Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Description CEB Power Consumption in kwh CEB Power Factor CEB Maximum Demand in kva DG Power Consumption in kwh Total Power Consumption in kwh Water consumption in K Liters Main Sump Water Level in % Diesel Stock Opening in Liters Diesel Stock Closing in Liters Diesel Stock in bulk tank Opening in Litters Diesel Stock in bulk tank Closing in Liters Diesel Consumption in Liters Cafeteria consumption in kwh Food Stall A (Elephant house) Consumption Kwh Food Stall B (Smile & Dine) Consumption Kwh Dialog tower
174748 0.99 NA 2606 177354 317 90 12769 12444 9861 9536 690 1662 570 17 12
LY REPORT - 12 - 05 - 2012
Difference Remarks -3740 0 0 0 -121 59 0 0 0 0 0 0 -61 -37 0 0 * Compare to last Saturday the compressor running hours has increased by 08 hours. Due to ambient temperature and the humidity conditions.
Actual reading measured was 11199 L Actual reading measured is 11199 L Actual reading measured was 8194L Actual reading measured is 8194L
Garbage Details Yesterday Today Sl.No Description of Garbage / wastage (Kgs) (11/05/2012) (12/05/2012) Shredder 11.5 14.4 1 Tissue 151.6 53.1 2 Cups 41.3 31.1 3 Card Board 25 1.2 4 Food 254.8 46 5 Lunch Wrapping Paper 23.3 10.6 6 News Paper 0 0 7 Lunch Sheet 13.8 3.3 8 IT wastage 0 0 9 Plastic 0 0 10 Fused Bulbs 0 0 11 Regiform 0 0 12 Damaged Glass 0 0 13 Damaged Plates 0 0 14 Others 0 0 15 Timber 0 2.2 16
MTD 156.4 1203.7 510 177.8 1789.2 165.8 35.4 121.2 9 9.2 5.3 0 0 0 0 3.5
Difference 2.9 -98.5 -10.2 -23.8 -208.8 -12.7 0.0 0.0 3.3 0.0 0.0 4.4 0.0 0.0 0.0 2.2
Sl.No 1 2 3 4 5 6 7 8 9
Description SAUCERS PLATES DISHES CUPS SOUP CUPS SMALL SPOONS SPOONS FORKS SIDE PLATES
Remarks
1 2 3
Energy Consumption cost CEB (KWHR) 19.10 260003.45 12151.00 Diesel in ltrs 115.00 0.00 0 Water in ltrs 70.00 4130.00 59 Total cost spent utility & water / day (LKR) 264133.45
Status of Equipment Working Condition Sl.No Equipments DG -1 (1250 KVA) DG-2 (1250 KVA) DG-3 (1250 KVA) System No.1 Chiller No-1 System No.2 System No.3 Status OK OK OK OK OK Compressor out of order GI condenser beadings are corroded System No.1 2 Chiller No-2 System No.2 System No.3 System No.1 Chiller No-3 System No.2 System No.3 Equipment HT Panels Compressor # 01 under maintenance OK OK GI condenser beadings are corroded OK OK OK Transformer 1
Status
OK
OK
5 Status
OK
BMS OK
ondition Total Run Hours Today MTD (12/05/2012) 0 3.9 0 3.9 0 0.2 24 24 0 129 134 0 YTD
0 0 0 0 6 0 Transformer 2
0 133 124 70 118 53 MV Panels ETU of DG-1 Incoming breaker to be serviced. But the breaker is functional. CCTV OK / Put it back to Sprinkler pumps
OK
* Non-return valve of the main hydrant electrical & Diesel pump is leaking thus its shut down. But can be used in OK the event of an emergency. * Couplin of jockey pump brocken Water systems OK Earth pits OK
Details of activities carried out SI NO. * Elelctrical PPM in 2F LDB,PDB,SLP,SPP,ELDB's. * Repalced 01no 14w lamp in BMS room. Replaced 01no 11w lamp in 4F near gents wash room. Replaced 01no 10w exit lamp in 2F lift lobby. Cable truncking fixing on GF. GF table nos are -65,100,102 * Monitored the system and updated the log sheets. * Monitored the system and updated the log sheets. * DG - 1, DG - 2, DG - 3, are in auto mode.
ELECTRICAL
* * *
2 3 4 5
* Checked all doors in the building to ensure the proper function of the access control system.
7 8
ELEVATORS PLUMBING
* Kept 02 nos of elevators switched off. * Applied silicon for 3nos of wash basins in 5F hand wash.
CARPENTRY
* Repaired chaires at 3F & entrance guard room. * Fixed back the wooden skirting at 1F NE side near ladies wash room.
