighting for the employees housing complex, hospital and other facilities.
III. Water Treatment Facility The first unit to supply clean water required by the Corporation was located at Gunungsari Surabaya, taking in its raw water from the river Brantas. The clean water was subsequently pumped through a 14-inch diameter pipeline to Gresik at a distance of 22 Kilometers away. The treatment and subsequent pumping capacity of this Gunungsari plant stood at 720 cubic meters per hour. The second water treatment unit could be found in Babat Lamongan, processing raw water from the river Bengawan Solo. The processed water is then pumped through a 28-inch pipeline to Gresik some 60 kilometers away. The treatment capacity of this Babat plant is 1500 cubic meters per hour.Yet,itscapacitycouldbeincreasedupto2500cubicmetershourly.
Distribution Distribution System 290909 Sistem Distribusi Pupuk Gudang Gresik Sistem Distribusi Pupuk Gudang Penyangga Teknis Pengambilan Barang Pelayanan Penjualan Pupuk Coverage Area Supply Point Community Development Small Business & Partnership Public Responsibility
PT Petrokimia Gresik
2002 PT Petrokimia Gresik