Você está na página 1de 245

CONTRATISTA:

CONSTRUCTION DAILY REPORT

INCIDENTS / ACCIDENTS:
Description:

Working days:
Working hours:
Accum Manhours:
SN4X:

47
270
5200

WORK PROGRESS:
(%)
Estimated :
40.43
Current:
6.45

OTHER:

BUDGET USD$:
Lump Sum
Others

Estimated
2,582,760.79
-

Executed
691,885.07
-

No

PROCOPET

SITUCHE NORTE 4X
GENERAL INFORMATION:
Initial Date
5/13/2011
Termination Date
9/28/2011
Report Date
6/28/2011

FUEL CONSUMPTION:
D2
Daily
1,055.00
Accum.

Manhours worked since last accident:

Gasoil
175.00

5,200

00047

FLIGHT HOURS CHARGED:


MI-17
MI-8
Daily
Accum.
24.0

Chinook
9.8

Total LTA since initial Date:

Other
-

No incidents / accidents reported

LUMP SUM CONTRACT

13

1.36%

14

2.12%

15

15.87%

70

4.397

5.037

7.734

2.506

0.891

1.839

1.084

1.764

60
50

40
30

20
10
0

16

30-Sep

3.68%

80

23-Sep

12

0.040

9-Sep

0.72%

16-Sep

4.45%

11

2-Sep

10

Current

26-Aug

2.51%

90

19-Aug

2.154

5-Aug

10.74%

12-Aug

29-Jul

21.21%

Estimated

100

22-Jul

5.00%

5.421

8-Jul

1.653

15-Jul

4.82%

0.095

1-Jul

0.46%

Work Progress Comparative Curve

7.562

1.558

24-Jun

DAY ESTIMATED

4.797

17-Jun

5.39%

CURRENT ACCUM.

3-Jun

DAY PROGRESS

4.797

10-Jun

5.42%

LAST ACCUM.

27-May

Preliminary Works (mobilization/demob)


Clearing/Cleaning & Soil Movement
Cuttings & Water Pits
Grease Pits
Burning Pit
Drainage System
Rig Skid Piles Driving and H beam Frame
Chemical Warehouse
Helipads
Dura base (mating) instalation
Containment Pits for fuel tanks and pums
Grounding and Lightning rods
Cellars and 30in Conductor pipe
Water intake hose
Foundations for Mud tanks

20-May

16.26%

13-May

DESCRIPTION

INCIDENCE %

Completed %

17
18
19
20
21
22
23
24
25
26
27
28
29

100.00%

6.356

0.095

6.450

40.428

WORK FORCE (SITUCHE NORTE 4X)


Talisman Supervision
Construction Engineer
Planner Engineer
HSE supervisor
Doctor
Administrator / Warehouse man
Construction Foreman
Topographer
Riggers
Chainsaw Operator
Operators (Plant, Incinerator, etc)
Assembler

QTY

QTY
1
1
0
1
1
1
1
1
0
2
0
0

COMPLEMENTARY WORKS:
N

0
0
4
0
4
0
3
2
0
0
5

TOTAL PERSONNEL
DESCRIPTION

INCIDENCE %

Welder
Welder Assitant
Heavy Equipment Operator
Construction workers and Carpenters
General Laborer
CCNN Laborers
Mechanics & Electricians
Catering Personnel
Geomembrane operator
Pile driving personnel
Other

LAST ACCUM.

DAY PROGRESS

CURRENT ACCUM.

27

DAY ESTIMATED

0%

EQUIPMENT (SITUCHE NORTE 4X)

0%

Caterpillar tractor

Minor equipment

0%

Chainsaw

Mixer

0%

Crane
Electric generator

Retro excavator
Roller

0
0

0.00%

MAIN ACTIVITIES:
Cleaning of heliport emergency area.Advance 50%. Fuel pit for minor equipments relocated,finished heavy
equipment assembly. Topography activities

HOURS

HOURS

0
12

Excavator

Welding Machine

Frontal Loader
Geomembrane welding equip.
Manlift

0
0
0

Wood chipper
Others

0
0
24

TOTAL HOURS

COMMENTS:
Morning activities were suspended because they had no equipment and operators in their respective certifications and sent us
campo.Luego operations continued.

PICTURES:

Roots extraction for emergency heliport finished at 50%

Cleaning of emergency heliport area finished at 50%

fuel pit for minors equipments relocated

heavy equipment (excavator 320D) assembly culminated

CAMP CLEAN PETREX 40%

CONTRACTOR SUPERVISOR
ENG. LUIS FERNANDO COBLENTZ

TALISMAN SUPERVISOR
ENG. ERICK JAUREGUI

2.1 Trazo y Replanteo


2.2

Deforestacin de rea de plataforma (tala, desbroce y limpieza)


2.3 Corte y relleno compensado
2.4 Relleno compactado estructural
MOVIMIENTO DE TIERRAS

Avance
por
actividad
38.00

7.74%
16.26%

0.26
0.79

29.50

0.77%

0.01

30

0.77%
1.94%
1.94%
5.42%

0.04
0.05

92
0
0

21.00

30.50

0
0
0
0
0
0

Suministro y colocacin de tubera de acero sch.40. D=10in

1.23%

Suministro y colocacin de planchas de apoyo de columnas


3.9 Montaje de techo metlico en Poza de Cortes
POZA DE LODOS Y AGUA

0.77%
0.52%
5.39%

0
0

Trazo y Replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno con material propio (incl. compactacin)
Nivelado y Compactado e=0.20 m.

0.02%
0.08%
0.02%
0.01%
0.01%

Suministro y colocacin de geomembrana HDPE e=1.5 mm

0.13%

4.7 Construccin de trampas de grasa al ingreso de cada poza


POZA DE GRASAS

0.19%
0.46%

Trazo y replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno compactado con material impermeable
Nivelado y compactacin e=0.20m

0.21%
1.16%
0.39%
0.46%
0.39%

Suministro y colocacin de geomembrana HDPE e=1.5 mm


5.7 Suministro y colocacin de tubera de acero SCH40 d=8in
5.8 Suministro y colocacin de tubera de acero SCH40 d=10in
5.9 Suministro y colocacin de codos de 90.
5.10 Montaje de estructura metlica y cortina de agua
POZA DE QUEMA

1.16%
0.14%
0.71%
0.19%
0.00%
4.82%

3.8

4.1
4.2
4.3
4.4
4.5
4.6

5.1
5.2
5.3
5.4
5.5
5.6

0.53

0.25%
0.72%
0.20%
0.36%
0.32%
1.02%

3.7

8.52%

Trazo y Replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno compactado con material impermeable
Nivelado y compactacin e=0.20m
Suministro y colocacin de geomembrana HDPE=1.5mm

3.1
3.2
3.3
3.4
3.5
3.6

Avance
Ponderad
o

LISTA DE PARTIDAS
1.1 Movilizacin y Desmovilizacin de Equipos y Personal
Movilizacin, desmovilizacin, campamento provisional,
1.2 alimentacin por 90 das
TRABAJOS PRELIMINARES

Incidencia

SITUCHE NORTE 4X

5
0.29%
1.13%
0.41%

Suministro y colocacin de geomembrana HDPE e=1.5 mm


6.5 Suministro y colocacin de alcantarillas en accesos
SISTEMA DE DRENAJE PLUVIAL

2.40%
0.77%
5.00%

Colocacin y compactacin de Relleno Estructural


Suministro y acondicionamiento de pilotes 10in
Izaje, colocacin e hincado de pilotes 10in
Suministro, frabricacin y montaje de estructura de vigas H
Construccin de losa de mortero armado de 20cm alrededor de
7.5
cellar segn plano
Construccin de cunetas de drenaje interno alrededor de cellar
7.6
y equipos de tratamiento de lodos
7.7 Suministro de grating para cuneta de drenaje interno
Construccin de trampa de grasa previo ingreso de cuneta
7.8 interior al cellar
PILOTAJE PATINES DE PLATAFORMA

0.01%
10.53%
5.28%
2.13%

0.03%

2.27%
0.77%

0.19%
21.21%

0.02%
4.39%
2.20%
0.01%
0.22%

6.1 Trazo y replanteo


6.2 Excavacin en Terreno Natural
6.3 Eliminacin de Material Excedente
6.4

7.1
7.2
7.3
7.4

8.1
8.2
8.3
8.4
8.5

Trazo y replanteo
Suministro y acondicionamiento de pilotes 10in
Izaje, colocacin e hincado de pilotes 10in
Excavacin en Terreno Natural
Colocacin y compactacin de Relleno Estructural

8.6

10

Suministro y colocacin de geomembrana HDPE e=1.5 mm


8.7 Colocacin de Mating Dura-Base
8.8 Montaje de estructura metlica y techo
8.9 Montaje de Vinilona
Relleno de espacios libres entre mating y pilotes con tablones
8.10 de madera
ALMACEN DE QUIMICA

0.20%
1.94%
0.52%
1.16%

0.08%
10.74%

9.1 Excavacin en Terreno Natural


9.2 Colocacin y compactacin de Relleno Estructural
9.3 Colocacin e instalacin de geomembrana HDPE 1.5mm
9.4 Drenajes
9.5 Colocacin de Pavimento Flexible-Mating
9.6 Pintado de helipuertos segn norma Peruana
HELIPUERTOS

0.11%
0.17%
0.08%
1.57%
0.39%
0.19%
2.51%

10.1 Trazo y replanteo


10.2 Colocacin y compactacin de Relleno Estructural
10.3 Acabado, refine y compactacin de plataforma
10.4 Colocacin e instalacin de geomembrana HDPE 1.5mm
10.5 Colocacin de Pavimento Flexible-Mating
10.6 Colocacin de pavimento Unimat
SUMINISTRO Y COLOCACION DE DURABASE

0.39%
0.58%
1.16%
0.39%
0.77%
1.16%
4.45%

0.04%
0.39%

11.1 Trazo y replanteo


11.2 Construccin de diques en madera

11

11.3 Suministro e instalacin de geomembrana HDPE e=1,5mm


0.30%
0.72% MOTOBOMBAS;
CONSTRUCCION DE PITS DE CONTENCION DE TANQUES DE COMBUSTIBLE,
-BLADDERS Y B
12.1 Suministro e instalacin de postes de luz
Suministro e instalacin de pozos a tierra para sistema de
12.2 comunicaciones TLM, campamento y pararrayos (por separado
- ohmiaje mximo 5ohm)
12.3 Pararrayo en campamento de perforacin

