Escolar Documentos
Profissional Documentos
Cultura Documentos
INVERSOR-CARGADOR SOLAR PARA SISTEMAS AISLADOS CENTRALIZADOS / SOLAR INVERTER-CHARGER FOR OFF-GRID CENTRALIZED SYSTEMS
HITC 30/50/100kW
www.ZIGOR.com
Manual de Operacin
HITC
ndice
1 PRECAUCIONES............................................................................................................................ 1 Precauciones generales ............................................................................................................................ 1 Precauciones medioambientales ............................................................................................................. 3 Precauciones ante el transporte del material ......................................................................................... 3 Precauciones ante la recepcin de material ........................................................................................... 4 Precauciones de almacenaje .................................................................................................................... 4 2 DESCRIPCIN................................................................................................................................ 5 2.1 Introduccin ................................................................................................................................................ 5 2.2 Principales caractersticas ........................................................................................................................ 5 2.3 Entrada renovable ...................................................................................................................................... 6 2.4 Batera ......................................................................................................................................................... 6 2.5 Entrada Red / Grupo .................................................................................................................................. 6 3 INSTALACIN ................................................................................................................................ 7 3.1 Recepcin del material .............................................................................................................................. 7 3.2 Emplazamiento y condiciones de instalacin ......................................................................................... 7 3.3 Conexin elctrica ................................................................................................................................... 10 3.3.1 Conexin de las opciones............................................................................................................................... 12 4 FUNCIONAMIENTO...................................................................................................................... 14 4.1 Puesta en marcha..................................................................................................................................... 14 4.1.1 Comprobar el estado del sistema .................................................................................................................. 14 4.1.2 Conexin e instalacin .................................................................................................................................... 14 4.1.3 Puesta en marcha ............................................................................................................................................ 14 4.2 Parada del sistema ................................................................................................................................... 15 4.3 Manejo ....................................................................................................................................................... 15 4.3.1 Panel de control ............................................................................................................................................... 16 4.3.2 Alarmas............................................................................................................................................................. 17 4.4 Sistema de mens .................................................................................................................................... 17 4.4.1 Pantalla Principal ............................................................................................................................................. 18 4.4.2 Alarmas............................................................................................................................................................. 18 4.4.3 Medidas ............................................................................................................................................................ 18 4.4.4 Estado ............................................................................................................................................................... 19 4.4.5 Configuracin .................................................................................................................................................. 19 4.5 Operacin sistema ................................................................................................................................... 19 5 MANTENIMIENTO HITC ............................................................................................................... 20 5.1 Mantenimiento del sistema electrnico ................................................................................................. 20 5.2 Mantenimiento de las bateras ................................................................................................................ 21 5.2.1 Sustitucin de las bateras ............................................................................................................................. 22 6 MONITORIZACIN ....................................................................................................................... 23 6.1 Pantalla Password.................................................................................................................................... 23 6.2 Pantalla Sinptico-Inicial ......................................................................................................................... 24 6.3 Pantalla Estado......................................................................................................................................... 28 6.4 Pantalla Parmetros ................................................................................................................................. 29 6.5 Pantalla Eventos....................................................................................................................................... 30 6.6 Pantalla Histrico de Eventos ................................................................................................................. 31 7 OPCIONES.................................................................................................................................... 33 7.1 SUNZET STRING Box............................................................................................................................... 33 7.2 Casetas intemperie .................................................................................................................................. 34 7.3 MODEM GSM ............................................................................................................................................ 35 7.4 SUNZET METEO ....................................................................................................................................... 35 8 ESQUEMA HITC 30/50KW ........................................................................................................... 37 9 ESQUEMA HITC 100KW .............................................................................................................. 38 10 VISTA GENERAL HITC 30/50KW ................................................................................................ 39 11 VISTA GENERAL HITC 100KW ................................................................................................... 40 12 ESPECIFICACIONES TCNICAS ................................................................................................ 41 13 NORMATIVA ................................................................................................................................. 43
1.1 1.2 1.3 1.4 1.5
ZIGOR
Manual de Operacin
HITC
2012, ZIGOR
Reservados todos los derechos. No est permitida la reproduccin total o parcial de este Manual de Operacin, ni su transmisin de ninguna forma o por cualquier medio, ya sea electrnico o mecnico, por fotocopia, registro u otro procedimiento de almacenamiento o recuperacin de informacin sin permiso del editor El contenido de este manual es exacto en el momento en que se procede a su impresin. Pero, con la intencin de cumplir con el compromiso de una poltica de continuos desarrollos y mejoras, el fabricante se reserva el derecho de cambiar las especificaciones del producto, su funcionamiento, o los contenidos del Manual de Operacin sin previo aviso.
ii
ZIGOR
Manual de Operacin
HITC
PRECAUCIONES
Para su propia seguridad y la del equipo, usted tiene que haber ledo y comprendido las instrucciones recogidas en este documento antes de comenzar a trabajar.
Manual de Operacin
HITC
La apertura del armario detiene el sistema. El interruptor general desconecta incondicionalmente los contactores de potencia de la entrada y de salida. An y todo despus de la desconexin del interruptor general, las distintas tensiones siguen presentes en las bornas de conexin y el lado exterior de los contactores. Por estos motivos se debe extremar la precaucin y, si existieran, abrir los seccionadores de entrada y salida del inversor, externos al mismo. La apertura del interruptor general se debe hacer con el sistema parado (interruptor de marcha/paro en posicin de paro), aunque la apertura del mismo es posible en cualquier condicin. El sistema dispone para su funcionamiento de condensadores que almacenan gran cantidad de energa. Cuando se abre el interruptor general entra en funcionamiento el Descargador de los mismos y se oye un pitido. Cuando los condensadores estn en una tensin segura se deja de or el pitido, esta operacin dura unos 10 segundos. Si el sistema lleva un tiempo parado (media hora aproximadamente), al abrir el interruptor general puede no orse el pitido ya que los condensadores se habrn descargado por s mismos. An y con todos los sistemas de seguridad, antes de tocar ningn punto activo debe comprobar que no hay tensin alguna. Este sistema est destinado para uso industrial y domstico-comercial. Si se vierte algo de lquido accidentalmente sobre el sistema, desconctelo y consulte con el personal de ZIGOR. El sistema est preparado para recibir alimentacin desde los paneles fotovoltaicos. El campo fotovoltaico puede presentar riesgo de descarga elctrica o quemaduras por su elevada tensin de funcionamiento. Durante labores de montaje, puesta en servicio o mantenimientos, utilizar proteccin ocular para evitar lesiones debidas a arcos elctricos accidentales. Debe ser protegido de la lluvia y de la excesiva humedad e instalado en un ambiente limpio, sin lquidos inflamables, gases o sustancias oxidantes. Indicaciones Medio Ambientales. Diferentes subconjuntos del sistema pueden ser productos reciclables. Para preservar el medio ambiente, gestinelos de acuerdo con la normativa y requisitos medioambientales vigentes en cada pas o comunidad. En caso de duda consulte con el fabricante. Reservados todos los derechos. No est permitida la reproduccin total o parcial de este Manual de Usuario, ni su transmisin de ninguna forma o por cualquier medio, ya sea electrnico o mecnico, por fotocopia, registro u otro procedimiento de almacenamiento o recuperacin de informacin sin permiso del editor. El contenido de este manual. El contenido es exacto en el momento en que se procede a su impresin. Pero, con la intencin de cumplir con el compromiso de una poltica de continuos desarrollos y mejoras, el fabricante se reserva el derecho de cambiar las especificaciones del producto, o su funcionamiento, o los contenidos del Manual de Usuario sin previo aviso.
2012, ZIGOR
ZIGOR
Manual de Operacin
HITC
Fig. 1-1 Forma de manipulacin adecuada La manipulacin mediante cinchas, volcado, cncamos, correas similares puede provocar desperfectos en los equipos no contemplados dentro de la garanta. Manipulacin incorrecta:
ZIGOR
Manual de Operacin
HITC
NO RESPETAR ESTAS NORMAS DE PRECAUCION INDICADAS, PUEDE SUPONER LA PERDIDA DE GARANTA DEL PRODUCTO.
ZIGOR
Manual de Operacin
HITC
DESCRIPCIN
2.1 Introduccin
El HITC es un inversor-cargador trifsico de ltima generacin para aplicaciones OFF-GRID. Su misin es convertir la tensin continua generada por los paneles fotovoltaicos, batera o aporte de energa desde grupo electrgeno, en corriente trifsica alterna adecuada para ser utilizada como red de energa elctrica. La instalacin y conexin del HITC deben estar sujetas a las normativas locales vigentes y puede exigir la instalacin de aparatos de proteccin elctrica adecuados. El HITC no puede funcionar conectado, en la salida, a la lnea de compaa de energa elctrica, ya que no es un sistema de inyeccin en red. El HITC genera una red estndar de distribucin trifsica.
ZIGOR
Manual de Operacin
HITC
2.4 Batera
El sistema HITC debe de coexistir con una batera para el almacenaje de energa de disposicin inmediata, para puntas de arranque, baja generacin transitoria, u otras circunstancias transitorias del funcionamiento de la instalacin. La conexin de batera tiene las siguientes caractersticas: Valor de tensin nominal de 350Vdc. Rango de tensin de batera entre 300Vdc ~ 420Vdc. Valor de capacidad de la batera de hasta: o 1000Ah, en el modelo HITC 100kW. o 500Ah, en el modelo HITC 50kW. o 500Ah, en el modelo HITC 30kW. Se pueden usar distintos tipos de batera, Pb estanco, Pb abierto, Gel. Valor configurable de la corriente de carga. Proteccin interna contra cortocircuitos. Capaz de gestionar la potencia nominal del sistema.
ZIGOR
Manual de Operacin
HITC
INSTALACIN
ADVERTENCIA Asegrese de que el peso del equipo est dentro de los lmites de carga (Kg.) de las herramientas que se usen para manejarlo y de los elementos de soporte que se utilicen para fijarlo. Revise las especificaciones del HITC para los detalles sobre el peso. Si tiene que mover el HITC utilice carretilla elevadora traspaleta. NUNCA UTILICE GRUA Y CANCAMOS para mover el HITC ya que su elevado peso no lo permite. Compruebe si el material entregado corresponde con el albarn de entrega. Esto se realizar consultando la placa del fabricante que se encuentra en la parte frontal o interior de la puerta del HITC. NO SE ADMITIRAN RECLAMACIONES SI, TRANSCURRIDAS 24 HORAS DESDE LA ENTREGA DE LA MERCANCA, NO SE RECIBE AVISO DE RECEPCIN DEL MATERIAL EN MAL ESTADO Y SI NO SE HACE CONSTAR ESTA CIRCUNSTANCIA AL TRANSPORTISTA EN EL MOMENTO DE LA ENTREGA EN EL CORRESPONDIENTE ALBARN DE ENTREGA.
