Você está na página 1de 94

International Management & Construction Consultants

BOQ

For

AFRED

Cairo Festival City


Kidzania

05 June 2011

KIDZANIA AFRED - Cairo Festival City


PROJECT: Cairo Festival City Scheme: Retail Boxes Sheet: Kidzania Section A B B/9 B/11 B/12 B/19 B/20 B/22 C C/2 C/3 C/4 D D/2 E E/1 E/2 E/3 G G/2 G/3 G/4 H H/1 H/2 H/4 J J/2 J/3 J/5 N N/3 P P/1 Q Q/2 Q/3 Q/4 Q/5 Q/6 Q/7 Q/9 R R/2 R/3 R/4 R/5 R/6 R/7 Description Preliminaries Site Work Excavation Disposal Filling Underground Drainage Paving and Surfacing Landscaping Concrete Work Poured Concrete Reinforcement Shuttering Masonry Walls and piers Metal Work General Metal Work General Structural Metalwork Non-Structural Metalwork Thermal and Moisture Protection Coverings and linings Damp-proof courses Insulation Doors and Windows Doors Windows Ironmongery Finishes Backgrounds Finishings Suspended Ceiling Special Construction Installations Conveying Systems Generally Mechanical Engineering Installations Pipework and Gutter Work Duct Work Equipment Automatic Controls Connections to supply mains Insulation Work incidental to mechanical engineering installations Electrical Engineering Installations Main Circuits Sub-main circuits Final sub-circuits and auxiliary installations Accessories Control Gear Equipment Sub Total Add Social Insurance 2.50% Add Construction sales tax 2.90% Sub Total Before Contingency Add Contingency 10% Grand Total GEFA Areas/m Total 0 0 0 0 0 0 0 0 0 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0 0 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! Issue Date: 27-Apr-2011 Update: 5-Jun-2011 Rev 1.0 Cost /m % of Cost #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF!

#REF! #REF!

FESTIVAL LIVING AFRED - Cairo Festival City

Section A

General Requirements

EGP

A/0

Preamble

A/1

Conditions of Contract

A/2

Specification

A/3

Restrictions

A/4

Contractor's Administrative Arrangements

A/5

Construction Plant

A/6

Employer's Facilities

A/7

Contractor's Facilities

A/8

Temporary Works

A/9

Sundry Items

Sub Total Add Construction sales tax Grand Total 2.90%

0 0 0

0 - Summary Of Prelims

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A0 - PREAMBLE Generally; This bill is to be read in conjunction with all other tender/contract documents; General notes A Compliance with all the Tender Requirements and Tender Instructions B The Technical Specifications describe the Works which cannot be readily indicated on the Drawings, and it is not intended to mention every item of the work in the Technical Specification which can be adequately shown on the Drawings. C The Bills of Quantities herein form an integral part of the Contract Documents. The items listed are intended to describe the entire Works. The Contractor is required to familiarise himself of the full content of the Contract Documents, including the Form of Agreement, Bonds, Guarantees, Specifications, Drawings, Programme, General Conditions, Particular Conditions, General Requirements, etc. in order to allow for the type, quality and standards required to complete the Works. D The following notation is used in the General Requirements: F = Fixed Cost T= Time=Related Cost E Time related periods, in weeks( wks), are to be completed by the contractor F 1 item incl F 1 item incl F 1 item incl F 1 item incl F 1 item incl Unit Rate EGP

Carried to Collection

A0 - Preamble

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A The Works have been measured and quantified generally in accordance with The Principles of Measurement (International) of Works of Construction, June 1979, ("POMI"). B Unless otherwise stated, all works have been measured net and fitted and/or fixed in place. C The following are applicable to all kinds of work in the Contract and are deemed to be included in the Contractor's rates and prices - Materials, equipment, labour, handling, attendance, storage, protection and making good; - transport, hoisting, lifting; - Work in any classification, in any location, width or area and at any depth of height; - scaffolding and tools; - assembling and jointing together; - fixing in place and adjustment, including supports and all accessories; - temporary works; - forming to shape; - coordination with different trades; - cleaning down and preparing surfaces; - multiple handling; - samples; - shopdrawings and as-built drawings; - wastage and cutting; - protection; - work in small and/or isolated quantities; - sealants and making good; - raking, sloping, uneven surfaces; - overhead and profit - testing and commissioning F 1 item incl F 1 item incl F 1 item incl Unit Rate EGP