12

12.4 Tendido de tuberas de paso de 6in en la locacin para paso de


cableado elctrico y de comunicacin (segn plano)
NSTALACIONES ELECTRICAS; PUESTAS A TIERRA Y PARARRAYOS
Suministro e instalacin de 02 cellar metlicos pre fabricados
(de acuerdo a plano)
Suministro e instalacin y cementacin de 02 tuberas
13.2 conductoras de 35pie x 30in
CONSTRUCCIN DE CELLAR Y CONDUCTORA DE 30in
13.1

13

14.1 Trazo y Replanteo


Limpieza de trocha y deforestacin de rea de bombas,
14.2
construccin de pit
14.3

14

Suministro e instalacin de geomembrana HDPE e=1,5mm


14.4 Colocacin de Pavimento Flexible-Mating
Suministro, tendido y colocacin de tubera HDPE 3in, incluye
14.5 lneas dentro de locacin (aprox. 1200m Tee y vlvulas de
derivacin)
Instalacin de casing de 9 5/8in como conductoras para los
14.6 pozos de inyeccin de agua - a ser hincados con martillo
delmag - TLM proveer el casing de 9 5/8in
TOMA Y TENDIDO DE LINEA DE AGUA
15.1

15

Suministro y habilitacin de pilotes 10in y vigas WF 12x6 1/2in


15.2 Hincado pilotes 10in
15.3 Soldado de vigas WF12x6 1/2in
15.4 Relleno interior con suelo cemento e=15cm
Instalacin de geomembrana con cuneta de drenaje y trampa
15.5 de grasa
CIMENTACION DE TANQUES DE LODO
Total de incidencia

1.94%

0.39%
0.77%

0.58%
3.68%

0.77%

0.58%
1.36%

0.04%

0.04%

0.14%
0.35%

1.16%

0.39%
2.12%

8.52%
3.87%
1.16%
0.39%

1.94%
15.87%

100%

Avance por da
Avance Acumulado
Avance Total

COMPLEMENTARY WORKS
1.1 1.2
1.3
1.4

5%
5%
20%
10%

1.5
1.6
1.7
1.8
1.9
1.10
1.11

100.00%

Current Accumulated
Estimated Dayly
Estimated Accumulated

1
2.1 2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11

5%
5%
20%
10%
5%
5%
15%
10%
15%
5%
5%

100.00%

Current Accumulated
Estimated Dayly
Estimated Accumulated

2
3.1 3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.1'
3.11

5%
5%
20%
10%
5%
5%
15%
10%
15%
5%
5%

100.00%

Current Accumulated
Estimated Dayly
Estimated Accumulated

3
4.1 4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11

5%
5%
15%
10%
15%
5%
5%

5%
5%
20%
10%
5%
5%
15%
10%
15%
5%
5%

100.00%

Current Accumulated
Estimated Dayly
Estimated Accumulated

100.00

24/may/2011

23/may/2011

22/may/2011

21/may/2011

20/may/2011

19/may/2011

18/may/2011

17/may/2011

16/may/2011

15/may/2011

14/may/2011

13/may/2011

4.00%

10.00
10.00

10.00
20.00

10.00
30.00

10.00
40.00

10.00
50.00

10.00
60.00

10.00
70.00

10.00
80.00

10.00
90.00

10.00
100.00

100.00

100.00

0.81
0.81

0.81

0.81

0.81

1/jun/2011

2/jun/2011

3/jun/2011

4/jun/2011

5/jun/2011

31/may/2011

30/may/2011

29/may/2011

28/may/2011

27/may/2011

26/may/2011

25/may/2011

10

0.08
0.89

0.08
0.98

0.08
1.06

0.08
1.14

5
0.49
1.63

0.81
0.81

0.81

0.81

0.81

0.08
0.89

0.08
0.98

0.08
1.06

0.08
1.14

0.49
1.63

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

1
0.16
2.03
2.00

2.03
10.00

2.03
4.00

2.03
2.00

2.03

0.50

7.00

2.00

4.50

4.50

10.00

12.00

0.03
0.03

0.12
0.16

0.05
0.21

0.20
0.41

0.12
0.52

0.16
0.68

0.16
0.85

17/jun/2011

0
0.16
1.87
2.00

16/jun/2011

0
0.08
1.71
2.00

15/jun/2011

14/jun/2011

13/jun/2011

12/jun/2011

11/jun/2011

8/jun/2011

10/jun/2011

7/jun/2011

9/jun/2011

6/jun/2011

5
5
0.81
2.85

2.85

2.85

2.85

2.85

11.50

8.00

6.00

10.00

4.00

0.16
1.00

0.11
1.11

0.08
1.19

0.14
1.33

0.05
1.38

0.12
1.74

0.28
2.03

0.22
2.24

0.20
2.44

0.12
2.55

0.16
2.72

0.16
2.88

0.97
3.85

0.11
3.96

0.08
4.04

0.14
4.17

0.05
4.23

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

22/jun/2011

23/jun/2011

24/jun/2011

25/jun/2011

26/jun/2011

2.85

1
0.24
3.09

4.00

2.00

0.05
1.44

0.03
1.46

0.08
3.17

1.46

3
0.33
3.50

1
0.24
3.74

1
0.24
3.98

1
0.24
4.23

1
0.24
4.47

2
0.33
4.80

1.00

1.00

0.01
1.48

0.01
1.49

1.46

1.46

1.46

1.49

4.80
3.00

4.80
5

2.00

0.07
1.56

0.09
1.65

29/jun/2011

21/jun/2011

28/jun/2011

20/jun/2011

27/jun/2011

19/jun/2011

18/jun/2011

4.80

1.65

0.05
4.28

0.27
4.55

0.08
4.63

0.33
4.96

0.24
5.20

0.24
5.45

0.26
5.71

0.26
5.96

0.33
6.29

0.07
6.36

0.09
6.45

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

11/jul/2011

10/jul/2011

9/jul/2011

8/jul/2011

7/jul/2011

6/jul/2011

5/jul/2011

4/jul/2011

3/jul/2011

2/jul/2011

1/jul/2011

30/jun/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

23/jul/2011

22/jul/2011

21/jul/2011

20/jul/2011

19/jul/2011

18/jul/2011

17/jul/2011

16/jul/2011

15/jul/2011

14/jul/2011

13/jul/2011

12/jul/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

4/ago/2011

3/ago/2011

2/ago/2011

1/ago/2011

31/jul/2011

30/jul/2011

29/jul/2011

28/jul/2011

27/jul/2011

26/jul/2011

25/jul/2011

24/jul/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

16/ago/2011

15/ago/2011

14/ago/2011

13/ago/2011

12/ago/2011

11/ago/2011

10/ago/2011

9/ago/2011

8/ago/2011

7/ago/2011

6/ago/2011

5/ago/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

28/ago/2011

27/ago/2011

26/ago/2011

25/ago/2011

24/ago/2011

23/ago/2011

22/ago/2011

21/ago/2011

20/ago/2011

19/ago/2011

18/ago/2011

17/ago/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

9/sep/2011

8/sep/2011

7/sep/2011

6/sep/2011

5/sep/2011

4/sep/2011

3/sep/2011

2/sep/2011

1/sep/2011

31/ago/2011

30/ago/2011

29/ago/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

21/sep/2011

20/sep/2011

19/sep/2011

18/sep/2011

17/sep/2011

16/sep/2011

15/sep/2011

14/sep/2011

13/sep/2011

12/sep/2011

11/sep/2011

10/sep/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

3/oct/2011

2/oct/2011

1/oct/2011

30/sep/2011

29/sep/2011

28/sep/2011

27/sep/2011

26/sep/2011

25/sep/2011

24/sep/2011

23/sep/2011

22/sep/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

15/oct/2011

14/oct/2011

13/oct/2011

12/oct/2011

11/oct/2011

10/oct/2011

9/oct/2011

8/oct/2011

7/oct/2011

6/oct/2011

5/oct/2011

4/oct/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

27/oct/2011

26/oct/2011

25/oct/2011

24/oct/2011

23/oct/2011

22/oct/2011

21/oct/2011

20/oct/2011

19/oct/2011

18/oct/2011

17/oct/2011

16/oct/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

8/nov/2011

7/nov/2011

6/nov/2011

5/nov/2011

4/nov/2011

3/nov/2011

2/nov/2011

1/nov/2011

31/oct/2011

30/oct/2011

29/oct/2011

28/oct/2011

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

4.80

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

1.65

PERSONAL EN SITUCHE NORTE 4X

PERSONAL
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

22/may/2011

10
21/may/2011

9
20/may/2011

19/may/2011

10

10

10

10

10

10

10

20

30

40

50

60

60

60

60

60

Construction Engineer
Planner Engineer
HSE supervisor
Doctor
Administrator / Warehouse man
Construction Foreman
Topographer
Riggers
Chainsaw Operator
Operators (Plant, Incinerator, etc)
Assembler
Welder
Welder Assitant
Heavy Equipment Operator
Construction workers and Carpenters
General Laborer
CCNN Laborers
Mechanics & Electricians
Catering Personnel
Geomembrane operator
Pile driving personnel
Other

EQUIPOS

Ingresar las horas laboradas por equipo tanto para SN4X. En el caso de existir dos o ms equipos del mism

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Caterpillar tractor
Chainsaw
Crane
Electric generator
Excavator
Frontal Loader
Geomembrane welding equip.
Manlift
Minor equipment
Mixer
Retro excavator
Roller
Welding Machine
Wood chipper
Others

SITUCHE NORTE 4X
OTROS
TOTAL SN4X & OTROS

COMBUSTIBLE ENTREGADO POR TLM


FUEL

7
18/may/2011

6
17/may/2011

5
16/may/2011

4
15/may/2011

Ingresar la cantidad de trabajadores de SN4X. En el caso de existir dos o ms trabajadores del mismo car
Talisman Supervision

SITUCHE NORTE 4X
OTROS
TOTAL SN4X & OTROS
Total Manhours
Accumulated Manhours
HRS POR EQUIPO EN SITUCHE NORTE 4X

2
14/may/2011

10

1
13/may/2011

Horas de Trabajo diarias:

1
2

Diesel Diario (gln)


Gasolina Diario (gln)

(Ingresar la cantidad en galones entregados en el da por TLM

FUEL
INCIDENTES / ACCIDENTES EN EL PROYECTO

Acumulado Diesel (gln)


Acumulado Gasolina (gln)

