EXAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES


(For Information only - Delete this sheet & table from Spreadsheet if it is to be used as a template for SOR/BQ preparation.)

REVISION REGISTER
Date 3-May-11 12-Aug-09 24-Apr-09 Item Number 302.1 503.08 502 504 30-Jan-08 02-Feb-07 28-Sep-06 07-Sep-06 Description of Revision Amended duplicate numbering for 302.10 Geotextile Reinforced Seal added Stone Mastic Asphalt has been added Reference to Polymer Modified Binder added MPCMP SO SO SO Authorised By A/MPCMP PSM A/SCO

References to 'Particular Preambles' amended to 'Contract Specific Preambles' 204.07 Unit corrected from 'Item' to 'No.' General Items - Section numbers added and Item numbering Series 100 amended General "Revision Register" created General Some section/specification titles updated Further Note added Examples Author's Notes Reference to "Particular Preambles" added

MAIN ROADS
W estern Australia

Contents

EXAMPLE OF FORMAT AND LAYOUT SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES CONTRACT No. ??/?? SCHEDULES OF RATES/BILLS OF QUANTITIES

CONTENTS
page THIS PAGE - CONTENTS SCHEDULE No. 1 - GENERAL ITEMS SCHEDULE No. 2 - ROADWORKS SERIES 300 - EARTHWORKS SERIES 400 - DRAINAGE SERIES 500 - PAVEMENT & SURFACING SERIES 600 - TRAFFIC FACILITIES SERIES 700 - ELECTRICAL & LIGHTING SERIES 900 - MISCELLANEOUS SCHEDULE No. 3 - PROVISIONAL SUMS SCHEDULE No. 4 - DAYWORK BILL No. 1 - BRIDGE No. ? OVER ? SUMMARY 1 2 6 7 9 13 16 18 20 22 24 26 37

Contract No. ??/??

Page 2

MAIN ROADS
W estern Australia

Summary

SUMMARY

Contract No. ??/??

Page 3

MAIN ROADS
W estern Australia

Summary

EXAMPLE OF FORMAT AND LAYOUT SAMPLE SCHEDULES OF RATES/BILLS OF QUANTITIES CONTRACT No. ??/?? SUMMARY

SCHEDULE No. 1 - GENERAL ITEMS SCHEDULE No. 2 - ROADWORKS SERIES 300 - EARTHWORKS SERIES 400 - DRAINAGE SERIES 500 - PAVEMENT & SURFACING SERIES 600 - TRAFFIC FACILITIES SERIES 700 - ELECTRICAL & LIGHTING SERIES 900 - MISCELLANEOUS SCHEDULE No. 3 - PROVISIONAL SUMS SCHEDULE No. 4 - DAYWORK BILL No. 1 - BRIDGE No. ? OVER ? GST EXCLUSIVE AMOUNT ESTIMATED GST PAYABLE TOTAL OF TENDER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Contract No. ??/??

Page 4

MAIN ROADS
W estern Australia

General Items

SCHEDULE No. 1 - GENERAL ITEMS

Contract No. ??/??

Page 5

MAIN ROADS
W estern Australia

General Items

Item

Description

Unit

Qty

Rate

Amount

CONDITIONS OF CONTRACT
GENERAL CONDITIONS OF CONTRACT GCC.01 Insurances in accordance with the General Conditions of Contract GCC.02 Contractor's superintendence during the execution of the Works GCC.03 All charges, costs and obligations relating to the General Conditions of Contract not provided for elsewhere SPECIAL CONDITIONS OF CONTRACT SCC.01 All charges, costs and obligations relating to the Special Conditions of Contract not provided for elsewhere Item 1 Item 1

Item

Item

SERIES 100 - GENERAL REQUIREMENTS


101 DESCRIPTION OF WORKS 101.01 Provision of access for others to undertake work 101.02 Contractors programs 101.03 Project works sign 102 SURVEY INFORMATION 102.01 Survey information, control and setting out of the works 103 SITE FACILITIES Contractors Site Facilities 103.01 Provision of Contractor's site facilities 103.02 Maintenance of Contractor's site facilities 103.03 Removal of Contractor's site facilities Superintendent's Site Facilities 103.04 Provision of the Superintendent site facilities 103.05 Maintenance of the Superintendent site facilities 103.06 Removal of the Superintendent site facilities Superintendent's Living Facilities 103.07 Provision of the Superintendent living facilities 103.08 Maintenance of the Superintendent living facilities
Contract No. ??/??

Item Item No.

1 1

Item

Item Item Item

1 1 1

Item Item Item

1 1 1

Item Item

1 1
Page 6

MAIN ROADS
W estern Australia

General Items

Item

Description

Unit

Qty

Rate

Amount

103.09 Removal of the Superintendent living facilities 103.10 Superintendent's meals 104 ENTRY TO LAND 104.01 Entry to land 105 WATER SUPPLIES 105.01 Supply of water 106 UTILITIES AND SERVICES 106.01 Liaison, programming, location and protection of utilities and services 106.02 Relocation of ? mains 106.03 Relocation of existing street lighting

Item M/day

Item

Item

Item

Item Item

1 1

SERIES 200 - MANAGEMENT REQUIREMENTS


202 - TRAFFIC 202.01 Traffic management 202.02 Traffic control devices 202.03 Traffic controllers 202.04 Construction, maintenance and removal of sidetracks, temporary driving surfaces and temporary pedestrian access 202.05 Maintenance of existing roads 203 - OCCUPATIONAL SAFETY AND HEALTH 203.01 Occupational safety and health including safety plans and safety audits 204 - ENVIRONMENT 204.01 Protection, preservation and monitoring of Aboriginal sites 204.02 Protection of flora and fauna 204.03 Fire prevention 204.04 Waste disposal 204.05 Dieback control
Contract No. ??/??

Item Item Item Item

1 1 1 1

Item

Item

Item

Item Item Item Item

1 1 1 1
Page 7

MAIN ROADS
W estern Australia

General Items

Item

Description

Unit

Qty

Rate

Amount

204.06 Protection of public and property 204.07 Pre-construction property inspections 204.08 Dust control

Item No. Item

1 1 1

To Summary

Contract No. ??/??