Carried to Collection

A0 - Preamble

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Unit Rate EGP A Page 1 B Page 2 -

Carried to Summary

A0 - Preamble

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A1 - CONDITIONS OF CONTRACT Generally; This bill is to be read in conjunction with all other tender/contract documents; Conditions of contract; compliance with the conditions of contract included within the tender and / or contract documents A The Form of Agreement B The Schedules C The Conditions of Contract - General Conditions D The Conditions of Contract - Particular Conditions E The Conditions of Contact - Appendices F Performance Bond G Bank Guarantee H Project Insurances F F F F F 1 1 1 1 1 item item item item item incl incl N/A F 1 item incl F F 1 1 item item incl incl Unit Rate EGP

Carried to Collection

A1 - Conditions of Contract

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A Page 1 Unit Rate EGP -

Carried to Summary

A1 - Conditions of Contract

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A2 - SPECIFICATION Generally; This bill is to be read in conjunction with all other tender/contract documents; Specifications and employer's requirements; the contractor is deemed to have taken account of all specification documents, both text and drawn, as well as the employer's requirements included within the tender / contract documents; the contractor must check and report any errors, omissions or conflicts A Generally, compliance with the specifications and employer's requirements Independent Bill List here the particulars, if applicable and / or necessary, of any measures taken to comply with the specifications and / or employer's requirements B List of particulars: PPE & HSE materials Induction & security passes Safety Harnessess F F F 200 1 30 nr item nr F 1 item Unit Rate EGP

Carried to Collection

A2 - Specification

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A Page 1 Unit Rate EGP -

Carried to Summary

A2 - Specification

10

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A3 - RESTRICTIONS Generally; This bill is to be read in conjunction with all other tender/contract documents; The contractor must: have visited site and taken account of all existing features of the site, its surrounding areas and access/egress to and from the site and is to make all provisions necessary for carrying out the works, including all temporary works and facilities; Restrictions; at the discretion of the contractor having visited site, reviewed all tender / contract documents and having requested and reviewed all other documents pertaining to the works; make appropriate allowance, where applicable and / or necessary for the following; A Access to and possession of the site Borehole tests - building plot Borehole tests - carpark Borehole tests - outbuilding Site level survey & transfer coordinates B Limitation of working space C Limitations of working hours D Maintenance of existing services on, under or over the site E The execution or completion of the work in any specific order F 1 item N/A F F F F F F F F 1 1 1 1 1 1 1 1 item item item item item item item item incl incl incl Unit Rate EGP

Carried to Collection

A3 - Restrictions

11

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A Existing features, adjoining site and / or adjoining works B Items of a like nature C Permits and licences F F F 1 1 1 item item item incl incl incl Unit Rate EGP

Carried to Collection A Page 1 -

A3 - Restrictions

12

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Unit Rate EGP

B Page 2

Carried to Summary

A3 - Restrictions

13

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A4 - CONTRACTOR'S ADMINISTRATIVE ARRANGEMENTS Generally; This bill is to be read in conjunction with all other tender/contract documents; The contractor shall provide a detailed organisation chart showing names / roles, rates and period of deployments for all supervision and administrative staff summarised as follows: A Site project management B Site / trade supervision C Health and safety D Quality management E Commercial and procurement F Office administration G Site and office security H Site, welfare and office attendant labour I Transport and banksmen J Shop drawings / design K Surveys and reports T T T T T T T T T T T 58 58 58 58 58 58 58 58 58 58 58 wks wks wks wks wks wks wks wks wks wks wks Unit Rate EGP

Carried to Collection

A4 - Administrative Arrangement

14

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Office and administration facilities; at the contractor's discretion provide all equipment, hardware, software, consumables and office facilities to perform the administration, management supervision and security of the site A Establish administration facilities B Maintain and provide facilities C Hand-over to the employer or remove as directed administration facilities List here all facilities, supplies and equipment provided by the contractor: D Contractor to list here: F 1 item F T 1 43 item wks Unit Rate EGP