ACCIDENTES DEL PROYECTO


1
2

Fecha

SITUCHE NORTE 4X
Total
Total Acumulado
HH-desde ltimo accidente

(Ingresar el nmero de accidentes considerados con tiempo pe


0

0
0

10

20

30

40

50

60

60

60

60

60

Descripcin del Accidente (Mx 1500 caracteres) - Presionar Alt+Enter para salto de lnea dentro de la celda
5/13/2011
5/14/2011
5/15/2011
5/16/2011
5/17/2011
5/18/2011
5/19/2011
5/20/2011
5/21/2011
5/22/2011
5/23/2011
5/24/2011
5/25/2011
5/26/2011
5/27/2011
5/28/2011
5/29/2011
5/30/2011
5/31/2011
6/1/2011
6/2/2011
6/3/2011
6/4/2011
6/5/2011
6/6/2011
6/7/2011
6/8/2011
6/9/2011
6/10/2011
6/11/2011
6/12/2011
6/13/2011
6/14/2011
6/15/2011
6/16/2011
6/17/2011
6/18/2011
6/19/2011
6/20/2011
6/21/2011
6/22/2011
6/23/2011
6/24/2011
6/25/2011
6/26/2011
6/27/2011
6/28/2011
6/29/2011
6/30/2011

No incidents / accidents reported


No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported

7/1/2011
7/2/2011
7/3/2011
7/4/2011
7/5/2011
7/6/2011
7/7/2011
7/8/2011
7/9/2011
7/10/2011
7/11/2011
7/12/2011
7/13/2011
7/14/2011
7/15/2011
7/16/2011
7/17/2011
7/18/2011
7/19/2011
7/20/2011
7/21/2011
7/22/2011
7/23/2011
7/24/2011
7/25/2011
7/26/2011
7/27/2011
7/28/2011
7/29/2011
7/30/2011
7/31/2011
8/1/2011
8/2/2011
8/3/2011
8/4/2011
8/5/2011
8/6/2011
8/7/2011
8/8/2011
8/9/2011
8/10/2011
8/11/2011
8/12/2011
8/13/2011
8/14/2011
8/15/2011
8/16/2011
8/17/2011
8/18/2011
8/19/2011
8/20/2011
8/21/2011
8/22/2011
8/23/2011
8/24/2011
8/25/2011
8/26/2011
8/27/2011
8/28/2011
8/29/2011
8/30/2011
8/31/2011
9/1/2011

No incidents / accidents reported


No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported
No incidents / accidents reported

No incidents / accidents reported

9/2/2011
9/3/2011
9/4/2011
9/5/2011
9/6/2011
9/7/2011
9/8/2011
9/9/2011
9/10/2011
9/11/2011
9/12/2011
9/13/2011
9/14/2011
9/15/2011
9/16/2011
9/17/2011
9/18/2011
9/19/2011
9/20/2011
9/21/2011
9/22/2011
9/23/2011
9/24/2011
9/25/2011
9/26/2011
9/27/2011
9/28/2011
9/29/2011
9/30/2011
10/1/2011
10/2/2011
10/3/2011
10/4/2011
10/5/2011
10/6/2011
10/7/2011
10/8/2011
10/9/2011
10/10/2011
10/11/2011
10/12/2011
10/13/2011
10/14/2011
10/15/2011
10/16/2011
10/17/2011
10/18/2011
10/19/2011
10/20/2011
10/21/2011
10/22/2011
10/23/2011
10/24/2011
10/25/2011
10/26/2011
10/27/2011
10/28/2011
10/29/2011
10/30/2011
10/31/2011
11/1/2011
11/2/2011
11/3/2011

11/4/2011
11/5/2011
11/6/2011
11/7/2011

9/jun/2011

28

8/jun/2011

27

7/jun/2011

26

6/jun/2011

25

5/jun/2011

24

4/jun/2011

23

3/jun/2011

22

2/jun/2011

21

1/jun/2011

20

31/may/2011

19

30/may/2011

18

29/may/2011

17

28/may/2011

16

27/may/2011

15

26/may/2011

14

25/may/2011

13

24/may/2011

12

23/may/2011

11

1
1

1
1

1
1

1
1

1
1

1
1

1
1

4
5

4
5

4
5

4
5

4
5

4
5

4
5

4
5

4
5

16

16

17

17

17

17

17

17

17

os o ms trabajadores del mismo cargo, colocar el total en el recuadro correspondiente

16

16

17

17

17

17

17

17

17

160

160

170

170

170

170

170

170

170

60

60

60

60

60

60

60

60

60

220

380

550

720

890

1060

1230

1400

1570

12

10

10

10

10

12

22

de existir dos o ms equipos del mismo tipo, sumar las horas trabajadas y colocarlas en el recuadro correspondiente

22

20

16

22

20

16

22

alones entregados en el da por TLM a la contratista para efectuar sus actividades)


0

120

120

120

120

120

120

120

120

cidentes considerados con tiempo perdido o incapacitantes en la fecha correspondiente y luego ingresar una breve descripcin lneas abajo)
0

60

60

60

60

60

60

60

60

60

220

380

550

720

890

1060

1230

1400

1570

nea dentro de la celda

27/jun/2011

46

26/jun/2011

45

25/jun/2011

1
1

44

24/jun/2011

1
1

43

23/jun/2011

1
1

42

22/jun/2011

1
1

41

21/jun/2011

1
1

40

20/jun/2011

1
1

39

19/jun/2011

38

18/jun/2011

37

17/jun/2011

36

16/jun/2011

35

15/jun/2011

34

14/jun/2011

33

13/jun/2011

32

12/jun/2011

31

11/jun/2011

30

10/jun/2011

29

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
1

1
0

1
1

1
1

1
1

1
1

1
1

1
1
1

1
1
1
1
1

1
1
1
1
1

4
5
3
2

4
0
3
2

1
1

4
5

4
5

4
5

4
5

4
5

4
5

4
5

4
5

4
5

4
5
1
2

4
5

4
5

4
5

4
5

4
5

4
5
1
2

17

17

17

17

17

17

16

16

16

19

19

18

18

18

18

21

28

27

17

17

17

17

17

17

16

16

16

19

19

18

18

18

18

21

28

27

170

170

170

170

170

170

160

160

160

190

190

180

180

180

180

210

280

270

1740

1910

2080

2250

2420

2590

2750

2910

3070

3260

3450

3630

3810

3990

4170

4380

4660

4930

12

12

15

15

15

15

12

12

12

12

12

12

12

12

12

12
6

17

20

24

24

21

21

20

12

20

20

20

20

20

20

20

20

26

17

20

24

24

21

21

20

12

20

20

20

20

20

20

20

20

26

55

1000

55

55

55

55

55

55

55

55

1055

1055

120

120

120

120

120

120

175

175

175

175

175

175

175

175

175

175

175

175

1740

1910

2080

2250

2420

2590

2750

2910

3070

3260

3450

3630

3810

3990

4170

4380

4660

4930

15/jul/2011

64

14/jul/2011

63

13/jul/2011

62

12/jul/2011

61

11/jul/2011

60

10/jul/2011

59

9/jul/2011

58

8/jul/2011

57

7/jul/2011

56

6/jul/2011

55

5/jul/2011

54

4/jul/2011

53

3/jul/2011

52

2/jul/2011

51

1/jul/2011

50

30/jun/2011

49

29/jun/2011

48

28/jun/2011

47

27

1
1
1
1
1
1
1
2

4
4
0
3
2

5
0

27

270

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

24

24

12
6

0
0

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

2/ago/2011

82

1/ago/2011

81

31/jul/2011

80

30/jul/2011

79

29/jul/2011

78

28/jul/2011

77

27/jul/2011

76

26/jul/2011

75

25/jul/2011

74

24/jul/2011

73

23/jul/2011

72

22/jul/2011

71

21/jul/2011

70

20/jul/2011

69

19/jul/2011

68

18/jul/2011

67

17/jul/2011

66

16/jul/2011

65

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

20/ago/2011

100

19/ago/2011

99

18/ago/2011

98

17/ago/2011

97

16/ago/2011

96

15/ago/2011

95

14/ago/2011

94

13/ago/2011

93

12/ago/2011

92

11/ago/2011

91

10/ago/2011

90

9/ago/2011

89

8/ago/2011

88

7/ago/2011

87

6/ago/2011

86

5/ago/2011

85

4/ago/2011

84

3/ago/2011

83

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

7/sep/2011

118

6/sep/2011

117

5/sep/2011

116

4/sep/2011

115

3/sep/2011

114

2/sep/2011

113

1/sep/2011

112

31/ago/2011

111

30/ago/2011

110

29/ago/2011

109

28/ago/2011

108

27/ago/2011

107

26/ago/2011

106

25/ago/2011

105

24/ago/2011

104

23/ago/2011

103

22/ago/2011

102

21/ago/2011

101

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

25/sep/2011

136

24/sep/2011

135

23/sep/2011

134

22/sep/2011

133

21/sep/2011

132

20/sep/2011

131

19/sep/2011

130

18/sep/2011

129

17/sep/2011

128

16/sep/2011

127

15/sep/2011

126

14/sep/2011

125

13/sep/2011

124

12/sep/2011

123

11/sep/2011

122

10/sep/2011

121

9/sep/2011

120

8/sep/2011

119

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

13/oct/2011

154

12/oct/2011

153

11/oct/2011

152

10/oct/2011

151

9/oct/2011

150

8/oct/2011

149

7/oct/2011

148

6/oct/2011

147

5/oct/2011

146

4/oct/2011

145

3/oct/2011

144

2/oct/2011

143

1/oct/2011

142

30/sep/2011

141

29/sep/2011

140

28/sep/2011

139

27/sep/2011

138

26/sep/2011

137

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

31/oct/2011

172

30/oct/2011

171

29/oct/2011

170

28/oct/2011

169

27/oct/2011

168

26/oct/2011

167

25/oct/2011

166

24/oct/2011

165

23/oct/2011

164

22/oct/2011

163

21/oct/2011

162

20/oct/2011

161

19/oct/2011

160

18/oct/2011

159

17/oct/2011

158

16/oct/2011

157

15/oct/2011

156

14/oct/2011

155

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

5200

8/nov/2011

180

7/nov/2011

179

6/nov/2011

178

5/nov/2011

177

4/nov/2011

176

3/nov/2011

175

2/nov/2011

174

1/nov/2011

173

5200

5200

5200

5200

5200

5200

5200

5200

1055

1055

1055

1055

1055

1055

1055

1055

175

175

175

175

175

175

175

175

5200

5200

5200

5200

5200

5200

5200

5200

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Fecha
5/13/2011
5/14/2011
5/15/2011
5/16/2011
5/17/2011
5/18/2011
5/19/2011
5/20/2011
5/21/2011
5/22/2011
5/23/2011
5/24/2011
5/25/2011
5/26/2011
5/27/2011
5/28/2011

16
17
18

Actividad (Mximo 10 actividades por fecha) - Usar Alt+Enter para salto de rengln

Comentarios - Usar Alt+Enter para salto de rengln

Contract Signed between TALISMAN ENERGY and PROCOPET

Today at 15:30 hours M/F Maricarmen departed from Iquitos to Sgto Puo loaded with 67
M Tons of PROCOPET cargo for Situche and Puo.
The estimated date of arrival (ETA) Sgto Puo is 9th of June,2011.

