Você está na página 1de 10

Sl. No.

Name of the Project 1 Solapur-Maharashtra/Karnataka Border-Bijapur 2 Aurangabad- Barwa Adda 3 Hoskote- Dobaspet 4 Rajahmundary-Gundugulanu 5 Jalgaon-Gujarat/Maharashtra Border 6 Amravati-Jalgaon 7 Jind-Punjab/Haryana Border 8 Anandpuram-Vishakhapatnam-Ankapalli S. No Name of Project 1 Ahmedabad- Vadodara 2 Beawar- Pali-Pindwara 3 Kota-Jhalawar 4 Nagpur- Wainganga Bridge 5 Barwa Adda- Panagarh 6 Jabalpur- Lakhanadon 7 Kishangarh-Udaipur-Ahmedabad 8 Chhatisgarh/Orissa Border- Aurang 9 Jabalpur-Katni-Rewa 10 Hospet-Bellary- KNT/AP Border 11 Shivpuri- Dewas 12 Gwalior- Shivpuri 13 Meerut- Bulandshahar 14 Vijayawada- Machhlipatanam 15 Rohtak-Jind 16 Patna-Buxar 17 Birmitrapur-Barkote 18 Angul-Sambalpur 19 Muzaffarpur-Barauni 20 Raipur-Bilaspur 21 Hospet-Chitradurga 22 Cuttack-Angul 23 Mah/KNT Border-Sangareddy 24 Rampur-Katgodam 25 Etawah-Chakeri 26 Agra-Etawah 27 Lucknow-Raebarelly 28 Muhulia-Baharagora-Kharagpur 29 Solapur-Maharashtra/Karnataka Border 30 Tindivanam- Krishnagiri 31 Panikholi- Rimoli 32 Lucknow-Sultanpur 33 Kiratpur - Ner Chowk 34 Vijaywada-Elluru-Gundugolanu 35 Abdulgunj-Betul

Length (Km.) 110.54 221.51 80.02 120.74 208.84 275.23 69.35 58.22 Length (km) 102.3 244.12 88.09 45.43 122.88 80.82 555.5 150.4 225.69 95.44 321 125.3 62.52 64.6 48.6 125.44 125.62 153 107.56 125.53 120.03 112 145 93.23 160.21 124.52 70 125.9 100.06 182.18 166.17 125.9 84.32 103.59 121

TPC 1102.48 2340 720.69 1617 1968.37 2537.81 438.75 839 TPC 2125.4 2388 530.01 484.19 1665 776.76 5387.3 1232 1895.45 910.08 2815 1055 508.87 606 283.25 1129.11 778.15 1220.32 354.09 1216.03 1033.65 1123.69 1266.6 790 1573 1207 635.9 940 923.04 624.2 1410 1043.51 1818.47 1684 912

36 Gomti Udaipur 37 Baleshwar-Khargpur 38 Jowai-Meghalaya/Assam Border 39 H/UP Border-Yamunanagar 40 Khagria-Bakhtiarpur 41 Mulbagal-Karnataka/AP Border 42 Gwalior-MP/UP Border 43 Bamitha-Satna 44 Solapur-Maharashtra/Karnataka Border-Bijapur 45 Aurangabad- Barwa Adda 46 Hoskote- Dobaspet 47 Rajahmundary-Gundugulanu 48 Jalgaon-Gujarat/Maharashtra Border 49 Amravati-Jalgaon 50 Jind-Punjab/Haryana Border 51 Anandpuram-Vishakhapatnam-Ankapalli

79.31 119.3 102.26 104.77 112.98 22.19 107.5 97.6 110.54 221.51 80.02 120.74 208.84 275.23 69.35 58.22

942.45 471.05 390.74 934.93 1635.33 141.11 320.35 257.83 1102.48 2340 720.69 1617 1968.37 2537.81 438.75 839

Premium / Grant Projected 108.37 (9.83 %) Grant 62 Premium 149 Grant 145.53 (9 %) Grant 140.32 (5.3 %) Grant 3 Premium Td.50.72 (11.56 %) Grant 83.9 (10 %) Grant Premium / Grant Projected 5.5 Premium 81 Premium 228 Grant 5.5 Premium 5.5 Premium 133.60 Grant 261.25 Premium 381.92 Grant 917.02 Grant 336.72 Grant 422.25 Grant 331.27 Grant 101.77 Grant 172.59 Grant 82.99 Grant 394.62 Grant 219.83 Grant 475.92 Grant 148.68 Grant 221.31 Grant 255.52 Grant 79.89 Grant 463.96 Grant 276.50 Grant 68.70 Grant 12.80 Premium 63.20 Semi Annual Annuity 365.94 Grant 369.22 Grant 67.13 Semi-Annual Annuity 146.64 Grant 21.5 Grant 159.31 Grant 383.04 Grant