Carried to Collection A Page 1

A4 - Administrative Arrangement

15

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Unit Rate EGP

B Page 2

Carried to Summary

A4 - Administrative Arrangement

16

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A5 - CONSTRUCTION PLANT Generally; This bill is to be read in conjunction with all other tender/contract documents; Provide all common-user and shared plant and equipment; include all plant not in rates elsewhere; plant provided at the discretion of the contractor as appropriate for the nature of the site and works and as required by the contractor to comply with the programme, sequence and operation of the works A Provide small plant and tools B Erect scaffold C Maintain, adapt and modify scaffold D Remove scaffold E Erect tower cranes F Maintain and operate tower cranes G Remove tower cranes H Mobile cranes I Hoists and lifting equipment J Site transportation T F T F F T F T T T 1 13 31 58 58 1 58 1 1 wks item wks item item wks item wks wks wks Unit Rate EGP

Carried to Collection

A5 - Construction Plant

17

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Plant required for specific trades and / or site operations A Generally; contractor to list here Roller 5 ton Mini-Loader Plate Compactor (3) Bar bending machine 36 mm Cutting machine 36 mm Chop saw Bench saw Total Station 180 CFM Compressor c/w tools Pokers engines (3) Pokers (6) Diesel for plant Water bowser T T T T T T T T T T T T T T 18 18 18 18 18 11 15 39 37 26 26 47 37 wks wks wks wks wks wks wks wks wks wks wks wks wks wks Unit Rate EGP

Carried to Collection A Page 1 A5 - Construction Plant

18

FESTIVAL LIVING AFRED - Cairo Festival City


Qty B Page 2 Unit Rate EGP -

Carried to Summary

A5 - Construction Plant

19

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A6 - EMPLOYER'S FACILITIES Generally; This bill is to be read in conjunction with all other tender/contract documents; Provide all employer's, engineers, supervisors and / or consultant facilities and accommodation as directed by the tender / contract documents or by the employer's requirements; pay all bills Temporary site accommodation; as directed A Establish temporary accommodation B Maintain temporary accommodation C Remove temporary accommodation List here the nature, number and size of temporary accommodation D Contractor to list here: N/A F T F 1 1 item wks item N/A N/A N/A Unit Rate EGP

Carried to Collection

A6 - Employer's Facilities

20

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Temporary facilities for the employer. engineer, supervisor and / or consultants as directed A Establish temporary facilities B Maintain temporary facilities C Hand to employer temporary facilities List here the nature, number and size of temporary accommodation D Contractor to list here: N/A F T F 1 1 item wks item N/A N/A N/A Unit Rate EGP

Carried to Collection A Page 1 A6 - Employer's Facilities


21

FESTIVAL LIVING AFRED - Cairo Festival City


Qty B Page 2 Unit Rate EGP

Carried to Summary

A6 - Employer's Facilities

22

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A7 - CONTRACTOR'S FACILITIES Generally; This bill is to be read in conjunction with all other tender/contract documents; At the discretion of the contractor provide temporary works and facilities where applicable and/or required by the nature of the site, the works, the specification the employer's requirements or by statutory or other requirements; the contractor must allow for the establishment, maintenance, removal of any temporary works or facilities as well as the reinstatement of any features or other works, buildings or installations affected by any temporary works or facilities as appropriate; pay all bills Temporary site accommodation; including buildings for offices, laboratories compounds, stores, mess rooms and / or living accommodation; A Establish temporary accommodation B Maintain temporary accommodation C Remove temporary accommodation List here the nature, number and size of temporary accommodation D Contractor to list here: F T F 1 45 1 item wks item Unit Rate EGP

Carried to Collection

A7 - Contractor's Facilities

23

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Temporary fencing; including hoardings, screens, roofs and guardrails; unless otherwise directed by the tender / contract documents provide temporary fencing appropriate for the nature of the site and works A Erect site perimeter fencing / gates B Maintain site perimeter fencing / gates C Remove site perimeter fencing / gates D Erect hoarding for the works E Maintain hoarding for the works F Remove hoarding for the works G Erect temporary screens for the works H Maintain temporary screens for the works I Remove temporary screens for the works J Erect temporary roofs or coverings K Maintain temporary roofs or coverings L Remove temporary roofs or coverings M Erect guardrails / edge protection N Maintain / modify guardrails / edge protection O Remove guardrails / edge protection F F F F T F F T F F T F F T F 1 1 1 1 1 1 1 1 1 1 1 item item item item wks item item wks item item wks item item wks item Unit Rate EGP