Fig. 3-1 Ventilacin recomendada Por su grado de proteccin IP21, no permite su montaje en intemperie. Para asegurar un mximo de vida til del equipo, instlelo en un lugar limpio, seco y fresco. ZIGOR 7
Manual de Operacin El lugar escogido para la instalacin debe reunir las siguientes caractersticas:
HITC
Proteccin contra el polvo. Proteccin contra la humedad excesiva y las fuentes de calor elevado. Proteccin contra los agentes atmosfricos. Temperatura ptima del ambiente operativo entre +20C y +25C. Facilidad para las conexiones. Se evitar la proximidad a campos magnticos y a sistemas de gran potencia. Posicione el sistema en un lugar horizontal y equilibrado, libre de vibraciones y preparado para aguantar el peso del equipo. Evite que el sistema est expuesto al sol, la lluvia o a terrenos hmedos. Evite la exposicin del sistema a gases o productos corrosivos. No obstruya las salidas de ventilacin, impedira la correcta disipacin del calor producido por el equipo.
Para no tener prdidas de potencia la localizacin de la instalacin debe asegurar los siguientes parmetros: La temperatura ambiente en el entorno de trabajo debe estar entre 0C y 40C. La ubicacin ideal no debe sobrepasar los 1000m de altitud. Para localizaciones con altitudes superiores, consultar la configuracin adecuada para un funcionamiento adecuado. El rango de humedad relativa ser entre 0 y 95% sin condensacin.
El sistema dispone de unas conexiones elctricas las cuales deben ser accesibles en todo momento, por lo que a la hora de definir la ubicacin del sistema deben ser tenidas en cuenta estas circunstancias.
ZIGOR
Manual de Operacin
HITC
Fig. 3-2 Distancias recomendadas HITC 30/50kW y HITC 100kW En la figura 3.2 se indican las distancias minimas recomendadas de separacin del sistema con los dems elementos de la instalacin para un funcionamiento ptimo. Recomendaciones de la ubicacin: La ubicacin debe favorecer la entrada de aire fresco y la salida del aire caliente, para facilitar en lo posible la conveccin natural de la instalacin. Para asegurar una correcta renovacin del aire, en la caseta debe existir un elemento de ventilacin forzada que asegure una circulacin de aire de: o 4000m3/hora por cada HITC de 100kW. o 2500m3/hora por cada HITC de 30/50kW. El HITC dispone de una salida de rel para el control de un ventilador externo para asegurar la circulacin de aire en el recinto. Proteger al inversor de la incidencia del calor del sol. Mantener las distancias recomendadas del sistema con respecto al resto de la instalacin.
Este equipo debe ir siempre acompaado de bateras, por lo tanto se debe prestar especial atencin a su ubicacin. Toda batera se instalar en lugares libres de humedad y bien ventilados. Siempre que se instalen en lugares cerrados es importante mantener una ventilacin adecuada para minimizar la condensacin y garantizar la evacuacin de los gases generados en la carga.
IMPORTANTE El local donde se instale el equipo debe contar con medios de proteccin contra incendio adecuados. Debe colocarse en el lugar del emplazamiento de las bateras la advertencia de Prohibido fumar, as como generar cualquier actividad que pueda ocasionar chispa en la sala de bateras.
ZIGOR
Manual de Operacin
HITC
Las instrucciones de manipulacin, seguridad y mantenimiento de bateras debern situarse en el lugar donde estn localizadas las bateras, acompaando a stas. De este modo el usuario podr atender los aspectos de instalacin y mantenimiento de las bateras de un modo ms eficaz, alargando la vida de las mismas. Para facilitar el mantenimiento y prolongar la vida de las bateras la localizacin de la instalacin debe asegurar los siguientes parmetros: La temperatura ambiente en el entorno de trabajo debe estar entre 0C y 30C. La ubicacin debe disponer del suficiente espacio para poder un correcto mantenimiento de las bateras cumpliendo la normativa de seguridad aplicable. El rango de humedad relativa ser entre 0 y 95% sin condensacin. La batera tiene un valor de tensin nominal de 350Vdc, por lo tanto estar protegida contra el contacto de personas y la cada de objetos sobre la misma.
El sistema de refrigeracin de las bateras se puede complementar con un sistema de ventilacin forzada formado por unos ventiladores que facilitan la recirculacin del aire acondicionado. Hay que recordar que la vida de las bateras depende directamente de su temperatura de trabajo.
10
ZIGOR
Manual de Operacin
HITC
Fig. 3-4 Vista general de las conexiones DC y AC del HITC 30/50kW Para una conexin ms cmoda los cables llegaran al sistema soterrados, eventualmente pueden llegar por el suelo con lo que se deber desmontar los cubre zcalos correspondientes. El equipo dispone de una conexin Ethernet y otra para MODEM GSM (opcin) para comunicaciones remotas, localizadas en la parte interior de las puertas. El HITC lleva incorporados sistemas de proteccin y seccionamiento: En la conexin de entrada de recurso renovable dispone de seccionador de gestin interna que permite desconectar el recurso renovable del equipo. En la conexin de batera dispone de un fusible de proteccin. En la conexin de entrada de grupo/red dispone de fusibles de proteccin. En la conexin de salida de alterna dispone de fusibles y seccionador de gestin interna que permite aislar la unidad de los consumos.
Con el objetivo de operar con una estrategia segura de uso, la instalacin debera tener: Un seccionador antes de la entrada de recurso renovable. Un seccionador en la rama de bateras. Un magnetotrmico-diferencial en la salida AC. Un magnetotrmico en la entrada grupo/red. Bypass externo, entre grupo/red y los consumos AC, de accionamiento manual, este elemento proporcionar una forma de desenergizar el sistema en los procesos de instalacin y mantenimiento, asegurando el suministro de energa a los consumos.
En la salida AC del HITC, el equipamiento protector debe de ser de actuacin lenta para que no se dispare por la corriente de conexin (inrush current) cuyo pico puede alcanzar varias veces el valor nominal. Las conexiones AC y DC del HITC estn en la parte frontal del sistema, segn la figura 3-3 y 3-4. En el sistema HITC 100kW: La salida AC consta de 3 fases y neutro. La conexin se realiza directamente en el fusible de proteccin y la pletina del lateral derecho. La entrada AC consta de 3 fases, la conexin se realiza sobre borna de 95mm2. La conexin de tierra AC se realiza en la barra transversal situada en la parte inferior de los fusibles. La conexin de batera consta de dos pletinas desnudas de cobre marcadas con (+) y (-). La pletina (-) es comn con la entrada del recurso renovable. La conexin del recurso renovable consta de dos pletinas desnudas de cobre marcadas con (-) y (+). La pletina (-) es comn con la entrada de batera. ZIGOR 11
Manual de Operacin
HITC
La conexin de tierra DC se realiza en la barra transversal situada en la parte inferior de los fusibles. Esta tierra est aislada del resto del sistema. En el sistema HITC 30/50kW: La salida AC consta de 3 fases y neutro. La conexin se realiza en bornas de 35mm2. La entrada AC consta de 3 fases, la conexin se realiza sobre bornas de 35mm2. La conexin de tierra AC se realiza en la barra vertical situada a la derecha de la bornas. La conexin de batera consta de dos bornas de 70mm2. La conexin del recurso renovable consta de dos bornas de 70mm2. La conexin de tierra DC se realiza en la barra vertical situada a la izquierda de las bornas. Esta tierra est aislada del resto del sistema. Las conexiones de sealizacin del HITC se realizan segn la figura 3-6. En estas bornas se dispone de alarmas, control del ventilador externo, arranque del grupo electrgeno. Las conexiones de sealizacin son con borna de 2,5mm2.
3.3.1 Conexin de las opciones Los inversores-cargadores de la gama HITC trifsicos disponen de distintas opciones de comunicacin con elementos auxiliares o con el exterior. Para permitir estas comunicaciones existen puertos de comunicaciones especficos sobre los que se conectarn, para la correcta identificacin de la opcin y posterior funcionamiento.
12
ZIGOR
Manual de Operacin
HITC
ADVERTENCIA: Antes de conectar el HITC asegrese de que la lnea elctrica de la instalacin est seccionada y los paneles solares desconectados o totalmente cubiertos con un material opaco. Controle que los correspondientes interruptores exteriores estn abiertos y coloque las seales de atencin necesarias para evitar maniobras accidentales. Si los procedimientos de conexin a tierra no se siguen de manera adecuada se pueden dar descargas elctricas, peligros para el personal, o riesgos de incendio.
ADVERTENCIA: Tenga en cuenta que los paneles solares proporcionan tensin cuando son expuestos a la luz, aunque sea muy poca, y pueden suponer un peligro de descarga elctrica cuando son manipulados durante su instalacin. Verifique cuidadosamente la polaridad de todas las conexiones antes de conectar los paneles solares y la batera. La tensin en circuito abierto del grupo de paneles solares debe ser inferior a 880V bajo cualquier circunstancia.
ZIGOR
13
Manual de Operacin
HITC
FUNCIONAMIENTO
4.1.1 Comprobar el estado del sistema Comprobar el estado de los siguientes elementos dentro del sistema: Golpes en su estructura. Ubicacin adecuada, nivelacin, distancias al resto de elementos. Ventilacin de la sala donde se ubique el inversor. Amarres al suelo. Oxidacin de los elementos metlicos. Documentacin. Sujecin de tarjetas, cableado interior, fusibles, aprietes. Protecciones externas, cajas de distribucin AC, proteccin batera (s dispone). Cajas SUNZET STRING Box (si dispone)
4.1.2 Conexin e instalacin Pasos a realizar para las conexiones de las alimentaciones del HITC: Comprobar el valor de la tensin de la entrada fotovoltaica en vaco y comprobar que su valor no supera el valor mximo del sistema. Dejar abiertas las protecciones externas, si existen. Comprobar los valores de la tensin de la entrada grupo/red y comprobar que sus valores, tanto de tensin y frecuencia, son adecuados para el sistema. Si los valores no son los adecuados el equipo puede sufrir daos. Dejar abiertas las protecciones externas, si existen. Comprobar el valor de la tensin de la entrada de batera y comprobar que su valor es adecuado para el sistema. Dejar abiertas las protecciones externas, si existen. Comprobar que no hay tensin en los cables de conexin con el HITC. Conectar los cables de entrada DC, batera, Grupo/Red y salida AC del inversor-cargador HITC. Comprobar las conexiones, aprietes, cable adecuado, terminales. La conexin de tierra se realizar con cable adecuado y de seccin suficiente para la potencia del sistema.