Page 8

MAIN ROADS
W estern Australia

Roadworks

SCHEDULE No. 2 - ROADWORKS

Contract No. ??/??

Page 9

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

SERIES 300 - EARTHWORKS


301 - CLEARING 301.01 Site clearing 302 - EARTHWORKS TOPSOILING Topsoil Removal 302.01 Topsoil removal, ? deep 302.02 Topsoil removal, ? deep, and disposal of to Contractor's spoil area off-site Topsoil Spreading 302.03 Respread topsoil, ? thick Topsoil Stockpiles 302.04 Batter protection to stockpiles using hydro-mulch REMOVAL OF REDUNDANT PAVEMENTS 302.05 Removal of redundant pavement including seal 302.06 Removal of redundant seal from existing pavement 302.07 Ripping and rehabilitating redundant pavement 302.08 Preparation of retained pavement to receive overlay 302.09 Removal of redundant kerbs 302.10 Marking out and cutting edge along junction between new pavement and existing pavement including trimming existing pavement layers as required to bond to new pavement UNSUITABLE MATERIAL 302.11 Excavation and removal of unsuitable material 302.12 Backfilling unsuitable material excavations with site excavated material or imported material EXCAVATION IN ROCK 302.13 Excavation and removal of rock EMBANKMENT CONSTRUCTION 302.14 Embankment foundation compaction 302.15 Embankment foundation compaction in widenings 302.16 Embankment construction using site excavated material and imported material m ha

ha ha

ha

m m m m m m

m m

m m m

Contract No. ??/??

Page 10

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit m

Qty

Rate

302.17 Embankment construction in widenings using site excavated material and borrow material 302.18 Embankment construction for noise bunds using site excavated material SUBGRADE 302.19 Subgrade improvement ? thick using select borrow material 302.20 Subgrade 302.21 Subgrade in road widenings 302.22 Subgrade to principal shared path 303 - PITS AND QUARRIES EMBANKMENT MATERIAL BORROW PITS 303.01 Establishment of embankment material borrow pits 303.02 Reinstatement of embankment material borrow pits EXISTING PAVEMENT MATERIAL BORROW PITS 303.03 Reinstatement of existing pavement material borrow pits

m m m

Item Item

1 1

Item

304 - REVEGETATION AND LANDSCAPING 304.01 Seed collection 304.02 Transplanting ? Plants 304.03 Herbicide treatment 304.04 Ground preparation 304.05 Erosion control netting type? 304.06 Imported topsoil, ? thick 304.07 Seed mixture type ? 304.08 Seed mixture type ? by hydro-seeding 304.09 Grass turf 304.10 Grass stolons planted at the rate of ?m of turf to cover ?m of ground 304.11 Grass seeding planted at the rate of ?m of seed to ?m of ground 304.12 Plants type? 304.13 Mulch, ? thick, in plant beds hr No. ha m m m ha m m m

No. m

Contract No. ??/??

Page 11

MAIN ROADS
W estern Australia

Roadworks

Item 304.14 Hydro-mulch, ? thick 304.15 Tree grates

Description

Unit m No. Item

Qty

Rate

304.16 Reinstate existing verges including landscaped areas, irrigation, etc. 304.17 Irrigation system installed complete including connection to scheme water supply 304.18 Establishment of vegetation To Summary

Item

wk

Contract No. ??/??

Page 12

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

SERIES 400 - DRAINAGE


402 - SURFACE DRAINS AND LEVEES SURFACE DRAINS AND LEVEES 402.01 Drain type ? 402.02 Drain type ? and parallel levee 402.03 Culvert outlet drain type ?, not exceeding ?m wide at base 402.04 Levee, not exceeding ? high 402.05 Extra over surface drains for excavation in rock 402.06 Table drain block 402.07 Reinforced concrete check structure type ? SPOON DRAINS 402.08 Spoon drain type ?, size ? x ? DRAINAGE BASINS 402.09 Drainage basin at Cha. ? (Approx. cut volume ? m) 403 - SUBSOIL DRAINS 403.01 ? Diameter slotted PVC pipe subsoil drain including filter aggregate, geotextile lining and drainage layer 403.02 Cleanout/flushout point to ? diameter pipe subsoil drain including concrete cover and removable cap 404 - CULVERTS CULVERTS Reinforced Concrete Pipes Class ? 404.01 ? Diameter pipe culvert Corrugated Steel Pipes 404.02 ? Diameter pipe culvert Reinforced Concrete Box Sections 404.03 ? x ? Box culvert All Culverts 404.04 Selected bedding material 404.05 Extra over culverts for cement stabilised backfill 404.06 Reinforced concrete base slab and shear keys 404.07 Reinforced concrete insitu end treatment m

m m m

m m No. No.

No.

No.

m m m m

Contract No. ??/??

Page 13

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit m No.

Qty

Rate

404.08 Extra over culverts for excavation in rock 404.09 Precast concrete end treatment to suit ? diameter pipe Redundant Culverts 404.10 Removal of existing ? diameter pipe culvert and backfilling excavations 404.11 Removal of existing ? diameter pipe culvert (No backfilling - culvert replaced) 404.12 Removal of existing ? x ? box culvert and backfilling excavations 404.13 Removal of existing ? x ? box culvert (No backfilling culvert replaced) 404.14 Extra over removal of existing ? diameter pipe culvert for delivering salvageable pipes to Main Roads depot at ?