Carried to Collection Temporary roads;

A7 - Contractor's Facilities

24

FESTIVAL LIVING AFRED - Cairo Festival City


Qty including roads, pavements, hardstandings and crossings; unless otherwise directed by the tender / contract documents provide temporary roads appropriate for the nature of the site and works A Establish temporary roads / pavements B Maintain temporary roads / pavements C Remove temporary roads / pavements D Establish temporary hardstandings E Maintain temporary hardstandings F Remove temporary hardstandings G Establish secure crossings H Maintain secure crossings I Remove temporary crossings F F F F T F F T F 1 1 1 1 1 1 1 item item item item wks item item wks item incl incl incl Unit Rate EGP

Carried to Collection Water for the works; supplied by the contractor;

A7 - Contractor's Facilities

25

FESTIVAL LIVING AFRED - Cairo Festival City


Qty including all arrangements, meters, supply networks and distribution; including all waste water provision A Establish temporary water facilities B Maintain and pay all water costs C Remove temporary water facilities Lighting and power for the works; supplied by the contractor; including all arrangements, meters, supply networks and distribution; D Establish temporary lights and power E Maintain, adapt and pay all power costs F Remove temporary lights and power Temporary telephones and communications; supplied by the contractor; including all arrangements, meters, supply networks and distribution; G Establish site communications networks H Maintain, adapt and pay all costs I Remove site communications networks Site signage; General, directional and site signage J Site sign as directed by the employer K Safety and site signage L Remove all signage F F F 1 1 1 item item item Carried to Collection A Page 1 B Page 2 F T F 1 40 1 item wks item F T F 1 58 1 item wks item F T F 1 58 1 item wks item incl Unit Rate EGP

A7 - Contractor's Facilities

26

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Unit Rate EGP

C Page 3 D Page 4

Carried to Summary

A7 - Contractor's Facilities

27

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A8 - TEMPORARY WORKS Generally; This bill is to be read in conjunction with all other tender/contract documents; At the discretion of the contractor provide temporary works and facilities where applicable and/or required by the nature of the site, the works, the specification the employer's requirements or by statutory or other requirements; the contractor must allow for the establishment, maintenance, removal of any temporary works or facilities as well as the reinstatement of any features or other works, buildings or installations affected by any temporary works or facilities as appropriate A Traffic diversion B Maintenance / operation of traffic diversions C Access roads D Maintenance of access roads E Piling mats F Maintenance of piling mats G Bridges H Maintenance of bridges F T F T F T F T 1 1 1 1 item wks item wks item wks item wks N/A N/A incl incl N/A N/A N/A N/A Unit Rate EGP

Carried to Collection

A8 - Temporary Works

28

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Temporary works and /or facilities continued A Cofferdams B Maintenance of cofferdams C Pumping D Maintenance of pumping E Dewatering installations F Maintenance of dewatering installations G Compressed air for tunnelling H Maintenance of compressed air F T F T F T F T 1 1 1 1 item wks item wks item wks item wks N/A N/A N/A N/A N/A N/A N/A N/A Unit Rate EGP

Carried to Collection Temporary works generally;

A8 - Temporary Works

29

FESTIVAL LIVING AFRED - Cairo Festival City


Qty the contractor shall list here all other temporary works required to carry out the works and to comply with the tender and/or contract requirements A Contractor to list here: N/A Unit Rate EGP