Todas las conexiones elctricas estn accesibles en el frontal del equipo, parte inferior. 4.1.3 Puesta en marcha Para la puesta en marcha siga los siguientes pasos: 14 Compruebe el correcto conexionado de los cables. ZIGOR
Manual de Operacin
HITC
Compruebe el cierre de la puerta. Si existe seccionador de batera externo al sistema, cirrelo. Compruebe el correcto encendido del display. A partir de este punto toda la electrnica de gestin est alimentada y es posible la comunicacin con el operador va panel de control remota. Esperar unos dos minutos para que finalice el encendido. Si existen seccionadores de entrada y salida externos al sistema, cirrelos. Compruebe que el interruptor de MARCHA/PARO est en PARO. Comprobar que la Seta de Emergencia, no est activada, si lo est desbloquearla para que el sistema pueda arrancar. Cierre el Interruptor general (AC). El sistema se queda en espera de poner el interruptor de MARCHA/PARO en posicin MARCHA. Ponga el interruptor de MARCHA/PARO en posicin MARCHA. El equipo realizar la secuencia de arranque y el led verde se quedar parpadeando. A partir de este punto el sistema es completamente autnomo.
Existe un mtodo de parada de emergencia por presin de seta de emergencia este no es mtodo normal de parada, siempre que sea posible evitar esta forma de parada. SOLO SE DEBE ACCIONAR LA SETA DE EMERGENCIA EN CASO DE EMERGENCIA REAL
4.3 Manejo
Los circuitos de control entran en funcionamiento tan pronto como exista tensin continua en la entrada de batera. Despus de realizar la puesta en marcha indicada anteriormente, el inversor est permanentemente en marcha aportando la energa que precisen los consumos, gestionando las fuentes de energas disponibles y optimizando en todo momento el aporte de energa del recurso renovable. Cuando no hay suficiente energa en el recurso renovable, el inversor-cargador aporta la energa a las cargas proveniente de la batera y si fuera necesario del grupo electrgeno de apoyo (si existiera). Una vez que haya energa suficiente en el recurso renovable, el inversor-cargador aporta la energa a las cargas proveniente de este recurso, el cargador cargar las bateras y gestionar la extraccin de energa del recurso renovable. Los inversorescargadores HITC son capaces de sumar las energas provenientes de distintos recursos, maximizando el uso de recursos renovables (DC) frente al consumo de recursos fsiles (AC). Si durante la operacin del sistema se produce una sobrecarga o falta de recursos (renovable, batera o grupo) el sistema se parar por falta de energa de generacin. Recordar de forma especial que los inversores-cargadores de la familia HITC son inversores en isla y no pueden inyectar energa en redes elctricas de compaa. El funcionamiento del HITC es completamente autnomo. Una vez en funcionamiento el sistema se adapta automticamente a las circunstancias del recurso renovable y de los consumos, no necesitando la intervencin de ningn operador, siempre y cuando el interruptor de MARCHA/PARO se mantenga en posicin de MARCHA, ya que tambin realiza la gestin de arranque y parada del grupo electrgeno si fuera necesario. ZIGOR 15
Manual de Operacin
HITC
Si se desea abrir la puerta debemos parar el sistema accionado el interruptor de MARCHA/PARO a posicin PARO y abrir el interruptor general.
4.3.1 Panel de control El control por parte del usuario del sistema in situ se realiza a travs del panel de control, siendo esta la forma normal de verificar el estado del sistema por parte del operador. Este panel de control est integrado por: Display LCD 2x16 caracteres, donde se presenta la informacin del sistema. Teclado de membrana de 4 teclas, situadas debajo del display, utilizadas para la navegacin dentro del sistema de mens y modificacin de valores. Indicacin con tres diodos led del estado general del sistema.
En el panel de control podremos conocer el estado actual de funcionamiento, las magnitudes instantneas y acumuladas, as como los posibles eventos o alarmas que estn provocando un funcionamiento incorrecto del sistema. Tambin podemos ajustar un nmero limitado de parmetros para el correcto funcionamiento del HITC, igualmente se pueden configurar los datos de la comunicacin remota. Para la modificacin de algunos valores mediante el panel de control se necesita un password, que por defecto en los sistemas HITC trifsicos es la siguiente secuencia ESC .
OK
ERROR
ESC
Fig. 4-1 Panel de control Hay tres pilotos (LED), cuatro pulsadores y un display LCD en el panel de control del equipo. A continuacin se describe la relacin de los distintos elementos del Panel de control y su funcionalidad en funcin de su estado.
Funcin El sistema se encuentra en PARADA, FALLO DESCONEXION. El sistema se encuentra en proceso de arranque. El sistema se encuentra ARRANCADO El sistema no tiene ninguna alarma leve persistente El sistema tiene alguna alarma Leve Persistente El sistema no tiene ninguna alarma grave severa El sistema tiene alguna alarma Grave Severa Tabla 4-1 Indicadores luminosos
16
ZIGOR
Manual de Operacin Nombre Escape Abajo Derecha Enter Smbolo ESC Funcin Vuelve al men anterior Navegacin por los mens y reduce valores. Navegacin por los mens y aumenta valores. Entra en el men y confirma un valor. Tabla 4-2 Pulsadores
HITC
4.3.2 Alarmas El HITC dispone de dos salidas alarmas de libre potencial. Estas estn disponibles en la parte inferior del frontal del equipo, en la parte de sealizacin. Dichos contactos de libre potencial soportan 5A a 250Vac. A continuacin se identifican de las distintas alarmas y su funcionalidad en funcin de su estado. Nombre Equipo en Marcha Equipo en Marcha Fallo Equipo Fallo Equipo Estado Rel Activado Desactivado Activado Desactivado Funcin El sistema est en funcionamiento correcto. El sistema no est en funcionamiento correcto. El sistema no tiene ninguna alarma activa. El sistema tiene alguna alarma activa.
Para cambiar de acceso bsico al avanzado se seguirn los siguientes pasos: Ir al men Configuracin. o Parmetro Cambio de nivel. Introducir el password definido para el panel de control (el valor por defecto indicado anteriormente). Realizar la accin deseada. El sistema est en este nivel de acceso avanzado durante cinco minutos. Tambin se puede volver al nivel bsico editando de nuevo el parmetro Cambio de nivel e introduciendo un password errneo.
ZIGOR
17
Manual de Operacin 4.4.1 Pantalla Principal En este men se presentan las siguientes informaciones: Estado del sistema, que puede tener los siguientes valores: o OFF El sistema est en parada, interruptor en PARO. o ARRANQUE El sistema esta inicializando los sistemas. o FALLO El sistema est parado por deteccin de fallo. o MARCHA El sistema est en funcionamiento correcto.
HITC
4.4.2 Alarmas En este men se presentan las siguientes informaciones: Cdigo de alarma Descripcin de la alarma ndice/n total de alarmas Estado (de alarmas reseteables): o Activa R o No activa pero sin resetear
R!
4.4.3 Medidas En este men se presentan las siguientes informaciones: Entrada FV: o Potencia Clula Potencia instantnea suministrada por el recurso renovable. o Tensin FV Tensin en la entrada renovable. o Corriente Corriente en la entrada renovable. o Resistencia de aislamiento Valor de la resistencia de aislamiento, valor usado para dar alarma de aislamiento. Batera: o Potencia Batera Potencia instantnea en la rama de batera. o Tensin Batera Tensin en la rama de batera. o Corriente Batera Corriente en la rama de batera. o Contador Ah Contador de Ah actual de la batera. Grupo: o Potencia Grupo Potencia instantnea suministrada por el grupo electrgeno. Salida AC: o Potencia Salida Potencia total instantnea aportada a las cargas. o Potencia Fase R Potencia en fase R instantnea aportada a las cargas. o Potencia Fase S Potencia en fase S instantnea aportada a las cargas. o Potencia Fase T Potencia en fase T instantnea aportada a las cargas. o Corriente Salida Fase R Corriente en la fase R. o Corriente Salida Fase S Corriente en la fase S. o Corriente Salida Fase T Corriente en la fase T. Temperaturas: Valor de temperatura en el interior del armario. o Temperatura Interior Armario o Temperatura Ambiente Valor de temperatura del aire de entrada para refrigeracin. o Temperatura Radiador 1 Valor de temperatura en el radiador 1. o Temperatura Radiador 2 Valor de temperatura en el radiador 2. o Temperatura Transformador Valor de temperatura del transformador de salida.
18
ZIGOR
Manual de Operacin 4.4.4 Estado En este men se presentan las siguientes informaciones: Estado Inversor Interruptor Marcha/Paro Protecciones o P. Sobretensin AC. o P. Sobretensin DC. o Interruptor General. o Puerta Inversor. o Alarma Exterior.
HITC
4.4.5 Configuracin Para modificar los parmetros de este men se debe modificar el nivel de acceso, a acceso Avanzado. En este men se presentan las siguientes informaciones: Fecha y Hora Direccin IP Mascara de red Gateway Cambio de nivel (password) Versin.
ZIGOR
19
Manual de Operacin
HITC
MANTENIMIENTO HITC
Para algunas de estas labores de mantenimiento se deben realizar paradas en la generacin de energa.
20
ZIGOR
Manual de Operacin
HITC
Un mantenimiento eficaz alarga la vida de las bateras y asegura un buen funcionamiento del conjunto.
El correcto emplazamiento de las bateras de modo que se pueda acceder a todos los elementos facilita las tareas de mantenimiento. Dicho mantenimiento consiste en comprobar los siguientes aspectos: Limpieza: Los elementos, sus conexiones y sus soportes deben mantenerse limpios y secos. Se recomienda proteger los terminales y las conexiones metlicas con vaselina diluida. No utilizar productos de limpieza compuestos de disolventes y/o sustancias dainas para la limpieza de elementos con recipientes plsticos. Conexionado y embornaje: Comprobar el apriete de las tuercas sobre los polos de los elementos as como el apriete del conexionado elctrico a intervalos regulares de 12 meses aproximadamente. Verificacin de las tensiones: Comprobar las tensiones de los elementos para detectar posibles anomalas de los mismos. Rellenado del electrolito en los elementos (solo cuando proceda): El nivel de electrolito nunca debe estar por debajo de la marca de seguridad mnima. Solo se debe completar el nivel del electrolito con agua destilada. El rellenado con electrolito solo se debe realizar cuando haya que sustituir el original. Nunca sobrepasar el nivel mximo indicado en los elementos. Si se cayera electrolito sobre los elementos o sus accesorios, durante el rellenado, es indispensable realizar una limpieza profunda de las partes afectadas y a continuacin un secado de las mismas. Comprobacin de la densidad del electrolito (solo cuando proceda): La densidad no vara con el estado de carga, sin embargo se reduce durante la vida de servicio de la batera. La densidad estndar del electrolito depende del fabricante. ADVERTENCIA El electrolito es altamente corrosivo. En caso de contacto con la piel, qutese la ropa manchada y lave con mucha agua las partes afectadas de la piel. En caso de molestias acuda al mdico. En caso de contacto con los ojos, aclarar con mucho agua durante 10-15 minutos y acuda al oftalmlogo si es necesario. Descargas Peridicas: Si por motivos de uso, las bateras no soportan cargas y descarga sistemticas; se debern aplicar las siguientes indicaciones: Con objeto de que el material activo que constituye la batera mantenga sus propiedades, debe procederse a descargar peridicamente la batera (recomendablemente cada seis meses). Las descargas peridicas permiten estimar la autonoma de funcionamiento, detectar elementos defectuosos y descubrir sntomas de envejecimiento prematuros. No es necesario llegar a la descarga total, ya que pude ocasionar un riesgo incmodo de desconexin de la salida, por no disponer la batera de su capacidad completa. Tras estas descargas intencionadas se dejar el sistema conectado al menos durante 24 horas, para que recargue completamente la batera. No Fumar, hacer fuego y/o producir chispas en las proximidades de las bateras durante su recarga, existe riesgo de inflamacin y/o explosin. Para su limpieza no utilizar trapos o esponjas de materiales sintticos. Mantenga siempre las bateras limpias y secas. Protjalas contra la suciedad, polvo, virutas metlicas, etc. ADVERTENCIA Si el HITC va estar desconectado o parado durante un periodo de tres das o ms debe desconectarse el interruptor o el fusible de proteccin de batera, para evitar descargas descontroladas. La batera del HITC debe mantenerse en un lugar no muy caliente.