Premium / Grant Received 75.60 Premium 135.00 Premium 27.00 (3.74 %) Grant 72.09 Premium 145.08 Premium 131.04 Premium 10.20 Premium 82.00 Premium Premium / Grant Received 309.60 Premium 251.01 Premium 3.51 Premium 27.35 Premium 106.00 Premium 37.00 (4.76%) Grant 636 Premium 29.70 Premium 340 (17.94 %) Grant 18.00 Premium 180.90 Premium 66.60 Premium 29 (5.69%) Grant 209.00 (34.49%) Grant 68.5 Grant 316.00 (27.99%) Grant 311 Grant 337 (27.61%) Grant 5.00 Premium 45.45 Premium 63.00 Premium 61.09 Premium 80.01 Premium 34.00 Premium 91.89 Premium 128.07 Premium 50.40 Semi- Annual Annuity 126 (13.40%) Grant 27.99 Premium 40.00 Semi- Annual Annuity 548.49 (38.9%)Grant 9.60 Premium 134.567 Grant 57.57 Premium 33 Premium

47.12 Grant 0.99 Premium 156.30 Grant 172.70 Grant 245.23 Grant 56.44 Grant 64.07 (20%) Grant 103.13 (40%) Grant 9.83% Grant 62 Premium 149 Grant 9 % Grant 5.3 % Grant 3 Premium 11.56 % Grant 10 % Grant

21.60 s Premium 35 Premium 125.30 Grant 279 Grant 521.67 Grant 5.67 Premium 28.6 Grant 15.75 Grant 75.60 Premium 135.00 Premium 27.00 (3.74 %) Grant 72.09 Premium 145.08 Premium 131.04 Premium 10.20 Premium 82.00 Premium

Preferred Bidder Sadbhav Enginnering Ltd KMC Constructions Ltd. Transstroy-OJSC Consortium IVRCL Assets & Holdings Ltd. L&T Infrastructure Development Projects Ltd. L&T Infrastructure Development Projects Ltd. Unity Infra Projects Transstroy (India) Ltd.-

IRB LT GVK JMC DS Construction Gannon Dunkerley GMR BSCPL SOMA PNC GVK Essel C&C Madhucon Vijay Gammon Gammon Abhijeet KNR-JKM IVRCL Ramky Abhijeet L&T ERA Oriental Ramky Essel

Transtrroy Gayatri Essel-Atlanta ILFS Gammon Transtrroy

Sadbhav

Gammon Navayuga

Sadbhav KMC Transstroy IVRCL L&T L&T Unity Transtrroy

6,500 km road contract awarded by NHAI during FY2011-12

In yet another instance of aggressive bidding for highway projects, developers offered premium to seven out of eight highway projects with a

Larsen and Toubro got the two bids of NH6 and thus would be completing the full stretch from Gujarat border to Amravati. This road connect

These bids gave a NPV saving of Rs 6,451 crore. In the full year, the total benefit (premium or grant versus what was expected) to NHAI has

All put together NHAI has been able to award about 6,500 km of NHDP in the year 2011-12, which is about 28 percent higher than the previo Already bids for about 1,500 km have been invited or are under evaluation and they are likely to be awarded in the early months of the new

Statement showing NPV of Savings on account of awarded amount and the projections in respect of projects awarded/Bids received during 2 1. Premium is payable after the commercial operation date and is expected to increase by 5% p.a. over the concession period. 2. NPV is the present value of the expected annual premium over the concession period, discounted at 12% p.a. 3. The NPV of grant amount (VGF) is shown in negative in parenthesis.

4. Grant/VGF is taken at the level projected or bid out. It has not been discounted as it will be paid during the period of construction and prior

n out of eight highway projects with a total length of 1,144 kms awarded by National Highway Authority of India (NHAI) during March-end. One project faile

border to Amravati. This road connects Hazira port Surat to Paradip and eventually Kolkata. KMC-led consortium grabbed the project in Bihar-Jharkhand

rsus what was expected) to NHAI has been to the order of Rs 30,980 crore. This shows the continued interest of the highway developer group in the NHAI

bout 28 percent higher than the previous record , which was in 2010-11 at 5,085 km. Besides this, the road ministry awarded projects under NHDP and oth

arded in the early months of the new calendar year. NHAI is committed to award 7,300 km in the year 2012-13 and road ministry would be awarding a tota

ojects awarded/Bids received during 2011-12 (upto 30.03.2012)

r the concession period.

ng the period of construction and prior to the commercial operation date.

AI) during March-end. One project failed to attract strong interest and thus the quoted amount was much lower than the expected bid.

abbed the project in Bihar-Jharkhand of Aurangabad- BarwaAdda, which is 6 laning of the Golden quadrilateral between Delhi-Kolkata. Other successful

highway developer group in the NHAI projects.

awarded projects under NHDP and other heads.

oad ministry would be awarding a total of 8,800 km from NHDP including 7,300 from NHAI.

he expected bid.

ween Delhi-Kolkata. Other successful bidders include Sadbhav, Unity Infra, Transtroy and IVRCL.

Você também pode gostar