Carried to Collection A Page 1

A8 - Temporary Works

30

FESTIVAL LIVING AFRED - Cairo Festival City


Qty B Page 2 C Page 3 Unit Rate EGP

Carried to Summary

A8 - Temporary Works

31

FESTIVAL LIVING AFRED - Cairo Festival City


Qty A9 - SUNDRIES Generally; This bill is to be read in conjunction with all other tender/contract documents In compliance with all specification and other construction and/or statutory requirements the contractor is required to make all due allowance for the following Testing of materials; either on site or off site in specialist facilities, as required and producing all testing certificates and documentation A Soil tests B Concrete tests C Reinforcement steel tests D Blockwork tests E Glazing tests F Electrical tests G Mechanical tests H Public health / plumbing tests I Other tests required by the contractor or specification; contractor to list here: F F F F F F F F 1 1 1 1 1 1 1 1 item item item item item item item item incl incl incl incl incl incl incl incl Unit Rate EGP

item

incl

Carried to Collection

A9 - Sundries

32

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Testing of the works A Generally, test the works as required by the specification All Testing Protecting the works from inclement weather B Generally, external protection to the works as required by the specification Protection Material Removal of building and general debris and rubbish off site or as directed by the specification; maintaining the works in good and clean order C Generally, rubbish removal D Maintain the site and works 10 General Laborers E Final clean of the works 15 Cleaners Traffic regulations F Establish and maintain traffic, materials and pedestrian management systems Public and private highways G Maintain all public and private highways and roads affected by the works Drying the works H Generally, maintain the works T wks incl F 1 item N/A T wks N/A T 4 wks F T 1 32 item wks incl F 1 item F 1 item Unit Rate EGP

Carried to Collection Control of noise and pollution

A9 - Sundries

33

FESTIVAL LIVING AFRED - Cairo Festival City


Qty Unit Rate EGP

A Generally, maintain the works All statutory obligations B Generally, comply with all prevailing statutory obligations

item

incl

item

incl

Carried to Collection Overhead and profit allowances; the contractor shall note here, as rates

A9 - Sundries

34

FESTIVAL LIVING AFRED - Cairo Festival City


Qty only, the following allowances included within the contractor's price A Head office overhead contribution B Profit margin % % Unit Rate EGP

Sundries generally; the contractor shall list here all other sundry items required to carry out the works

A9 - Sundries

35

FESTIVAL LIVING AFRED - Cairo Festival City


Qty and to comply with the tender and/or contract requirements Unit Rate EGP

Carried to Collection A Page 1 B Page 2 -

A9 - Sundries

36

FESTIVAL LIVING AFRED - Cairo Festival City


Qty C Page 3 D Page 4 E Page 5 Unit Rate EGP rates only -

Carried to Summary

A9 - Sundries

37

KIDZANIA AFRED - Cairo Festival City

Item B9 - EXCAVATION Generally; This bill is to be read in conjunction with all other tender/contract documents; Excavation; including supporting sides of excavation. No classification according to kinds of excavation and type of soil the work shall be from the actual surface of existing soil to the required excavation levels shown on drawings and according to geotechnical report. Main Building A Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads B Excavate for soil replacement Utilities Building C Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads External Works D Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads Water Tank J Excavation in ordinary soil and transporting the surplus materials to the public dumping areas

Gleeds

Unit

Rate

Total (EGP)

26,676 5,227

m m

163

1,300

1,963

Carried to Collection

B-Site Work

38

KIDZANIA AFRED - Cairo Festival City

Item B11 - DISPOSAL Generally; This bill is to be read in conjunction with all other tender/contract documents; Disposal of material arising from excavation on site and offsite. Main Building A Disposal on site, backfilled into excavation Utilities Building B Disposal off site External Works C Disposal on site, backfilled into excavation Water Tank D Disposal off site

Gleeds

Unit

Rate

Total (EGP)

5,227

163

1,300

1,963

Carried to Collection

B-Site Work

39

KIDZANIA AFRED - Cairo Festival City

Item B12 - Filling Generally; This bill is to be read in conjunction with all other tender/contract documents;

Gleeds

Unit

Rate

Total (EGP)

Main Building A Soil replacement with sand B Soil replacement with sand and aggregate mix C Backfilling with compacted clean sand Utilities Building D Backfilling with compacted clean sand External Works F Filling with suitable materials from Excavation after approval of the engineering on the site for the subgrade level of roads 86 m 2,015 3,213 3,105 m m m -