404.15 Removal of existing culvert end treatment (All sizes) STORMWATER DRAINS Reinforced Concrete Pipes Class ? 404.16 ? Diameter drain in trench, depth not exceeding 1.5m 404.17 ? Diameter drain in trench, depth exceeding 1.5m but not exceeding 2.5m 404.18 ? Diameter drain in trench, depth exceeding 2.5m but not exceeding 3.5m 404.19 ? Diameter drain in trench, depth exceeding 3.5m but not exceeding 4.5m All Stormwater Drains 404.20 Extra over stormwater drains for cement stabilised backfill 404.21 Extra over stormwater drains for excavation in rock Redundant Stormwater Drains 404.22 Removal of existing ? diameter pipe drain and backfilling excavations

No.

m m

m m

404.23 Extra over removal of existing ? diameter pipe drain for delivering salvageable pipes to Main Roads depot at ? 405 - DRAINAGE STRUCTURES MANHOLES 405.01 Manhole type ? GULLIES 405.02 Gully type ?

No.

No.

Contract No. ??/??

Page 14

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit No.

Qty

Rate

405.03 Gully type ? with silt trap CATCHPITS 405.04 Catchpit type ?

No.

ALTERATIONS TO EXISTING DRAINAGE STRUCTURES 405.05 Breaking into existing drainage structure and building-in ? No. diameter pipe 405.06 Breaking into existing drainage structure, building-in ? diameter pipe and alteration of structure and cover to suit new finished level 405.07 Alteration of structure and cover to suit new finished level No.

No.

405.08 Replacement of existing non-trafficable cover with trafficable cover type ? REDUNDANT DRAINAGE STRUCTURES 405.09 Removal of existing drainage structure 406 - ROCK PROTECTION ROCK PROTECTION 406.01 ? Rock protection to embankments GROUT ROCK PROTECTION 406.02 ? Grouted rock protection to embankments SPALLS 406.03 ? Limestone spalls 407 - KERBING 407.01 Kerb type ? 407.02 Temporary kerb type ? laid on and including plastic sheeting 407.03 Kerb opening type ? 407.04 Extra over kerbs for pedestrian ramp type ? 407.05 Extra over kerbs for driveway kerb 408 - REVETMENT MATTRESS 408.01 ? Thick revetment mattress 408.02 Extra over ? revetment mattress for footing including excavation 410 - LOW STRENGTH INFILL REDUNDANT STORMWATER DRAINS

No.

No.

m m

No. No. m

m m

Contract No. ??/??

Page 15

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit m

Qty

Rate

410.01 Filling of existing redundant ? diameter pipe drain with low strength infill REDUNDANT DRAINAGE STRUCTURES 410.02 Filling of existing redundant drainage structure with low strength infill To Summary

No.

Contract No. ??/??

Page 16

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

SERIES 500 - PAVEMENT & SURFACING


501 - PAVEMENTS DRAINAGE LAYER 501.01 ? Geotextile lining laid over subgrade 501.02 ?mm Thick sand drainage layer SUBBASE 501.03 ?mm Thick <subbase material> subbase 501.04 ?mm Thick <subbase material> subbase in widenings 501.05 Varying thickness <subbase material> subbase overlay 501.06 Final trimming of varying thickness subbase overlay

m m

m m m m

Material Supplied By Principal Free Of Charge From Stockpiles 501.07 ?mm Thick gravel subbase m 501.08 ?mm Thick gravel subbase in widenings 501.09 Varying thickness gravel subbase overlay 501.10 Final trimming of varying thickness gravel subbase overlay BASECOURSE 501.12 ?mm Thick <basecourse material> basecourse 501.13 ?mm Thick <basecourse material> basecourse in widenings 501.14 Varying thickness <basecourse material> basecourse overlay 501.15 Final trimming of varying thickness basecourse overlay m m m

m m

Material Supplied By Principal Free Of Charge From Stockpiles 501.16 ?mm Thick gravel basecourse m 501.17 ?mm thick gravel basecourse in widenings 501.18 Varying thickness gravel basecourse overlay 501.19 Final trimming of varying thickness gravel basecourse overlay PAVEMENT STABILISATION 501.20 Extra over gravel pavement for cement stabilisation, ? deep 501.21 Extra over gravel pavement in widenings for cement stabilisation, ? deep
Contract No. ??/??

m m m

Page 17

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

501.22 Extra over gravel pavement for lime stabilisation, ? deep 501.23 Extra over gravel pavement in widenings for lime stabilisation, ? deep PRINCIPAL SHARED PATH 501.24 ?mm Thick <basecourse material> basecourse

m m

Material Supplied By Principal Free Of Charge From Stockpiles 501.25 ?mm Thick gravel basecourse m 502 - STONE MASTIC ASPHALT ROADWORKS 502.01 Tack coat 502.02 ?mm Thick stone mastic asphalt 502.03 ?mm Thick stone mastic asphalt with Polymer Modified Binder (PMB) 502.04 Varying thickness stone mastic asphalt 502.05 Varying thickness stone mastic asphalt with PMB 503 - BITUMINOUS SURFACING ROADWORKS Prime 503.01 Prime coat with BAR of ? litres/m Primerseal 503.02 First coat primerseal with BAR of ? litres/m and ?mm aggregate 503.03 Second coat primerseal with BAR of ? litres/m and ?mm aggregate 503.04 Single coat primerseal with BAR of ? litres/m and ?mm aggregate Seal 503.05 First coat seal with BAR of ? litres/m and ?mm aggregate 503.06 Second coat seal with BAR of ? litres/m and ?mm aggregate 503.07 Single coat seal with BAR of ? litres/m and ?mm aggregate Geotextile Reinforced Seal (GRS) 503.08 Single coat GRS with BAR of ? litres/m and ?mm aggregate

m m m

t t

Contract No. ??/??

