CONTENT OJT PORTFOLIO OF WORKS OJT NARRATIVE REPORT CWC CERTIFICATE OF ACCEPTANCE CWC COMPANY PROFILE CWC DAILY LOGS OF TRAINING EXPERIENCE CWC WEEKLY LOGS INTERIOR DESIGN AND ARCHITRECTURAL CERTIFICATE OF ACCEPTANCE ERFE AND ASSOCIATES COMPANY PROFILE MENTORS PRC ID INTERIOR DESIGN DAILY LOGS OF TRAINING EXPERIENCE INTERIOR DESIGN WEEKLY LOGS ARCHITECTURAL DAILY LOGS OF TRAINING EXPERIENCE ARCHITECTURAL WEEKLY REPORT

MARTER, MARK BONI R. 2009-05309-MN-0 BSID 3-1

OJT PORTFOLIO OF WORKS

OJT NARRATIVE REPORT

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES COLLEGE OF ARCHITECTURE AND FINE ARTS DEPARTMENT OF INTERIOR DESIGN PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training

ON-THE-JOB TRAINING NARRATIVE REPORT

By

Marter, Mark Boni R. 2009-05309-MN-0 BSID 3-1

INTRODUCTION

Every input we make a learning has to expected

On-the-Job Training or OJT is a method which schools give their students to apply the lessons learned from the school. It aids the students to acquire relevant knowledge and skills through the actual experience in working in the field of their profession. Thus, making the workplace and the office a new venue of learning for the student.

On the companies side, OJT program provides additional manpower with lesser labor cost than a regular employee. Trainees are eager to learn the ropes of the business so cooperation is not a question. Employers can make use of the OJT program as a method in recruiting new employees since the mentor had witnessed the trainees performance, behavior and attitude progress and growth.

As for the OJT program for the Interior Design course, the students would be trained by one, two, or three companies in three different categories of the program. Students are required to complete fifty (50) hours each for the Architecture and Furniture Design Company or department and one hundred (100) hours for Interior Design.

With these different departments, the students are expected to learns and experience the life of an Interior Designer in the field.

CHAPTER 1

THE BACKGROUND

FURNITURE DESIGN: CWC INDUSTRIES INC.

Established in 1996, CWC Industries combines the best of CWCs original product lines under one umbrella. With a combined 30 years in the industry, the company now represents products from no less than twelve countries in three continents. With a product line that that is 50 quality names strong, and unparalleled service that begins before the contract is signed, and continues long after, we are committed to being your only source for all your furnishing solutions. Virtually everything you need to furnish your spaces. Feel the finest fabrics from trusted names like Robert Allen and Kravet. Decorate your windows with our line of Tachikawa or Somfy window treatments. Stylishly control the amount of sunlight in your spaces with Louvolite and Mermet blinds fabric. Surround yourself with color and elegance by covering your walls with Artisan/Erimo, York, or Vescom wall treatments. Refresh old furnishings with laminates from Melatone and Maica. Feel the stylish luxury of our Koinor Sofas and Dinner Sofas. Save space with our modular cabinets and storage solutions. Finally, our line of LED illumination systems bring lighting into the 21st century with our colorful and at the same time environmentallyconscious fixtures.

OFFICERS Chairman EDWARD K. LEE President RUBEN C. TAN EVP Operation / Marketing VALENTINA L. ANG EVP Admin / Finance CATHERINE L. ONG VP Controller EDITHA S. POBLE

One of their major PROJECTS SINCE ESTABLISHED:

Hotels: Century Park, Crowne Plaza Hotel, Crown Regency Hotel, Discovery Suites, Dusit Hotel, Edsa Shangri-la, Four Seasons, Holiday Inn, The Hyatt, Hotel Intercontinental, Makati Shangri-la,

Restaurants: The Coffee Bean & Tea Leaf, Dencios, DiMarks Pizza, The French Baker, Jollibee Foods Corp., PAGCOR, Pancake House, Terriyaki Boy, UCC Coffee

Corporations: ABS-CBN, Accenture, American Express, Ayala Land, Chevron, Coca-Cola Philippines, DuPont Philippines, Enterprise Center, Globe Telecom, Jaguar Cars (showroom), Johnson & Johnson, Megaworld Properties, PLDT, Pilipinas Shell, San Miguel Corporation, ShoeMart (Cinema, Planetarium), Smart Telecom

Banks/Financials: Asian Development Bank, Banco De Oro, Bank of the Philippine Islands, Bangko Sentral ng Pilipinas, China Bank, Citibank N.A., Hong Kong Shanghai Bank Corp, ING Bank, JP Morgan, RCBC, UCPB, World Bank

ARCHITECTURE AND INTERIOR DESIGN: ERFE AND ASSOCIATES

Ma. Alicia B. Erfe Architect CUAP , Interior Designer PIID Graduate, B.S. Architecture, U.P. Diliman (1974) Post Graduate Units in Urban and Rural Planning, U.P. Diliman School of Urban and Regional Planning Member, UAP (United Architects of the Philippines, New Manila Chapter) Member, PIID, 2008 Junior Associate Architect & Planner, Felipe Mendoza & Associates/Comptech Asia (19741977) Private Practice in Architecture for various residential projects (1977 1991) Furniture Manufacturing and Interior Design Construction Proprietor, Erfes Artlines (19791991). Budget Consultant, Lead Interior Design Coordinator and Purchasing Manager for I.D. & FFE Items (Project Management Team of Ayala / Enjay Hotels, Inc.) for the Hotel Inter*Continental Manila Rehabilitation (1991-93). Artifacts and Artworks Consultant of Ayala Hotels, Inc. for the Davao Insular Hotel Rehabilitation (1993). Lead Coordinator for interior design and sourcing/procurement of I.D. & FFE items (Project Management Team of JNAPI) for the renovation of Manila Peninsula Hotel (1994). Consulting Interior Architect, Budget Consultant of Ayala Hotels, Inc. for the rehabilitation of the 9th to 12th Floor Guestrooms and End Suites of Hotel Inter*Continental Manila (1995) Principal Architect, Interior Designer of Erfe & Associates (1996 to present). Erfe & Associates specialize in Residential Architectural and Interior Design projects, low-rise office projects