4,200

Carried to Collection

B-Site Work

40

KIDZANIA AFRED - Cairo Festival City

Item B19 - UNDERGROUND DRAINAGE Generally; This bill is to be read in conjunction with all other tender/contract documents; Main Building Drainage System Underground UPVC pipes and Fittings A 160 mm B 110 mm C 75 mm D 50 mm Concrete beds and coverings for pipes including formwork E 160 mm F 110 mm G 75 mm H 50 mm Drain accessories including concrete surrounds and additional excavation I Gully Trap (GT) J Grease Interceptor (GI) Inspection chambers K Inspection chamber (IC)(60cm*60cm) L Inspection chamber (IC)(60cm*90cm) External Works Drainage System Underground UPVC pipes and Fittings M 160 mm ( UPVC ) (10bar) N 110 mm ( UPVC ) (10bar) P 75 mm ( UPVC ) (10bar) Q 63 mm ( UPVC ) (10bar)

Gleeds

Unit

Rate

Total (EGP)

96 276 33 10

m m m m

96 276 33 10

m m m m

6 1

nr nr

10 1

nr nr

24 834 18 54

m m m m

Carried forward

B-Site Work

41

KIDZANIA AFRED - Cairo Festival City

Item

Gleeds

Unit

Rate

Total (EGP) -

Brought forward A 50 mm (UPVC ) (10bar) B 40 mm ( UPVC ) (10bar) C 32 mm ( UPVC ) (10bar) Concrete beds and coverings for pipes including formwork 160 mm ( UPVC ) (10bar) 110 mm ( UPVC ) (10bar) 75 mm ( UPVC ) (10bar) 63 mm ( UPVC ) (10bar) 50 mm (UPVC ) (10bar) 40 mm ( UPVC ) (10bar) 32 mm ( UPVC ) (10bar) Combined sewage and storm water network Gravity Pipes, depth up to 3500 mm ,Are classified according to material and diameter to the depth indicated on Drawings. Rates shall include supply of pipes, jointing materials, excavation of pipe trenches to the grade shown on Drawings, dewatering, shoring grading and leveling of excavation bottom, furnishing, placing and compacting bedding material , lowering pipes into trench, placing concrete supports, pipe surrounding, pipe crossing protection, road crossing protection, laying out, aligning, jointing pipes, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface 372 72 3,162 m m m

D E F G H I J

24 834 18 54 372 72 3,162

m m m m m m m

K UPVC spigot and socket 200 mm Dia PN 6 L UPVC spigot and socket 250 mm Dia PN 6 M UPVC spigot and socket 250 mm Dia PN 6 with depth up to 3500 mm ,Are classified according to material and diameter to the depth indicated on Drawings. Rates shall include supply of pipes, jointing materials, excavation of pipe trenches to the grade shown on Drawings, dewatering, shoring grading and leveling of excavation bottom, furnishing, placing and compacting bedding material , lowering pipes into trench, placing concrete supports, pipe surrounding, pipe crossing protection, road crossing protection, laying out, aligning, jointing pipes, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface N Hose connection / inspection chamber

348 190

m m

26 12

m nr

Carried forward

B-Site Work

42

KIDZANIA AFRED - Cairo Festival City

Item

Gleeds

Unit

Rate

Total (EGP) -

Brought forward Tie in pipes - Catch Basin pipes A uPVC 160 mm connecting building's tie in, Catch basin pipes with combined sewage and storm network with maximum length 25 m nr Manhole construction Manhole measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar, blinding concrete, supporting concrete, inside concrete benching, 1 heavy duty frame and cover class D 400, internal and external coating, ramp backdrop including all required fittings and concrete surroundings, typical vertical backdrop including all required fittings and concrete surrounding, concrete backfill, concrete cradle, rocker pipe, cast iron step iron and all required materials and fittings for complete construction of the manhole B Manhole with internal diameter 1000 mm and outer diameter 1500 mm, base thickness 350 mm and depth up to 2500 mm