Page 18

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit m

Qty

Rate

503.09 First coat GRS with BAR of ? litres/m and ?mm aggregate 503.10 Second coat GRS with BAR of ? litres/m and ?mm aggregate BRIDGEWORKS Prime 503.11 Prime coat with BAR of ? litres/m Seal 503.12 Single coat rubberised seal with BAR of ? litres/m and ?mm aggregate PRINCIPAL SHARED PATH Prime 503.13 Prime coat with BAR of ? litres/m Primerseal 503.14 Single coat primerseal with BAR of ? litres/m and ?mm aggregate GENERAL Binder Application Rate Variation 503.15 Rate (L) for bituminous binder in $ per litre for adjustments greater than 7.5% of the tendered BAR ordered by the Superintendent. 503.16 Marking for future centreline 504 - ASPHALT SURFACING ROADWORKS 504.01 Tack coat 504.02 ?mm Thick dense graded asphalt 504.03 ?mm Thick dense graded asphalt with PMB 504.04 ?mm Thick dense graded coloured asphalt 504.05 Varying thickness dense graded asphalt 504.06 Varying thickness dense graded asphalt with PMB 504.07 ?mm Thick open graded asphalt 504.08 ?mm Thick open graded asphalt with PMB 504.09 Varying thickness open graded asphalt 504.10 Varying thickness open graded asphalt with PMB BRIDGEWORKS 504.11 Tack coat

litre

m m m m t t m m t t

Contract No. ??/??

Page 19

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit m

Qty

Rate

504.12 ?mm dense graded asphalt on bridge deck PRINCIPAL SHARED PATHS 504.13 Tack coat 504.14 ?mm Thick dense graded coloured asphalt 505 - SEGMENTAL PAVING PRINCIPAL SHARED PATHS 505.01 ?mm x ?mm Brick paving units on and including ?mm sand bedding 505.02 Tactile ground surface indicators MEDIANS AND TRAFFIC ISLANDS 505.03 ?mm x ?mm Brick paving units on and including ?mm sand bedding 505.04 Removal of existing concrete slab paving, storage and relaying including ?mm sand bedding 508 - COLD PLANING 508.01 Cold planing of ?mm asphalt

m m

509 - POLYMER MODIFIED BITUMINOUS SURFACING ROADWORKS Seal 509.01 Single coat PMB seal with BAR of ? litres/m and ?mm aggregate To Summary

SERIES 600 - TRAFFIC FACILITIES


601 - SIGNS SINGLE POST SIGNS 601.01 Traffic sign ? (Stop) 601.02 Traffic sign ? (Give way) DOUBLE POST SIGNS 601.03 Traffic sign ? (Hazard board) MAJOR SIGNS 601.04 Major sign ?, size ?m x ?m REMOVAL OF EXISTING SIGNS 601.05 Single post sign 601.06 Double post sign
Contract No. ??/??

No. No.

No.

No.

No. No.
Page 20

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

601.07 Major sign RELOCATION OF EXISTING SIGNS 601.08 Single post sign 601.09 Double post sign 601.10 Major sign REPLACEMENT OF EXISTING SIGN COMPONENTS 601.11 Post type ? 601.12 Sign panel type ? 602 - GUIDE POSTS 602.01 Guide post 602.02 Guide post with footing cast into concrete edge wall 602.03 Guide post (supplied by Principal free of charge from Main Roads depot at ?) 602.04 Removal of existing guide post 602.05 Relocation of existing guide post 603 - ROAD SAFETY BARRIER SYSTEMS BARRIER 603.01 Galvanised W-Beam barrier 603.02 Galvanised Thriebeam barrier 603.03 Galvanised Thriebeam/W-Beam transition 603.04 Galvanised modified eccentric loader terminal (MELT) WIRE ROPE ROAD SAFETY BARRIER SYSTEM 603.05 Wire rope road safety barrier system complete 603.06 Anchor block to wire rope road safety barrier REDUNDANT ROAD SAFETY BARRIER SYSTEM 603.07 Removal of redundant W-Beam guardrail INSITU CONCRETE BARRIER 603.08 Cast insitu concrete barrier complete 603.09 Transition treatment between instu concrete barrier and W-Beam barrier 603.10 Insitu concrete end treatment 604 - PAVEMENT MARKING

No.

No. No. No.

No. No.

No. No. No.

No. No.

m m No. No.

m No.

m No.

No.

Contract No. ??/??

Page 21

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

ROAD PAVEMENT MARKINGS 604.01 Line type ? 604.02 Chevron marking type ? 604.03 ? Turn arrow 604.04 Removal of redundant road pavement markings RAISED PAVEMENT MARKERS 604.05 Raised pavement marker type ? 604.06 Temporary raised pavement markers 604.07 Removal of redundant raised pavement marker 605 - GRAB RAILS AND BOLLARDS GRAB RAILS 605.01 ? Wide x ? diameter pipe grab rail type ? 605.02 Removal of redundant grab rail 605.03 Relocation of existing grab rail BOLLARDS 605.04 ? Diameter bollard type ? 605.05 Removal of redundant bollard 605.06 Relocation of existing bollard To Summary

m m No. Item 1

No. Item No. 1

No. No. No.

No. No. No.

Contract No. ??/??

Page 22

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

SERIES 700 - ELECTRICAL & LIGHTING


701 - ROADWAY LIGHTING LIGHTING POLES 701.01 Concrete base for single outreach arm pole 701.02 Galvanised steel light pole (Type ?) ?m high overall complete with ?m outreach arm 701.03 Roadway lighting luminaire fixed to lighting pole outreach arm SWITCHBOARDS 701.04 Switchboard No. ? CONDUITS AND CABLING Conduits 701.05 ? Diameter heavy duty PVC conduit in trench 701.06 Extra over conduit in trench for excavation in rock 701.07 Extra over conduit in trench for directional drilling under existing roadway 701.08 Cable pit type ? Cabling 701.09 ? Core ?mm diameter cabling between Switchboard No. ? and lighting poles 701.10 ? Core ?mm diameter cabling between circuit cabling and luminaire 701.11 Connection to consumer mains 702 - EMERGENCY ROADSIDE TELEPHONES 702.01 Emergency roadside telephone 702.02 ? Thick concrete paving surround No. Item 1

No. No.

No.

No.

m m m

No.

Item

704 - CABLE CONDUITS FOR INTELLIGENT TRANSPORT SYSTEMS 704.01 ?mm Diameter heavy duty PVC conduit in trench 704.02 Extra over conduit in trench for excavation in rock 704.03 Extra over conduit in trench for directional drilling under existing roadway 704.04 Lockable cable pit type ? 712 - TRAFFIC SIGNALS m m m

No.