ZIGOR
21
HITC
La sustitucin o manipulacin de bateras debe ser realizada con especial cuidado, teniendo presente unas normas bsicas de prevencin de accidentes: No intente abrir las bateras. Estas contienen lquido electroltico que puede producir quemaduras en ojos o piel. No lleve anillos, pulseras, relojes, etc., que puedan producir cortocircuitos o descargas elctricas. Use herramientas aisladas. Lleve guantes, zapatos aislados de proteccin y gafas de seguridad. Descargue la electricidad esttica corporal antes de manipular las conexiones. No ponga herramientas encima de las bateras. No ponga las bateras cerca del fuego ni fuentes de calor. No fume, existe riesgo de explosin. Asegrese que el HITC est completamente apagado y desconectado de las lneas de generacin y consumo antes de proceder a sustituir las bateras.
ATENCIN LAS BATERAS SON MATERIALES CONSIDERADOS COMO RESIDUOS PELIGROSOS. PARA PRESERVAR EL MEDIO AMBIENTE, GESTIONE LAS BATERAS USADAS DE ACUERDO CON LA NORMATIVA Y REQUISITOS MEDIOAMBIENTALES VIGENTES EN CADA PAS O COMUNIDAD. Importante: La temperatura acta sobre la vida de la batera. La temperatura ptima est entre 20C y 30C, una elevacin de 10C puede reducir su vida un 50%.
El contenedor con ruedas tachado en el producto, la documentacin o sus envases, significa que los componentes elctricos-electrnicos y las bateras deben ser objeto de recogida por separado al terminar su ciclo de vida. Este requisito se aplica en la Unin Europea y en aquellos lugares donde estn disponibles sistemas de recogida por separado. No se deshaga de estos componentes como basura municipal sin clasificar. 22 ZIGOR
Manual de Operacin
HITC
MONITORIZACIN
El sistema HITC puede ser monitorizada remotamente mediante el AppletServer. Aportando al usuario una potente herramienta de control sobre la explotacin fotovoltaica. Los inversores-cargadores solares HITC, mediante su plataforma de consola ETX, ofrecen una serie de servicios TCP/IP para su interaccin: Servicio WEB: Se utiliza el puerto por defecto, puerto 80. Adems se utiliza tambin por debajo el puerto 5901. Servidor SNMP: Se utiliza el puerto por defecto, puerto 161.
El acceso a dichos servicios puede ser Local o Remoto, utilizando para ello alguno de los interfaces fsicos de comunicacin que se ofrecen: RS-232 y puerto Ethernet. Acceso Local Es posible un acceso local a travs del puerto Ethernet, utilizando un cable cruzado, si se conecta directamente a un nodo tipo PC; o uno normal, en el caso de hacerlo a travs de un elemento de interconexin como un switch. En el nodo PC se deber configurar sus parmetros de red (direccin IP y Mscara) acorde a los parmetros establecidos en el inversor (lase el manual de usuario para la consulta o modificacin de los mismos), teniendo en cuenta siempre que cada nodo debe tener una direccin IP nica. Acceso Remoto Se posibilita el acceso remoto a travs de alguno de los dos siguientes escenarios: 1. Uso de mdem GSM RTC En este caso se utilizar un mdem homologado conectndolo mediante cable serie al puerto RS-232. En el caso de utilizar mdem GSM, y por tanto tambin una tarjeta SIM, es importante hacer notar que previamente a la conexin se ha de introducir el nmero PIN de la SIM en el parmetro correspondiente del inversor (si no se corre el peligro de bloquear la SIM para lo cual habra que utilizar el cdigo PUK de desbloqueo), o bien deshabilitar dicho nmero. La conexin se habr de establecer desde otro mdem estableciendo un acceso telefnico a redes. Una vez establecida la conexin, el acceso ser posible a travs de la direccin IP del enlace PPP establecido (192.168.55.1 por defecto, vase manual de usuario y anexos del mismo). 2. A travs de otro nodo de la red que hace de pasarela o gateway (Router etc.) La forma de acceder depender de las funcionalidades de la pasarela. En cualquier caso, la comunicacin ser posible por el puerto Ethernet de manera anloga a la conexin local. En la mayora de los casos ser necesario configurar la pasarela y redirigir los puertos TCP/IP ya descritos. Adems se habr de establecer el valor del parmetro Gateway del inversor con la direccin IP de la pasarela puesto que es el elemento de comunicacin al exterior. Para la utilizacin de esta herramienta, el sistema HITC debe estar conectado a Internet y disponer de una direccin IP vlida. En el puesto de control se debe disponer de un ordenador conectado, del mismo modo, a Internet y un Browser de Internet con el runtime de Java correctamente instalado. Si despus de conectarnos al sistema no realizamos ninguna actividad durante ms de cinco minutos, se perder la comunicacin, debiendo tener que reestablecerla si queremos realizar alguna otra accin. Descripcin de las distintas pantallas del Applet:
Manual de Operacin Bsico con el password public, solo permite la monitorizacin de las variables. Avanzado con el password user, permite variar configuraciones de usuario.
HITC
Y el botn Salir que como su nombre indica sirve para salir de la aplicacin
24
ZIGOR
Manual de Operacin
HITC
Fig. 6-2 Pantalla Sinptico-Inicial (1) Indicador del estado de la comunicacin remota con el HITC: o o (2) o o (3) o o Verde parpadeante, comunicacin OK. Rojo, fallo de comunicacin. Verde, no hay eventos activos. Rojo, hay eventos activos. Trabajo, la configuracin que se presenta en pantalla es la misma que la que tiene el sistema HITC. Temporal, la configuracin que se presenta en pantalla ha sido modificada y todava no ha sido guardada en el sistema HITC. Si transcurren ms de cinco minutos desde que se ha realizado la modificacin y no se ha guardado la modificacin en el sistema HITC, esta volver automticamente a la ltima configuracin de Trabajo.
(4)
Esta pantalla tiene tres botones con los que podemos acceder a los datos registrados: Descargas, este botn permite acceder a descargas directas de ficheros en formato CSV, con datos de produccin y flujo de las energas. Borrar, este botn permite borrar todos los datos almacenados, para mayor seguridad pide confirmacin. Grficas, este botn permite acceder a visualizar grficas de los datos existen en los ficheros anteriormente indicados.
Al acceder a las descargas se nos presenta una pantalla de este tipo para la descarga de los ficheros en formato CVS. ZIGOR 25
Manual de Operacin
HITC
Fig. 6-3 Pantalla Descarga de ficheros Las grficas presentadas con los datos histricos almacenados son del tipo.
Manual de Operacin
HITC
Manual de Operacin
HITC
28
ZIGOR
Manual de Operacin
HITC
Apartados accesibles:
ZIGOR
29
Manual de Operacin
HITC
El color de la campana de cada evento tiene el siguiente significado: Rojo, el evento est activo y no reconocido. mbar, el evento est activo y reconocido. Verde, el evento se ha desactivado.
30
ZIGOR
Manual de Operacin
HITC
ZIGOR
31
Manual de Operacin
HITC
32
ZIGOR
Manual de Operacin
HITC
OPCIONES
Para la familia de inversores-cargadores HITC, ZIGOR ha desarrollado una serie de opciones para optimizar las funcionalidades del sistema, facilitando el control de la energa y la supervisin del funcionamiento.
ZIGOR
33
Manual de Operacin
HITC
34
ZIGOR
Manual de Operacin
HITC
Fig. 11-4 MODEM GSM Recordar que el MODEM GSM necesita una tarjeta SIM activa para poden aportar su funcionalidad a la gestin del equipo. Esta tarjeta SIM no es proporcionada por ZIGOR, sino que ser el cliente el que disponga de ella. Antes de insertar la tarjeta SIM se debe configurar el PIN de dicha tarjeta, por defecto el PIN que tiene configurado el sistema es el 0000. Si no se configura antes de insertarla en el MODEM la tarjeta se puede bloquear. Para poder conectarse al sistema HITC remotamente se establecer una conexin PPP mediante una conexin telefnica a redes.
