Você está na página 1de 3

MAJOR PROJECT GUIDELINES VIII SEM INFORMATION TECHNOLOGY REPORT CONSISTS OF ALL THESE PAGES INCLUDING OTHER IMPORTANT

PAGES. ON COVER: COVER PAGE 1ST PAGE: FRONT PAGE 2ND PAGE: CERTIFICATE OF COLLEGE 3RD PAGE: APPROVAL OF INTERNAL & EXTERNAL 4TH PAGE: ACKNOWLEDGEMENT 5TH PAGE: PREFACE 6TH PAGE: CONTENTS ALL STUDENTS OF BHABHA ENGINEERING RESEARCH INSTITUTE HAVE TO FOLLOW SAME FORMAT FOR COVER PAGE & ALL ABOVE PAGES. EACH STUDENT WILL INDLUDE THEIR NAME ACCORDING TO THEIR ENROLLMENT NUMBER. NO ONE WILL WRITE MR. OR MRS. OR MISS. WITH PROJECT GUIDE, HOD AND PRINCIPAL NAME. USE INITIALS LIKE LECT. OR PROF. OR ASST. PROF. OR DR. USE SHEET SEPERATOR AFTER EACH CHAPTER. FILE COVER SHOULD BE MARROON AND FONT COLOR SHOULD BE GOLDEN. CONTENTS SHOULD HAVE BEEN IN THIS FORMAT. FRONT PAGE CERTIFICATE OF COLLEGE APPROVAL OF INTERNAL & EXTERNAL ACKNOWLEDGEMENT PREFACE CONTENTS LIST OF TABLE LIST OF FIGURES 1. ... 1.2.1 1.2.2 2 ... (13-18)

I II III IV V VI VII VIII (1-12)

www.earnrupees4you.com

Page 1

FOR HEADINGS--FONT NAME: TIMES NEW ROMAN FONT SIZE: 16 FOR SUBHEADINGS--FONT NAME: TIMES NEW ROMAN FONT SIZE: 14 FOR PARAGRAPH--FONT NAME: TIMES NEW ROMAN FONT SIZE: 12 LINE SPACING--FOR HEAD LINE: 1.75 FOR PARAGRAPH: 1.15 TO 1.25

PAGE ALIGNMENT--TOP: 1.25 BOTTOM: 1.0 LEFT: 1.5 RIGHT: 1.0 FOOTER NOTE: NAME OF PROJECT HEADER AREA: COLLEGE MONO ALL PARAGRAGH SHOULD BE PARAALIGNED AND JUSTIFY.

PAGE NO.

www.earnrupees4you.com

Page 2

ALL STUDENTS HAVE TO SHOW THEIR PROJECT (ALONG WITH CODING PART) PLEASE COMPLETE ALL THESE PHASES. PLANNING ---> REQUIREMENT GATHERING >CODING --- >TESTING --- >MAINTENANCE AND ANALYSIS --->DESIGN ---

INITIAL PROBLEM STATEMENT NAME OF PROJECT, ABSTRACT OF PROJECT & GOAL OF PROJECT WITH HARDWARE & SOFTWARE REQUIREMENT SRS SOFTWARE REQUIREMENT SPECIFICATION WITH FUNCTIONAL AND NONFUNCTIONAL REQUIREMENT STUDENTS HAVE TO MAKE ALL THESE FIGURES IN THEIR INFORMATION SYSTEM PLAN: ARCHITECTURE OF THE PROPOSED SYSTEM FLOW OF INFORMATION OR FLOW CHART ORGANIZATIONAL CHART E-R DIAGRAM CONTEXT DIAGRAM DATA FLOW DIAGRAM USE CASE DIAGRAM TRANSACTION ANALYSIS ACTIVITY DIAGRAM STATE DIAGRAM SEQUENCE DIAGRAM COLLABORATION DIAGRAM WBS WORK BREAKDOWN STRUCTURE GANTT CHART PERT CHART ACTIVITY NETWORK WORK PLAN (TENTATIVE) A. METHODOLOGY B. ORGANIZATION OF WORK ELEMENT C. TIME SCHEDULE OF ACTIVITIES AND MILESTONES PROJECT TABLE PROJECT ESTIMATION (TENTATIVE) A. DURATION OF THE PROJECT B. COST OF EQUIPMENTS AND SOFTWARE C. SALARY AND COST OF TRAINING TIME LINE CHART

ALL GUI & WEBPAGES OR FRONT PAGES PROJECT FILE CONSIST COMPLETE DESCRIPTION OF PROGRAMMING LANGUAGES & DATABASE TOOL. PROJECT FILE CONSIST COMPLETE DESCRIPTION OF DATA MODEL, WHICH YOU ARE USING. CONCLUSION BIBLIOGRAPHY

www.earnrupees4you.com

Page 3

Você também pode gostar