Note:This is a 100% efficient transport due to shallow draft - volume cargo.


Containers 20ft and 40ft, airconditoners, potable water plant, transformer
and compressor.

Today at 14:30 hours M/F San Martin IV departed from Iquitos to Sgto Puo loaded with 30
Tons of Procopet cargo. ETA June 12th 2011.

Cargo: Plantas de tratamiento de aguas grises/negras, tanque metlico de almacenamiento 4500 gln,
balancin metlico sprider, motosoldadoras cd 1073, compresor de aire nro 326709uam288,
luminaria, caja de herramientas metlicas, skid de estructuras para caseta generador, skid de
estructuras para caseta taller, skid con pisos para carpa obreros, congeladoras

Procopet/Ingecon crew arrived at Sgto Puo from S2X at noon.

This crew came from SC2X - they were performing the Scouting, Soil and
geotechnical studies for SC5.

5/29/2011
5/30/2011
5/31/2011

19
20

6/1/2011
6/2/2011

21

6/3/2011

Due to bad weather conditions TLM could not arrive at Sgto Puo. Safety induction to
Procopet/Ingecon crew regarding Fatal accident on block 123 - Tree felling techniques
discussed.
TLM Supervisor arrives at Sgto Puo.
Meeting with SN4X crew supervisor about the activities to be held when arriving at SN1X
and then to SN4X.
Flight plan agreed with Naranjal Camp boss.
All food, fuel and equipment ready to be sent to SN1X.

120 gasoil gallons given to Procopet/Ingecon for SN4X activities


20 gal SAE 40 and 5 gal 2 times oils were given to Procopet/Ingecon.

22
23

6/4/2011

6/5/2011
24

6/6/2011

Safety meeting about activities to be developed for jobs at SN1X and SN4X.
Inspection to materials, equipment, food and medicines for SN4X. OK
Two flights from Sgto Puo to SN1X with Pax, food and equipment.
SN1X temporary camp installed.
An advance crew reach SN4X and opened the pathway. GPS points at SN4X found broken Will be re installed making a new survey from SN1X.

Personnel and equipment ready to travel to SN1X-SN4X. Flight cancelled


due to bad weather
No Incidents/Accidents Registered.
Communication by radio clearly established. Trying to establish internet
connection.
Flight hours consider the mobilization from and to Naranjal. 399gln of JP1
consumed.
GPS points at SN4X reinstalled.
It takes a total of 4hrs going back and forth to from SN1X to SN4X.
Boundaries marking activities at SN4X
Coordination with Naranjal in order to move the camp from SN1X to SN4X
Tree felling activities started in the camp area. An approx. Area of 30m x 50m cleared today. as soon as the camp and helipad areas are cleared.
We estimate to clear the camp and helipad areas by Wednesday.
Internet conection not available yet. Communication held by Radio and
Phone.

25
6/7/2011
26
6/8/2011
27
6/9/2011
28
6/10/2011

Boundaries marking continue


Tree felling activities in the camp area finished. Area of the emergency helipad cleared and
ready to move the temporary camp from SN1X to SN4X.
E/F Maricarmen arrived at Puo with Portakamps and water plant for SN4X.
Continue with boundaries marking activities.
Two flights held today - SN1X temporary camp moved on SN4X. Camp installed.
Tree felling activities in the runway area of the lease.
Boundaries marking activities finished.
Tree felling activities in the runway area of the lease finished. Continue with the forest
inventory.
Tree felling activities continue: Operations helipad cleared. Working on approximation areas.
See the diagram below for the tree felling progress.
Continue with the forest inventory.

It's been programmed to have two flights to move camp and pax from SN1X
to SN4X.

Continue with tree felling activities: Approximation areas completed - Started in shot point
area towards cuttings pit - Water captation area identified and marked.
Continue with forest inventory.
Intermittent rain all day.

Departure of Rescue boat with personnel of Procopet for crew change


delayed due to lack of insurance documents of personnel. Crew change date
was moved on June 16th.

Continue with tree felling activities: Continue cutting trees in lease area nearby cuttings pit
and chemical warehouse.
Continue with forest inventory.
Tree felling activities continue: Camp, Operations and Emergency helipads and platform area
cleared. Still pending: Burning pit and water intake areas. After finishing trees feeling we will
proceed to clean all areas out - starting on helipads.
Trees inventory continue.

Tree felling activities at SN4X: Still pending 50% of Burning pit and water intake area. We
started chipping logs and clearing all areas out.
Delays due to rain in the morning.
Trees inventory continue - Documents signed by NNCC monitor.

Procopet people departed from Nauta today morning in the Rescue I boat.
Food and other supplies also departed in a fast boat from Nauta today
afternoon. ETA at Puo Thr. 16th.

Camp successfully moved on. No incidents reported.


Area on SN1X was cleaned and no waste were left there.
Flight hours charged: 1.35hrs. JP1 consumption: 203 gal.
NNCC monitor supports the forest inventory activities.

One chainsaw is broken - we need to replace two bolts in the blade.


Temporary camp has been placed in the walkway in order to avoid damages
when helicopters land in the camp area.

29

6/11/2011
30
6/12/2011
31

6/13/2011

We expect Procopet people to depart tomorrow from Nauta in the Rescue I


boat.
Crew change and food supply for SN4X: Flight scheduled on June 16th

32
6/14/2011
33

6/15/2011
34

6/16/2011
35
36

6/17/2011
6/18/2011

Tree felling activities at SN4X: Water intake area completed. Clearing main helipad area in
order to receive the MI-8 flight tomorrow.
Continue with trees inventory.
Is completed cutting down the burning pit area.The total area of the location of this cut
SN4X
Place wooden platform auxiliary and main heliport
continuous with clean camping area Petrex 40%
monumentation of landmarks N1 and N2
Cleaning camp Petrex 95%
Inspection of equipment and materials of Procopet en Puo
Cleaning camp Petrex 100%
Preparation of external load of Puno SN4X

Procopet workers arrived today at San Lorenzo. We expect them to arrive


tomorrow.

cleaning are for equipment unloading


Crew shift today 09 peolple left, 12 went in
One external cargo flight with fuel,scafolds, camp floor

A Archealogist went there today(Mr Pavel Tello).


Satellite internet and telephone installation 50%
water pump and shower installation 100%
Bathroom was fixed
Five flights programmed for tomorrow with generator, bedroom furniture,
geommebrane.
Comunication telephone& internet its finished ok

Procopet workers arrived today at Puo. They must enter the day tomorrow

Rain continued all day long


Suspend the change over in by bad weather SN4X

37
6/19/2011
38
39
40

6/20/2011
6/21/2011
6/22/2011

41
6/23/2011

Main Procopet camp& comunication system mounting. Cleaning areas to receive heavy
equipment from Sgto. Puo
Main Procopet camp mounting. Cleaning areas to receive disassembled heavy
equipment(Excavators&tractors)
Main Procopet camp mounting. Cleaning areas to receive heavy equipment, material and
small camp equipment.

Five flight at least are programmed for tomorrow to transport procopet


material and a Talisman&Procopet Supervision visit in order to inspect
activities advance.
Main Procopet camp mounting. Cleaning areas for Procopet fuel tanks mounting. Temporary No flights to SN4X due bad weather. One flight to SN4X is programmed for
heliport area enlargement and cleaning
tomorrow to transport Procopet people(Engs, technicians, others).

42
43
44

6/24/2011
6/25/2011
6/26/2011

Cleaning of plataform access. Cleaning of areas for Procopet fuel tanks installation. Procopet
camp generator installation.
Procopet camp installation. Temporary dike construction for Procopet fuel tanks. Heavy
equipment, camp containers and materials reception.
Procopet camp installation. Helipad plataform enlargement. Procopet camp loads reception The chinock flights were done in the afternoon due bad weather in the
(containers, materials, fuel tank, potable water treatment plant, sewage plants, etc)
morning.

45
46

6/27/2011
6/28/2011

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

6/29/2011
6/30/2011
7/1/2011
7/2/2011
7/3/2011
7/4/2011
7/5/2011
7/6/2011
7/7/2011
7/8/2011
7/9/2011
7/10/2011
7/11/2011
7/12/2011
7/13/2011
7/14/2011
7/15/2011
7/16/2011
7/17/2011
7/18/2011
7/19/2011
7/20/2011
7/21/2011
7/22/2011
7/23/2011
7/24/2011
7/25/2011
7/26/2011
7/27/2011
7/28/2011
7/29/2011
7/30/2011
7/31/2011
8/1/2011
8/2/2011
8/3/2011
8/4/2011
8/5/2011
8/6/2011
8/7/2011
8/8/2011
8/9/2011

Heavy equipment assembly. Procopet camp installation


Aserrado de madera para base de contenedores varios
Cleaning of heliport emergency area.Advance 50%. Fuel pit for minor equipments
relocated,finished heavy equipment assembly. Topography activities

Morning activities were suspended because they had no equipment and


operators in their respective certifications and sent us campo.Luego
operations continued.