and condominium interiors, Model Units and offer Interior Design Project Management & ID & FFE Budgetting, Sourcing and Procurement Services. ID & FFE Sourcing and Budget Consultant of Subic Bay Waterfront Development Corp. for Subic Yacht Club Project, Subic Bay, Philippines (1997-1998). ID & FFE Sourcing, Procurement and Budget Consultants of Rockwell Land Corporation for all Model Units and public areas of Rizal, Hidalgo, Luna, Manansala, Joya, One Rockwell and The Grove Towers of the Rockwell Center Makati City, Philippines (1996-present). Interior Designer, Rockwell The Grove Information Center (2009), Rockwell Information Center, Power Plant Chapel Interior Design Coordinator & ID & FFE Sourcing Consultant of Filinvest Land Inc for various projects : Seascapes Resort & Club, Cebu Palms, Beaufort Hotel, Entrata Hotel, Timberland, Palms Country Club (ID by Arch Arlen de Guzman), West Park Tower, Pioneer Tower. (2002 to present) Interior Designer of model units & houses for projects of Ayala LPHI (2000- 2002), Earth & Style (2001-2004), Dolmar Property Ventures (2004), Robinsons Land (2005), Edsa Shangrilas St. Francis Tower (2005), Luxureville, Hyundai (2007), Filinvests Pioneer, West Park & Beaufort Towers (2002- 2008), Rockwells Joya (2003) and The Grove (2008).

As this lots of attainment Alice Erfe established Erfe and Associates. They offer services like Architectural, Interior Design, ID & FFE sourcing and so much more as indicadate in the company profile

CHAPTER 2

THE HAPPENING

T h i s ch a p t e r n a r ra t e s t h e t ra in in g s t h a t t h e s t u d e n t t ra in e e had gone t h ro u g h d u r in g t h e O JT p e r io d . Th i s re f le c t s h o w t h e t ra in in g p la ye d as a d e ve lo p me n t a l t o o l a n d how it wa s d e li ve re d e f f e ct i ve l y and may be the down fall of them if ever the trainee fails to give his all b y t h e co mp a n y. On th e j o b t ra in in g wa s an i mp o rt a n t e le me n t for students to get more knowledge .

F U RN I T U RE DE S IG N

T he t ra in e e s 50 h o u r s of O J T f o r f u rn it u re d e s ig n st a rt e d on A p ri l 16, 2012. I t st a rt e d w it h t h e in t ro d u c t io n of t h e co m p a n y s p ro f i le , wh a t a re t h e p ro d u ct s, se r vi ce s , t h e wo r ks d o n e in t h e o f f ice and o u t s id e t h e o f f ice . A nd b e ca u se CWC INDUSTRIES, In c . is half way through this side of business f o r mo s t p e o p le in t h e d e sig n b u s in e ss, t h e t ra in e e is q u i t e su rp ri se d a n d o ve rwh e l me d to kn o w t h e co mp a n y s d e t a il s and c l ie n t s because its been established for a decade and a half .

D u r in g t h e t ra in in g p e rio d , t h e t ra in e e wa s i n t ro d u ce d to t h e d if f e re n t f a ce s of t h e b u s in e s s and t h e p ro f e ssi o n . O n t h e f i rst d a y of t h e O JT , t h e t ra in e e wa s a b le to sh a re h i s d e s ig n s ki l ls wh e n she w a s a s ke d me to help her in giving the client ( SOLAIRE MANILA HOTEL ) o p t i o n s f o r s e a t c o v e r i n g s a n d f o r accessories there in need to suite in to the design of the hotel m a d e b y t h e d e s i g n t e a m c a m e f r o m U S A . The me n t o r e xp la in e d t h e st a n d a rd m e a su re me n t s, t h e m a t e ria l s and t h e d e t a i ls to t h e t ra in e e and wa s a l it

t le i mp re sse d

on how t h e t r a in ee ma n a g e d to d ig e st and u se t h e e n t i re me n t o r

e x p la in e d . Th is wa s new to t h e t r a in e e the way they do their presentation to the clients and fabrics technical and aesthetic specification, it give more explaination about material as well as the fabrics and furniture itself that what Materials and Decorative Resources 1&2 discusses not all of its curriculum cover

I n t h e end of t h e O J T p e r io d f o r f u rn it u re d e s ig n , A p r i l 24 , 2012, t h e t ra in e e f e lt ma t u re as a n In t e rio r De s ig n st u d e n t . My mentor give my last task to make a scheme to a modern living room. The t ra in e e re a li ze d t h a t t h e re we re t h in g s sh e needed to le a rn t h a t t h e co u rse cu r r icu lu m ca n n o t p ro v id e , and t h a t is w h y t h e t ra in e e was so t h a n kf u l f o r t h e O J T P ro g ra m and e xp e c t s to le a rn mo re l e s so n s in t h i s f ie ld in t h e t wo o t h e r O J T ca t e g o r ie s h e wo u ld t a ke .

I N T E R I O R DE S I G N

T he Erfe nad Associates o f f ice is ve ry d i ve r se and different view f ro m t h e t ra in e e s f i rst O J T o f f ice The p la ce wa s ve r y q u ie t every Monday Thursday but from Friday the quiet place become a loud place because of worshiping on the other building by the unknown religious group and ma y be co n s id e re d o p e n f o r an o f f ice because it is place in the commercial areas in Cainta. .