Contract No. ??/??

Page 23

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

? STREET INTERSECTION 712.01 Traffic signal controller 712.02 Traffic signal poles 712.03 Traffic signal aspects 712.04 Traffic signal detection loop 712.05 Pedestrian push button 712.06 Advanced flashing warning signal mounted on double poles 712.07 Red light infringement camera and housing 712.08 Red light infringement camera pole 712.09 Traffic signal cable pit type ? 712.10 ? Diameter heavy duty PVC conduit in trench 712.11 Extra over conduit in trench for directional drilling under existing roadway 712.12 ? Core ?mm diameter cabling between traffic controller and traffic signals, (pedestrian push buttons, red light infringement camera and advanced flashing warning signal > as required <) 712.13 Connection to consumer mains To Summary

No. No. No. No. No. No.

No. No. No. m m

Item

Contract No. ??/??

Page 24

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

SERIES 900 - MISCELLANEOUS


901 - CONCRETE - GENERAL WORKS ?mm Thick concrete footpath 903 - FENCING Chainlink Fencing 903.01 ? High chainlink non-railed tension wire fence (Type ?) 903.02 ? Wide x ? high single chainlink gate Agricultural Fencing 903.03 ? High agricultural fence (Type ?) Relocation Of Existing Fencing 903.04 Relocation of existing ? high chainlink fencing 903.05 Relocation of existing ? wide x ? high chainlink gate Removal Of Redundant Fencing 903.06 Removal of redundant ? high chainlink fencing including gates 904 - NOISE WALLS 904.01 Reinforced concrete footings including excavation, formwork and reinforcement 904.02 ? Brickwork in noise wall type ? 904.03 Extra over brickwork in noise wall for ? x ? pier (In ? No. piers) 904.04 ? x ? capping to pier 906 - STOCK GRIDS 906.01 Stock grid type ?, size ?m x ?m 906.02 Removal of redundant stock grid type ?, size ?m x ?m 907 - LITTER BINS 907.01 Litter bin 907.02 Relocation of existing litter bin 907.03 Removal of redundant litter bin No. No. No. No. No. m m

m No.

m No.

m m

No.

908 - ANTI-GRAFFITI 908.01 Anti-graffiti coating to brick noise wall


Contract No. ??/??

m
Page 25

MAIN ROADS
W estern Australia

Roadworks

Item

Description

Unit

Qty

Rate

To Summary

Contract No. ??/??

Page 26

MAIN ROADS
W estern Australia

Roadworks

KS

Contract No. ??/??

Page 27

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 28

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 29

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 30

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 31

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 32

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 33

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 34

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 35

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 36

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 37

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 38

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 39

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 40

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 41

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 42

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 43

MAIN ROADS
W estern Australia

Roadworks

Amount

Contract No. ??/??

Page 44

MAIN ROADS
W estern Australia

Provisional Sums

SCHEDULE No. 3 - PROVISIONAL SUMS

Contract No. ??/??

Page 45

MAIN ROADS
W estern Australia

Provisional Sums

Item

Description

Unit

Qty

Rate

Amount

PROVISIONAL SUMS
SUPERINTENDENT'S TELEPHONE AND FACSIMILE CALLS PS.01 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of metered telephone and facsimile calls of the Superintendent EARTHWORKS PS.02 Allow the Provisional Sum of $? (? Thousand Dollars) for the removal and replacement of unsuitable material PS.03 Allow the Provisional Sum of $? (? Thousand Dollars) for the excavation of rock PS.04 Allow the Provisional Sum of $? (? Thousand Dollars) for landscaping DRAINAGE PS.05 Allow the Provisional Sum of $? (? Thousand Dollars) for the removal and replacement of unsuitable insitu bedding material PAVEMENTS AND SURFACING PS.06 Allow the Provisional Sum of $? (? Thousand Dollars) for backrolling of sealed sections of MISCELLANEOUS PS.07 Allow the Provisional Sum of $? (? Thousand Dollars) for fencing BRIDGEWORKS PS.08 Allow the Provisional Sum of $? (? Thousand Dollars) for pile set-up tests PS.09 Allow the Provisional Sum of $? (? Thousand Dollars) for load testing of falsework SERVICES PS.10 Allow the Provisional Sum of $? (? Thousand Dollars) for the relocation of existing ?? Mains To Summary P.S. P.S. P.S. P.S. P.S. P.S. P.S.

P.S.

P.S.

P.S.

Contract No. ??/??

Page 46

MAIN ROADS
W estern Australia

Daywork

SCHEDULE No. 4 - DAYWORK

Contract No. ??/??

Page 47

MAIN ROADS
W estern Australia

Daywork

Item

Description

Unit

Qty

Rate

Amount

DAYWORK
LABOUR DW.01 Allow the Provisional Sum of $? (? Thousand Dollars) for labour of the Contractor only expended on persons employed on daywork DW.02 Labour on-costs MATERIALS DW.03 Allow the Provisional Sum of $? (? Thousand Dollars) for the net cost of delivered materials of the Contractor only expended on daywork including delivery to site DW.04 Materials on-costs PLANT DW.05 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of plant of the Contractor only expended on daywork DW.06 Subcontractors on-costs SUBCONTRACTORS DW.07 Allow the Provisional Sum of $? (? Thousand Dollars) for the cost of labour, materials and plant of Subcontractors expended on daywork DW.08 Subcontractors on-costs To Summary P.S. P.S. P.S. P.S.

Contract No. ??/??

Page 48

MAIN ROADS
W estern Australia

Bridge

BILL No. 1 - BRIDGE ? OVER ?

Contract No. ??/??