10
* Checked the condition and cleaned SMO, CM, VIP, 2F new office. CONDITION OF TR, MEETING, CONFERENCE * Checked and cleaned the training room # 01,02,03,04,05. * Checked and cleaned the conference rooms at 1F,2F,3F,4F. ROOMS * Cleaned tables & bins in smoking area. * Cleaned smoking area, lift lobbies, stair cases, E-caf, game room, ladies and gents toilets. * Changed TV channels as per the schedule. * Cleaned all the pantries at process areas . * Checked and cleaned MD/SMO/VIP/ Conference rooms and training rooms. * Vaccumed 2F,4F,MD,SMO,VIP,TR,Conference rooms * Regular 24 hours operation. * SP2/SP4/SP7/Ph meter/Flow meter /Oil skimmer /PLC are out of order.
11
HK ACTIVITIES
12
STP
13
OTHER
* painted white coloure in 4F outsude if SMO room. White & Red coloure in GF around ATM door
Plumbing PPM in Dish wash,food outlets & kitchen BREAK DOWN DESCRIPTION ACTION TAKEN
G. Remarks / Other activities * Vendor Sperrys bought the dish washer back and found that it was not working after giving power and water connection to it. Informed the vendor and technician will come on Monday to check it. * Vendor Synergy started the UPS power cable laying on 3F and 4F NE side Locker rooms. Work is in progress. * Vendor Fire X is in progress in wiring for the Inergen system from BMS room to main building. * Vendor Asoka glass fixed scafoldings for glass panel changing in 3F & 4F. * Vendor Fish pond cleaned the fish tank and fish pond. * Vendor Johnson Diversy conducted the training programe for the KH team.
,SLP,SPP,ELDB's. MS room. ear gents wash room. 2F lift lobby. table nos are -65,100,102
* * *
auto mode.
ed off.
ned SMO, CM, VIP, 2F new office. ng room # 01,02,03,04,05. erence rooms at 1F,2F,3F,4F.
he schedule. ess areas . O/VIP/ Conference rooms and training * TR,Conference rooms
,LDB,ELDB
ng after giving power and water heck it. * cker rooms. Work is in progress. * o main building. * * Vendor * Vendor Johnson
Department
Description of items
Location
Remarks
ELECTRICAL
MAN POWER DETAILS SHIFTS DAY SHIFT NIGHT SHIFT GENERAL SHIFT Venkatesh Facility Manager Asst. Managers Technical Suranga Mohan Basenbech Asst. Managers Soft Services
F&S supervisor
HVAC Supervisor
HVAC OPERATORS
Joseph
MAN POWER DETAILS Shift Engineers Bandara Amiyu ELECTRICIANS Jayasundara / Nilantha Bandara / Nilanka PLUMBERS Premadasa Wasantha Anil PUMP MECHANIC CARPENTER
IT Boy Sudarshan
IT Technician Eranga
Gardener Anthoney
JANITORS 18 13
PAINTER
MASON
Gunapala
House Keeping Painting F&S. Electrical Carpentry Plumbing A/C Mason Total Calls
Nature of Calls House Keeping Painting F&S Electrical Carpentry Plumbing A/C Mason Total Calls
Complaints Closed 0 0 0 0 0 0 0 0 0
Carpentry, 0, 0%
Painting, 0, 0%
Requests Closed 0 0 0 0 0 0 0 0 0
Carpentry, 0, 0%
A/C, 0, 0%
A/C, 0, 0%
Pending 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0
Pending 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0
Mason, 0, 0%
Mason, 0, 0%
11:15
11:20
0:05
Ok Ok Ground Floor-P3 (Near HR) Ok Ok Ok First Floor - P1 Ok Ok First Floor - P2 Ok Ok Ok Second Floor - P1 Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok
9 Water dispenser Ok Ok Ok Third Floor - P2 Tea Machine 10 Water dispenser Ok Ok Ok Third Floor - P3 Pepsi Machine 11 Water dispenser Coca Cola Machine 12 Water dispenser Ok Ok Ok Fourth Floor - P2 Pepsi Machine 13 Tea Machine Water dispenser Milo/Nescafe Machine Water dispenser Tea Machine 15 Nescafe Machine Water dispenser Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Fourth Floor - P3 Ok Ok Fifth Floor Ok Ok Ok Ok Ok Ok Ok Ok 14 Ok Ok Ok Ok Ok Ok Ok Ok Ok Fourth Floor - P1 Ok Ok Ok To be Fixed Ok Ok Ok Ok Ok Ok
dition
23:00 4:00 Remarks
me
cess) Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok OK Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok
PS)
R)
Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok
OK Ok
OK Ok
Ok
Ok
Ok Ok
Ok Ok
Ok Ok Ok
Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok Ok
1 2 3 4 5 6 7
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok First Floor
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
8 9
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Fourth Floor 14 15 Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok
ndition
14:00 15:00 16:00 17:00 18:00 19:00
nspected time
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok Ok Ok Ok Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ok Ok
Ambient Temperature & RH Readings Date Time 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00 D 28 27 29 30.5 31.5 32 31 29.5 29 28.5 28 28 W 25 24.5 24.5 25 25.5 26 26 25.5 25.5 25 25 25 12.05.2012 Difference 3 2.5 4.5 5.5 6 6 5 4 3.5 3.5 3 3 RH % 78 82 82 72 67 65 62 64 73 72 76 78