ZIGOR
35
HITC
Parmetros generales Tensin de alimentacin nominal Consumo mximo Dimensiones Rango de temperatura Grado de proteccin Peso Comunicacin con HITC Clula calibrada 2 Clulas calibradas 0 ~ 1200 W/m2 0,2% 2% Medidas de temperatura Tipo de sensor PT100 Rango de medida de temperatura De -20C hasta +100C Error mximo 0,8C Anemmetro Tensiones de funcionamiento 12 ~ 230 Vac / Vdc Corriente mxima admisible 500 mA Potencia mxima conmutada 10 W Frecuencia mxima 200 Hz Grado de proteccin IP - 65 Vida til estimada 20 aos Velocidad de arranque 4 km/h Velocidad mxima admisible 150 km/h Dimensiones 150 x 150 x 200 mm Los datos que se pueden monitorizar son: Irradiancia, por medio de una clula de irradiancia. Temperatura ambiente, por medio de una sonda de temperatura PT-100. Temperatura de panel, partiendo del supuesto que todos los paneles del campo FV tendr una temperatura similar, se mide la temperatura de la clula de irradiancia por medio de una sonda PT-100. Velocidad del viento, esta medida es una opcin dentro del SUNZET MET, la medida se realiza mediante un anemmetro Tipo de sensor Rango de medida Error intrnseco de medida Error de medida contra patrn 6 ~ 28 Vdc 90 mW 266 x 266 x 35mm De -20C hasta +50C IP - 54 1,2Kg RS-485
36
ZIGOR
Manual de Operacin
HITC
ZIGOR
37
Manual de Operacin
HITC
38
ZIGOR
Manual de Operacin
HITC
ZIGOR
39
Manual de Operacin
HITC
40
ZIGOR
Manual de Operacin
HITC
12 ESPECIFICACIONES TCNICAS
Parmetros generales Potencia nominal Potencia en sobrecarga Capacidad de sobrecarga Tensin nominal de salida Frecuencia de operacin Numero de fases Corriente mxima por fase Distorsin armnica total de corriente (THD) Proteccin sobretensiones AC Proteccin cortocircuito HITC 30 Salida AC 30 kW (30 kVA) HITC 50 HITC 100
50 kW (50 kVA) 100 kW (100 kVA) 110% continuo 150% / 1 segundo 380-400Vac (*) / 208-220-240Vac (**) 10% 50 / 60Hz 1Hz 3 fases + neutro 46A (*) / 83A (**) 76A (*) / 139A (**) 152A (*) / 278A (**) <3% a Pot.Nom. (2,5%) Si Si
Pot. de campo FV (mxima generacin) Mxima corriente de entrada Nmero de entradas Rango MPPT Tensin mxima en circuito abierto CC Proteccin sobretensiones DC Proteccin conexin inversa Eficiencia MPP
>105kWp 250A
Potencia mnima Tensin nominal de entrada Frecuencia de operacin Numero de fases Corriente mxima por fase Control Arranque Grupo Proteccin cortocircuito
Entrada Grupo / Red 50kW 70kW 140kW (*) (**) 380-400Vac / 208-220-240Vac 5% 50 / 60Hz 5Hz 3 fases (*) (**) (*) 76A / 139A 106A / 194A (**) 213A (*) / 389A (**) Contacto libre de potencial (230Vac/4A mx.) Si
Batera Tensin Nominal Rango de tensin Mxima corriente de carga Mxima corriente de descarga Capacidad mnima de batera Capacidad mxima recomendada de batera Nmero nominal de celdas (Pb) Proteccin cortocircuito Proteccin conexin inversa Proteccin sobre-descarga Gestin de carga 350Vdc 300 / 420Vdc 50A 167A 50Ah 500Ah 172 elementos Si Si Si Si
ZIGOR
41
Manual de Operacin Parmetros generales Eficiencia Consumo interno en operacin Altitud de funcionamiento Temperatura ambiente de funcionamiento Humedad relativa Dimensiones (mm) Peso aproximado Grado de proteccin del armario Refrigeracin Control ventilador externo Seccionadores AC y DC HITC 30 HITC 50 HITC100 Datos Generales >96% Incluido el transformador Desde recurso renovable. <1% de Pot. Nom. <1000m sin prdida de potencia 0C ~ +50C (2)
HITC
Transformador de aislamiento
0 ~ 95% sin condensacin 1950x1200x600 1950x1200x600 2150x1600x600 800Kg 850Kg 1320Kg IP21 Ventilacin forzada Contacto libre de potencial (230Vac/4A mx.) Integrados en el sistema Integrado en el sistema Aislamiento galvnico entre: FV Consumos Batera Consumos Entrada grupo Consumos Display 2 lneas Teclado 3 leds de sealizacin S S Ethernet Web Server SNMP Modem GSM (opcin)
(1) (2)
Por debajo de 40C el sistema funciona con valores nominales, hasta 50C el sistema realiza derating de potencia. Nota:
Las especificaciones tcnicas podrn modificarse sin previo aviso. Para cualquier otra necesidad tcnica modificacin de las existentes, consultar a ZIGOR.
42
ZIGOR
Manual de Operacin
HITC
13 NORMATIVA
Los equipos HITC de este manual cumplen las directivas indicadas a continuacin: Directiva de Baja Tensin 2006/95/CE y posteriores enmiendas. o EN 50178 (1998) Directiva de Baja Tensin 2004/108/CE y posteriores enmiendas. o UNE-EN 61000-6-2 (2006), Compatibilidad electromagntica: Norma de Inmunidad. o UNE-EN 61000-6-3 (2007), Compatibilidad electromagntica: Norma Emisin. o EN 61000-2-2 (2002), Compatibilidad electromagntica: Niveles de compatibilidad para las perturbaciones conducidas de baja frecuencia y la transmisin de seales en las redes de suministro pblico en baja tensin. o EN 61000-3-12 (2005), Compatibilidad electromagntica: Lmites para las emisiones de corriente armnica.
La Asociacin Espaola de Normalizacin y Certificacin (AENOR), certifica que los "Sistemas de Gestin de la Calidad" y de "Gestin Ambiental" adoptados por ZIGOR Corporacin, S.A. para el diseo, el desarrollo, la produccin y el servicio postventa para equipos electrnicos de conversin de energa de corriente continua y alterna, as como protecciones electrnicas, sistemas de comunicacin, aplicaciones de telegestin y proyectos llave en mano elctricos y electrnicos, son conformes a las exigencias de las Normas Espaolas UNE-EN ISO 9001:2008 y UNE-EN ISO 14001:2004 respectivamente. ZIGOR 43
Operating Manual
HITC
Index
1 PRECAUTIONS ............................................................................................................................... 1 General precautions ................................................................................................................................... 1 Environmental precautions ....................................................................................................................... 2 Precautions during the transport of the material.................................................................................... 3 Precautions on receiving the unit............................................................................................................. 3 Storage precautions ................................................................................................................................... 4 2 DESCRIPTION................................................................................................................................. 5 2.1 Introduction................................................................................................................................................. 5 2.2 Main features .............................................................................................................................................. 5 2.3 Renewable input ......................................................................................................................................... 6 2.4 Battery ......................................................................................................................................................... 6 2.5 Grid / Unit Input .......................................................................................................................................... 6 3 INSTALLATION ............................................................................................................................... 7 3.1 Receiving the material ............................................................................................................................... 7 3.2 Site and installation conditions ................................................................................................................ 7 3.3 Electrical connection ............................................................................................................................... 10 3.3.1 Connecting options .......................................................................................................................................... 12 4 OPERATION .................................................................................................................................. 14 4.1 Start-up ...................................................................................................................................................... 14 4.1.1 Check the system status ................................................................................................................................. 14 4.1.2 Connection and installation ............................................................................................................................ 14 4.1.3 Start-up.............................................................................................................................................................. 15 4.2 Stopping the system ................................................................................................................................ 15 4.3 Handling .................................................................................................................................................... 15 4.3.1 Control panel .................................................................................................................................................... 16 4.3.2 Alarms ............................................................................................................................................................... 17 4.4 Menu system ............................................................................................................................................. 17 4.4.1 Main Screen ...................................................................................................................................................... 18 4.4.2 Alarms ............................................................................................................................................................... 18 4.4.3 Measurements .................................................................................................................................................. 18 4.4.4 Status ................................................................................................................................................................ 19 4.4.5 Configuration .................................................................................................................................................... 19 4.5 System operation ..................................................................................................................................... 19 5 HITC MAINTENANCE ................................................................................................................... 20 5.1 Maintaining the electronic system.......................................................................................................... 20 5.2 Battery maintenance ................................................................................................................................ 21 5.2.1 Battery replacement ......................................................................................................................................... 22 6 MONITORISATION........................................................................................................................ 23 6.1 Password Screen...................................................................................................................................... 23 6.2 Synoptic-Start Screen .............................................................................................................................. 24 6.3 Status screen ............................................................................................................................................ 28 6.4 Parameters Screen ................................................................................................................................... 29 6.5 Events Screen ........................................................................................................................................... 30 6.6 Events History Screen ............................................................................................................................. 31 7 OPTIONS ....................................................................................................................................... 32 7.1 SUNZET STRING Box ............................................................................................................................... 32 7.2 Weatherproof cabins ................................................................................................................................ 33 7.3 GSM MODEM............................................................................................................................................. 34 7.4 SUNZET METEO ....................................................................................................................................... 34 8 HITC 30/50KW DIAGRAM............................................................................................................. 36 9 HITC 100KW DIAGRAM................................................................................................................ 37 10 HITC 30/50KW GENERAL VIEW .................................................................................................. 38 11 HITC 100KW GENERAL VIEW ..................................................................................................... 39 12 TECHNICAL SPECIFICATIONS ................................................................................................... 40 13 STANDARDS................................................................................................................................. 42
1.1 1.2 1.3 1.4 1.5 2012, ZIGOR
All rights reserved. The total or partial reproduction of this Operating Manual, its transmission in whatever manner, being mechanical or electronic, photocopies, registration or any other information storage or recovery procedure, is totally prohibited without the permission of the editor. The content of this manual is accurate at the time it was printed. However, with the intention of complying with our aim of continuous development and improvement, the manufacturer reserves the right to change the specifications of the product, its operation or the contents of the Operating Manual without warning.
ii
ZIGOR
Operating Manual
HITC
PRECAUTIONS
For your own safety and that of the unit, you must read and understand the instructions contained in this document before starting work.
Operating Manual
HITC
However, even after switching off the general switch, the connecting terminals and the outside of contactors are still live. For these reasons, precautions must be taken and the inlet isolating switches and inverter outlet, if any, placed outside the inverter, must be opened. The general switch must be opened when the system is shut down (on/off switch in the OFF position) and when no energy is being injected into the network, although this can be opened under any conditions. The system is supplied with high energy storing capacitors for its operation. When the general switch is turned on its discharger comes into operation and a beep will be heard. When the capacitors are at a safe voltage, the beeping will stop. This operation will take about ten seconds. If the system has been turned off for some time (about half an hour), when the general switch is turned on the beep may not be heard as the capacitors will have discharged by themselves. Even though all the safety systems are in place, before touching any working parts, you must check that they are not live. This system has been designed for industrial and/or domestic-commercial use. If any liquid is spilt accidentally on the System, disconnect this and consult ZIGOR personnel. The system is ready to receive power from the photovoltaic panels. The photovoltaic field may pose a risk of electric shock or burns due to its high short circuit current. During assembly work, start-up or maintenance, wear goggles to avoid any damage to your eyes due to accidental electric arcing. The unit must be protected against rain and excess humidity and installed in a clean atmosphere, without inflammable liquids, gases or oxidising substances. Environmental indications A number of system subassemblies may be recyclable products. In order to protect the environment, manage these in accordance with current environmental regulations and requirements in force in each country or community. If you are in any doubt please consult the manufacturer. All rights reserved. The total or partial reproduction of this User Manual, its transmission of any type or by the any means, be this mechanical or electronic, by means of photocopies, registration or other information storage or recovery procedure, without the permission of the editor, is totally forbidden. The contents of this manual. The contents of this manual were accurate at the time of printing. However, in order to comply with our policy of continuous improvement and development, we reserve the right to change the specifications or operation of the product or the contents of the operation manual without warning.