B e f o re t h e t ra i n e e st a rt e d to wo r k on t h e i r f i rst d a y ( May , A r ch i t e ct Leila Garcia , the

16 ,

2012 )

associate a r ch it e c t , e xp la in e d t h e co mp a n y s

p ro f i le , t h e c l ie n t s, t h e wo rk s t h e t ra in e e s w o u ld e n co u n t e r, a n d t h e co mp a n y s ru le s. S a me as f ro m t h e f u rn it u re co mp a n y t h e t ra in e e had gone in t o , A rch it e ct E r f e co mp a n y d i d not a d ve rt ise t h e i r se l ve s . Th e y d id n o t e ve n h a ve a we b s it e un l ike any o t h e r d e s ig n co m p a n ie s b u t t h e y h a ve b ig -t i me cl ie n

T he In t e r io r De s ig n O J T wa s n o t h in g n e w f o r t h e t ra in e e wh e n it co me s to o f f ice ro u t in e and e n v i ro n me n t . A ct u a l ly, h e wa s g e t t i n g u se d to e ve ryt h in g in t h e EA o f f i ce .

T he t ra in e e had w id e n e d h is t h o u g h t s and k n o w le d g e as h e st a ye d in t h e co mp a n y. The b o s se s we re ve ry in f or m a t ive and kn o w le d g e -g iv in g wh e n

a s s ig n in g a t a sk . Th e re wa s not a t i me t h a t I D r. Fuchette, wo u ld t a lk to an e mp lo ye e w it h o u t le a v in g wo rd s to f e e d t h e m in d .

A t t h i s p o in t of t h e O J T p e r io d , le sso n s l e a rn e d by t h e t r a in e e we re not f o cu se d ma in ly on t h e t e ch n i ca l and aesthetical s id e of t h e p ro f e ss io n . The le s so n s h e le a rn e d w a s socially, and mainly to his skills as a student and a trainee . T he t ra in e e , e ve n t h o u g h it wa s n o t t a u g h t at t h e t ra in in g , le a rn e d h o w to be p ro f e ss io n a l at wo r k. S he had le a rn e d t h e e t h ic s an e mp lo ye e and a d e s ig n e r mu st p o s se s s to be an e f f ic ie n t and e f f e ct i ve wo rke r.

And on the last day (May 15, 2012) for my training in their good office they give me some stuff that could help in my studies like swatches and the knowledge he get in the training period

ARCHITECTURE Th i s is d e f in it e l y an o f f ice . The t ra in e e t h o u g h t to h im se lf . Du r in g t h e O j t f o r a rch it e ct u re , t h e t ra in e e s f i r st a s s ig n m e n t is to make an option fabrics for their long time client the Lichuacos. It wa s s ca ry f o r t h e t ra in e e b e ca u se sh e kn o w t h a t e ve ry e a r wa s on h im. B ut h e a cco mp li sh e d it t h o u g h it wa s not as i mp re ss ive as it sh o u ld b e .

T he t ra in e e le a rn e d a lo t f ro m t h e A r ch it e c t u re O JT p e rio d , wh i ch is f ro May 16 to May 25, 2012. Every work they give to him is important to a n a l yze , and to improve in his so ci a l sk i l ls. The t ra in e e w a s a l wa y s h e s it a n t to st a n d f ro m h is p la ce and a sk his me n t o r t ime to t i me . He kn o w s h e needed to dep e n d e n t b u t h e r e a li ze d h e d o e s n o t need t h a t a l l t h e t i me . For t h e t ra in e e , it is b e t t e r to a sk and a s k and a

sk t h a n to g i ve ch a n ce s f o r m i st a ke s because office work once can be a bad look for the office.

I n t h i s O JT , t h e t ra in e e wa s in t ro d u ce d to p la n s h e n e v e r k n e w b e f o re . Hhe wa s asked to do the work that he is not new to him. His e xp e r ie n ce wa s t i r in g , s it t in g a l l day in f ro n t of t h e co mp u t e r calling to the phone for material availability . Du r in g t h e f ir st d a ys , h e e xp e r ie n ce s body a ch e . The t ra in e e re a ll y f e lt h e wa s an e mp lo ye e , and it wa s f u lf il l in g f o r h im. And for my last day this May 25 , 2012. I am ready to face other from of task this school year but he need to rest his mind and body to a stressful day of him. Th i s is d e f in it e l y an o f f ice . The t ra in e e t h o u g h t to h im se lf . Du r in g t h e O j t f o r a rch it e ct u re , t h e t ra in e e s f i r st a s s ig n m e n t is to make an option fabrics for their long time client the Lichuacos. It wa s s ca ry f o r t h e t ra in e e b e ca u se sh e kn o w t h a t e ve ry e a r wa s on h im. B ut h e a cco mp li sh e d it t h o u g h it wa s not as i mp re ss ive as it sh o u ld b e .

T he t ra in e e le a rn e d a lo t f ro m t h e A r ch it e c t u re O JT p e rio d , wh i ch is f ro m A to A p r i l 24, 2012. E ve ry a rch it e ct u r a l p la n s a s sig n e d to h e r to d ra f t wa s a ch a l le n g e to h e r sk il l s in d ra f t in g , a n a l yzi n g , and h e r so ci a l sk i l ls. The t ra in e e w a s a l wa y s h e s it a n t to st a n d f ro m h e r p la ce and a sk her me n t o r t ime to t i me . S he kn o w s sh e needed to dep e n d e n t b u t sh e r e a li ze d sh e d o e s n o t need t h a t a l l t h e t i me . For t h e t ra in e e , it is b e t t e r to a sk and a s k and a sk t h a n to g i ve ch a n ce s f o r m i st a ke s.

