PLANT ITEM: LDO UNLOADING PUMP

STATION:NTPC-RAMAGUNDAM Stage III (1 X 500 MW) SYSTEM:LDO UNLOADING SYSTEM


SL.NO. 1. 2. 3. ACTIVITY Access to the plant item is adequate. Illumination in the plant area is adequate. Any other requisite safety provision is adequate for the immediate commissioning activity. General conditions satisfy the site standing instructions as listed in the Plant item commissioning essential prerequisites(SCL MS 1/1). The name plate legend agrees with the NTPC Plant nomenclature , is clearly visible , securely fixed,durable and correlates with remote lables. The installation is complete and correct in accordance with the latest drawings and specification. Provision for adjustments maintenance and repairs is satisfactory. Correct lubricating oils and greases have been applied. Check that oil level in out board bearing can be adequately monitered. Confirm adequate facilities for filling and draining the oil. Confirm that pump is free to rotate.

UNIT: 7 LOCATION:LDO UNLOADING PUMP HOUSE


STATUS (YES/NO) REMARKS

4.

5.

6.

7.

8. 9.

10. 11.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

PLANT ITEM: LDO UNLOADING PUMP


STATION:NTPC-RAMAGUNDAM Stage III (1 X 500 MW) SYSTEM:LDO UNLOADING SYSTEM
SL.NO. 12. 13. ACTIVITY Confirm satisfactory coupling alignment figures and that coupling is made. Confirm proper fitting of mechanical seals at both the ends of the secrews. Confirm drainage facilities are satisfactory for the fluid being pumped. Verify that discharge side relief valve provided is calibrated (tested /Test certificate provided ). Check that all rotating adequately guarded. parts (couplings,etc) are

UNIT:COMMON LOCATION:LDO UNLOADING PUMP HOUSE


STATUS (YES/NO) REMARKS

14. 15.

16. 17.

Confirm that lifting lugs/eyes are rendered inoperable and (if applicable) holes plugged and threads identified. Confirm pressure gauges are provided as per approved drawings. Check that the heating steam arrangement lines and all other pipe lines for the pump are provided as per the approved drawings. Confirm satisfactory operation of the relief valve. Confirm for no l akages from mechanical seals. e

18.

19.

20. 21.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR

PLANT ITEM: LDO UNLOADING PUMP


STATION:NTPC-RAMAGUNDAM Stage III (1 X 500 MW) SYSTEM:LDO UNLOADING SYSTEM
SL.NO. 22. ACTIVITY As soon as the pump can be operated as part of a system, run the pump for preferably 4 hours to verify that vibration levels are within acceptable limits. Monitor the following parameters and record the stable levels. Pump Suction Pressure Pump Discharge Pressure Pump Speed Pump flow Pump Inboard Bearing Temperature Pump Outboard Bearing Temperature Pump Inboard Bearing Vibration Pump Outboard bearing Vibration Motor Starting Current and run Up time Motor winding casing Temperature

UNIT:COMMON LOCATION:LDO UNLOADING PUMP HOUSE


STATUS (YES/NO) REMARKS

23.

NAME MECH.ERECT. NTPC ELECT.ERECT. COMMNG. C&I BHEL ERECT. COMMNG.

SIGNATURE

DATE

CONTRACTOR