2012, ZIGOR
The drawing of a crossed out wheeled container on the product or in the documentation or packaging means that the electrical-electronic components and batteries must be disposed of separately at the end of their service life. This requirement is applied in the European Union and in those locations where individual disposal systems are available. Do not dispose of these components in the form of unsorted municipal waste. 2 ZIGOR
Operating Manual
HITC
Fig. 1-1 Correct way to handle the unit Handling with straps, hooks, belts or similar devices may cause damage to the equipment, not included in the warranty. Improper handling:
ZIGOR
Operating Manual
HITC
AS OF THIS MOMENT, THE CUSTOMER WILL HAVE 24 HOURS TO MAKE ANY CLAIM UNDER GUARANTEE FOR ANY ANOMALY IN THE AMOUNT OR QUALITY OF THE PRODUCTS RECEIVED, PROVIDING DETAILS OF THE MATERIAL RECEIVED IN BAD CONDITION AFTER REPORTING THIS CIRCUMSTANCE ON THE FORWARDING AGENT'S DELIVERY NOTE ON RECEPTION. SHOULD THE CUSTOMER NOT REPORT ANY DEFECT WITHIN 24 HOURS, IT WILL BE UNDERSTOOD THAT HE HAS ACCEPTED DELIVERY OF THE UNIT.
ANY FAILURE TO RESPECT THESE PRECAUTIONS MAY RENDER THE PRODUCT WARRANTY NULL AND VOID
ZIGOR
Operating Manual
HITC
DESCRIPTION
2.1 Introduction
The HITC is a state-of-the-art three-phase inverter-charger for OFF-GRID applications. It is designed to convert continuous voltage generated by photovoltaic panels, battery or the supply of power from an emergency generator, in alternating three-phase current, appropriate for use as an electrical power grid. The HITC must be installed and connected in accordance with the local regulations currently in force and may require the installation of the adequate electrical protection devices. The HITC cannot operate while connected, at its output, to the power line of the electricity company as it is not a grid injection system. The HITC generates a standard three-phase distribution grid.
ZIGOR
Operating Manual
HITC
2.4 Battery
The HITC system has to coexist with a battery for the storage of immediately available power, for start-up spikes, low transitory generation, or other transitory circumstances in the operation of the installation. The battery connection has the following characteristics: Nominal voltage value of 350Vdc. Battery voltage range between 300Vdc ~ 420Vdc. Battery capacity value up to: o 1000Ah, in the HITC 100kW model. o 500Ah, in the HITC 50kW model. o 500Ah, in the HITC 30kW model. Different types of battery can be used, Pb watertight, Pb open, Gel. Adjustable load current value. Intense short-circuit protection. Capable of managing the nominal power of the system.
ZIGOR
Operating Manual
HITC
INSTALLATION
WARNING Ensure that the weight of the unit is within the maximum load limits (kg) of the tools used in order to handle it and the supports used to secure it in place. Review weight details in the specifications of the HITC. If it is necessary to move the HITC, use a forklift truck or pallet truck. NEVER USE A CRANE AND LIFTING RINGS to move the HITC as its great weight does not allow this. Check that the material delivered corresponds to the delivery note. To do this, check the manufacturer's data plate situated on the front or inside the door of the HITC. NO CLAIMS WILL BE ACCEPTED IF, 24 HOURS FOLLOWING THE DELIVERY OF THE GOODS, NO NOTIFICATION OF RECEPTION OF MATERIAL IN BAD CONDITION HAS BEEN RECEIVED AND IF THIS CIRCUMSTANCE IS NOT NOTIFIED TO THE FORWARDING AGENT ON THE CORRESPONDING DELIVERY NOTE AT THE TIME OF DELIVERY.
ZIGOR
Operating Manual
HITC
Due to its IP21 protection, the unit cannot be installed outdoors. In order to ensure the maximum service life of the equipment, install it in a clean, dry and cool location. The place chosen for the installation must meet the following characteristics: Protection against dust. Protection against excessive humidity and heat sources. Protection against atmospheric agents. Optimum atmospheric operating temperature between +20C and +25C. Easy connections. Proximity to magnetic fields and high-power lamps must be avoided. Place the system on a horizontal, stable surface free of vibrations and of sufficient strength to bear the load of the unit. Prevent the system from being exposed to sunlight, rain or dampness. Do not expose to gases or corrosive products. Do not obstruct the vents as this would prevent the heat produced by the unit from being dissipated correctly.
In order to avoid power losses, the location where the unit is installed shall ensure the following parameters: The ambient temperature in the work area must be between 0C and 40C. The location shall not be made at a height of over 1000 m. In the case of sites at a greater height, please check upon the appropriate configuration for correct operation. The relative humidity range shall be between 0 and 95% without condensation.
The system has a number of electrical connections which must be access all at all times. Therefore when defining the site for the system these circumstances must be taken into consideration.
ZIGOR
Operating Manual
HITC
Fig. 3-2 Recommended distances HITC 30/50kW and HITC 100kW Figure 3.2 shows the recommended minimum distances separating the system and other elements in the installation to ensure optimum performance. Recommendations on placing the unit: The location chosen for the unit must allow fresh air to enter and hot air to exit in order to facilitate as far as possible the natural convection of the installation. In order to ensure correct air renewal, the cabin must be fitted with a forced ventilation device ensuring an air circulation of: o 4000m3/hour for each 100kW HITC. o 2500m3/hour for each 30/50kW HITC. In order to guarantee air circulation, the HITC is fitted with a relay outlet to control an external fan. Protect the inverter from the heat of the sun. Keep the recommended distances between the system and the rest of the installation.
This unit must be accompanied by batteries at all times and therefore it is necessary to pay special attention to their location. All batteries must be installed in well-ventilated places free of damp. Whenever these are installed in enclosed areas it is important to maintain the correct ventilation in order to minimise condensation and guarantee the evacuation of gases generated in the load.
IMPORTANT: The locations where the unit is installed must be supplied with adequate fire protection means. No Smoking signs must be placed in the area where the batteries are installed and any activity which might create a spark in the battery room must be prohibited.
ZIGOR
Operating Manual
HITC
Instructions for the handling, safety and maintenance of batteries will be placed next to the site where the batteries are installed. In this way, the user may attend to the installation and maintenance of the batteries more efficiently, lengthening their service life. In order to facilitate maintenance and prolong the service life of batteries, the place where these are installed must ensure the following parameters: The ambient temperature in the work area must be between 0C and 40C. The sides must have sufficient space to enable the proper maintenance of the batteries in accordance with the applicable safety standards. The relative humidity range shall be between 0 and 95% without condensation. The battery has a nominal voltage value of 350 VDC. Therefore, it will be protected in order to avoid people touching this and to prevent objects from falling on it.
In addition to the battery cooling system, it is possible to install a forced ventilation system made up of a number of fans in order to facilitate the free circulation of conditioned air. It is necessary to remember that battery life depends directly on the working temperature.
Fig. 3-3 General view of the DC and AC connections of the HITC 100kW
10
ZIGOR
Operating Manual
HITC
Fig. 3-4 General view of the DC and AC connections of the HITC 30/50kW In order to facilitate their connection, cables will be laid underground but may be laid on the floor and to do this the corresponding skirting board cover must be removed. The equipment has an Ethernet connection and another for GSM MODEM (optional) for remote communications. This connection is situated inside the doors. The HITC is fitted with protection and disconnection systems: In the renewable resource input connection, there is an internal management disconnector that allows the renewable resource to be disconnected from the unit. The battery connection is fitted with a protective fuse. The unit/grid input connection is fitted with protective fuses. The alternating current output connection is fitted with fuses and an internal management disconnector that allows the unit to be isolated from consumers.
In order to ensure safe operation, the installation shall be fitted with the following: One disconnector upstream of the renewable resource input. One disconnector in the battery branch. One magnetothermal-differential switch at the AC output. One magnetothermal switch at the unit/grid input. Manual operation external bypass, between the unit/grid and AC consumers. This device will provide a way of de-energising the system during installation and maintenance processes, thereby ensuring the supply of energy to consumers.
At the HITC AC output, the protective equipment must be of the slow operating type so that it does not trip due to the inrush current, the peaks of which can be several times higher than the nominal value. The AC and DC connections of the HITC are in the front of the system, as shown in figures 3-3 and 3-4. In the HITC 100 kW system: The AC output consists of 3 phases and neutral. The connection is made directly in the protection fuse and the bar on the right-hand side. The AC input consists of 3 phases, and the connection is made on a terminal of 95 mm2. The AC ground connection is made on the crosswise bar situated on the lower part of the fuses. The battery connection consists of two bare copper bars marked (+) and (-). The bar (-) is common to the renewable resource input. The renewable resource connection consists of two bare copper bars marked (+) and (-). The bar (-) is common to the battery input. The AC ground connection is made on the crosswise bar situated on the lower part of the fuses. This ground is isolated from the rest of the system. ZIGOR 11
Operating Manual In the HITC 30/50 kW system: The AC output consists of 3 phases and neutral. The connection is made in terminals of 35mm2. The AC input consists of 3 phases, and the connection is made on terminals of 35 mm2. The AC ground connection is made on the vertical bar located on the right of the terminals. The battery connection consists of two terminals of 70mm2. The renewable resource connection consists of two terminals of 70mm2.
HITC
The AC ground connection is made on the vertical bar on the left of the terminals. This ground is isolated from the rest of the system. The signalling connections of the HITC are made according to figure 3-6. These terminals are provided with alarms, external fan control and emergency generator unit start-up. The signalling connections are made with a terminal of 2.5 mm2.
3.3.1 Connecting options The inverters-chargers of the three-phase HITC range have a number of different options for communicating with auxiliary elements or outside. To allow these communications, there are specific communications ports to which these will be connected for the correct identification of the option and subsequent operation.
12
ZIGOR
Operating Manual
HITC
WARNING: Before connecting the HITC, make sure that the installation's electricity line is disconnected and that the solar panels are disconnected or completely covered with an opaque material. Make sure that the corresponding external switches are open and place the necessary warnings to avoid accidental operations. If the ground connection procedures are not followed adequately, there may be electric shocks, danger for personnel or risk of fire.
WARNING: Bear in mind that solar panels provide voltage when exposed to light, even at low light levels, and there is a danger of electric shocks when these are being handled during installation. Check the polarity of all the connections carefully before connecting the solar panels and the battery. The open circuit voltage of the solar panel unit must be lower than 880 V under all circumstances.
ZIGOR
13
Operating Manual
HITC
OPERATION
4.1 Start-up
WARNING: Before putting the HITC into operation, make sure to remove all parts and tools placed on the unit and carry out a final check of the correct connection of the unit, paying special attention to the polarity of the direct current line (use a voltmeter on the terminals in order to check this). Check that the ventilation grills are not obstructed. The start-up procedure for HITC systems is linked to the guarantee provided by ZIGOR to the equipment. Consult ZIGOR for warranty conditions when the start-up procedure is carried out by technical services department of ZIGOR. Any attempt to operate the HITC units of ZIGOR will be considered a start-up operation.
