Theory:
This document (Software Project Management Plan) describes the project management standards, procedures and various technical processes to be followed by 433-440 Team F throughout this project.These standards ensure management quality and consistency throughout the duration of the project. This document describes management processes and practices that the Team shall adopt throughout the duration of this project. These processes and management practices will be enforced in order for the Team to meet its four quality goals of Correctness, Completeness, Consistency and Reliability.
The purpose of this document is to present a detailed description of the Online TechFest Management System. It will explain the purpose and features of the system, the interfaces of the system, what the system will do, the constraints under which it must operate and how the system will react to external stimuli.
This Web Application will be a TechFest management system for a college/university to organize and manage the technical festival. This system will be designed to maximize the organizing committees productivity by providing tools to assist in automating the selection process of events and their respective heads and the finance matters, which would otherwise have to be performed manually. By maximizing the committees work efficiency and production the system will meet the committees needs while remaining easy to understand and use. The application will facilitate communication between the organizing head, committee and the event managers via E-Mail.
2
2. Project estimation
2.1 Historical data used
Primarily we follow the manual systems documents that the HMS committee have been generated. The work done only on MS Excel and Ms Word. They created certain tables and done data entry in those excel sheets and take print outs. Then by analysing those prints they found conflicts manually. Then again change in those excel sheets. They place all these print out in store room for future reference.
2.2.3 Time estimation Tdev is time to develop project is, Tdev = 2.5(Effort)0.38 Months = 2.5(9)0.38 Months = 5.76 6 Months
2.2.4 Cost Estimation Large systems are made up of smaller sub-systems so the cost can be affected depends on the behaviour, size, type and complexity of the project. Cost of each sub-system is estimated separately. Costs of the sub-systems are added to obtain total cost. It reduces the margin of error in the final estimate. It the schedule of the project is change then the cost can be affected relatively.
Risks
Size estimated may significantly low Large number of users than planned Less reuse than planned Delivery deadline will be tightened Funding will be lost Customer will change requirements Technology will not meet expectations Lack of training on tools Staff inexperienced Staff turnover will be high PS BU CU TE ST Project size risk Business risk Customer requirements risk Technological risk Staffing risk
Category
PS PS PS BU CU CU TE ST ST ST
Probability
70% 60% 50% 80% 10% 10% 50% 80% 60% 10%
Impact
2 3 2 2 1 2 1 3 2 2
4 Negligible
4. Schedule
4.1Gantt chart representation:
5. Project resources
Human Resource:
Chintan Radia Chintan Pathak Chintan Ram Namra Saheba Shreyash Samani Keval Shah
2. Main Memory : 1-2 GB RAM 3. Display : Colour Monitor (800 * 600 or higher resolution)
4. Input Device : Mouse, Keyboard For the system to work properly Software Requirements are as follows: 1. Net Beans IDE 7.1 2. Microsoft Project 2010 3. Microsoft Word 2007 4. My SQL Server5.5
6. Staff organization
Team structure
Chintan Radia :: GUI Designing,Requirements gathering,Integration Chintan Pathak ::Coding,Integration,Database,Deployment Chintan Ram :: Analysis,Documentation,Testing,Scheduling
Namra Saheba ::Coding,Integration,Database,Deployment Shreyash Samani: GUI Designing,Requirements gathering,Intergration Keval Shah :: Analysis, Documentation,Testing,Scheduling
Conclusion:
Thus we studied and developed the SPMP document.