Escolar Documentos
Profissional Documentos
Cultura Documentos
MATERIAL
%
BRITA 2
47.0
BRITA 1
8.3
PEDRISCO
9.7
P DE PEDRA
35.0
CIMENTO
0
TOTAL
100
19.9
39.8 2X
19
2.095
7541.1
a
b=2a
c
d=b/c
e=3600d
19.9 m
SILO N 1
SILO N 2
SILO N 3
SILO N 4
MATERIAL PEDRISCO
MATERIAL P DE PEDRA
MATERIAL BRITA 1
MATERIAL BRITA 2
PESO POR m
PESO POR m
PESO POR m
PESO POR m
ABERTURA
ABERTURA
ABERTURA
ABERTURA
DE CORREIA
DE CORREIA
DE CORREIA
DE CORREIA
(cm)
(cm)
(cm)
(cm)
(kg)
(kg)
(kg)
(kg)
2.0
3.50
1.0
19.20
0.0
5.00
3.0
4.20
2.3
4.80
1.5
23.60
0.5
6.80
5.0
16.00
2.5
8.00
2.0
30.90
1.0
14.60
6.0
22.40
3.5
14.00
y = 0.0182x + 1.5364
y = 0.0111x - 0.5576
3
2
0
0
20
40
60
80
100
120
0
0
50
100
SILO N 1
MATERIAL PEDRISCO
0,0182x + 1,5364
b
0.0182
a
1.5364
1
1
1
1
0
0
0
20
40
60
80
100
SILO N 3
MATERIAL BRITA 1
0,0122x - 0,3111
b
0.0122
a
-0.3111
200
250
SILO N 2
MATERIAL P DE PEDRA
0,0111x - 0,5576
b
0.0111
a
-0.5576
y = 0.0122x - 0.3111
150
120
y = 0.0219x + 2.3178
7
6
5
4
3
2
1
0
0
20
40
60
80
100
120
140
SILO N 4
MATERIAL BRITA 2
0,0219x + 2,3178
b
0.0219
a
2.3178
160
180
SILO N 1
MATERIAL PEDRISCO
PESO POR m
ABERTURA
PESAGEM N DE CORREIA
(cm)
(kg)
1
3.50
2.0
2
4.80
2.3
3
8.00
2.5
4
14.00
3.5
5
0.00
0.0
SILO N 1
2.00
2.30
2.50
3.50
26.39
36.20
60.33
105.57
SILO N 2
MATERIAL P DE PEDRA
PESO POR m
CONTRIBUIO
ABERTURA
PESAGEM N DE CORREIA
(t/h)
(cm)
(kg)
26.39
1
19.20
1.0
36.20
2
23.60
1.5
60.33
3
30.90
2.0
105.57
4
0.00
0.0
0.00
5
0.00
0.0
SILO N 2
1.00
1.50
2.00
144.79
177.97
233.02
SILO N 3
0.00
0.50
1.00
37.71
51.28
110.10
SILO N 3
MATERIAL BRITA 1
PESO POR m
CONTRIBUIO
ABERTURA
PESAGEM N DE CORREIA
(t/h)
(cm)
(kg)
144.79
1
5.00
0.0
177.97
2
6.80
0.5
233.02
3
14.60
1.0
0.00
4
0.00
0.0
0.00
5
0.00
0.0
SILO N 4
3.00
5.00
6.00
31.67
120.66
168.92
SILO N 4
MATERIAL BRITA 2
PESO POR m
CONTRIBUIO
ABERTURA
PESAGEM N DE CORREIA
(t/h)
(cm)
(kg)
37.71
1
4.20
3.0
51.28
2
16.00
5.0
110.10
3
22.40
6.0
0.00
4
0.00
0.0
0.00
5
0.00
0.0
CONTRIBUIO
(t/h)
31.67
120.66
168.92
0.00
0.00
MATERIAL
BRITA 2
BRITA 1
PEDRISCO
P DE PEDRA
CIMENTO
TOTAL
PRODUO
MATERIAL BRITA 2
CONTRIBUIO (t/h)
SILO N 4
ABERTURA (cm)
MATERIAL BRITA 1
CONTRIBUIO (t/h)
SILO N 3
ABERTURA (cm)
MATERIAL PEDRISCO CONTRIBUIO (t/h)
SILO N 1
ABERTURA (cm)
MATERIAL P DE PEDRA
CONTRIBUIO (t/h)
SILO N 2
ABERTURA (cm)
500
TOTAL
PRODUO
MATERIAL BRITA 2
CONTRIBUIO (t/h)
SILO N 4
ABERTURA (cm)
MATERIAL BRITA 1
CONTRIBUIO (t/h)
SILO N 3
ABERTURA (cm)
MATERIAL PEDRISCO CONTRIBUIO (t/h)
SILO N 1
ABERTURA (cm)
MATERIAL P DE PEDRA
CONTRIBUIO (t/h)
SILO N 2
ABERTURA (cm)
540
TOTAL
PRODUO
MATERIAL BRITA 2
CONTRIBUIO (t/h)
SILO N 4
ABERTURA (cm)
MATERIAL BRITA 1
CONTRIBUIO (t/h)
SILO N 3
ABERTURA (cm)
MATERIAL PEDRISCO CONTRIBUIO (t/h)
SILO N 1
ABERTURA (cm)
MATERIAL P DE PEDRA
CONTRIBUIO (t/h)
SILO N 2
ABERTURA (cm)
580
TOTAL
PRODUO
MATERIAL BRITA 2
CONTRIBUIO (t/h)
SILO N 4
ABERTURA (cm)
MATERIAL BRITA 1
CONTRIBUIO (t/h)
SILO N 3
ABERTURA (cm)
MATERIAL PEDRISCO CONTRIBUIO (t/h)
SILO N 1
ABERTURA (cm)
MATERIAL P DE PEDRA
CONTRIBUIO (t/h)
SILO N 2
ABERTURA (cm)
620
TOTAL
t/h
235.0
7.5
41.5
0.2
48.5
2.4
175.0
1.4
500.0
t/h
253.8
7.9
44.8
0.2
52.4
2.5
189.0
1.5
540.0
t/h
272.6
8.3
48.1
0.3
56.3
2.6
203.0
1.7
580.0
t/h
291.4
8.7
51.5
0.3
60.1
2.6
217.0
1.9
620.0
%
47.0
8.3
9.7
35.0
0.0
100.0