I n t h i s O JT , t h e t ra in e e wa s in t ro d u ce d to p la n s sh e n e v e r k n e w b e f o re . S he wa s a s ke d to d ra f t a CC TV la yo u t an d a lo t p l a n wh ich sh e n e ve r d id e n co u n t e r b e f o re . Her e xp e r ie n ce wa s t i r in g , s it t in g a l l day in f ro n t of t h e co mp u t e r . Du r in g t h e f ir st d a ys , sh e e xp e r ie n ce s body a ch e . The t ra in e e re a ll y f e lt sh e wa s an e mp lo ye e , and it wa s f u lf il l in g f o r h e r.

C HA P TE R 3

T HE O U T CO ME

T h e t ra in in g in s id e t h e co mp a n y is le a rn in g e xp e r ie n ce e a ch d a y. Th e t rainee l ea rn ed t o app reci at e th e lesson s st ud ied in s choo l. He was a b l e t o r e a li ze t h e i mp o rt a n ce o f t h e o r ie s a n d f or m u la s t h a t we re d i scu sse d in s id e t h e classroom, and also to understand that everything that was taught at school can be a weapon to be used in the future career. As the trainee was working at CWC Industries INC.and Erfe and Associates, he learned to work hard and strive harder.

The on-the-job-training is indeed a very useful program for students to show and develop the skills they have and to develop their selves into the type of professional we all should be.

Du rin g t h e O JT, t h e t ra in ee le a rn ed t o in t era ct wit h o t h e r p e o p le more than in school . A lt h o ug h pe o p le d if f e r, ma kin g f rie nd s wit h t h e staf f of t hese t wo co mp an ie s is n o t d if f icu lt just like in CWC I have a mother and a frined there that my co employees that is older than me . E ven t h o ug h h e wa s o n ly a t ra ine e , t h e t re a t me n t is ve ry o ve rwh e lmin g . B y in te ra ct in g wit h t h e m, th e t ra in e e le a rne d to wo rk wit h p a t ien ce . A lt h ou g h thoroughly working on something was time consuming, the quality of the output is the most important. She also learned from his co-workers experiences and mistakes and applies them whenever he needed it. They also encouraged the trainee to do well in school and become a successful Interior Designer someday

The trainee realized that learning is a lifetime commitment that will continue even you already had a job. The training served as the stepping stone of the trainees to the real life of a designer. It served as the beginning the real life of being an employee. The t ra in ing g a ve t h e st u d en t s mo re initiative to their chosen career. The students were more encouraged to pursue the Interior Design course. The training inspired the trainees to enhance their skills and knowledge from their chosen field. The trainees were given some ideas what could be the feeling or situation being an employee. The training enriched their individuality as a beginner and created the foundation of being a good worker. The best thing that the trainees have gained inside the company was the good orientation of the person having the higher positions.

CWC INDUSTRIES INC.


#2 CWC BLDG., PALANZA ST., COR ZARAGOSA ST., IMELDA SUBDIVISION QUEZON CITY

CERTIFICATE OF ACCEPTANCE, EMPLOYER GUIDELINES, CWC COMPANY PROFILE, AND EVALUATION FORM

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training

PERFORMANCE EVALUATION
Name of Student MARTER, MARK BONI R Age 18 Y/O Gender MALE rd BS Interior Design 3 Year/Section 3-1 Company Name: CWC INDUSTRIES INC. Company Address #2 CWC BLDG., PALANZA ST. COR ZARAGOZA ST., QC Job Description FURNITURE / ID Division/ Department Assigned CWCII Field of Training Given SWATCH FOR HOTEL PROJECT No. of Hours Spent 56 HRS. Inclusive Date From APRIL 16 TO 24 , 2012 No. 1 2 3 4 5 6 Criteria Evaluation Attendance/ Punctuality (Regularity and promptness in attendance and proper observation of allotted break periods) Competence/ Dependability (Ability to work with minimum supervision) Accuracy and Effectiveness in Delivery of Work (Quality of work accomplished) Interest/ Cooperation (Works well with everyone; effective team worker) Personality/ Interpersonal Relations (Personal grooming and socially pleasant disposition) Work Ethics (Conduct to accomplish work within allotted time limits) TOTAL
Maximum Ratings

Rating 15 15 20 10 10 15 85

15% 15% 20% 15% 15% 20% 100%

Recommendations for the Apprentices further growth and development:

Evaluated by:

Employer/ Mentor
(Signature over printed Name)

Designation:

DATE: APRIL 24, 2012

DAILY REPORT OF TRAINING EXPERIENCE

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 16 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: ASANTEKS

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE TEXTILES TECHNICAL SPECIFICATION

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 16

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 17 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location:

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY SYMPHONY MILLS

Assigned Work Task: PREPARING THE SWATCH BRDS. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW MANY YARDS OF FABRICS DO YOU NEED FOR UPHOLSTERY BASED IN FABRIC WIDTH, FABRIC REPEAT, RAILROADING, AND THE RIGHT WAY.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 17

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 18 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY SOLAIRE MANILA

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

FABRIC MATCHING

. Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: SOLAIRE MANILA FABRIC MATCHING PREPARING THE SWATCH BOARDS INSPIRATIONS

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE DIFFERENT TYPES OF ARMS AND OTHER FURNITURE HARDWARE.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 18

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 19 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: INSPIRATION

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARING THE SWATCH BOARDS UART PREPARING THE SWATCH BOARDS

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE DIFFERENT TYPES AND VARIETY OF FABRICS IN THE MARKET

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 19

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 20 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY SOLAIRE MANILA