Page 49

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

SERIES 800 - BRIDGES AND MAJOR STRUCTURES


801 - EXCAVATION AND BACKFILL FOR STRUCTURES STRUCTURAL EXCAVATION Abutments And Approach Slabs 801.01 Abutment footing excavation not exceeding ? m deep commencing at existing ground level 801.02 Extra over abutment footing excavation for excavation in rock Piers 801.03 Pier footing excavation not exceeding ? m deep commencing at existing ground level 801.04 Extra over pier footing excavation for excavation in rock Retaining Walls 801.05 Retaining wall footing excavation not exceeding ? m deep commencing at existing ground level 801.06 Extra over retaining wall footing excavation for excavation in rock EMBANKMENT CONSTRUCTION 801.07 Embankment construction behind abutment using select material 801.08 Extra over selected embankment fill for compaction in zone of special compaction 801.09 Preparation, levelling and trimming embankment construction to receive wingwall footing 802 - MECHANICALLY STABILISED EARTH WALLS 802.01 Mechanically stabilised earth wall to abutment 803 - DISMANTLING AND DEMOLITION 803.01 Demolition of existing Bridge No. ? 803.02 Removal of redundant reinforced concrete deck overlay 803.03 Removal of existing timber traffic barrier 808 - INCREMENTAL LAUNCHING 808.01 Casting bay and temporary supports 808.02 Launching girder 808.03 Launching system
Contract No. ??/??

m3

m3

m3

m3

m3

m3

m3

m3

m2

Item

m2 m2

Item Item Item

1 1 1
Page 50

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

808.04 Launching of deck segment 810 - DRIVEN STEEL PILES 810.01 Mobilisation and demobilisation of piling plant 810.02 ?UC? Steel pile (In ? No. piles) 810.03 ?UC? Steel pile extension (Provisional Quantity) 810.04 Extra over ?UC? steel piles and ?UC? steel pile extensions for galvanising (Provisional Quantity) 810.05 Preparation, handling and pitching of ?UC? steel pile 810.06 Driving of ?UC? steel pile (Provisional Quantity) 810.07 Site welded splice to ?UC? steel pile (Provisional Quantity) 810.08 Re-driving of ?UC? steel pile (Provisional Quantity) 810.09 Cutting off top of ?UC? steel pile and preparing head for bonding into structure 811 - DRIVEN CONCRETE PILES 811.01 Mobilisation and demobilisation of piling plant 811.02 ? x ? Concrete pile, ?m long 811.03 Preparation, handling and pitching of ? x ? concrete pile 811.04 Driving of ? x ? concrete pile 811.05 ? x ? Concrete pile extension 811.06 Re-driving of ? x ? concrete pile 811.07 Cutting off top of ? x ? concrete pile and preparing head for bonding into structure 819 - FALSEWORK 819.01 Provision and erection of falsework 819.02 Maintenance of falsework 819.03 Removal of falsework 820 - CONCRETE FOR STRUCTURES ABUTMENTS AND APPROACH SLABS Plain Insitu Concrete Class ? 820.01 ? Blinding layer under abutment footing (In ? m2)
Contract No. ??/??

No.

Item t t t

No. m No.

m No.

Item No. No.

m m m No.

Item Item Item

1 1 1

m3
Page 51

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

820.02 ? Blinding layer under abutment capbeam and wingwalls (In ? m2) 820.03 ? Blinding layer under wingwall (In ? m2) 820.04 ? Blinding layer under approach slab (In ? m2) 820.05 ? Blinding layer under dual use path (In ? m2) Reinforced Insitu Concrete Class ? 820.06 Abutment footing 820.07 Abutment wall and wingwalls 820.08 Abutment column 820.09 Abutment capbeam and wingwalls 820.10 Wingwall 820.11 Approach slab 820.12 Dual use path PIERS Plain Insitu Concrete Class ? 820.13 ? Blinding layer under pier footing (In ? m2) Reinforced Insitu Concrete Class ? 820.14 Pier footing 820.15 Pier 820.16 Pier column 820.17 Pier capbeam RETAINING WALLS Plain Insitu Concrete Class ? 820.18 ? Blinding layer under retaining wall footing (In ? m2) Reinforced Insitu Concrete Class ? 820.19 Retaining wall footing 820.20 Retaining wall DECK Reinforced Insitu Concrete Class ? 820.21 Deck slab, diaphragms and beams 820.22 Dual use path Post-tensioned Prestressed Insitu Concrete Class ? 820.23 Deck slab, diaphragms and beams 821 - FORMWORK
Contract No. ??/??

m3

m3 m3 m3

m3 m3 m3 m3 m3 m3 m3

m3

m3 m3 m3 m3

m3

m3 m3

m3 m3

m3

Page 52

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

ABUTMENTS AND APPROACH SLABS Formwork Class ? 821.01 Sides of abutment footing 821.02 Sides of abutment wall and wingwalls 821.03 Sides of abutment wall and wingwalls, curved on 821.04 Sides of abutment column, curved on plan 821.05 Sides of abutment capbeam and wingwalls 821.06 Sides of wingwall 821.07 Sides of wingwall, curved on plan 821.08 Sides of approach slab 821.09 Sides of dual use path PIERS Formwork Class ? 821.10 Sides of pier footing 821.11 Sides of pier 821.12 Sides of pier, curved on plan 821.13 Sides of pier column, curved on plan 821.14 Sides and soffit of pier capbeam RETAINING WALLS Formwork Class ? 821.15 Sides of retaining wall footing 821.16 Sides and ends of retaining wall 821.17 Sides of retaining wall, curved on plan DECK Formwork Class ? 821.18 Sides of diaphragm 821.19 Soffit of deck slab 821.20 Sides of deck slab and upstand 821.21 Sides and soffit of diaphragm 821.22 Sides of kerb/edge beam 821.23 Sloping soffit of diaphragm 821.24 Sides of dual use path

m2 m2 m2 m2 m2 m2 m2 m2 m2

m2 m2 m2 m2 m2

m2 m2 m2

m2 m2 m2 m2 m2 m2 m2

Contract No. ??/??

