In TATA Motors, various parts of the truck, some manufactured in plant itself and some parts procured from other companies are assembled in the TRUCK ASSEMBLY. Since there are many stations and in most of them operations are done manually and in each station different operation is performed, there are many possibilities of errors. There can be error related to inaccuracy, overlooking or missing of parts etc. The truck after assembly goes to testing for checking of errors or faults. The errors are then detected during testing and the truck is then sent to rectification area if any defect is found. After taking required actions/changes in rectification area, the truck is sent to dispatch.
Data
Assembly lapses Deficiency Material Defect TruckIII TS/PPC/ TTIL/NPI/ADD/ERC Material Handling Issue Engine HVAL TCL Frame shop HVTL 239 678 155 52 38 30 25 25 24 10 2
Fouling Fastener Loose Parts missing Assembly not OK Damaged part fitted
56 40 16 102 30
Data
Model No.
SK 1616 SK 1613 LPT 2518 LPT 1613 SE 1616 LPT 1616 SE 1613 LPT 2513 LP 1512 LPT 3118TC LPT 2513TC LPT 3118 LPT 1613TC SK 1613TC LPT 2518TC SE 1613TC LP 1512TC LPT 2515 LPT 2523 SK 1616/36 LPT 2515TC LPT 2523TC LOT 2518 LP 1613 LPK1616 LPS 3518
No. of defects
272 207 199 166 143 116 54 49 44 25 23 17 15 10 9 9 8 3 3 3 2 2 1 1 1 1
Agency
Assembly lapses Deficiency TruckIII
No. Of Defects
281 551 132
Material Defect Engine Material Handling Issue TS/PPC/ TTIL/NPI/ADD/ERC HVAL TCL Frame shop HVTL
127 61 49 43 41 41 38 19
Type Of Defects
Fouling Fastener Loose Parts missing Assembly not OK Damaged part fitted
No. Of Defects
35 56 59 113 20
Data
Model No.
SK 1616 SK 1613 LPT 1616 LPT 1613 SE 1616 SE 1613 LP 1512 LP 1512TC LPT 1613TC LPT 2518 LPT 2518TC SK 1613TC LPT 2513TC Agency LPT 2513 Fouling LPT 3118 SE 1613TC LPT 2515 Fastener Loose LPT 2515TC Parts missing Assembly not OK Damaged part fitted
No. of defects
314 248 201 185 164 81 59 47 47 85 28 16 44 25 38 12 2 1 75 1 44 173 64
No. Of Defects
Deficien cy 495
Frame shop 75
Engin e 76
HVA L 47
TS/PPC/ TTIL/NPI/ADD/ERC 31
TC L 48
H V T L 1 3
Data
Defect Type Fouling Fastener Loose Part missing Assembly not OK Damaged/Deform part fitted
Agency Assembly lapses Deficiency Material Defect TruckIII TS/PPC/ TTIL/NPI/ADD/ERC HVAL TCL Material Handling Issue Frame shop Engine HVTL Forge div.
Model No.
LPT 3118 LPT 3118TC SD 1015 LPK 1615 SA 1212 LPT 1615 LPT 2518 LPT 1615TC SD 1015TC LPK 2518 LPT 2518TC LPK 2518TC LPK 2516 LPK 1615TC LPK 1616 LPT 2516TC LPT 1618 LPT 2516 LPTA 715TC LPS 3518TC LPTA 715 LPT 2513 LPK 2516TC
Quantity
263 87 69 52 49 42 38 34 33 32 32 30 29 28 27 23 20 18 18 17 17 16 14
Model No.
LPS 3518 SA 1212TC SAK 1212TC LPK 1518 LPT 1618 TC SAK 1212 LPT 3118 TC LPTA 713TC LPTA 713 LPS 4018 LPS 4018TC LPT 1618 Tilt LPT 2518 Tilt LPT 3118 Tilt LPK 1015 LPT 1613 Tilt LPT 1618LHD LPT 2513TC LPT 2515 LPT 3118TC (Tilt) LPT 3118Tilt LPT 713 LPT 715
Quantity
13 11 10 7 7 6 4 4 3 2 2 2 2 2 1 1 1 1 1 1 1 1 1
In this section various Assembly line Lapses have been categorized to various defect categories such as Incomplete Operation, Fastener Loose, wrong layout, kinked, leakage, deformed/damaged part fitted, Equipment Malfunction, Fouling etc . Firstly Pareto of various defect contributing models was made, then Pareto and pie charts of various defects causing agency was made, then by the use of 80-20 rule various defect types in assembly line lapses were analyzed and within those defects type again by the use of 80-20 rule models in which those defects occurred were analyzed.
Defect Distribution
Type
Total
276
Contribution of Defects
S.N . 1 2 3 4 5 6 7 8 9 Defect Description Incomplete Operation Fouling Wrong Layout Fastener Loose Kinking Deform & Damage Equipment Malfunctioning Leakage Plant-3 Defect qty 113 64 35 21 17 14 6 5 1 %age Contr 40.9 23.2 12.7 7.6 6.2 5.1 2.2 1.8 0.4 100.0 Cumm% 40.9 64.1 76.8 84.4 90.6 95.7 97.8 99.6 100.0
Total
276
Total
2245
Total
276
Total
113
Total
21
Total
36
2.