90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170

8/10/2011
8/11/2011
8/12/2011
8/13/2011
8/14/2011
8/15/2011
8/16/2011
8/17/2011
8/18/2011
8/19/2011
8/20/2011
8/21/2011
8/22/2011
8/23/2011
8/24/2011
8/25/2011
8/26/2011
8/27/2011
8/28/2011
8/29/2011
8/30/2011
8/31/2011
9/1/2011
9/2/2011
9/3/2011
9/4/2011
9/5/2011
9/6/2011
9/7/2011
9/8/2011
9/9/2011
9/10/2011
9/11/2011
9/12/2011
9/13/2011
9/14/2011
9/15/2011
9/16/2011
9/17/2011
9/18/2011
9/19/2011
9/20/2011
9/21/2011
9/22/2011
9/23/2011
9/24/2011
9/25/2011
9/26/2011
9/27/2011
9/28/2011
9/29/2011
9/30/2011
10/1/2011
10/2/2011
10/3/2011
10/4/2011
10/5/2011
10/6/2011
10/7/2011
10/8/2011
10/9/2011
10/10/2011
10/11/2011
10/12/2011
10/13/2011
10/14/2011
10/15/2011
10/16/2011
10/17/2011
10/18/2011
10/19/2011
10/20/2011
10/21/2011
10/22/2011
10/23/2011
10/24/2011
10/25/2011
10/26/2011
10/27/2011
10/28/2011
10/29/2011

171
172
173
174
175
176
177
178
179
180

10/30/2011
10/31/2011
11/1/2011
11/2/2011
11/3/2011
11/4/2011
11/5/2011
11/6/2011
11/7/2011
11/8/2011

13/may/2011

14/may/2011

15/may/2011

16/may/2011

17/may/2011

18/may/2011

19/may/2011

20/may/2011

21/may/2011

22/may/2011

23/may/2011

24/may/2011

25/may/2011

MI-17

MI-8

Chinook
Other

TOTAL

MI-17
MI-8
Chinook
Other

TOTAL

HORAS DE VUELO

1
2
3
4

HORAS DE VUELO
ACUMULADAS

1
2
3
4

FECHA

DETALLE DE LOS VUELOS - DESCRIBIR PORQUE EL VUELO FUE CARGAD

5/10/2011
5/11/2011
5/12/2011
5/13/2011
5/14/2011
5/15/2011
5/16/2011
5/17/2011
5/18/2011
5/19/2011
5/20/2011
5/21/2011
5/22/2011
5/23/2011
5/24/2011
5/25/2011
5/26/2011
5/27/2011
5/28/2011
5/29/2011
5/30/2011
5/31/2011
6/1/2011
6/2/2011
6/3/2011
6/4/2011
6/5/2011 First flight to SN4X: Naranjal - Puo 0.8 hrs Puo-SN1X-Puo 0.6 hrs Puo-SN1X 0.4 hrs (external loa

6/6/2011
6/7/2011
6/8/2011
6/9/2011
6/10/2011
6/11/2011
6/12/2011
6/13/2011
6/14/2011
6/15/2011
6/16/2011
6/17/2011
6/18/2011
6/19/2011
6/20/2011
6/21/2011
6/22/2011
6/23/2011
6/24/2011
6/25/2011
6/26/2011
6/27/2011
6/28/2011
6/29/2011
6/30/2011
7/1/2011
7/2/2011
7/3/2011
7/4/2011
7/5/2011
7/6/2011
7/7/2011
7/8/2011
7/9/2011
7/10/2011
7/11/2011
7/12/2011
7/13/2011
7/14/2011
7/15/2011
7/16/2011
7/17/2011
7/18/2011
7/19/2011
7/20/2011
7/21/2011
7/22/2011

No flights today
No flights to SN1X/SN4X today - the 0.5hrs is equivalent to the flight from Naranjal to Puo shared wit
Two flights to move SN1X camp on SN4X - total flight hours: 6.3 hrs - Shared with Coproe: SC2X: 4.9hrs
No flights held today, however it was charged 0.5 hrs of flight for the flight the MI-8 performed to retu
No flights today
No flights today
No flights today
No flights today
No flights today
Twin otter 30% charge to construction TLM supervisors and Three procopet.. Iquitos to Puo-Iquitos
Two flights to move Puno on SN4X - total flight hours: 2.3 hrs -Naranjal-Puo 0.8 hrs Puo-SN4X-Puo
No flights today
No flights today
6.3 hours 50 % charge to Procopet 14 pax from Iquitos, 50% demobilizationingecon peolple and one c
No flights today
Five flight from Puo to SN4X with Procopet camp materials & 125KW generator. First flight with Talism
No flyghts to SN4X today
No flights to SN4X today
No flights to SN4X today
twelve chinock flights from Puo transporting PROCOPET heavy equipment, containers and materials
Six chinock flights from Puo transporting PROCOPET containers, materials and others.
One MI8 people flight from SN4X to Puo - 1.3 flight hours - 319 gal of JP1
No flights to SN4X today

7/23/2011
7/24/2011
7/25/2011
7/26/2011
7/27/2011
7/28/2011
7/29/2011
7/30/2011
7/31/2011
8/1/2011
8/2/2011
8/3/2011
8/4/2011
8/5/2011
8/6/2011
8/7/2011
8/8/2011
8/9/2011
8/10/2011
8/11/2011
8/12/2011
8/13/2011
8/14/2011
8/15/2011
8/16/2011
8/17/2011
8/18/2011
8/19/2011
8/20/2011
8/21/2011
8/22/2011
8/23/2011
8/24/2011
8/25/2011
8/26/2011
8/27/2011
8/28/2011
8/29/2011
8/30/2011
8/31/2011
9/1/2011
9/2/2011
9/3/2011
9/4/2011
9/5/2011
9/6/2011
9/7/2011

9/8/2011
9/9/2011
9/10/2011
9/11/2011
9/12/2011
9/13/2011
9/14/2011
9/15/2011
9/16/2011
9/17/2011
9/18/2011
9/19/2011
9/20/2011
9/21/2011
9/22/2011
9/23/2011
9/24/2011
9/25/2011
9/26/2011
9/27/2011
9/28/2011
9/29/2011
9/30/2011
10/1/2011
10/2/2011
10/3/2011
10/4/2011
10/5/2011
10/6/2011
10/7/2011
10/8/2011
10/9/2011
10/10/2011
10/11/2011
10/12/2011
10/13/2011
10/14/2011
10/15/2011
10/16/2011
10/17/2011
10/18/2011
10/19/2011
10/20/2011
10/21/2011
10/22/2011
10/23/2011
10/24/2011

10/25/2011
10/26/2011
10/27/2011
10/28/2011
10/29/2011
10/30/2011
10/31/2011
11/1/2011
11/2/2011
11/3/2011
11/4/2011
11/5/2011

28/may/2011

29/may/2011

30/may/2011

31/may/2011

1/jun/2011

2/jun/2011

3/jun/2011

4/jun/2011

5/jun/2011

6/jun/2011

9/jun/2011

10/jun/2011

2.9

0.5

1.4

0.5

2.9

0.5

1.4

0.5

2.9

2.9

3.4

4.8

5.3

5.3

2.9

2.9

3.4

4.8

5.3

5.3

8/jun/2011

27/may/2011

7/jun/2011

26/may/2011

UELO FUE CARGADO A CONSTRUCCIONES - Usar Alt+Enter para salto de rengln

N1X 0.4 hrs (external load) SN1X - Puo 0.3 hrs Puo - Naranjal : 0.8 hrs TOTAL: 2.9 hrs - Fuel consumption: 399 gln JP1

ranjal to Puo shared with SC2X activities. Fuel consumption 879 gal Total flight hours 4.3 - Fuel consumption for SN4X: 102gal JP1
with Coproe: SC2X: 4.9hrs SN4X: 1.4hrs. Fuel consumption 948 gal Total - SC2X: 737 gal and SN4X 211 gal JP1
he MI-8 performed to return to Naranjal

Iquitos to Puo-Iquitos
0.8 hrs Puo-SN4X-Puo 0.7 hrs Puo- SN4X -Puo 0.8 hrs. Fuel consumption 135 gal JP1 Total

ngecon peolple and one cargo flight from puo to sn4x. Fuel consumption 420 gal JP1

ator. First flight with Talisman and Procopet Engineers

containers and materials + one MI8 flight with people from Puo
nd others.

399 gln JP1

12/jun/2011

13/jun/2011

14/jun/2011

15/jun/2011

16/jun/2011

17/jun/2011

18/jun/2011

19/jun/2011

20/jun/2011

21/jun/2011

22/jun/2011

23/jun/2011

25/jun/2011

26/jun/2011

24/jun/2011

11/jun/2011

2.3

6.3

5.9

1.3

1.6

6.6

3.2

2.3

6.3

5.9

1.3

8.2

3.2

5.3

5.3

5.3

5.3

5.3

7.6

7.6

7.6

13.9

13.9

19.8

19.8

19.8

21.1

22.7

22.7

6.6

9.8

5.3

5.3

5.3

5.3

5.3

7.6

7.6

7.6

13.9

13.9

19.8

19.8

19.8

21.1

29.3

32.5

n for SN4X: 102gal JP1


P1

28/jun/2011

29/jun/2011

30/jun/2011

1/jul/2011

2/jul/2011

3/jul/2011

4/jul/2011

5/jul/2011

6/jul/2011

7/jul/2011

8/jul/2011

9/jul/2011

10/jul/2011

11/jul/2011

12/jul/2011

27/jun/2011

1.3

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

0
1.3
0
0

13/jul/2011

14/jul/2011

15/jul/2011

16/jul/2011

17/jul/2011

18/jul/2011

19/jul/2011

20/jul/2011

21/jul/2011

22/jul/2011

23/jul/2011

24/jul/2011

25/jul/2011

26/jul/2011

27/jul/2011

28/jul/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

29/jul/2011

30/jul/2011

31/jul/2011

1/ago/2011

2/ago/2011

3/ago/2011

4/ago/2011

5/ago/2011

6/ago/2011

7/ago/2011

8/ago/2011

9/ago/2011

10/ago/2011

11/ago/2011

12/ago/2011

13/ago/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

14/ago/2011

15/ago/2011

16/ago/2011

17/ago/2011

18/ago/2011

19/ago/2011

20/ago/2011

21/ago/2011

22/ago/2011

23/ago/2011

24/ago/2011

25/ago/2011

26/ago/2011

27/ago/2011

28/ago/2011

29/ago/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

30/ago/2011

31/ago/2011

1/sep/2011

2/sep/2011

3/sep/2011

4/sep/2011

5/sep/2011

6/sep/2011

7/sep/2011

8/sep/2011

9/sep/2011

10/sep/2011

11/sep/2011

12/sep/2011

13/sep/2011

14/sep/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

15/sep/2011

16/sep/2011

17/sep/2011

18/sep/2011

19/sep/2011

20/sep/2011

21/sep/2011

22/sep/2011

23/sep/2011

24/sep/2011

25/sep/2011

26/sep/2011

27/sep/2011

28/sep/2011

29/sep/2011

30/sep/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

1/oct/2011

2/oct/2011

3/oct/2011

4/oct/2011

5/oct/2011

6/oct/2011

7/oct/2011

8/oct/2011

9/oct/2011

10/oct/2011

11/oct/2011

12/oct/2011

13/oct/2011

14/oct/2011

15/oct/2011

16/oct/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

17/oct/2011

18/oct/2011

19/oct/2011

20/oct/2011

21/oct/2011

22/oct/2011

23/oct/2011

24/oct/2011

25/oct/2011

26/oct/2011

27/oct/2011

28/oct/2011

29/oct/2011

30/oct/2011

31/oct/2011

1/nov/2011

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

2/nov/2011

3/nov/2011

4/nov/2011

5/nov/2011

6/nov/2011

7/nov/2011

8/nov/2011

24

24

24

24

24

24

24

9.8

9.8

9.8

9.8

9.8

9.8

9.8

33.8

33.8

33.8

33.8

33.8

33.8

33.8

VALORIZACIONES
SN4X LEASE CONSTRUCTION
Item Descripcin
1 Construccin SN4X - Lump sum