20

nr

C Manhole with internal diameter 1200 mm and outer diameter 1700 mm, base thickness 350 mm and depth up to 3500 mm

nr

Catch basin Plain concrete measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, Cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar Blinding concrete, Supporting concrete, 1 medium duty grating frame and cover class C 250, internal and external coating, concrete backfill, concrete cradle, rocker pipe, supply and install cast iron trap and all required materials and fittings for complete construction of catch basin and installation for all accessories inside the catch basin D Plain concrete catch basin with internal dimension 600 mm and outer dimension,1100 mm with depth up to 1000 mm 12 nr -

Carried forward

B-Site Work

43

KIDZANIA AFRED - Cairo Festival City

Item

Gleeds

Unit

Rate

Total (EGP) -

Brought forward A Plain concrete double catch basin with internal dimension 1000 mm x 1200 mm and outer dimension 1500 mm x 1700 mm with depth up to 1000 mm, are measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar Blinding concrete, Supporting concrete, 2 medium duty grating frame and cover class C 250, internal and external coating, concrete backfill, concrete cradle, rocker pipe, supply and install cast iron trap and all required materials and fittings for complete construction of double catch basin and installation for all accessories inside the chamber Gully Gutter Drainage Channel R.C concrete drainage channel, with internal width (200 mm) and internal depth up to 500mm, are measured by meter length, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in place reinforced concrete walls and base covered with RC B slab rested on 50 mm cement mortar, cast - in place blinding concrete, 1 heavy duty linear grating frame and cover class D 400, internal and external coating,. rate shall include laying out, aligning, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface and all required material and fittings for complete installation Water Tank Drainage System Underground UPVC pipes and Fittings C 110mm Upvc pipes and fittings High pressure D 75mm

nr

7 5

m m

E F G H I

Drain accessories including concrete surrounds and additional excavation Trench grate 300 mm width (TG1) Retarding Chamber, RCH Trench Drain, 110 mm (TD1) Floor Cleanout, 110 mm (FCO) Sump Pump SP1 (A&B), P5 (A&B)

15 1 2 1 1

m nr nr nr nr

Carried to Collection

B-Site Work

44

KIDZANIA AFRED - Cairo Festival City

Item B20 - PAVING AND SURFACING Generally; This bill is to be read in conjunction with all other tender/contract documents; External Works A Furnishing and constructing graded crushed aggregate base course of 25cm thickness after compaction. B Prime coat to the base course surface at a rate of 1.5 kg./m2 of liquid asphalt grade MC-30 C Apply and spread of asphalt base course layer with thickness of 5 cm after compaction D Furnishing and applying a tack coat to the top of the binder course at a rate of 0.50 kg./m2 of liquid asphalt grade RC3000 E Apply and spread of asphalt wearing course layer with thickness of 5 cm after compaction F Rigid pavement using reinforcement concrete tiles with dimension (4m*4m) and 25cm Thickness including the expansion joints & damp-proof I Supply and install precast concrete curbs for roads with dimensions of (50*30*15-12.5) J Road markings using thermoplastic reflective paints for lane.

Gleeds

Unit

Rate

Total (EGP)

16,850

14,800

14,800

14,800

14,800

2,550

K Lane Marking, Center Line Marking, Pedestrian Crossing, Stop Lines & Stop Marking L Traffic Direction Arrows M Traffic signs with different types (Mandatory, Prohibitory, Warning and Guide signs) according to the details shown on the drawings. The item include sign aluminum face, sign poles, fixing and supporting features. The contractor has to submit sample for engineer approval. N Rubber setting O Interlocking Concrete Pavers : Light Gray (100x100x80mm ) P Interlock Concrete Pavers : Dark Red (100 x 100 x 60 mm ) Q Interlock Concrete Pavers : Light Gray (100 x 100 x 60 mm)

460 44

m m

10 620 245 1000 1550

nr m m m m Carried forward -

B-Site Work

45

KIDZANIA AFRED - Cairo Festival City

Item

Gleeds

Unit

Rate

Total (EGP) -

Brought forward A Interlock Concrete Pavers : light white (1000x250x150/125mm) B Loose gravel 50-80 mm mulch C Cast in situ concrete curbs (1000x250x150/125mm) D Basalt Cobble Pavers: Light Gray ( 100 X 100 X 80 mm )

1100 440 1592 20 425

m m m m m

E Natural Stone Straight Cut (600 X 600 X 40 mm )