Page 53

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

Permanent Steel Formwork 821.25 ? Bondek to soffit of deck slab Permanent Void Formwork 821.26 ? Diameter x ? thick helical lock seam corrugated galvanised steel pipe void former (In ? No.) 822 - STEEL REINFORCEMENT ABUTMENTS AND APPROACH SLABS Reinforcing Bars 822.01 Bars less than 16 diameter in abutment footing 822.02 Bars less than 16 diameter in abutment wall and wingwalls 822.03 Bars less than 16 diameter in abutment column 822.04 Bars less than 16 diameter in abutment capbeam and wingwalls 822.05 Bars less than 16 diameter in wingwall 822.06 Bars less than 16 diameter in approach slab 822.07 Bars less than 16 diameter in dual use path 822.08 Bars 16 - 36 diameter in abutment footing 822.09 Bars 16 - 36 diameter in abutment wall and wingwalls 822.10 Bars 16 - 36 diameter in abutment column 822.11 Bars 16 - 36 diameter in abutment capbeam and wingwalls 822.12 Bars 16 - 36 diameter in wingwall 822.13 Bars 16 - 36 diameter in approach slab 822.14 Bars 16 - 36 diameter in dual use path Reinforcing Fabric 822.15 ? Fabric in approach slab 822.16 ? Fabric in dual use path PIERS Reinforcing Bars 822.17 Bars less than 16 diameter in pier footing 822.18 Bars less than 16 diameter in pier 822.19 Bars less than 16 diameter in pier column 822.20 Bars less than 16 diameter in pier capbeam

m2

t t

t t

t t t t t t t

t t t

m2 m2

t t t t

Contract No. ??/??

Page 54

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit t t t t

Qty

Rate

Amount

822.21 Bars 16 - 36 diameter in pier footing 822.22 Bars 16 - 36 diameter in pier 822.23 Bars 16 - 36 diameter in pier column 822.24 Bars 16 - 36 diameter in pier capbeam Reinforcing Wire 822.25 Wire less than 16 diameter in pier column Reinforcing Fabric 822.26 ? Fabric in pier capbeam RETAINING WALLS Reinforcing Bars 822.27 Bars less than 16 diameter in retaining wall footing 822.28 Bars less than 16 diameter in retaining wall 822.29 Bars 16 - 36 diameter in retaining wall footing 822.30 Bars 16 - 36 diameter in retaining wall Reinforcing Fabric 822.31 ? Fabric in retaining wall DECK Reinforcing Bars 822.32 Bars less than 16 diameter in deck slab, diaphragms and beams 822.33 Bars less than 16 diameter in dual use path 822.34 Bars 16 - 36 diameter in deck slab, diaphragms and beams 822.35 Bars 16 - 36 diameter in dual use path 822.36 ?mm Diameter mechanical splice Reinforcing Fabric 822.37 ? Fabric in deck slab, diaphragms and beams 822.38 ? Fabric in dual use path 824 - PRESTRESSING OF CONCRETE DECK 824.01 Stressing anchorage type ? 824.02 Dead end anchorage type ? 824.03 Coupler type ?

m2

t t t t

m2

t t

t No.

m2 m2

No. No. No.

Contract No. ??/??

Page 55

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit m

Qty

Rate

Amount

824.04 Prestressing tendon comprising ? No. ? diameter wires in ? diameter tendon sheathing duct (In ? No. tendons) 824.05 Stressing of ? No. x ? diameter wire tendon and grouting of ? diameter tendon sheathing duct 825 - SANDBLASTED CONCRETE FINISH ABUTMENTS AND APPROACH SLABS 825.01 Sandblasted finish to exposed surfaces of abutment wall and wingwalls PIERS 825.02 Sandblasted finish to exposed surfaces of pier RETAINING WALLS 825.03 Sandblasted finish to exposed surfaces of retaining wall 828 - PRECAST CONCRETE MEMBERS Precast Prestressed Concrete "I" Beams 828.01 ?m Long "I" beam Precast Prestressed Concrete Plank Beams 828.02 ? x ? Plank beam, ?m long 829 - PRECAST CONCRETE PARAPET PANELS 829.01 Parapet panel type ?, ? long 830 - STRUCTURAL STEELWORK 830.01 ?WB? Deck beam (In ? No. beams) 830.02 ?UC? Deck bracing (In ? No. braces) 830.03 ? x ? x ? Beam base plate 831 - MINOR STEEL ITEMS 831.01 Galvanised ? x ? x ? plate fixed to abutment wall with chemical anchors 831.02 Galvanised pier shear key 603 - ROAD SAFETY BARRIER SYSTEMS AND TRAFFIC BARRIERS FOR STRUCTURES BARRIER 603.01 3 rail RHS traffic barrier for structure complete as Drawing ? 603.02 Galvanised Thriebeam barrier system 603.03 Galvanised W-Beam barrier system

No.

m2

m2

m2

No.

No.

No.

t t No.

No.

No.

m m

Contract No. ??/??

Page 56

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit No.

Qty

Rate

Amount

603.04 Galvanised Thriebeam/W-Beam barrier system transition 603.05 Galvanised modified eccentric loader terminal 833 - BALUSTRADES AND HANDRAILS BALUSTRADES 833.01 Galvanised and painted balustrade complete as Drawing ? 833.02 Extra over balustrade for light pole base all as Drawing ? including conduit connection to junction box, and casting in edge plate and tie-in reinforcement to deck slab 835 - PROTECTIVE TREATMENT OF STEELWORK 835.01 Extra over ?WB? deck beam for galvanising 835.02 Extra over ?UB? bracing for galvanising 835.03 ? Coat chlorinated rubber paint to deck beam 850 - TIMBER BRIDGES 850.01 Preparation of timber decking to receive concrete overlay 850.02 Routine maintenance of outside timber stringer (In ? No. stringers) 850.03 Replacement of timber stringer with ?UB? Stringer (In. ? No. stringers) 850.04 Stringer or corbel bolting 850.05 Anti-fungal groundline treatment of timber pile 850.06 Pile repair type ? to abutment pile 850.07 Pile band to variable diameter timber pile 850.08 Bolt tightening to ? 850.09 End grain sealing to ? 850.10 Vegetaion and debris clearance below bridge 860 - BRIDGE BEARINGS BRIDGE BEARINGS 860.01 ? Diameter x ? elastomeric laminated rubber bearing including galvanised ? O.D. x ? CHS socket cast into concrete, ? diameter galvanised dowel ? long, dry pack mortars, forming horizontal recess, etc., all as Drawing ?
Contract No. ??/??