PRODUCT LISTING

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: SOLAIRE MANILA, PRODUCT LISTING

INSPIRATION PREPARATION OF SWATCH BOARDS PREPARATION OF SWATCH BOARDS UART

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW MANY FABRICS ARE USE IN VARIOUS FURNITURES.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 20

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 23 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: UARTS

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY

Assigned Work Task: PREPARING THE SWATCH BRDS. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed:

PREPARING THE SWATCH BOARDS FOR UART SYMPHONY MILLS NV

SOLAIRE PRODUCT LISTING FOR SUBMISSION

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN THE NATURE OF LEATHERS IN WHERE IT CAME FROM?, MADE OF?, THE PROCESSES, HOW IT SOLDS AND HOW TO MAINTAIN IT.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 23

, 2012

Date: ________________ , 2012

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 24 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location:

CWC INDUSTRIES INC. Project Description:

#2 CWC BLDG., ZARAGOSA ST.,COR PALANZA ST., QUEZON CITY MODERN LIVING SPACE

Assigned Work Task: PREPARING THE SWATCH BRDS. specify Time In Time Out : : 8:00 AM 5:00 PM SUNNY

Office

Site

Others, pls.

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition:

Work Activities Performed: PREPARATION OF SWATCHES FOR MODERN LIVING SPACE

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO MAKE SWATCH BOADRD IN SPECIFIC TIME ALLOTED

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 24

, 2012

Date: ________________, 2012

WEEKLY LOGS

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

CWC INDUSTRIES INC.

#2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY 16


Day

Reporting Period from:

APRIL
Month

2012 to

20 APRIL
Day Month

2012
Percentage of Assigned Work Completed

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


PREPARING BOARDS PREPARING BOARDS PREPARING BOARDS PREPARING BOARDS SWATCH

No. of Hours
3 HRS

100% = Full Completion


90%

INTERWALL COVERING

ASANTEK LEATHERETTES

SWATCH

8 HRS

100%

SYMPHONY MILLS NV

SWATCH

5 HRS

98%

INSPIRATIONS

SWATCH

9 HRS

100%

SOLAIRE MANILA

FABRIC MATCHING AND PRODUCT LISTING PREPARING BOARDS SWATCH

7 HRS

100%

UART

8 HRS

98%

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

40 HRS

97.6%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

CWC INDUSTRIES INC.

#2 CWC BLD., PALANZA ST. COR ZARAGOZA ST., QUEZON CITY 23


Month

Reporting Period from:


Day

APRIL

2012 to
Day

24 APRIL
Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


PREPARING BOARDS PREPARING BOARDS SWATCH

No. of Hours
2HRS

Percentage of Assigned Work Completed

100% = Full Completion


100%

UART LEATHERETTES

SYMPHONY MILLS NV

SWATCH

2HRS

100%

SOLAIRE MANILA

PRODUCT LISTING

3 HRS

100%

MODERN LIVING ROOM

PREPARING BOARDS

SWATCH

8 HRS

100%

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

16 HRS

100%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name)

ERFE & ASSOCIATES RM. 204 AND 206, J&F BLDG, V.V. SOLIVEN AVE., CAINTA, RIZAL

CERTIFICATE OF ACCEPTANCE, EMPLOYER GUIDELINES, CWC COMPANY PROFILE, AND EVALUATION FORM

INTERIOR DESIGN
DAILY LOGS AND WEEKLY LOGS

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 27 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Project Title: LICHUACO RESIDENCE Project Location:

#23 LEO ST., BEL AIR ,MAKATI CITY Office Site Others, pls. specify

Assigned Work Task: FABRIC OPTION Time In Time Out : : 9:00 AM 6:00 PM SUNNY

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

FABRIC OPTIONS FOR DEN, FAMILY ROOM, AND BETTINA LICHUACO BEDROOM OPTION 1 AND 2 MACQUERA RESIDENCE @ UNIT 2918 ONE ROCKWELL, MAKATI CITY, CHECKING THE FINAL LIQUIDATION FIXING THE PAINT LIBRARY

Personal Observations at the Project Site:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 148 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE MORE OPTIONS FOR A CERTAIN SPACE THAT NOT ESCAPING TO THE MAJOR SCHEME.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 27

, 2012

Date: ________________, 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 149 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 28 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title : JAMES CHUA UNIT

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Project Location: Assigned Work Task: Time In Time Out : :

UNIT 3507, ONE ROCKWELL, WEST TOWER, MAKATI CITY ID SOURCING 9:00 AM 6:00 PM SUNNY Total No. of Hour/s Spent: Site Condition: 8 HRS. Office Site Others, pls. specify

Weather Condition: Work Activities Performed: -

ID SOURCING FOR REFRIGERATOR ELECTROLUX BRAND UPDATING THE FURNITURE LIBRARY

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 150 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN WHAT IS ID SOURCING, IT IS GIVING THE CLIENT A PRODUCT THAT HAS GOOD QUALITY IN CHEAPER PRICE.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 28

, 2012

Date: ________________ , 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 151 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

APRIL 30 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL LAHOZ RESIDENCE

UNIT 3410 ONE ROCKWELL WEST TOWER, MAKATI CITY Office Site Others, pls. specify

Assigned Work Task: FABRIC OPTIONS Time In Time Out : : 9:00 AM 6:00 PM SUNNY

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

FABRIC OPTION TO THE GIRLS BEDROOM SCHEME THE GROVE BY ROCKWELL AMENITY 5TH AND 6TH FLOOR, E. RODRIGUEZ AVE. ,C-5 ROAD, BRGY. UGONG, PASIG CITY

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 152 of 2

Report/s Submitted, if any:

