METHOD STATEMENT
FOR
APPLICATION OF VARIOUS APCS SYSTEM FOR INTERNAL, EXTERNAL & UNDERSIDE OF FLOOR PLATE COATING OF CARBON STEEL TANKS
MS -KHI- 001
21 Feb, 2012
Rev
00
Date
Reviewed By
Approved By
Page 1 of 11
Index
1. 2. 3. 4. 5. 6. 7. 8. 9. Scope Purpose Definitions References General Access Equipments Procedure Personnel Qualification
Page 2 of 11
REFERENCES 4.1 SAUDI ARAMCO Engineering Standard H-001, Coating Selection & Application Requirements for Industrial Plants & Equipment
4.2 SAUDI ARAMCO Engineering Standard H-102. Safety Requirements for Coating Applications 4.3 SAUDI ARAMCO Engineering Procedure 316 Performance Qualification of Coating Personnel SUADI ARAMCO material system specification 09-SAMSS-067 Steel Structure Painting Council (SSPC-SP1) Swedish Standards Institution SIS 05 59 00 Manufacturers Product Data Sheets & MSDS National Association of Corrosion Engineers (NACE) British standard for protective coating of iron and steel structures against corrosion (BS 5493)
Page 3 of 11
5.2
5.3
OTC will deploy trained and skilled manpower for the project. Such manpower will have experience of working in operational petrochemical / refinery plant. All the manpower being mobilized for the project will go the safety orientation programme of S. K. engineering /KHI prior to start working in the plant. OTC will ensure sufficient supervision for the project. Separate QA/QC & safety officer shall be deployed and shall report directly to KHI Project Manager. Sky climbers motor and control panel shall be covered by sheeting or tarpaulin to prevent the ingress of dust or paint wherever practical. The immediate work area will be barricade with tube and No Entry & danger painting work is progress Sign will be posted.
5.4
5.6
5.7
6.0
ACCESS 6.1 Access to coating work for external shall be by suspended plateform such as sky climber and man lift. Sky climber access shall comply safety requirement of Saudi Kayan. Sky climber shall meet or exceed all OSHA and ANSI standard. Fixed and mobile scaffold shall be used for internal painting work. Scaffold shall meet Saudi Aramco requirement.
7.0
EQUIPMENT. 7.1 Air operated Alpha 500 Sky Climber hoists with 2/3/4 meter suspended plateform will be used. 7.2 Sufficient 375/800 CFM compressor will be used to supply free air to motor of the Sky climber. 7.3 All compressed air hoses and steel wire ropes shall be circular in section, free of cuts, kinks and twists. Any change in direction shall be by long radius curves to maintain constant and unrestricted flow where possible.
Page 4 of 11
7.6
7.7
7.8
7.9
Spray painting machine will be of the airless type and will be fitted with moisture and oil separators and pressure control valves. Vacuum cleaners for internal dust removal will be of industrial quality and will be of 220/110 voltage. Spotlight and background lights for internal blasting will be of 110 voltages. Lighting for spray painting will be of the explosion proof type. Venturi air movers and extractors fans will be utilized for dust removal during internal blasting operations. All major equipment will be run to ground. Power tool & paint mixer shall by air driven (Pneumatic)
7.10
7.11
7.12
7.13 7.14 8
PROCEDURE
Pre-Blast Check 8.1.1 QC Inspector shall carry out checks before blasting to determine if cleaning is required either with the use of chemicals or solvents. If required solvent cleaning shall be carried out in accordance with SSPC - SPI. 8.1.2 No abrasive blasting shall be carried out unless the steel surface is at least minimum 3C above the Dew Point. 8.1.3 Prior to start for blasting, all sharp edges and cut-offs shall be rounded to a smooth radius and all weld spatters shall be removed.
Page 5 of 11
8.1.5 All compressed air hoses and paint lines shall be circular in section, free of cuts, kinks and twists. Any change in direction shall be by long radius curves to maintain constant and unrestricted flow where possible. 8.1.6 All hoses and nozzle connections shall be inspected prior to commencement of work to ensure they are secured. Any defective connection will be immediately replaced. Surface Preparation: (Shop & Field) 8.1.7 Surface preparation shall be carried out to achieve Sa-3 and Sa-2.5 as per SAES H-101. All abrasive blasting shall be carried out by regular blasting equipment and Track blasting equipment for the Floor Plates.