Item Descripcin
2 -

Item Descripcin
3 -

Item Descripcin
4 -

Item Descripcin
5 -

Monto
Presupuestado
5/10/2011

2,582,760.79

Monto
Presupuestado
5/10/2011

Monto
Presupuestado
5/10/2011

Monto
Presupuestado
5/10/2011

Monto
Presupuestado
5/10/2011

% Adelanto

20%

% Adelanto

10%

% Adelanto

10%

% Adelanto

10%

% Adelanto

10%

Fecha de entrega de
adelanto
5/12/2011
516,552.16

Fecha Primera
Valorizacin
6/15/2011
83,440.00

Fecha Segunda
Valorizacin
6/20/2011
91,892.91

Fecha Tercera
Valorizacin

Fecha Cuarta
Valorizacin

Fecha Valorizacin
Final de Cierre

Pagado a la
fecha

Saldo a la Fecha

7/15/2011

7/30/2011

8/7/2011

6/28/2011

6/28/2011

691,885.07 - 1,890,875.72

Fecha de entrega de
adelanto

Fecha Primera
Valorizacin

Fecha Segunda
Valorizacin

Fecha Tercera
Valorizacin

Fecha Cuarta
Valorizacin

Fecha Valorizacin
Final de Cierre

Pagado a la
fecha

Saldo a la Fecha

5/11/2011

5/30/2011

6/29/2011

7/29/2011

8/28/2011

9/23/2011

6/28/2011

6/28/2011

Fecha de entrega de
adelanto

Fecha Primera
Valorizacin

Fecha Segunda
Valorizacin

Fecha Tercera
Valorizacin

Fecha Cuarta
Valorizacin

Fecha Valorizacin
Final de Cierre

Pagado a la
fecha

Saldo a la Fecha

5/12/2011

6/11/2011

7/11/2011

8/10/2011

9/9/2011

9/23/2011

6/28/2011

6/28/2011

Fecha de entrega de
adelanto

Fecha Primera
Valorizacin

Fecha Segunda
Valorizacin

Fecha Tercera
Valorizacin

Fecha Cuarta
Valorizacin

Fecha Valorizacin
Final de Cierre

Pagado a la
fecha

Saldo a la Fecha

5/12/2011

6/11/2011

7/11/2011

8/10/2011

9/9/2011

9/23/2011

6/28/2011

6/28/2011

Fecha de entrega de
adelanto

Fecha Primera
Valorizacin

Fecha Segunda
Valorizacin

Fecha Tercera
Valorizacin

Fecha Cuarta
Valorizacin

Fecha Valorizacin
Final de Cierre

Pagado a la
fecha

Saldo a la Fecha

5/12/2011

6/11/2011

7/11/2011

8/10/2011

9/9/2011

9/23/2011

6/28/2011

6/28/2011

2.1 Trazo y Replanteo

1%

2.2

Deforestacin de rea de plataforma (tala, desbroce y limpieza) 1%


2%
2.3 Corte y relleno compensado
2%
2.4 Relleno compactado estructural
5.42%
MOVIMIENTO DE TIERRAS
3.1
3.2
3.3
3.4
3.5
3.6
3.7

4.6

5.6

1.26
2.64

100.00

100.00

0.04

100

0.04
0.10
0.10
0.29

100
100
100

100.00

0.01
0.04
0.01
0.02
0.02
0.06

100
100
100
100
100
100

Suministro y colocacin de tubera de acero sch.40. D=10in

1%

0.07

100

1%
1%
5.39%

0.04
0.03
0.29

100
100

100.00

Trazo y Replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno con material propio (incl. compactacin)
Nivelado y Compactado e=0.20 m.

0%
0%
0%
0%
0%

0.00
0.00
0.00
0.00
0.00

100.00
100.00
100.00
100.00
100.00

Suministro y colocacin de geomembrana HDPE e=1.5 mm

0%

0.00

100.00

0%
0.46%

0.00
0.00

100.00

100.00

0%
1%
0%
0%
0%

0.01
0.06
0.02
0.02
0.02

100.00
100.00
100.00
100.00
100.00

1%
0%
1%
0%
0%
4.82%

0.06
0.01
0.03
0.01
0.00
0.23

100.00
100.00
100.00
100.00
100.00

4.7 Construccin de trampas de grasa al ingreso de cada poza


POZA DE GRASAS
5.1
5.2
5.3
5.4
5.5

100.00

0%
1%
0%
0%
0%
1%

Suministro y colocacin de planchas de apoyo de columnas


3.9 Montaje de techo metlico en Poza de Cortes
POZA DE LODOS Y AGUA
4.1
4.2
4.3
4.4
4.5

1.39

Trazo y Replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno compactado con material impermeable
Nivelado y compactacin e=0.20m
Suministro y colocacin de geomembrana HDPE=1.5mm

3.8

Avance
por
actividad

LISTA DE PARTIDAS
9%
1.1 Movilizacin y Desmovilizacin de Equipos y Personal
Movilizacin, desmovilizacin, campamento provisional,
1.2 alimentacin por 90 das
8%
16.26%
TRABAJOS PRELIMINARES

Avance
Ponderad
o

Incidencia

SITUCHE NORTE 4X

Trazo y replanteo
Excavacin en Terreno Natural
Eliminacin de Material Excedente
Relleno compactado con material impermeable
Nivelado y compactacin e=0.20m

Suministro y colocacin de geomembrana HDPE e=1.5 mm


5.7 Suministro y colocacin de tubera de acero SCH40 d=8in
5.8 Suministro y colocacin de tubera de acero SCH40 d=10in
5.9 Suministro y colocacin de codos de 90.
5.10 Montaje de estructura metlica y cortina de agua
POZA DE QUEMA

100.00

5
0%
1%
0%

0.01
0.06
0.02

100.00
100.00
100.00

2%
1%
5.00%

0.12
0.04
0.25

100.00
100.00

100.00

Colocacin y compactacin de Relleno Estructural


0%
Suministro y acondicionamiento de pilotes 10in
11%
Izaje, colocacin e hincado de pilotes 10in
5%
Suministro, frabricacin y montaje de estructura de vigas H
2%
Construccin de losa de mortero armado de 20cm alrededor de
7.5
cellar segn plano
0%
Construccin de cunetas de drenaje interno alrededor de cellar
7.6
y equipos de tratamiento de lodos
2%
1%
7.7 Suministro de grating para cuneta de drenaje interno
Construccin de trampa de grasa previo ingreso de cuneta
7.8 interior al cellar
0%
21.21%
PILOTAJE PATINES DE PLATAFORMA

0.00
2.23
1.12
0.45

100.00
100.00
100.00
100.00

0.01

100.00

0.48
0.16

100.00
100.00

0.04
4.50

100.00

100.00

0.00
0.47
0.24
0.00
0.02

100.00
100.00
100.00
100.00
100.00

Suministro y colocacin de geomembrana HDPE e=1.5 mm


0%
2%
8.7 Colocacin de Mating Dura-Base
Montaje
de
estructura
metlica
y
techo
1%
8.8
Montaje
de
Vinilona
1%
8.9
Relleno de espacios libres entre mating y pilotes con tablones
8.10 de madera
0%
10.74%
ALMACEN DE QUIMICA

0.02
0.21
0.06
0.12

100.00
100.00
100.00
100.00

0.01
1.15

100.00

9.1 Excavacin en Terreno Natural


9.2 Colocacin y compactacin de Relleno Estructural
9.3 Colocacin e instalacin de geomembrana HDPE 1.5mm
9.4 Drenajes
9.5 Colocacin de Pavimento Flexible-Mating
9.6 Pintado de helipuertos segn norma Peruana
HELIPUERTOS

0%
0%
0%
2%
0%
0%
2.51%

0.00
0.00
0.00
0.04
0.01
0.00
0.06

10.1 Trazo y replanteo


10.2 Colocacin y compactacin de Relleno Estructural
10.3 Acabado, refine y compactacin de plataforma
10.4 Colocacin e instalacin de geomembrana HDPE 1.5mm
10.5 Colocacin de Pavimento Flexible-Mating
10.6 Colocacin de pavimento Unimat
SUMINISTRO Y COLOCACION DE DURABASE

0%
1%
1%
0%
1%
1%
4.45%

0.02
0.03
0.05
0.02
0.03
0.05
0.20

100.00

0%
0%

0.00
0.00

100.00
100.00

6.1 Trazo y replanteo


6.2 Excavacin en Terreno Natural
6.3 Eliminacin de Material Excedente
6.4

Suministro y colocacin de geomembrana HDPE e=1.5 mm


6.5 Suministro y colocacin de alcantarillas en accesos
SISTEMA DE DRENAJE PLUVIAL
7.1
7.2
7.3
7.4

8.1
8.2
8.3
8.4
8.5

Trazo y replanteo
Suministro y acondicionamiento de pilotes 10in
Izaje, colocacin e hincado de pilotes 10in
Excavacin en Terreno Natural
Colocacin y compactacin de Relleno Estructural

0%
4%
2%
0%
0%

8.6

10

11.1 Trazo y replanteo


11.2 Construccin de diques en madera

100.00

100.00
100.00
100.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00

11

11.3 Suministro e instalacin de geomembrana HDPE e=1,5mm


0.00
0%
100.00
0.72%
0.01
CONSTRUCCION DE PITS DE CONTENCION DE TANQUES DE COMBUSTIBLE,
MOTOBOMBAS;
100.00
BLADDERS Y BO
12.1 Suministro e instalacin de postes de luz
Suministro e instalacin de pozos a tierra para sistema de
12.2 comunicaciones TLM, campamento y pararrayos (por separado
- ohmiaje mximo 5ohm)
12.3 Pararrayo en campamento de perforacin

