K.E.S.C House, 39-B, Sunset Boulevard, Phase-II, Defence Housing Authority, Karachi Tel: 32647012 Fax: 99205192 & 99206275
1. Capacity:
Considered Capacity (MW)
2. Geographical Location:
Longitude & Latitude District/City Nearest Land Mark Distance from the nearest Land Mark (km)
3. Land Requirement:
Considering the case for 2000 MW Power Plant as reference, the land requirement for different divisions of power plant for a proposed capacity can be evaluated.
Area in ACRES (2000 MW)
S. No
Divisions
Remarks
Remarks
A. 1 2 3
Main Plant Area Power Block Stock Yard (Half a million Ton Storage) Cooling Towers, Pump Houses & Piping 50 150 50
Page 1 of 7
S. No
Divisions
Remarks
Remarks
4 5 6 7 8 9 10 11
Water treatment plant Coal Conveyors Switch Yard Other BOP Facilities Space For FGD (only for PC Boilers) Road & Drainage in Plant Area Non - Plant Buildings Equipment Lay down & Open Space Sub Total
150 700 250 Should be 33% of total area For disposal of 1 Million tons fly ash up to the height of 10 m per year About 60% of total workers strength have to be provided with residential accommodation 89
B.
C.
Ash Pond
10
D.
Staff & Officers Quarters, Dormitories Schools & Hospitals, Banks & Community Center etc. Roads, Parks, Green Belt Sub Total Total Area in ACRES
2 3
10 50 149 1109
Page 2 of 7
S. No 1.
2.
Now, Calculated Land = _____________ Acres Available Land = _____________ Acres Allotted weight to land = 25
S. No 1.
Overall value for land [L = 25 x P1] If available land = 80% of calculated land If available land = 60% to 80% of calculated land If available land < 60%
Remarks
Value
P1 = 1 P1 = 0.5 P1 =0
2. 3.
H2Oa = 4 x 0.9 x 365 x24 H2Or = C x H2Oa / year H2Or = ________ m _______ m
3 3
Page 3 of 7
S. No A.
Value
B.
Requirement of reservoir / dam / barrage for water intake i. ii. iii. Not required Reinforcement of old structure (s) required New Structure (s) required
C.
Distance of the proposed site from water source i. ii. Less than 3 km Greater than 3 km
D.
Available water source i. ii. iii. River Ocean Dam / Barrage / Reservoir Yes / No Yes / No Yes / No
Remarks [ E1 = 2.25 x P5 ] True [ P5 = 1 ] False [ P5 = 0 ] [ E2= 2.25 x P6 ] True [ P6 = 1 ] False [ P6 = 0 ] [ E3= 2.25 x P7 ] True [ P7 = 1 ] False [ P7 = 0 ]
Value
B.
C.
Page 4 of 7
D.
The proposed site does not fall in the approach funnel of the runway of the nearest airport. The proposed site does not utilize forest or prime agriculture land. The proposed site is at a distance beyond 5 km from the high tide line (HTL) (for coastal areas only).
[ E4 = 2.25 x P8 ] True [ P8 = 1 ] False [ P8 = 0 ] [ E5= 2.25 x P9 ] True [ P9 = 1 ] False [ P9 = 0 ] [ E6= 2.25 x P10 ] True [ P10 = 1 ] False [ P10 = 0 ] [ E7 = 2.25 x P11 ] True [ P11 = 1 ] False [ P11 = 0 ] [ E8= 2.25 x P12 ] True [ P12 = 1 ] False [ P12=0 ]
E.
F.
G.
The proposed site is at least 500 m away from the highway (s).
H.
The proposed site is at least 500 m away from the flood plain. Total value
Value
Existing dwelling, buildings Estimated population available Space available for relocation Development of civic amenities: The development of civic amenities is directly proportional to the size of power plant. E.g. the construction of hospitals, schools & roads. i. ii. Required Not Required
B.
R2 = 5 x P14
[ P14 = 0 ] [ P14 = 1 ]
Remarks [ C1 = 4.0 x P15 ] [ P15 =1 ] [ P15 = 0.5 ] [ P15 = 0 ] [ C2 = 4.0 x P16 ] [ P16 = 1 ] [ P16 = 0 ] [ C3 = 4.0 x P17 ]
Value
C.
Seaport i. ii. Within 200 km of the proposed site More than 200 km of the proposed site
Total value for Coal Transportation: C = C1 + C2 + C3 = ____________ 8. Available Infrastructure for Transmission of Electricity:
S. No 1. Nearest interconnection point: Available 2. Transmission line: Available Distance in Km Capacity /Voltage Level Yes / No _____km ______ Yes / No Parameters Remarks
S. No 1.
Total value for available Transmission Line [ T ] If the distance of available transmission line is < 3 Km If the distance of available transmission line is >3 Km
Value
2.
Page 6 of 7
Total value for infrastructure available for Transmission of Electricity: T = _________ Conclusion:
S. No
Parameters Land Water Environment Socio economic environment Coal transportation Infrastructure for Transmission of Electricity Total value
Value achieved
1. 2. 3. 4. 5. 6.
If total value obtained is < 75 then the proposed land is not considerable for power plant. Greater than 75% - Considerable Greater than 85% - Suitable Greater than 90% - Ideal Location
Page 7 of 7