ANNEXURE I
Net Phys Stock in Contractor Location in SAP 01.03.2012
Material Description
Unit
1 2 3 4 5 6 7 8 9
PE 100 Pipe, 32 mm Dia. SDR 11 PE 100 Pipe, 125 mm Dia. SDR 17.6 PE 100 Pipe, 63 mm Dia. SDR 11 Domestic Gas Meter G1.6 (Left Inlet) Domestic Gas Regulator-Low Pressure PE 100 Pipe, 90 mm Dia. SDR 17.6 Antirodent Warning Tape Service Regulator Module 200 SCMH Service Regulator Module 50 SCMH
M M M EA EA M M EA EA
Contractor
Material Executive
MATERIAL RETURN TO STORES IN MARCH 2012 Name of Contractor: V K PATEL CIVIL - RJV2
Material Returned Location: GSPC GAS RAJKOT ZONE : NORTH SAURASHTRA LOCATION RAJKOT ANNEXURE II
1) The above quantity returned by us is subject to verification of GSPC GAS 2) We have returned all the materials as reffered above and there is no loose material lying with us except CWIP
Verified by:
Material Executive
AM - Stores
Consumption of Materials ( April-2011- M Sr. No Material Description Unit Commissioned A 1 Steel Pipeline 12''X6.4mm 8"X6.4mm 6"X6.4mm 4"X6.4mm 2 CPRS / DRS 2000 SCMH 5000 SCMH 3 PE Pipes 160 mm 125 mm 110 mm 90 mm 63 mm 32 mm 4 PE Ball valves 160 mm 125 mm 90 mm 63 mm 5 Service Regulators B - 50 Assembly B - 150 / 250 Assembly B - 200 Assembly B - 50 B - 150 / 250 RPD Meters G - 16 G - 25 G - 40 G - 65 nos nos nos nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Mtr Mtr Mtr Mtr Mtr Mtr nos nos Mtr Mtr Mtr Mtr
G - 160 G - 250 G - 400 G - 650 7 Transition Fittings 1'' X 32 mm 2'' X 63 mm 3'' X 90 mm 4'' X 125 mm 8 Domestic Meter/ Regulators High Pressure Dom. Regulators Low Pressure Dom. Regulators Domestic Meter (G1.6) 9 Commercial Meters G6 G10 G16 G25 10 Commercial Regulators Mesura B - 10 Mesura B - 25 Mesura B - 50 Industrial metering skids 110 mbar 1 barg 1 barg with EVC G 25 G 40 G 65 G 160 G 250 G 400 Any other material (pl add)
Nos Nos Nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos
11
12
Note ::: 1 2 3 4
This sheet need to be prepared for each contractor for each working location Overall consolidated sheet to be prepared for each contractor / zone wise For example : a contractor is working in 3 cities in your zone than there will be THREE indivi your zone Only Hard copy to be submitted duly signed and forward soft copy in excel through e-mial to
Prepared By:
Recommended By:
Name of Engineer
City Manager
n of Materials ( April-2011- March-2012) overall Material Consumption WIP (work in Progress) B C= A+B
king location
n there will be THREE individual city wise consumption sheet and Overall one consolidated sheet for that contractor
y in excel through e-mial to Anand Gamit ( Asst. Manager) for calculation purpose at------ anand.g@gspc.in
Approved By:
Zonal Head
Remarks
Consumption of Materials ( April-201 Sr. No Material Description Unit Commissioned & Consumption booked (A) 1 Steel Pipeline 12''X6.4mm 8"X6.4mm 6"X6.4mm 4"X6.4mm 2 CPRS / DRS 2000 SCMH 5000 SCMH 3 PE Pipes 160 mm 125 mm 110 mm 90 mm 63 mm 32 mm 4 PE Ball valves 160 mm 125 mm 90 mm 63 mm 5 Service Regulators B - 50 Assembly B - 150 / 250 Assembly B - 200 Assembly B - 50 B - 150 / 250 6 RPD Meters G - 16 G - 25 G - 40 G - 65 Nos Nos Nos Nos Nos Nos Nos Nos Nos nos nos nos nos Mtr Mtr Mtr Mtr Mtr Mtr nos nos Mtr Mtr Mtr Mtr
G - 160 G - 250 G - 400 G - 650 7 Transition Fittings 1'' X 32 mm 2'' X 63 mm 3'' X 90 mm 4'' X 125 mm 8 Domestic Meter/ Regulators High Pressure Dom. Regulators Low Pressure Dom. Regulators Domestic Meter (G1.6) 9 Commercial Meters G6 G10 G16 G25 10 Commercial Regulators Mesura B - 10 Mesura B - 25 Mesura B - 50 11 Industrial metering skids 110 mbar 1 barg 1 barg with EVC G 25 G 40 G 65 G 160 G 250 G 400 Any other material (pl add)
Nos Nos Nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos
12
Note ::: 1 2 3 4
This sheet need to be prepared for each contractor for each working location Overall consolidated sheet to be prepared for each contractor / zone wise For example : a contractor is working in 3 cities in your zone than there will be THREE ind consolidated sheet for that contractor in your zone Only Hard copy to be submitted duly signed and forward soft copy in excel through e-mial t
Prepared By:
Recommended By:
Name of Engineer
City Manager
ANNEXURE III
of Materials ( April-2011- March-2012) overall Material Consumption Consumption not booked (B) C= A+B Remarks
ere will be THREE individual city wise consumption sheet and Overall one excel through e-mial to Anand Gamit ( Asst. Manager) for calculation purpose
Approved By:
Zonal Head
Contractor Sign
Sr. No
Material Description
Unit
G - 250 G - 400 G - 650 7 Transition Fittings 1'' X 32 mm 2'' X 63 mm 3'' X 90 mm 4'' X 125 mm 8 Domestic Meter/ Regulators High Pressure Dom. Regulators Low Pressure Dom. Regulators Domestic Meter (G1.6) 9 Commercial Meters G6 G10 G16 G25 10 Commercial Regulators Mesura B - 10 Mesura B - 25 Mesura B - 50 Industrial metering skids 110 mbar 1 barg 1 barg with EVC G 25 G 40 G 65 G 160 G 250 G 400 Any other Material ( pl Add)
Nos Nos Nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos nos
11
12
City Manager
AM - Stores
Remarks
Approved By:
Acceptance by:
Zonal Head
Contractor Sign