12

2%

0.07

100.00

0%
1%

0.01
0.03

100.00
100.00

0.02
0.14

100.00

0.01

100.00

0.01
0.02

100.00

100.00

0%

0.00

100.00

0%

0.00

100.00

0.00
0.01

100.00
100.00

0.02

100.00

0.01
0.04

100.00

1.35
0.61
0.18
0.06

100.00
100.00
100.00
100.00

0.31
2.52

100.00

12.4 Tendido de tuberas de paso de 6in en la locacin para paso de


cableado elctrico y de comunicacin (segn plano)
1%
3.68%
NSTALACIONES ELECTRICAS; PUESTAS A TIERRA Y PARARRAYOS
Suministro e instalacin de 02 cellar metlicos pre fabricados
(de acuerdo a plano)
1%
Suministro e instalacin y cementacin de 02 tuberas
13.2 conductoras de 35pie x 30in
1%
1.36%
CONSTRUCCIN DE CELLAR Y CONDUCTORA DE 30in
13.1

13

14.1 Trazo y Replanteo


Limpieza de trocha y deforestacin de rea de bombas,
14.2
construccin de pit
14.3

14

Suministro e instalacin de geomembrana HDPE e=1,5mm


0%
0%
14.4 Colocacin de Pavimento Flexible-Mating
Suministro, tendido y colocacin de tubera HDPE 3in, incluye
14.5 lneas dentro de locacin (aprox. 1200m Tee y vlvulas de
derivacin)
1%
Instalacin de casing de 9 5/8in como conductoras para los
14.6 pozos de inyeccin de agua - a ser hincados con martillo
delmag - TLM proveer el casing de 9 5/8in
0%
2.12%
TOMA Y TENDIDO DE LINEA DE AGUA
15.1

15

Suministro y habilitacin de pilotes 10in y vigas WF 12x6 1/2in


9%
4%
15.2 Hincado pilotes 10in
1%
15.3 Soldado de vigas WF12x6 1/2in
0%
15.4 Relleno interior con suelo cemento e=15cm
Instalacin de geomembrana con cuneta de drenaje y trampa
15.5 de grasa
2%
15.87%
CIMENTACION DE TANQUES DE LODO
Total de incidencia

