SOIL INVESTIGATION

Sl.No. 1

Description of item of work

Qty.

Unit Per KM

Rate 75

Amount
37500

Erection of boring plant in including transportation of boring rig crew and all 500.00 accessories to the site and setting of completes in all respects including departure of equipotent from six excluding VAT. Taking boring 150mm diameter using suitable drilling equipment and in water unto 576.00 1.25 mm depth of water complying with standard specification unto depth as specified by the Department Officers and supplying disturbed soil samples in imply gunny bags each sample weighing of all material such as soils etc., and all hire and operational charges of all T&P but excluding charges for transportation of boring to site shifting of boring equipment from one point to other boring point. Dismantling charges of charges of boring equipment including hire and operational charges of all T&P and excluding cost and conveyance of soil samples to Visakhapatnam etc., complete and as directed by the Departmental Officers in-charges of the for bed level to any depth in each point. In all types of soils including soft rock.

1 Rmt

1000

576000

Drilling into hard rock (NX size) with RQD presentation in bore logs using suitable 60.00 drifting equipment and in water unto 1.25 mm depth of water complying with standard specification unto depth as specified by the Departmental Officers and supplying disturbed soil samples in empty gunny bags each sample weighting if all materials such as soils etc., and all hire and operational charges if all T&P but excluding charges for transpiration of boring rig to site shifting of boring equipment from one point to other boring point, dismantling charges of boring equipment one including hire and operational charges of all T&P and excluding cost and conveyance of soil samples to Visakhapatnam etc., complete and as directed by the Departmental Officers in-charges of the work for bed level to any depth in each point including all incidental expenditure and all labor charges to make ready to bore hole on land or water including all etc., complete as directed by the Departmental Officers in-charges of the work Hard Rock.

1Mts

1320

79200

Conducting of Standard Penetration Test (SPT) at depth indicated by Departmental 270.00 Officers in the permitted and cleared bore as directed by the Departmental Officers including collection of the samples from the split space and preserving the same in light glass jars and charges for packing carefully and the same handed over at Visakhapatnam etc., complete as directed by the Departmental Officers in-charge of the work including all incidental expenditure and all labor charges etc., complete for analyzing and calculation of bearing capacity from N.Values.

1 No

600

162000

Drilling equipment shifting from point or bore to bore including all etc., complete as 30.00 directed by the Engineering personal in-charge. Dismantling machinery and other equipment of boring and platform at sub specified 2.00 including setting of the location as shown by the Departmental Officers in-charges of the work etc., complete including all incidental charges required labor charges for making ready for bore holes on land or water including transportation charges of equipment for road point to water point for bore point if any as directed by the Departmental Officers in-charges of the work (Charges for mobilization and demobilization of equipment) AU report & analysis of soil samples and field tests, bore long preparation & 576.00 recommendations

1 Shift

840

25200

1 Job

1200

2400

1 Rmt

500

288000

1170300