8.1.8 The type of abrasive to be used shall be determined by the surface Profile and cleanliness requirements as per SAES H-100 item 5.1. All inspection and tests shall be carried out on accessible areas only. 8.1.9 Approved Abrasives (GARNET, Steel Shot & Steel Grit) shall be kept dry and free of contamination as per SAES-H-100 Para 5.2.1 8.1.10 Sufficient capacity compressors shall be used to supply free air to all elements of the abrasive and coating operation as per SAES-H-100 Para 5.4 8.1.11 The Blast profile shall be measured for internal surface of pipes on accessible areas only using Profile thickness gauge with PRESS-O-FILM Testex tape (X coarse replica tape). The same replica tape shall be attached with inspection report as a permanent record. 8.2 Abrasive Blasting : 8.2.1 Abrasive shall be kept clean and dry and free of contamination and shall be an approved mineral abrasive such as Garnet, Coal Slag or Steel shot and grit. 8.2.2 Surface preparation shall be carried out by manual blasting to required surface cleanliness level. Tank floor plate shall be blasted using Blast Track Machine. On internal surfaces the abrasive will be removed, the area swept with clean soft brooms and finally vacuum cleaned. Salt contamination test shall be carried out in accessible areas for internal tanks surface. Blasted surfaces will be primed in accordance with the relevant specifications and before the surfaces conditions degrades below the specified cleanliness level.
8.2.3
8.2.4 8.2.5
Page 6 of 11
8.2.7
8.3 Cleaning: 8.3.1 Used abrasives shall be removed from blasted surfaces using a dry brush, blowing down with clean dry compressed air or vacuum cleaner.
8.4 Coating: 8.4.1 Paint Storage: a. Paints and thinners shall be stored in air-conditioned container. Warnings signs Danger, flammable, no smoking, no naked lights will be posted. The storage temperature shall be below 270C. Containers that show signs of leakage or materials that have gelled shall be discarded. The date of manufacture shall be clearly marked on each paint container and paints that have exceeded their shelf life shall be discarded. Manufactures data sheets and MSDS on all materials will be readily available at the job site.
b. c.
d.
8.5 Paint Preparation: a. b. c. d. All paints shall be thoroughly mixed using a power mixer. All paints shall be mixed or thinned in strict accordance with the manufactures instructions. The prepared surface shall be inspected for cleanliness and profile prior to coating. Prepared surface shall be coated within a maximum of six hours and before any deterioration begins. Surfaces that have begun to deteriorate, or have exceeded the six hours shall be reblasted. Paint shall only be applied if the following conditions are met (or as specified by the paint manufacturers.) * Surface temperature to be at least 30C above dew points. * Surface to be free of oil, grease and other contaminants. * Protection from adverse weather conditions
e.
8.6 Paint Application (Shop & Field): a. All full coat will be applied by spray or brush / roller. The spray application shall be preferred method.
Page 7 of 11
b. c.
9. PERSONNEL QUALIFICATION OTC personnel involved in preparation, application, direct supervision or inspection of coatings shall be qualified and certified by Hertel-OTC and ARAMCO as per SAEP-316. This includes abrasive blasters, coating applicators, crew supervisors and QC inspectors. 10.SAFETY. 10.1 Safety Requirements for Painting shall be observed at all times and shall be strictly followed in accordance with SAES-H-102 10.2 The Project safety plan will be fully enforced during the duration of the work.
OTC/QCP.Doc, MS-IC-002 (Rev 01) Page 8 of 11
10.4
10.5
10.6 All recommendations of the Material/Equipments manufacturers concerning the safe handling and application of their products shall be followed as per SAES-H-102 item 4.4. 10.7 Forced air ventilation during abrasive blasting, solvent cleaning, paint application and curing shall be followed as per SAES-H-102 item 4.2 & SAES-H-001 item 8.3.4
Page 9 of 11
Q68-D011A/B
Q68 D 12
15240
7315
Q70-D031
7315
7315
As par ASTMD5162
Q70-D032 Q68-D106/206
18288
1341 1 2011 7
SAES H-001 APCS-27 SAES H-001 APCS-2A SAES H-001 Epoxy Lining SAES H-001 Epoxy Lining
25603
Q68-D061A/B
30480
1402 1
SAES H-001 APCS-3 Painting is NOT Possible Due to PWHT SAES H-001 APCS-113
As par ASTMD5162
Q68-D062A/B
24993
1402 1
As par ASTMD5162
Q72-D001A/B
25908
9754
No
As par ASTMD5162
Q73-D108
21945
1280 1
As par ASTMD5162
10
Q73-D200A/B
7010
4876
As par ASTMD5162
Page 10 of 11
12
51816
1280 2
13
Q73-D901A/B
29260
1371 6
As par ASTMD5162
14
Q73-D101A/B
36576
1828 8
As par ASTMD5162
15
Q69-D182
8686
8686
As par ASTMD5162
Page 11 of 11