4.1.1 Check the system status Check the status of the following elements in the system: Dents in the structure. Correct location, levelling, distance between it and other equipment. Ventilation of the room where the inverter is installed. Means to secure the unit to the floor. Rusting of metal parts. Documentation. Fastening of cards, internal wiring, fuses, tightening. External protections, AC distribution boxes, battery protection (if fitted). SUNZET STRING Boxes (if fitted)
4.1.2 Connection and installation Steps to be taken for connecting HITC power supplies: Check the no load photovoltaic input voltage value and make sure that this does not exceed the maximum system value. Leave any external protections open. Check the mains voltage values of the unit/grid input and ensure that both its voltage and frequency values are correct for the system. If the values are not correct, the equipment may be damaged. Leave any external protections open. Check the value of the battery input voltage and check that its value is appropriate for the system. Leave any external protections open. Check that there are is no voltage in the connecting cables with the HITC. Connect the DC input cables, battery, Unit/Grid and AC output of the HITC inverter-charger. Check the connections, tightening torques, adequate cabling and terminals. The ground connection must be made with the adequate cable, which must be of sufficient section for the power of the system.
All electrical connections are accessible from the lower front part of the unit
14
ZIGOR
Operating Manual 4.1.3 Start-up Follow these steps to start up the unit
HITC
Check that the cables are connected correctly. Check the door lock. If there is a battery disconnector outside the system, close this. Check that the display turns on correctly. As of this moment, all the management electronics are on and communications with the operator via the control panel or remote device are now possible. Wait about two minutes for the power up procedure to be completed. If there are any external input and output isolating switches, close them. Check that START/STOP switch is in the STOP position. Check that the "Emergency Stop button" is not activated. If it is, deactivate this so that the system can start. Turn the general switch off (AC). The system waits for the START/STOP switch to be placed in the START position. Check that the START/STOP switch is in the START position. The unit will carry out the start-up sequence and the green light will flash intermittently. As of this point, the system is completely autonomous.
There is an emergency stop method which consists of pressing the "emergency button". This procedure is not the normal shut down method and should be avoided whenever possible. ONLY USE THE EMERGENCY BUTTON IN CASES OF REAL EMERGENCY
4.3 Handling
The control circuits come into operation as soon as there is direct voltage in the battery input. After carrying out the start-up procedure indicated above, the inverter is permanently in operation, providing the energy required by consumers, managing the available power sources and optimising at all times the energy provided by the renewable resource. When there is not sufficient to power in the renewable resource, the inverter-charger supplies the loads with the energy from the battery and if necessary from the auxiliary emergency power unit (if any). Once there is sufficient energy in the renewable resource, the inverter-charger provides the loads with energy from this resource. The charger will charge the batteries and manage the extraction of power from the renewable resource. HITC inverterschargers are capable of adding the energies from the different resources, maximising the use of renewable resources (DC) over the consumption of fossil resources (AC). If there is an overload or lack of resources (renewable, battery or unit) while the system is in operation, the system will stop due to a lack of generated power. Remember especially that the inverters-chargers of the HITC family are island inverters and cannot inject power into the grids of the utility company. ZIGOR 15
Operating Manual
HITC
The HITC operates completely autonomously. Once in operation, the system adapts automatically to the circumstances of the renewable resource and the consumers. It is not necessary for any operator to intervene provided that the START/STOP switch is kept in the START position, as this also manages the emergency generator unit start-up and stop should this be required. If you wish to open the door, you must stop the system by placing the START/STOP switch in the STOP position and by opening the general switch.
4.3.1 Control panel The system can be controlled "in situ" by the user via the control panel which is used by the operator to check on the status of the system. This control panel consists of the following: 2x16-character LCD Display, in which the system information is presented. 4-key membrane keyboard located underneath the display, used in order to navigate through the system of menus and to modify values. Indication of the general status of the system with three LED diodes.
The control panel provides information on the current operating status, instantaneous and accumulated values, as well as any possible events or alarms that are causing the system to malfunction. You can also adjust a limited number of parameters for the correct operation of the HITC, and you can also configure the remote communications data. In order to modify a number of values through the control panel a password is required. In HITC three-phase systems the default password is the following sequence ESC .
OK
ERROR
ESC
Fig. 4-1 Control panel There are three lights (LEDs), four buttons and an LCD display on the unit's control panel. A list is given below of the different elements on the control panel and their function in accordance with their status.
Function The system is in STOP, FAILURE or DISCONNECTION mode The system is starting up. The system is STARTING UP The system does not indicate any slight or persistent alarm The system has a "slight" or "persistent" alarm The system does not indicate any serious or severe alarm The system has a "serious" or "severe" alarm Table 4-1 Luminous indicators
16
ZIGOR
Operating Manual Name Escape Down Right Enter Symbol ESC Function Returns to the previous menu Navigation through menus and to reduce values Navigation through menus and to increase values Enters the menu and confirms a value Table 4-2 Buttons
HITC
4.3.2 Alarms The HITC has two potential free alarm outputs. These are available on the lower front part of the unit, in the signalling part. These potential free contacts support 5A at 250VAC. The different alarms and their functions according to their status are identified below. Name Unit in operation Unit in operation Equipment failure Equipment failure Relay status Activated Deactivated Activated Deactivated Function The system is operating correctly. The system is not operating correctly. The system has no active alarm The system has an active alarm Table 4-3 Buttons
In order to change access from basic to advance, follow these steps: Go to the "Configuration" menu. o "Change level" parameter. Enter the password defined for the control panel (the default value indicated above). Carry out the required action. This system remains in the advanced access level for five minutes. It is also possible to return to the basic level by editing once again the "Change level" parameter and entering an incorrect password.
ZIGOR
17
Operating Manual 4.4.1 Main Screen This menu presents the following information: System status, with the following values: o OFF The system is shut down, switch in the STOP position. o STARTUP The system is initialising the systems. o FAILURE The system has shut down because a failure has been detected. o OPERATION The system is operating correctly.
HITC
4.4.2 Alarms This menu presents the following information: Alarm code Description of the alarm Index/total number of alarms Status (of resettable alarms): o Active R o Not active but not reset
R!
4.4.3 Measurements: This menu presents the following information: FV Input: o Cell Power Instantaneous power supplied by the renewable resource. o FV Voltage Voltage at the renewable input. o Current Current at the renewable input. o Isolation resistance Isolation resistance value. Value used to generate the isolation alarm. Battery: o Battery Power Instantaneous power in the battery branch. o Battery Voltage Voltage in the battery branch. o Battery Current Current in the battery branch. o Ah Meter Current Ah meter of battery. Unit: o Unit Power Instantaneous power supplied by the emergency generator. AC output: o Output Power Total instantaneous power supplied to loads. o R Phase Power Instantaneous power in R phase supplied to loads. o S Phase Power Instantaneous power in S phase supplied to loads. o T Phase Power Instantaneous power in T phase supplied to loads. o R Phase Output Current R Phase Current. o S Phase Output Current S Phase Current. o T Phase Output Current T Phase Current. Temperatures: o Temperature Inside Cabinet Value for temperature inside the cabinet. o Ambient Temperature Value for the inlet air temperature for cooling. o Radiator 1 Temperature Value for temperature in radiator 1. o Radiator 2 Temperature Value for temperature in radiator 2. o Transformer Temperature Value for temperature of the output transformer.
18
ZIGOR
Operating Manual 4.4.4 Status This menu presents the following information: Inverter status Start/Stop switch Protections o AC Overvoltage protection o DC Overvoltage protection o General switch o Inverter door o External alarm
HITC
4.4.5 Configuration In order to modify the parameters of this menu, it is necessary to modify the access level to Advanced access. This menu presents the following information: Date and time IP Address Network mask Gateway Level change (password) Version
ZIGOR
19
Operating Manual
HITC
HITC MAINTENANCE
o 6 monthly: o o o o Annually: o o o o o o o
o o o
In the case of some of these maintenance tasks, power generating must be shut down.
20
ZIGOR
Operating Manual
HITC
Efficient maintenance lengthens the service life of batteries and ensures that the unit operates correctly.
Placing the batteries correctly so that all their elements can be easily reached facilitates maintenance. Maintenance consists of checking the following aspects: Cleanliness: The elements, their connections and supports must be kept clean and dry. It is recommended to protect the terminals and metal connections with diluted vaseline. Do not use cleaning products containing solvents and/or harmful substances for cleaning elements with plastic containers. Connections and terminals: Check the tightness of nuts on the poles of elements as well as the tightness of the electrical connection with at regular intervals of approximately 12 months. Checking voltages: Check the voltages of elements in order to detect any possible anomalies in these. Refilling elements with electrolyte (only when appropriate): The electrolyte level must never be under the minimum safety mark. The electrolyte level must be made up with distilled water. Filling with electrolyte must only be done when it is necessary to replace the original. Never exceed the maximum level indicated on the elements. Should electrolyte fall on the elements or their accessories during the refilling operation, the affected parts must be cleaned thoroughly and then dried. Checking the density of the electrolyte (only when appropriate): The density does not vary according to the load status, nevertheless it decreases during the service life of the battery. The standard density of the electrolyte depends on the manufacturer. WARNING Electrolyte is highly corrosive. In the case of any contact with the skin, remove stained clothing and wash with abundant water those parts of the skin affected. The case of any problem, see a doctor. The case of any contact with one's eyes, rinse with a great deal of water for 10 to 15 minutes and see an ophthalmologist. Periodic Discharges: If, due to use, the batteries do not support systematic charging and discharging operations, the following indications must be applied. In order to maintain the properties of the active material that makes up the battery, the battery must be discharged periodically (it is recommended that this be done every six months). Periodic discharges provide an indication of autonomous operation, allow you to detect faulty elements and discover symptoms of premature ageing. It is not necessary to discharge the battery completely as this might involve a risk of disconnecting the output as the battery does not have its complete capacity. After these intentional discharges, leave the system on for at least 24 hours in order to recharge the battery completely. Do not smoke, light a fire or generate sparks near batteries during recharging as there is a risk of fire and/or explosion. For cleaning, do not use synthetic material clothes or sponges. Keep batteries clean and dry at all times. Protect them against dirt, dust, metal shavings, etc. WARNING If the HITC is to remain disconnected or shut down during a period of three days or more, the battery switch or protection fuse must be disconnected in order to avoid uncontrolled discharges. The HITC must be kept in a place that is not excessively hot.
ZIGOR
21
HITC
Batteries must be placed or handled with special care in accordance with a number of basic accident prevention regulations: N.B.: BATTERIES ARE CONSIDERED TO BE DANGEROUS WASTE MATERIALS. IN ORDER TO SAFEGUARD THE ENVIRONMENT, MANAGE USED BATTERIES IN ACCORDANCE WITH THE REGULATIONS AND ENVIRONMENTAL REQUIREMENTS IN FORCE IN EACH COUNTRY OR COMMUNITY. Important: Temperature affects the service life of the battery. The optimum temperature is between 20C and 30C. An increase of 10C can reduce its service life by 50%. Do not attempt to open the batteries. These contain electrolyte, which can cause burns to eyes and skin. Do not wear rings, bracelets, watches, etc., as these could cause short-circuits or electric shocks. Use insulated tools. Wear gloves, insulated protective shoe wear and safety goggles. Discharge body static electricity before handling connections. Do not place tools on the batteries. Do not place batteries near fire or sources of heat. Do not smoke, there is a risk of explosion. Make sure that the HITC is completely switched off and disconnected from the generation and consumption lines before replacing the batteries.
