Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

1 of 11

Method Statement for

Canopy front beam and V columns lifting and installing operation

Distribution List: Available in the Mace Document Control Department REVISION HISTORY CONTRACTOR Date Prepared Reviewed Approved

Rev. No. 0

Revision History

ENGINEER

Status of Approval

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

2 of 11

CONTENTS 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 Purpose Scope of Work Definitions Responsibilities References Safety hazards and control measures Planning & Preparation Method of Work Sequence of Works Risk & Controls Risk Management Training Supervision at Site Inspection & Records

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

3 of 11

15.0
1.0

Attachments

PURPOSE

The purpose of this document is to outline the procedure for Canopy front beam and V columns lifting and installing operation

2.0

SCOPE OF WORK

The scope of this work is lifting and installing operation of front beam and V columns to the concrete slab by tower and mobile crane. Column quantity is 4 pcs. And total beam length is 36 meters.

3.0

DEFINITIONS
Project Manager Architect Structural Consultant Mechanical Consultant Contractor ITL ITP ITR QA P.P.E QC HSE : Mace International Limited - Azerbaijan : : : : Pano Jsc : Independent Testing Laboratory : Inspection & Test Plan : Inspection & Test Requests : Quality Assurance : Personal Protective Equipment. : Quality Control. : Health, Safety and Environment.

4.0

RESPONSIBILITIES
4.1 4.2 4.3 4.4 Contractor All listed activities Contractor HSE control and emergency procedures. Contractor Construction Manager Control & supervision of works Contractor HSE HSE monitoring of works

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation
5.0 SAFETY HAZARDS AND CONTROL MEASURES

Revision: 1 Date: 06.10.2011 Page:

4 of 11

This document is for general guidance and does not remove the responsibility for safe erection. 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 Only competent operatives shall perform the construction works listed. Only persons trained in scaffolding trainings on the grade intermediate works shall perform the activity. Works will only start once restricted area is signed at level2 and level3 and the Contractor HSE officer have performed the necessary gas tests and equipment inspections. Communication will be verbal and where possible also visual. Safe system of work shall reflect best industry practice and act in accordance with all Municipality regulation. Site condition should be clean and dry before and during operation and same condition after the termination of the work. All electrical systems must be off before operatives enter the signed and confined place at level3. Barricades and the signboards shall be displayed indicating the hazard to prevent personnel accidentally entering the area.

7.0
7.1

PLANNING & PREPARATION


Preliminary Activities & Approvals 7.1.1 Site observation 7.1.2 Material transferring 7.1.3 Taking site measurements 7.1.4 Getting start work permits and hot work permits 7.1.5 Marking no entrance area (barriers and ect.)

7.2

Pre-Construction Activities

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation
7.2.1 Organizing of staff office 7.2.2 Organizing of employee changing areas 7.2.3 Organizing of storage 7.3 Access, Egress & Logistics

Revision: 1 Date: 06.10.2011 Page:

5 of 11

7.3.1 Induction of employee 7.3.2 Providing Access cards or badges to enter the site and access to the scaffold to be as shown in the drawing ref. no: PAN-ST-CP-GE-027-076 and PAN-ST-CP-GE-027-077 7.3.3 Working times From 08:00 till 18:00 Six (6) days 7.3.4 Logistics as explained in the `Logistics Plan` submitted. 7.4 Facility & Area Management 7.4.1 Barricading and signposting underneath areas of suspended items and lift areas. 7.4.2 Banksman with whistles for signalling 7.5 Plant, Equipment & Tools 7.5.1 Spanner keys 7.5.2 Levels 7.5.3 Measure 7.5.4 Cutting machine for metals 7.5.4 Electrical saw

7.6

Hazardous Substances 7.7.1 none

7.7

Waste Management 7.8.1 The works will not involve any significant level of noise nuisance. 7.8.2 All waste will be immediately transferred to wastes skips. At the end of each shift theses bags will be

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

6 of 11

transferred to bins located on the ground floor exterior for collection and disposal by others. Based on site procedures : to collect daily and thrown outside the building to collecting boxes placed by others.

8.0

METHOD OF WORK
Activity Description: Task 1

8.1

Firstly will be prepared V columns base plates places with epoxy and bolting. Columns will installed and fixed to the beam on the ground. And installation will proceed by two steps. First step will install till deletation and second step is after dilatation joint. First Beam total length is 23 meters and to this beam will installed 3 pcs. V column. Main lifting operation will be proceed by tower crane. The beam will lifted vertically to the base plates point. And plates will inserted to the bolts which of installed on the concrete slab. Main mission is keep first bolt lines on the concrete slab to the first bolt holes on the palets. After by tower crane all columns of the beam will laying 10 degrees to the inside of the building. And beam side bolting holes will approach to the beam which of installed to top of the concrete beam in side of the canopy. ( picture 1, 2, 3)

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

7 of 11

Tower crane will continue to keep the main beam with V columns on the position which of must be installed. Bolts of base plates of columns will be immediately fixed, After by mobile crane will install first subframe beam between middle beam and canopy front beam. (Picture 4,5,6)

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

8 of 11

After installation of firs joint beam mobile crane will change its place to the another side of the tower crane. The Reason to change of mobile crane location it is to get safe installation process without any damages and failures. After changing of location mobile crane will installed last joint beam of the installed beam section with columns. (Picture 7,8,9)

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

9 of 11

After finishing this operation tower crane is free and can install another joint beams to its places. (picture 10,11)

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation

Revision: 1 Date: 06.10.2011 Page:

10 of 11

Second part of the canopy will installed simply by tower crane. Will not need mobile crane because during installation of second beam will possible make bolting to the sides of the beams which of located in the right and left sides which of installed before.
9.0 RISK & CONTROLS
9.1 9.2 9.3 9.4 Detailed risk assessment will be done & all possible hazards will be identified. In addition to the weekly tool box talks, Daily safety task instruction meeting / daily safety training will be done before the commencement of each shift and each new task. All persons involved in the activity will be trained in Training Consulting Services PPE shall be issued to all personnel, this shall be job specific and will include but it is not limited to: Full body harness Polycarbonate safety helmet Safety Boots Safety Harness Hand Protection Safety glasses Life line (if needed) Reflector jacket

10,1 RISK MANAGEMENT


Risk assessment attached separately.

11.2

EMERGENCY PREPAREDNESS
The EMERGENCY RESPONSE TEAM (ERT) will be responsible for any emergency arising at site. Contact No: 050 632 04 15 , Namiq Kasimov

Method Statement for Finishing of Pump Rooms & Water Tanks

Client

PASHA INSHAAT

Consultant Contractor

MACE INTERNATIONAL LIMITED - AZERBAIJAN PANO JSC


Project No.:

Document Category:

Method Statements
Project Title:

TC 3600
Document No.:

MS0010

CENTRAL PLAZA
Procedure Title:

Method Statement for Canopy front beam and V columns lifting and installing operation
12.0 TRAINING & COMMUNICATION
12.1 12.2 12.3 12.4 Manual handling Working at height First Aid Fire Warden

Revision: 1 Date: 06.10.2011 Page:

11 of 11

13.0

SUPERVISION AT SITE
13.1 13.2 Engineer Murat Sariten Foreman Yunus Daba

14.0

INSPECTION & RECORDS


14. Inspection will provided by MACE

Method Statement for Finishing of Pump Rooms & Water Tanks