ZADCO have carried out a QRA in order to assess and evaluate the effects of loss of containment on its Oil & Gas facilities on Zirku Island. From the findings of this study there was a recommendation to provide adequate F&G detection and alarm system to replace the existing aging system. As a result, ZADCO has initiated this project with the aim of providing Zirku with a new F&G system to increase the level of safety on the facility. EPC works to be carried out. Upgrade Zirku airport to handle additional traffic due to Fixed Wing aircrafts flights and helicopters. P-8276: Gas Injection and Gas Lift Facilities
Zirku
Construction
Zirku
Planned Award : Q3 2011 Finish : Q4 2012 Planned Award : Q1 2011 Finish : Q1 2012 Planned Award : Q1 2011 Finish : Q1 2012 Planned Award : Q2 2011 Finish : Q1 2013 Planned Award : Q3 2012 Finish : Q1 2015 Planned Award : Q3 2012 Finish : Q1 2015 Planned Award : Q3 2012 Finish : Q3 2015 Planned Award : Q3 2012 Finish : Q4 2016 Planned Award : Q1 2010 Finish : Q4 2011
Construction
Upper Zakum
Construction
Upper Zakum
EPC
Early Production System - First Oil Early Production System - Greenfield Facilities & Satellite/Central Platform Brwon Field Early Production System - Subsea Pipelines & Cables
Upper Zakum
EPC
Upper Zakum
EPC
Upper Zakum
EPC
Upper Zakum
EPC
Upper Zakum
10
EPC
P - 8163 Procurement & Installtion of 3rd Power Procurement and installtion of 3.3 MW Power Generation Unit at Generation Ubit UAD CPC
UAD
11
EPC
P - 8863 Upgrading of existing Power Generation The existing two Gas Turbine power generation Units to be Units at UAD CPC upgraded to higher capacity to meet growing power demand.
UAD
12
EPC
P - 7335 Procurement & Installtion of 2MW Diesel To provide reliable power supply a 2MW Diesel Generator Set to Generator Set be procured and installed at Arzanah Island
Satah
13
FEED
Upper Zakum
Type
14
Installation of two RO type desalination plants, each with capacity P-8362 :Potable Water & Sewage Treatment Plant of 1200m3/day to meet acute shortage of potable water and at Zirku sewage treatment plant at Zirku. FEED & EPC works to be carried for this project.
Zirku
FEED Planned Award : Q3 2010 Finish : Q1 2012 EPC Planned Award : Q4 2012 Finish : Q4 2014 FEED Planned Award : Q1 2011 Finish : Q1 2012 EPC Planned Award : Q1 2014 Finish : Q4 2015 FEED Planned Award : Q4 2010 Finish : Q4 2011 EPC Planned Award : Q4 2012 Finish : Q2 2014 FEED Planned Award : Q1 2012 Finish : Q4 2012 EPC Planned Award : Q1 2014 Finish : Q3 2016 FEED Planned Award : Q1 2011 Finish : Q4 2011 EPC Planned Award : Q3 2012 Finish : Q4 2014 EPC Planned Award : Q3 2010 Finish : Q1 2012
15
Upper Zakum
16
P-8341 Water Injection Plant Upgrade & P-8361 Cooling Water System Upgrade
Upper Zakum
17
Full field development based on installtion of ESPs. The project will include installtion of new platform for equipment, replacement of infield pipe lines and installtion of surface facilities.
UAD
18
Project
Installation of additional power generation facilities at Zirku Island since the existing power generation facilities enhancement due to the operational constraints for maintenance of aging turbines, increase in demand for the future projects and improve flexibility of operations
Zirku
19
Project
Package 1 : Replace the existing pipeline for Oily Water with more P 8424 - Oily Water Treatment and Disposal at reliable and durable flexible pipeline system along with associated ZIRKU components. EPC works
Zirku