The drawing of a crossed out wheeled container on the product or in the documentation or packaging means that the electrical-electronic components and batteries must be disposed of separately at the end of their service life. This requirement is applied in the European Union and in those locations where individual disposal systems are available. Do not dispose of these components in the form of unsorted municipal waste. 22 ZIGOR
Operating Manual
HITC
MONITORISATION
The HITC systems can be monitorised remotely by means of the AppletServer. For the user, this represents a powerful tool for controlling the photovoltaic operation. The SUNZET solar inverters, by ETX console platform, offer a range of TCP/IP services for their interaction: Web service: Port 80 is used as default port. The port 5901 can also use by below. SNMP server: Use the default port, port 161.
The access to these services can be Local or Remote, using any of the physical communication interfaces availables: RS-232 and Ethernet port. Local Access A local access is possible via Ethernet port, using a crossover cable, if it will be directly connected to a PC nodo; or using a normal one, in the case you do the interconnection element as a switch. In the PC nodo must configure its network parameters (IP address and Mask) according with the established parameters by the inverter (read the user manual for consulting or modifying them), taking into account where each nodo must have a unique IP address. Remote Access It is possible the remote access through any of the following two scenarios: 1. Using GSM modem or RTC: In this case, an approved modem will be used connecting to a PS-232 port by a serie cable. In the case of using a GSM modem, it is necessary a SIM card, it is important to note that before connecting, the PIN number or the SIM have to be introduced in the corresponding parameter of the inverter (if you dont do this, you can block the SIM so that you need the PUK code to release the card), or disable the number. The connection has been established from the other modem, establishing a network phone access. When the connection has been establishing, the access will be possible by the IP address of the PPP link (192.168.55.1 by default, see the user manual and the annexes) 2. Through another nodo of the network that it is as a platform or gateway (Router, etc.) The form of access depends on the funcitionalities of the platform. In any case, the communication will be possible by Ethernet port in the same way as the local connection. In the most cases, it will be necessary to configurate the platform and redirect the before TCP/IP ports. The value of the Gateway parameter of the inverter has been established with the IP address of the platform because this is the communication element with the outside. To use this tool, the SUNZET TP T inverters must be connected to Internet and must have a valid IP address. The control station must be provided with a computer connected to the Internet and an Internet Browser with Java runtime installed correctly. If, after being connected to the system, there is no activity for more than five minutes, communications will be lost and these will have to be re-established if you want to take any other action. Description of the different Applet screens:
ZIGOR
Operating Manual
HITC
And the "Exit" button, which, as its name suggests, is used for leaving the application.
24
ZIGOR
Operating Manual
HITC
Fig. 6-2 Synoptic-Start Screen (1) Indicator of the status of remote communications with the HITC: o o (2) o o (3) o o Green, blinking, communications OK. Red, communications failure. Green, there are no active events Red, there are active events. Work, the configuration presented on the screen is the same as the one used in the HITC system. Temporary, the configuration presented on screen has been modified and has not yet been stored in the HITC system. If more than five minutes elapsed from the time the modification has been made and the modification has not been stored in the HITC system, this will return automatically to the last Work configuration.
(4)
This screen has three buttons that provide you with access to the registered data: Downloads. This button allows you to access direct downloads of CSV format files with production data and energy flows. Erase. This button allows you to erase all stored data. For greater safety, it asks for confirmation. Graphics. This button allows you to visualise graphics of data existing in the aforementioned files.
In order to access downloads, a screen of this type appears for downloading files in CVS format.
ZIGOR
25
Operating Manual
HITC
Fig. 6-3 File Download Screen The graphics of stored historical data are of the following type:
Operating Manual
HITC
Operating Manual
HITC
28
ZIGOR
Operating Manual
HITC
Sections accessible:
Operating Manual
HITC
The colour of the "bell" of each event has the following meaning: Red, the event is active and not recognised. Amber, the event is active and recognised. Green, the event has been deactivated
30
ZIGOR
Operating Manual
HITC
ZIGOR
31
Operating Manual
HITC
OPTIONS
For the HITC family of inverters-chargers, ZIGOR has developed a series of options to optimise the functionalities of the system, facilitating power control and for supervising operation.
32
ZIGOR
Operating Manual
HITC
ZIGOR
33
Operating Manual
HITC
Fig. 11-4 GSM MODEM Remember that the GSM MODEM requires an active SIM card in order to be able to use this for managing the unit. This SIM card is not provided by ZIGOR; the customer must provide his own. Before inserting the SIM card, the PIN for each card must be configured. By default, the PIN configured for the system is 0000. If this is not configured before inserting it in the MODEM, the card may be blocked. In order to be able to connect to the HITC system remotely, a PPP connection will be established by means of a telephone connection to networks.
34
ZIGOR
Operating Manual Technical specifications: General parameters Nominal supply voltage Maximum consumption Dimensions Temperature range Protection level Weight Communications with HITC Calibrated cell Type of sensor 2 calibrated cells Measurement range 0 ~ 1200W/m2 Intrinsic measurement error 0,2% Measurement error against master 2% Temperature measurements Type of sensor PT100 Temperature measurement range From -20C to +100C Maximum error 0.8C Anemometer Operating voltages 12 ~ 230VAC/VDC Maximum admissible current 500mA Maximum switched power 10W Maximum efficiency 200Hz Protection level IP-65 Estimated service life 20 years Start-up speed 4 km/h Maximum admissible speed 150 km/h Dimensions 150x150x200mm The data that can be monitorised are as follows: Irradiance, by Ambient temperature, by means of a PT-100 temperature probe. 6 ~ 28 Vdc 90mW 266x266x35mm From -20C to +50C IP-54 1.2 Kg RS-485
HITC
Panel temperature, based on the assumption that all the FV field panels will have a similar temperature. The irradiance cell temperature is measured by means of a PT-100 probe. Wind speed. This measurement is an option within the SUNZET MET. The measurement is made by means of an anemometer.
ZIGOR
35
Operating Manual
HITC
36
ZIGOR
Operating Manual
HITC
ZIGOR
37
Operating Manual
HITC
38
ZIGOR
Operating Manual
HITC
ZIGOR
39
Operating Manual
HITC
12 TECHNICAL SPECIFICATIONS
General parameters Nominal power Overload power Overload capacity Nominal output voltage Operating frequency Number of phases Maximum income per phase Total current harmonic distortion (THD) AC over voltage protection Short circuit protection HITC 30 AC output 30kW (30kVA) HITC 50 HITC 100
50kW (50kVA) 100kW (100kVA) 110% continuous 150% / 1 second 380-400VAC (*) / 208-220-240VAC (**) 10% 50 / 60Hz 1Hz 3 phases + neutral 46A (*) / 83A (**) 76A (*) / 139A (**) 152A (*) / 278A (**) <3% at Nom. Pow. (2,5%) Yes Yes
FV field power (maximum generation) Maximum input current Number of inputs MPPT Range Maximum voltage in open DC circuit DC over voltage protection Inverse connection protection MPP Efficiency
>105kWp 250A
Minimum power Nominal input voltage Operating frequency Number of phases Maximum income per phase Unit Start-up Control Short circuit protection
Unit / Grid Input 50Kw 70Kw 140Kw 380-400VAC (*) / 208-220-240VAC (**) 5% 50 / 60Hz 5Hz 3 phases 76A (*) / 139A (**) 106A (*) / 194A (**) 213A (*) / 389A (**) Potential free contact (230Vac/4A max.) Yes
Battery Nominal Voltage Voltage range Maximum load current Maximum discharge current Minimum battery capacity Maximum recommended battery capacity Nominal number of cells Pb) Short circuit protection Inverse connection protection Over-discharge protection Load management 350VDC 300 / 420VDC 50A 167A 50Ah 500Ah 172 elements Yes Yes Yes Yes
40
ZIGOR
Operating Manual General parameters Efficiency Internal consumption in operation Operating altitude Ambient operating temperature Relative humidity Dimensions Approximate weight Cabinet protection level Refrigeration External fan control AC and DC isolating switches
HITC HITC 30 HITC 50 HITC 100 General Details >96% including transformer From renewable resource. <1% of nominal power <1,000m without power loss 0C ~ +50C (2) 0 ~ 95% without condensatiWill on 1950x1200x600 1950x1200x600 2150x1600x600 800Kg 850Kg 1320Kg IP21 Forced ventilation Potential free contact (230VAC/4A max.) Built into the system Built into the system Galvanic isolation between: FV Consumers Battery Consumers Unit input Consumers 2 line display Keyboard 3 signalling LEDs Yes Yes Ethernet Web Server SNMP GSM Modem (optional)
Isolation transformer
(1) (2)
This voltage value must not be exceeded under any circumstances. Under 40C the system operates with nominal values, up to 50C the system carries out power derating.
Note: The technical specifications may be modified without warning For any other technical requirement or modification of existing characteristics please consult ZIGOR.
ZIGOR
41
Operating Manual
HITC
13 STANDARDS
The HITC in this manual comply with the directives indicated below: 2006/95/CE Low Voltage Directive and subsequent modifications. o EN 50178 (1998) 2004/108/CE Low Voltage Directive and subsequent modifications. o UNE-EN 61000-6-2 (2006). Electromagnetic compatibility: Immunity standard. o UNE-EN 61000-6-4 (2007). Electromagnetic compatibility: Emissions standard. o EN 61000-2-2 (2002). Electromagnetic compatibility: Compatibility levels for low-frequency conducted disturbances and signalling in public low-voltage power supply systems o EN 61000-3-12 (2005). Electromagnetic compatibility: Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current > 16A and 75A per phase.
The Spanish Standardisation and Certification Association (AENOR) certifies that the Quality Assurance and Environmental Management Systems adopted by ZIGOR Corporacin, S.A. for the design, development, production and after sales service for electronic equipment for the conversion of direct and alternating current as well as electronic projections, communications systems, telemanagement applications and electrical and electronic turnkey projects, is an agreement with the requirements of the Spanish Standards UNE-EN ISO 9001:2008 and UNE-EN ISO 14001:2004 respectively. 42 ZIGOR
01773400MAOP
www.zigor.com
Consulte nuestra web para contactar con la red de delegaciones comerciales Refer to our website in order to contact the comercial branches network Veuillez consulter notre page web pour contacter nos dlgations commerciales Consulte a nossa web para contatar com a rede de degaoes comerciais