Lesson/s Learned: - I LEARN TO GIVE OPTION OF SCHEMES FOR A GIRL'S BEDROOM

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

APRIL 30

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 153 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 2 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Project Title: EDADES TOWERS AND GARDEN VILLAS Project Location: Assigned Work Task: Time In Time Out : : 9:00 AM 6:00 PM SUNNY

ROCKWELL CENTER, MAKATI CITY Office Site Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

Weather Condition: Work Activities Performed: -

PREPARING THE CONTRACT DRAWING FOR BLUEPRINTING

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 154 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW PROFESSIONALS MAKE THEIR DOCUMENTS.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 2

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 155 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 3 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : 9:00 AM 6:00 PM JAMES CHUA

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

UNIT 3507, ONE ROCKWELL WEST TOWER, MAKATI CITY Office Site Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

SUNNY

ID SOURCING SAMSUNG LED/LCD TV CONTINUATION OF EDADES TOWERS AND GARDEN VILLAS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 156 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN MORE ABOUT ID SOURCING

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 3

, 2012

Date: ________________ , 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 157 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 4 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Project Title: CITADINES SALCEDO MAKATI Project Location:

SALCEDO, MAKATI CITY Office Site Others, pls. specify

Assigned Work Task: SWATCH BRDS. Time In Time Out : : 9:00 AM 6:00 PM SUNNY

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

HELP IN PREPARING THE SWTCH BRDS. TANSIPEK RESIDENCE@ 146, SWALLOW DRIVE, GREEN MEADOWS,QC PAINT FINISH SPECS. CONTINUATION OF EDADES TOWERS AND GARDEN VILLAS

Personal Observations at the Project Site:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 158 of 2

Report/s Submitted, if any:

Lesson/s Learned: - I LEARN TO MAKE SWATCH BOARD THE ID WAY FOR CLIENT PRESENTATION

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 4

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 159 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 7 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: THE GROVE PASIG CITY

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Assigned Work Task:FABRIC OPTIONS Time In Time Out : : 9:00 AM 6:00 PM SUNNY

Office

Site

Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

FABRIC OPTIONS FOR SEATING COVER MARKING THE AREA FOR WALL PAPERING VALERO ID SOURCING TV LED/LCD EDADES TOWERS AND GADEN VILLAS CONTINUATION FOR SUBMISSION

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 160 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE OPTION TO THE GIVEN SPECIFICATION

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 7

, 2012

Date: ________________ , 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 161 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 8 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: JAMES CHUA Project Location:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY Office Site Others, pls. specify

Assigned Work Task: ID SOURCING Time In Time Out : : 9:00 AM 6:00 PM SUNNY

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: -

ID SOURCING FOR HEAVY DRAPERY AND SHEER CURTAIN THE GROVE PURCHASE REQUISITION

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 162 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE OPTION TO THE GIVEN SPECIFICATION

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 8

, 2012

Date: ________________ , 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 163 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 9 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : CITADINES

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

SALCEDO , MAKATI CITY FABRICS 9:00 AM 6:00 PM SUNNY Total No. of Hour/s Spent: Site Condition: 8 HRS Office Site Others, pls. specify

Weather Condition: Work Activities Performed: -

FABRIC SWATCHES OFFICE FILLING THE GROVE CONTRACT DOCUMENT DOING THE COPY FOR OFFICE

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 164 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW PROFESSIONAL MAKE THEIR DOCUMENTS

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 9

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 165 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 10 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: JAMES CHUA Project Location:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY Office Site Others, pls. specify

Assigned Work Task: SWATCH BOARDS Time In Time Out : : 9;00 AM 6:00 PM RAINY

Total No. of Hour/s Spent: Site Condition:

8 HRS

Weather Condition: Work Activities Performed:

JAMES CHUA @ UNIT 3507 ONE ROCKWELL WEST TOWER, MAKATI CITY ID SOURCING REFRIGERATOR G.E. PROPOSED RESIDENCE & GALLERY @ 44 BALETE DRIVE NEW MANILA QUEZON CITY

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 166 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE QUALITY WORK

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 10

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 167 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 11 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

Project Title: EVARISTO RESIDENCES Project Location: Assigned Work Task: Time In Time Out : :

UNIT 709, ONE ROCKWELL WEST TOWER, MAKATI CITY ENCODING 9:00 AM 6:00 PM SUNNY Total No. of Hour/s Spent: Site Condition: 8 HRS Office Site Others, pls. specify

Weather Condition: Work Activities Performed:

ENCODING THE DESK @ BEDROOM MARY PO RESIDENCE @ CORITHIAN GAREDEN, QUEZON CITY ENCODING THE MASTER BEDROOM TV CABINET @ GROUND AND SECOND FLOOR

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 168 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO USE GOOGLE SKETCH UP PROPERLY

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 11

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 169 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 14 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out :

ERFE AND ASSOCIATES MARK LOPEZ Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

UNIT 3916, ONE ROCKWELL WEST TOWER, MAKATI CITY SITE VISIT 9:00 AM 6:00 PM RAINY Total No. of Hour/s Spent: Site Condition: Office Site Others, pls. specify

Weather Condition: Work Activities Performed: -

ASSISTING THE WORKERS IN INSTALLING THE KNOCK DOWN FURNITURES

Personal Observations at the Project Site:

Report/s Submitted, if any:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 170 of 2

Lesson/s Learned: I LEARN TO OBSERVE (CRITICALLY) TO MAKE QALITY WORK.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 14

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 171 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 15 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: MARK LOPEZ

ERFE AND ASSOCIATES Project Description: CONDO UNIT

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN AVE., CAINTA, RIZAL

UNIT 3916, ONE REOCKWELL WEST TOWER, MAKATI CITY SITE VISIT Office Site Others, pls. specify

Assigned Work Task: Time In Time Out : : 9:00 AM

6:00 PM SUNNY

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed:

- ASSISTING THE WORKER IN INSTALLING THE KNOCK-DOWN FURNITURES

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 172 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO DO HOTEL FOLD IN MATTRESSES.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 15

, 2012

Date: ________________, 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 173 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 27


Day

Reporting Period from:

APRIL
Month

2012 to

28 APRIL
Day Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


FABRIC OPTIONS FOR GIVEN SPACES CHECKING THE FINAL LIQUIDATION PREPARING SWATCHES ID SOURCING PAINT

No. of Hours
4HRS.