100%

100.00

100.00

100.00

Avance por da
Avance Acumulado
Avance Total

13/may/2011

14/may/2011

15/may/2011

16/may/2011

17/may/2011

18/may/2011

19/may/2011

20/may/2011

21/may/2011

22/may/2011

23/may/2011

24/may/2011

1
0.16
0.16

1
0.16
0.33

1
0.16
0.49

1
0.16
0.65

1
0.16
0.81

1
0.16
0.98

1
0.16
1.14

1
0.16
1.30

1
0.16
1.46

1
0.16
1.63

1
0.16
1.79

1
0.16
1.95

20

20

60
25

35

40
50

50
50

50

25

0.07
0.07

0.23
0.23
100.00%

35

40

0.07
0.14

0.21
0.35

0.09
0.44

0.12
0.56

0.32
0.88

0.18
1.06

0.18
1.23

0.18
1.41

0.09
1.50

0.12
1.62

0.14
1.76

0.23
0.47

0.37
0.84

0.25
1.09

0.29
1.38

0.48
1.86

0.34
2.20

0.34
2.54

0.34
2.87

0.25
3.13

0.29
3.41

0.30
3.72

25/may/2011

26/may/2011

27/may/2011

28/may/2011

29/may/2011

30/may/2011

31/may/2011

1/jun/2011

2/jun/2011

3/jun/2011

4/jun/2011

5/jun/2011

1
0.16
2.11

1
0.16
2.28

1
0.16
2.44

1
0.16
2.60

1
0.16
2.76

1
0.16
2.93

1
0.16
3.09

1
0.16
3.25

1
0.16
3.41
10.00

1
0.16
3.58
20.00

1
0.16
3.74
30.00

1
0.16
3.90
40.00

5.00

10.00

10.00

10.00

0.20
0.20

0.41
0.61

0.54
1.15

0.68
1.83

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

0.16
3.88

0.16
4.04

0.16
4.20

0.16
4.37

0.16
4.53

0.16
4.69

0.16
4.85

0.16
5.02

0.37
5.38

0.57
5.95

0.70
6.66

0.84
7.50

8/jun/2011

9/jun/2011

10/jun/2011

11/jun/2011

12/jun/2011

13/jun/2011

14/jun/2011

15/jun/2011

1
0.16
4.07

1
0.16
4.23

1
0.16
4.39

1
0.16
4.55

1
0.16
4.72

1
0.16
4.88

1
0.16
5.04

1
0.16
5.20

1
0.16
5.37

1
0.16
5.53

1
0.08
5.61

1
0.16
5.77

5.42

5.42

5.42

5.42

5.42

10.00

10.00

10.00

10.00

10.00

0.06
0.66

0.06
0.72

0.06
0.78

0.06
0.84

0.06
0.90

0.14
1.96

10.00

0.14
2.10

10.00
10.00
10.00
0.41
2.51

10.00
20.00
20.00
0.68
3.18

10.00
30.00
30.00
0.95
4.13
25.00

0.15
0.15

15.00
30.00
30.00
1.02
5.15
35.00

0.21
0.36

10.00
10.00
0.27
5.42
40.00

0.24
0.60

17/jun/2011

7/jun/2011

10.00

16/jun/2011

6/jun/2011

25.00

0.25
0.25

25.00

0.25
0.50

25.00

0.25
0.75

25.00
5.00

0.30
1.05

5.00

0.05
1.10

5.00

0.05
1.15

50
15

25

0.70
0.70
25
25

5.00

0.05
1.20

50
15

0.70
1.40
25
25

10.00

10.00

10.00

10.00

10.00

5.00

5.00

5.00

5.00

0.15
1.35

0.15
1.50

0.15
1.65

0.15
1.80

5.00
20.00
0.35
2.15

15

0.16
1.56
25
25

15
20

0.38
1.93

15
20
25

0.64
2.58

0.10
0.10

0.21
0.31

0.21
0.52

0.21
0.73

15
20
25

0.64
3.22

10
20
25
25

0.86
4.08

20
25
25

0.75
4.83

25
30
25

25

0.21
0.94

0.23
1.17

30
20

0.21
1.38

30
20

0.21
1.59

10
10

0.08
1.67

20
25

0.41
0.41

20
25

0.41
0.83

20
25

0.41
1.24

20
25

0.41
1.66
10

1.66
10

1.66
10

1.66
10

1.66
10

0.07
0.07

0.07
0.14

0.07
0.20

0.07
0.27

0.07
0.34

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

0.55
8.04

0.55
8.59

0.82
9.41

1.24
10.66

2.63
13.29

2.76
16.05

1.51
17.55

1.44
18.99

1.31
20.31

1.29
21.60

1.43
23.03

1.48
24.50

18/jun/2011

19/jun/2011

20/jun/2011

21/jun/2011

22/jun/2011

23/jun/2011

24/jun/2011

25/jun/2011

26/jun/2011

27/jun/2011

28/jun/2011

29/jun/2011

1
0.16
5.94

1
0.16
6.10

1
0.16
6.26

1
0.16
6.42

1
0.16
6.59

1
0.16
6.75

1
0.16
6.91

1
0.16
7.07

1
0.16
7.24

1
0.16
7.40

1
0.16
7.56

1
0.16
7.72

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

10.00

10.00

10.00

10.00

10.00
20.00

20.00

20.00

20.00
20.00

20.00

20.00

20.00

0.12
2.03
30.00

0.12
2.15
30.00

0.12
2.27
40.00
20.00

0.02
0.02

0.02
0.04

0.04
0.08

20.00

0.06
0.96

0.06
1.02

0.06
1.08

0.06
1.14

0.18
1.32

0.12
1.44

0.12
1.56

0.12
1.68

0.24
1.91

10.00

5.00
25.00

5.00
25.00

5.00
25.00

5.00
25.00

5.00

5.00

5.00

5.00

5.00

0.15
2.30

0.35
2.65

0.35
3.00

0.35
3.35

0.35
3.70

25

5.00
20.00
0.25
3.95
25.00
10.00

5.00

5.00

5.00

0.05
4.00
25.00
10.00

0.05
4.05
25.00
10.00

0.05
4.10
25.00
10.00

5.00

5.00

5.00

1.06
1.06

1.06
2.12

1.06
3.18

5.00
20.00
0.25
4.35

5.00

5.00

0.05
4.40

0.05
4.45

10.00

10.00

5.00

5.00

5.00

10.00
10.00
5.00

1.06
4.24

0.40
4.64

0.40
5.04

0.66
5.70

25
25

25

25

25
30

30

40
10

0.27
5.10

0.27
5.37

33
0.14
1.81

0.27
5.64

33
0.14
1.95

10

20

0.27
5.91

0.27
6.18

0.27
6.45

0.32
6.77

0.32
7.09

0.43
7.52

0.11
7.63

0.11
7.73

0.21
7.95

50
0.21
2.30
20

50
0.21
2.51
20

2.51
20

2.51
20

2.51
20
5

2.51

2.51

2.51

2.51

0.19
0.78

0.04
0.82

34
0.14
2.09

0.15
0.15

0.15
0.30

0.15
0.45

0.15
0.59

0.04
0.85

0.04
0.89

10
5

0.11
1.00

10

1.66
10

1.66
10

1.66
10

1.66
10

1.66

10

0.09
1.75

0.09
1.84

1.84

1.84

1.84

1.84

1.84

10
0.07
0.81

10
0.07
0.88

10
0.07
0.95

10
0.07
1.02

10
0.07
1.08

10
0.07
1.15

10

0.07
0.41

0.07
0.47

0.07
0.54

0.07
0.61

0.07
0.68

10
0.07
0.75

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

0.85
25.35

1.05
26.39

1.05
27.45

1.27
28.71

1.39
30.10

2.17
32.27

2.02
34.29

1.97
36.26

2.05
38.30

1.16
39.47

0.96
40.43

1.43
41.86

30/jun/2011

1/jul/2011

2/jul/2011

3/jul/2011

4/jul/2011

5/jul/2011

6/jul/2011

7/jul/2011

8/jul/2011

9/jul/2011

10/jul/2011

11/jul/2011

1
0.16
7.89

1
0.16
8.05

1
0.16
8.21

1
0.08
8.29

1
0.08
8.37

1
0.08
8.46

1
0.08
8.54

1
0.08
8.62

1
0.08
8.70

1
0.08
8.78

1
0.08
8.86

1
0.08
8.94

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

100.00
20.00
10.00

10.00

10.00

10.00

10.00

10.00

10.00

0.12
2.39

0.06
2.45

0.06
2.51

0.06
2.57

0.06
2.63

0.06
2.69

0.06
2.75

0.06
2.81

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

0.01
0.09
50.00

0.24

0.01
0.09
50.00

0.24

0.01
0.10

0.01
0.11

0.01
0.11

0.01
0.12

25.00
25.00

25.00
25.00

25.00
25.00

25.00
25.00

0.24

0.24

0.24

0.24

10.00

10.00

10.00

20.00

20.00

20.00

0.06
2.87

0.18
3.05

0.18
3.23

0.72
3.95

25.00

25.00

25.00
25.00

25.00
25.00

0.01
0.13

0.01
0.13

0.02
0.15

0.02
0.17

0.03
0.20

0.03
0.23

10.00
10.00

10.00
10.00

10.00
10.00

10.00
10.00

10.00
10.00

10.00
10.00

0.10

0.10

0.10

0.10

0.10

0.10

0.24

0.48

0.72

0.96

1.20

1.45

1.54

1.64

1.73

1.83

1.93

2.02

5.00

5.00

0.05
4.50

0.05
4.55

5.00
20.00
0.25
4.80

4.80

4.80

4.80

20.00
0.20
5.00

5.00

5.00

5.00

5.00

5.00

10.00
10.00
5.00

10.00
10.00
5.00

10.00
10.00
5.00

10.00
5.00

10.00
5.00

10.00
5.00

10.00
5.00

10.00
5.00

10.00
5.00

5.00

5.00

5.00

0.66
6.36

0.66
7.03

0.66
7.69

0.40
8.09

0.40
8.48

0.40
8.88

0.40
9.28

0.40
9.68

0.40
10.07

0.13
10.21

0.13
10.34

0.13
10.47

20

20
20

20
20

20

20

20

0.21
8.16

0.43
8.59

0.43
9.02

0.21
9.24

0.21
9.45

0.21
9.67

10
0.11
9.78

10
0.11
9.88

30
0.32
10.20

30
0.32
10.53

10
0.11
10.63

10
0.11
10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

10
5

0.11
1.11

10
5

0.11
1.22

10
5

0.11
1.34

10
10

0.15
1.48

5
10
5

0.15
1.63

5
10
5

0.15
1.78

5
10
5

0.15
1.93

5
10
5

0.15
2.08

5
10
10

0.19
2.26

5
5
10
10
0.22
2.49

5
10
10
0.19
2.67

5
10
10
0.19
2.86

20

1.84

1.84

50
0.46
2.30

50
0.46
2.76

2.76

2.76

2.76

2.76

2.76

2.76

2.76

0.18
2.94

10
0.07
1.22

10
0.07
1.29

10
0.07
1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

1.76

50
0.18
1.94

50
0.18
2.12

2.12

10

10

10

1.64
43.49

1.79
45.28

2.45
47.74

1.61
49.34

1.15
50.49

1.15
51.64

0.32
0.32
1.41
53.06

10

0.32
0.63
1.22
54.27

10

0.32
0.95
1.48
55.75

0.32
1.27
1.55
57.30

0.32
1.59
1.31
58.61

10

0.32
1.90
1.86
60.46

12/jul/2011

13/jul/2011

14/jul/2011

15/jul/2011

16/jul/2011

17/jul/2011

18/jul/2011

19/jul/2011

20/jul/2011

21/jul/2011

22/jul/2011

23/jul/2011

1
0.08
9.03

1
0.08
9.11

1
0.08
9.19

1
0.08
9.27

1
0.08
9.35

1
0.08
9.43

1
0.08
9.51

1
0.08
9.59

1
0.08
9.68

1
0.08
9.76

1
0.08
9.84

1
0.08
9.92

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

20.00

20.00
20.00

20.00

20.00

20.00

20.00
10.00
0.06
4.91

10.00
0.06
4.97

10.00
0.06
5.03

10.00
0.06
5.09

10.00

20.00
20.00
0.01
0.42

20.00
0.01
0.44

0.12
4.07

0.12
4.19

0.12
4.31

0.12
4.43

0.12
4.55

0.12
4.67

0.12
4.79

10.00
0.06
4.85

10.00

10.00

10.00

10.00

10.00

100.00
25.00

25.00
20.00

0.02
0.25

0.02
0.26

0.08
0.34

0.01
0.35

10.00
10.00

10.00
10.00

10.00
10.00

10.00
10.00

0.10

0.10

0.10

0.10

0.01
0.36

0.01
0.36

0.01
0.37

0.01
0.38

0.01
0.38

20.00
0.03
0.41

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

2.12

2.22

2.31

2.41

2.60

2.79

2.99

3.18

3.37

3.57

3.76

3.95

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

15.00

15.00

15.00

15.00

15.00

15.00

10.00

15.00

15.00

15.00

15.00

15.00
25.00

15.00
25.00

10.00
25.00

25.00

5.00

0.13
10.60

0.80
11.40

0.80
12.19

25.00
1.46
13.65

25.00
1.46
15.11

50.00
2.78
17.89

1.46
19.35

1.19
20.55

0.66
21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

5
10
10
10
0.26
3.12

10
10
10
0.22
3.34

5
10
10
0.19
3.52

5
10
10
0.19
3.71

5
10
10
0.19
3.90

5
10
10
0.19
4.08

10
10
0.15
4.23

10
0.07
4.30

10
0.07
4.38

10
0.07
4.45

4.45

4.45

20

20

20

20

0.18
3.13

0.18
3.31

0.18
3.49

0.18
3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

10

0.32
2.22
1.21
61.67

10

0.32
2.54
1.83
63.50

10
30

1.27
3.81
2.81
66.31

10
10

0.63
4.44
2.77
69.08

10
10

0.63
5.08
2.68
71.76

10
10

0.63
5.71
4.00
75.76

10
10

0.63
6.35
2.64
78.41

10
10

0.63
6.98
2.24
80.65

10
10

0.63
7.62
1.71
82.36

10
10

0.63
8.25
1.07
83.43

10

0.32
8.57
0.66
84.09

10

0.32
8.89
0.66
84.76

24/jul/2011

25/jul/2011

26/jul/2011

27/jul/2011

28/jul/2011

29/jul/2011

30/jul/2011

31/jul/2011

1/ago/2011

2/ago/2011

3/ago/2011

4/ago/2011

1
0.08
10.00

1
0.08
10.08

1
0.08
10.16

1
0.08
10.24

2
0.16
10.41

2
0.16
10.57

2
0.16
10.73

2
0.16
10.90

2
0.16
11.06

2
0.16
11.22

2
0.16
11.38

2
0.16
11.55

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

10.00
0.06
5.15

10.00
0.06
5.21

10.00
0.06
5.27

10.00
0.06
5.33

10.00
0.06
5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

20.00
0.01
0.45

20.00
0.01
0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

10.00
10.00
10.00
10.00

10.00
10.00
10.00
10.00

0.19

0.19

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

10.00
0.05

10.00
0.05

10.00
0.05

4.14

4.34

4.36

4.39

4.41

4.43

4.46

4.48

4.51

4.55

4.60

4.65

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45
50

4.45
50

4.45

4.45

4.45

20

20

20

0.12
0.12

0.12
0.24

0.05
0.29

0.05
0.34

0.05
0.38

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

20
0.63
13.33
0.82
90.85

20
0.63
13.97
0.94
91.79

20
0.63
14.60
0.94
92.73

20
0.63
15.24
0.89
93.63

20
0.63
15.87
0.89
94.52

15.87
0.26
94.78

10

0.32
9.21
0.66
85.42

10
20

0.95
10.16
1.30
86.72

20

0.63
10.79
0.80
87.52

20

0.63
11.43
0.80
88.32

20

0.63
12.06
0.88
89.21

20

0.63
12.70
0.82
90.03

2
0.98
12.68

1
0.89
13.58

1
0.89
14.47

1
0.89
15.37

1
0.89
16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

10.00
0.05

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

5.00
0.02

16/ago/2011

2
0.16
11.71

15/ago/2011

10/ago/2011

10

14/ago/2011

9/ago/2011

10

13/ago/2011

8/ago/2011

10

12/ago/2011

7/ago/2011

11/ago/2011

6/ago/2011

10

5/ago/2011

10

4.70

4.72

4.75

4.77

4.79

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

20

20

0.05
0.43

20
0.10
0.53

20
0.05
0.58

20
0.05
0.62

20
0.05
0.67

20
0.05
0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
0.26
95.04

15.87
1.10
96.13

15.87
0.97
97.10

15.87
0.97
98.07

15.87
0.97
99.03

15.87
0.97
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

28/ago/2011

27/ago/2011

26/ago/2011

25/ago/2011

24/ago/2011

23/ago/2011

22/ago/2011

21/ago/2011

20/ago/2011

19/ago/2011

18/ago/2011

17/ago/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

9/sep/2011

8/sep/2011

7/sep/2011

6/sep/2011

5/sep/2011

4/sep/2011

3/sep/2011

2/sep/2011

1/sep/2011

31/ago/2011

30/ago/2011

29/ago/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

21/sep/2011

20/sep/2011

19/sep/2011

18/sep/2011

17/sep/2011

16/sep/2011

15/sep/2011

14/sep/2011

13/sep/2011

12/sep/2011

11/sep/2011

10/sep/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

3/oct/2011

2/oct/2011

1/oct/2011

30/sep/2011

29/sep/2011

28/sep/2011

27/sep/2011

26/sep/2011

25/sep/2011

24/sep/2011

23/sep/2011

22/sep/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15/oct/2011

14/oct/2011

13/oct/2011

12/oct/2011

11/oct/2011

10/oct/2011

9/oct/2011

8/oct/2011

7/oct/2011

6/oct/2011

5/oct/2011

4/oct/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

27/oct/2011

26/oct/2011

25/oct/2011

24/oct/2011

23/oct/2011

22/oct/2011

21/oct/2011

20/oct/2011

19/oct/2011

18/oct/2011

17/oct/2011

16/oct/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

8/nov/2011

7/nov/2011

6/nov/2011

5/nov/2011

4/nov/2011

3/nov/2011

2/nov/2011

1/nov/2011

31/oct/2011

30/oct/2011

29/oct/2011

28/oct/2011

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

16.26

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.42

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

5.39

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

0.46

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

4.82

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

5.00

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

21.21

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

10.74

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

2.51

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

4.45

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

0.72

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

3.68

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

1.36

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

2.12

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

15.87
100.00

Você também pode gostar