No.

No.

t t m2

m2

No. No. No. No. No. Item Item 1 1

No.

Page 57

MAIN ROADS
W estern Australia

Bridge

Item

Description

Unit

Qty

Rate

Amount

860.02 ? x ? Rubber bearing pad including ? diameter galvanised dowel cast into concrete APPROACH SLAB BEARINGS 860.03 Approach slab bearing comprising ? x ? x ? polyethylene sheet (HDPE), ? x ? x ? rubber bearing pad, galvanised dowel cap cast into approach slab and ? diameter galvanised dowel ? long cast into deck slab all as Drawing ? 870 - COMPRESSION JOINT SEAL 870.01 ? Compression seal including galvanised expansion joint edging with anchor straps cast into concrete and galvanised cover plates all as Drawing ? (In ? No. expansion joints) 875 - WATERPROOF MEMBRANE ABUTMENTS AND APPROACH SLABS 875.01 Bituthene ? waterproof membrane (? wide) applied behind contraction joint in abutment wall DECK 875.02 Bituthene ? waterproof membrane laid on deck slab under dual use path and median 908 - ANTI-GRAFFITI ABUTMENTS AND APPROACH SLABS 908.01 Anti-graffiti coating to exposed surfaces of abutment wall and wingwalls PIERS 908.02 Anti-graffiti coating to exposed surfaces of pier RETAINING WALLS 908.03 Anti-graffiti coating to exposed surfaces of retaining wall 407 - KERBING 407.01 ? x ? Overall precast concrete kerb laid on deck slab including mortar bed and all necessary insitu infill

No.

No.

m2

m2

m2

m2

m2

?M - MISCELLANEOUS ABUTMENTS AND APPROACH SLABS Expansion Joints Expansion joint between ? approach slab and abutment wingwalls including treating wingwall face with bond breaker, forming ? x ? groove at top and sealing with approved sealant as Drawing ?

M.01

Contract No. ??/??

Page 58

MAIN ROADS
W estern Australia

Bridge

Item M.02

Description ? x ? Polystyrene foam between approach slab blinding layer and abutment as Drawing ? Contraction Joints Contraction joint in ? approach slab comprising ? plywood ? wide set vertically and ? deep groove at top surface sealed with approved sealant as Drawing ? Diameter Class ? PVC pipe set vertically in abutment wall and tied to reinforcement behind dummy joint including end caps (In ? No.) Waterstops ? Waterstop cast into concrete RETAINING WALLS Expansion Joints Expansion joint comprising ? bitumen impregnated fibreboard joint filler ? wide with ? x ? sealant and ? centre type waterstop cast into concrete, ? diameter galvanised dowels ? long with PVC caps and bituminous paint cast into concrete at ? centres and forming groove in front face all as Drawing ? To Summary

Unit m

Qty

Rate

Amount

M.03

M.04

M.05

M.06

Contract No. ??/??

Page 59

MAIN ROADS
W estern Australia

Further Examples

FURTHER EXAMPLES

Contract No. ??/??

Page 60

MAIN ROADS
W estern Australia

Further Examples

Item

Description

Unit

Qty

Rate

Amount

SERIES 300 - EARTHWORKS


304 - REVEGETATION AND LANDSCAPING 304.01 Notwithstanding Main Roads Standard Method of Measurement for Construction Works Clause 304.2.4, establishment of landscaping shall be measured as an Item. 304.02 Ground preparation 304.03 Imported topsoil, ? thick 304.04 Mulch, ? thick, in plant beds 304.05 Grass stolons planted at the rate of ?m2 of turf to cover ?m2 of ground 304.06 Establishment of landscaping To Summary Note Refer also to SMM Example Contract Specific Preambles for alternative method where items not currently measured in SMM need to be included Note
Example of a "Contrac Specific Preamble" inserted in the relevant schedule/bill in accordance with the "Principles For Preparing Schedules Of Rates And Bills Of Quantities" Clause 1.5

m2 m2 m2 m2

Item

Contract No. ??/??

Page 61

MAIN ROADS
W estern Australia

Author's Notes

AUTHOR's NOTES Delete these notes from (or Do Not Print with) final tender documents
This Document must be measured and compiled in accordance with Main Roads Standard Method Of Measurement For Construction Works and incorporate the Preambles To The Schedule of Rates And Bills Of Quantities and where necessary, Contract Specific Preambles. This document must be completed by a Qualified Quantity Surveyor experienced in Main Roads WA Major Works Contracts. Main Roads' Quantity Surveyor can provide advice to ensure accuracy and completeness of these Schedules of Rates and/or Bills of Quantities and compliance with Main Roads Standard Method Of Measurement For Construction Works. The Project Description lines only need to be entered on the Contents Page. The information entered there will automatically appear on the Summary Page. Where additional items are added to Schedule 2 - Roadworks, the Contents page numbers should be checked, and when necessary manually corrected. If the "Bridge" Bill(s) is/are not required, delete the sheet and the entries on the Contents and Summary pages. If extra Bridge Bills are required, copy the Bridge Bill, and edit/amend both the Contents and the Summary page to suit. Correct the Contract number shown in ALL the footers : Press the CTRL & i keys together, and follow the prompts. With correct use of this document, ALL totals should automatically be transferred to the Section Total and Summary. However, Authors should still check that this has in fact happened. ALL items in the Schedule of Rates/Bill of Quantities that have, 'Item' as the Unit of measurement shall have the quantity of '1' entered in the Quantity column. This will encourage tenderers to provide an individual rate or price for each item, consistent with the requirements of the Preambles To The Schedule of Rates And Bills of Quantities and Clause 9.12 of the Conditions Of Tendering.