Percentage of Assigned Work Completed

100% = Full Completion


100%

LICHUACO RESIDCENCE

MACQUERA RESIDENCE

2 HRS.

100%

OFFICE PAINT LIBRARY

2 HRS.

100%

JAMES CHUA UNIT

3 HRS.

100%

OFFICE FURNITURE LIBRARY

UPDATING

5 HRS.

100%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 174 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

16 HRS.

100%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name) PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 175 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address: Period from:


Day Month

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES Reporting

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 30 APRIL 2012 to 4 MAY 2012
Day Month

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


FABRIC OPTIONS

No. of Hours
5 HRS.

Percentage of Assigned Work Completed

100% = Full Completion


100%

LAHOZ RESIDENCE

THE GROVE BY ROCKWELL

FABRIC OPTIONS

3 HRS.

100%

EDADES VILLAS

TOWER

AND

GARDEN

PREPARING THE CONTRACT DRAWINGS

14 HRS

100%

JAMES CHUA

ID SOURCING

3 HRS.

100%

CITADINES SALCEDO

5 HRS.

95%

TANSIPEK RESIDENCE

PAINT SWATCH

2 HRS.

98%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 176 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

32 HRS.

98. 83%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name)

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 177 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 7


Day

Reporting Period from:

MAY
Month

2012 to

11
Day

MAY
Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


MARKING WALLPAPERING ID SOURCING

No. of Hours
2HRS.

Percentage of Assigned Work Completed

100% = Full Completion


100%

THE GROVE MAKATI TOWERS

VALERO

3HRS.

100%

JAMES CHUA UNIT

ID SOURCING

100%

CITADINES SALCEDO

FABRIC SWATCHING

8HRS.

95%

45

PROPOSED GALLERY

RESIDENCE

AND

PREPARING THE CONTRACT DRAWINGS

5HRS

98%

EVARISTO RESIDENCE

ENCODING/SKETCHUP

3HRS.

98%

MARY PO RESIDENCE

ENCODING/SKETCHUP

4HRS

95%

OFFICE FABRIC LIBRARY

PREPARING SWATCHES PURCHASE REQUISITION FABRIC OPTIONS

6HRS.

100%

THE GROVE

5HRS.

100%

4HRS

100%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 178 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

40 HRS.

98.6%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name)

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 179 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address:

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 14


Day

Reporting Period from:

MAY
Month

2012 to

15
Day

MAY
Month

2012

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


SITE VISIT

No. of Hours
16HRS.

Percentage of Assigned Work Completed

100% = Full Completion


100%

MARK LOPEZ UNIT

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 180 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

16HRS.

100%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name) PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 181 of 2

ARCHITECTURAL
DAILY LOGS AND WEEKLY LOGS

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 182 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 16 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL MARY PO RESIDENCE

Project Location: Assigned Work Task: Time In Time Out : :

CORINTHIAN GARDENS, QUEZON CITY ENCODING 9:00 AM 6:00 PM RAINY Total No. of Hour/s Spent: Site Condition: 8 HRS. Office Site Others, pls. specify

Weather Condition: Work Activities Performed:

- CONTINUATION OF ENCODING OF MASTERS BEDROOM TV CABINET @ GROUND AND SECOND FLOOR

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 183 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO USE GOOGLE SKETCH UP MORE FAST

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 16

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 184 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 18 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL MARY PO RESIDENCE

CORINTHIAN GARDENS, QUEZON CITY FABRIC FILE 9:00 AM 6:00 PM RAINY Total No. of Hour/s Spent: Site Condition: 8 HRS. Office Site Others, pls. specify

Assigned Work Task: Time In Time Out : :

Weather Condition: Work Activities Performed:

- MARY PO FABRIC SWATCHES FOR OFFICE, SUPPLIER AND MANUFACTURER FILLING - ENTRATA CARPET OPTION

Personal Observations at the Project Site:


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 185 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN HOW TO MAKE A OFFICE FILE FOR SWATCHES AND NATURE OF CARPET OR THE STRICK OFF.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 18

, 2012

Date: ________________ , 2012


PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 186 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 21 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title:

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL LICHUACO RESIDENCE

Project Location: Assigned Work Task: Time In Time Out : : FABRIC OPTION 9:00 AM 6:00 PM RAINY Total No. of Hour/s Spent: Site Condition: 8 HRS. Office Site Others, pls. specify

Weather Condition: Work Activities Performed: -

CONTACTING THE SUPPLIERS FOR AVAILABILITY OF THE MATERIALS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 187 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE CLIENTS THE SAME MATERIAL ( OUT OF STOCK/DISCONTINUED MATERIALS ) AND TO CONTACT SUPPLIERS

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 21

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 188 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 22 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : 1:00 AM 7:00 PM RAINY

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL ONG-CASTRO

Office

Site

Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

6 HRS.

Weather Condition: Work Activities Performed: -

LOOKING FOR FABRIC OPTIONS FOR THEIR SOFA SEAT COVER

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 189 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE THE CLIENT A MORE CHEAPIER MATERIAL BUT HAS GOOD QUALITY