10 11 12 13
7 7 7 48
S. N. 1 2 3 4 5 6 7 8 9
Cumm% 52.60 78.55 86.85 92.73 95.85 97.92 98.96 99.65 100.00
Contribution of Defects
S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Defect Description Assembly lapses Total Deficiency Total Material Defect Total Truck III Total TS/PPC/ TTIL/NPI/ADD/ERC Total TCL Total Material Handling Issue Total TruckIII Total HVAL Total Frame shop Total Engine Total HVTL Total Material Handling Total Forge div. Total Total Defect qty 310 290 275 98 85 69 41 35 28 8 7 7 3 2 1258 %age Contr 24.6 23.1 21.9 7.8 6.8 5.5 3.3 2.8 2.2 0.6 0.6 0.6 0.2 0.2 100 Cumm% 24.6 47.7 69.6 77.3 84.1 89.6 92.8 95.6 97.9 98.5 99.0 99.6 99.8 100.0
LPT 3118 Total LPK 2518 Total LPK 1615 Total LPT 3118TC Total LPK 1615TC Total LPT 1615 Total LPT 1615TC Total others
35 25 20 17 9 5 5 27
Total
152
LPK 1615 LPT 3118 LPK 2518 LPT 1615 LPT 3118TC LPT 2513 LPT 2516TC LPK 2516 Others
16 11 6 6 6 5 5 4 16
Total
75
LPK 1615 Total LPT 2518 Total LPK 2518 Total LPT 1615 Total LPT 3118 Total LPK 1615TC Total others
3 3 2 2 2 1 4
Total
152
Action Plan
Based on Pareto Analysis Action Plan was prepared taking into account defect types and Truck models ,also a check sheet was prepared.
Defects Description
FUPD m ounting bolt loose W heel choke m ounting bolt loose Unloader v alav e pipe clam ping loose
Model
LPT3118 LPT3118 LPT3118
Action T aken
Resp Person
PDC
Im plem ented
After tigtening the bolt the operator is to O S Yadav confirm it by putting yellow paint.
After tigtening the bolt the operator is to Naresh Prasad Im plem ented confirm it by putting yellow paint. After tigtening the bolt the operator is to P S rao confirm it by putting yellow paint. Im plem ented
Defects Description
Model
Action T aken
Resp Person
PDC
Nylon bunch not pressed in bkt near stg gear box LPT1615 T C Nylon bunch not passing through eye clam p below cab Nylon bunch routing incorrect below 3rd XM
Nylon bunch was getting tied with the stg box so that it could not foul with clutch Naresh Prasad Im plem ented lev er. O perator awareness giv en. Naresh Prasad Im plem ented
SD1015 TC
LPT1615 T C
Eye clam p introduced below cross m em ber so that it could not foul with propK Banerjee S shaft.
Im plem ented
LPT3118 T C
A checksheet for all electrical connection in 3118 has been m ade so that no Sankalp electrical connection could be m issed. After fitm ent of tyre the operator is to confirm the stem v alv e position by putting yellow paint.
03.06.11
LPT3118 T C
Sankalp
Im plem ented
3 4
LPT3118 T C LPT3118 T C
Feedback giv en to SQ A for analysis & Lobo Thom os counterm easure. Now the operator writes the actual filled qty in the register from the diesel dispenser. O perator awareness giv en. Rajat Im plem ented
LPK2516 TC
Rajat
Im plem ented
Defects Description
FUPD m ounting bolt loose W heel choke m ounting bolt loose Unloader v alav e pipe clam ping loose
Model
LPT3118 LPT3118 LPT3118
Action T aken
Resp Person
PDC
Im plem ented
After tigtening the bolt the operator is to O S Yadav confirm it by putting yellow paint.
After tigtening the bolt the operator is to Naresh Prasad Im plem ented confirm it by putting yellow paint. After tigtening the bolt the operator is to P S rao confirm it by putting yellow paint. Im plem ented
Defects Description
Model
Action T aken
Resp Person
PDC
Nylon bunch not pressed in bkt near stg gear box LPT1615 T C Nylon bunch not passing through eye clam p below cab Nylon bunch routing incorrect below 3rd XM
Nylon bunch was getting tied with the stg box so that it could not foul with clutch Naresh Prasad Im plem ented lev er. O perator awareness giv en. Naresh Prasad Im plem ented
SD1015 TC
LPT1615 T C
Eye clam p introduced below cross m em ber so that it could not foul with propK Banerjee S shaft.
Im plem ented
LPT3118 T C
A checksheet for all electrical connection in 3118 has been m ade so that no Sankalp electrical connection could be m issed. After fitm ent of tyre the operator is to confirm the stem v alv e position by putting yellow paint.
03.06.11
LPT3118 T C
Sankalp
Im plem ented
3 4
LPT3118 T C LPT3118 T C
Feedback giv en to SQ A for analysis & Lobo Thom os counterm easure. Now the operator writes the actual filled qty in the register from the diesel dispenser. O perator awareness giv en. Eye clam p introduced. O perator awareness giv en. Rajat Im plem ented
5 6 7
Hyd pipe not clam ped from radiator bkt. Speedo cable layout wrong Silencer pipe clam p bkt taper
Check Sheet