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 22

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 190 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 23 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : 11:00 PM 7:00 PM

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL ONG- CASTRO

Office

Site

Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

7 HRS.

Weather Condition: Work Activities Performed:

RAINY

- CONTACTING THE SUPPLIERS FOR AVAILABILITY OF THE FABRICS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 191 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO COOPERATE MORE WITH MY CO- TRANIEES.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 23

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 192 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 24 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : 9:00 AM 6:00 PM RAINY

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL

Office

Site

Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed: LICHUACO RESIDENCE

- FABRIC SWATCHING FOR OFFICE FILE AND CONTACTING THE SUPPLIER FOR AVAILABILITY AND RESEVERVATION BEAUFORT - RESEARCH FOR DAY CARE CENTER DESIGN CONCEPT URATEX BUILDING - RESEARCH FOR OFFICE DESIGN CONCEPT EDADES SERVICE APARTMENT 2 BEDROOM UNIT, MAKATI CITY - FABRIC SWATCHING FOR OFFICE FILE AND SUPPLIER AVAILABILITY

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 193 of 2

Personal Observations at the Project Site:

Report/s Submitted, if any:

Lesson/s Learned: I LEARN MORE TO COOPERATE WITH MY CO TRAINEE.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 24

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 194 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS INTERIOR DESIGN OJT REPORT

Daily Log of Training Experience


Date: Name of Student: MARTER ,
Family Name

MAY 25 RAMOS
Middle Name

, 2012

MARK BONI
First Name

Office/Company Name: Address: Project Title: Project Location: Assigned Work Task: Time In Time Out : : 9:00 AM 6:00 PM RAINY

ERFE AND ASSOCIATES Project Description:

RM. 204 AND 206, J&F II BLDG., V.V. SOLIVEN, CAINTA, RIZAL

Office

Site

Others, pls. specify

Total No. of Hour/s Spent: Site Condition:

8 HRS.

Weather Condition: Work Activities Performed:

EDADES SERVICE APARTMENT 2 BEDROOM UNIT, MAKATI CITY - FABRIC SWATCHING FOR OFFICE FILE AND SUPPLIER AVAILABILITY MARCELO RESIDENCE - FABRIC OPTIONS FOR MASTERS BEDROOM HEADBOARDS

Personal Observations at the Project Site:

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 195 of 2

Report/s Submitted, if any:

Lesson/s Learned: I LEARN TO GIVE FABRIC OPTION FOR AN HEADBOARD THAT NOT OVER POWERING THE BEDS DESIGN.

Picture/s Taken, if any:

Certified True and Correct by:

Noted by:

Mentor
(Signature above Printed Name)

IDr. Billie Jean Dumlao-Dela Cruz, piid


Faculty OJT Coordinator

Date:

MAY 25

, 2012

Date: ________________ , 2012

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 196 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address: Period from:


Day Month

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES Reporting

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 16 MAY 2012 to 18 MAY 2012
Day Month

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


ENCODING/SKETCH UP FABRIC SWATCHES FOR OFFICE FILE

No. of Hours
4 HRS 8HRS

Percentage of Assigned Work Completed

100% = Full Completion


95% 100%

MARY PO RESIDENCE @ CORINTHIAN GARDEN ,QUEZON CITY

ENTRATA TOWERS

CARPET OPTIONS

4 HRS

98%

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 197 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

16 HRS.

97.67%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name) PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 198 of 2

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES

COLLEGE OF ARCHITECTURE AND FINE ARTS

DEPARTMENT OF INTERIOR DESIGN


PUP Engineering and Architecture BuildingNDC Compound, Anonas cor. Pureza Sts., Sta. Mesa, Manila Tel: (632) 713 9304

BS Interior Design On-the-Job Training ON-THE-JOB TRAINING WEEKLY ACCOMPLISHMENT REPORT


Name of Student: MARTER,
Family Name,

MARK BONI
First Name

RAMOS
Middle Name

Student No. Address: Period from:


Day Month

2009-05309-MN-0 Employed by:

ERFE AND ASSOCIATES Reporting

RM. 204& 206, J&FII BLDG., V.V. SOLIVEN, CAINTA,RIZAL 21 MAY 2012 to 25 MAY 2012
Day Month

Item No.
1

Project Title/Description/Location

Field of Practice (Brief Description)


FABRIC SWATCHES/CONTACTING THE SUPPLIERS FABRIC SWATCHES/CONTACTING THE SUPPLIERS RESEARCH FOR DESIGN CONCEPT RESEACH FOR DESIGN CONCEPT FABRIC OPTIONS FOR HEADBOARDS

No. of Hours
10HRS

Percentage of Assigned Work Completed

100% = Full Completion


100%

LICHUACO RESIDENCE @ #23, LEO ST. , BEL- AIR, MAKATI CITY

ONG-CASTRO RESIDENCE

13 HRS

100%

3 4 5

BEAUFORT URATEX BUILDING MARCELO RESIDENCE

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 199 of 2

Item No.

Project Title/Description/Location

Field of Practice (Brief Description)

No. of Hours

Percentage of Assigned Work Completed

100% = Full Completion

TOTAL NO. OF HOURS

21 HRS.

100%

Recommendations for the Trainees further growth and development:

Checked and Approved by:

Conforme:

OJT Faculty Coordinator


(Signature above printed name)

Student Trainee
(Signature above printed name)

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 200 of 2

EVALUATION FORM INTERIOR DESIGN AND ARCHITECTURE

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 201 of 2

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 202 of 2

PUP-CAFA BS Interior Design OJT Summer 2012 OJT Daily Log Page 203 of 2

Você também pode gostar