Carried to Collection

B-Site Work

46

KIDZANIA AFRED - Cairo Festival City

Item B22 - LANDSCAPING Generally; This bill is to be read in conjunction with all other tender/contract documents; External Works Palms A Washingtonia robusta / Mexican Fan Palm 3-4 m high Trees B Jacaranda mimosifolia / Jacaranda C Albizia Lebeek Shrubs D Bougainvillea glabra / Paper Flower, 2 Nr in planter size (1000 mm width X 600 mm depth) E Hibiscus rosa-sinensis / Chinese Hibiscus, 3 Nr in planter size (1000 mm width X 600 mm depth) F Tecomaria capensis / Cape Honeysuckle,5 Nr in planter size (1000 mm width X 600 mm depth) Ground cover G Carissa grandiflora / Natal Plum H Dimorphotheca aurantiaca / African Daisy I Wedelia trilobata / Wedelia Grass J Paspalum sod / Bahia Grass

Gleeds

Unit

Rate

Total (EGP)

nr

31 56

nr nr

22

nr

16

nr

199

nr

290 305 71

m m m

3,600

Carried to Collection

B-Site Work

47

KIDZANIA AFRED - Cairo Festival City


Item C2 - POURED CONCRETE Generally; This bill is to be read in conjunction with all other tender/contract documents; Supply, placing, finishing curing and testing of plain concrete, Grade C, minimum cement content 250 kg/cm3, average compressive strength 200 kg/cm2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification Main Building A Plain concrete for isolated footing Plain concrete for isolated footings 500 mm thick, Grade C with average concrete cube strength 200 kg/cm 2, footing dimensions as shown on drawing CFC/ECG/CR007/SB/DRG/000802 B Plain concrete under retaining wall Plain concrete for retaining wall footing 500 mm thick, Grade C with average concrete cube strength 200 kg/cm 2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802 181 C Plain concrete under tie beams Plain concrete under tie beams 100 mm thick, Grade C with minimum concrete cube strength 200 kg/cm 2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000002 D Plain concrete under slab on grade Plain concrete for tie beams 50 mm thick, Grade C with minimum concrete cube strength 200 kg/cm 2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000002 285 Utilities Building E Plain concrete for isolated footing Plain concrete for isolated footings 300 mm thick, Grade C with average concrete cube strength 200 kg/cm2 as shown on drawing CFC/ECG/CR007/SB/DRG/000805 F Plain concrete under slab on grade Plain concrete for tie beams 100 mm thick, Grade C with minimum concrete cube strength 200 kg/cm 2 G Plain concrete under tie beams Plain concrete under tie beams 100 mm thick, Grade C with average concrete cube strength 200 kg/cm 2 m m Qty Unit Rate Total (EGP)

971

302

21

24

m Carried forward -

C-Concrete Work

48

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward

External Works A Plain concrete 100 mm thick, Grade C with average concrete cube strength 200 kg/cm2 0 B light weight sloped concrete 100 mm thick, Grade C with average concrete cube strength 200 kg/cm2 C Plain concrete under, Natural stepping stone Water tank D Plain concrete for foundation100 mm thick, Grade C with average concrete cube strength 200 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 m -

16

30

Carried forward

C-Concrete Work

49

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward

Supply, placing, finishing curing and testing of reinforced concrete for substructure and superstructure, Grade A, minimum cement content 350 kg/cm3, average compressive strength 400 kg/cm2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification Main Building Reinforced concrete for isolated footing A Reinforced concrete for isolated footings 500 mm thick, Grade A with average concrete cube strength 400 kg/cm2, footing dimensions as shown on drawing CFC/ECG/CR007/SB/DRG/000802 Reinforced concrete footing for retaining wall B Reinforced concrete footing for retaining wall RW1, 600 mm thick, Grade A with average concrete cube strength 400 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802 Reinforced concrete for tie beams C Reinforced concrete for tie beams, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for slab on grade D Reinforced concrete for slab on grade 150 mm thickness, indoor slab concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing Reinforced concrete for suspended slabs E Reinforced concrete for suspended slab 400 mm thickness, Grade A with average concrete cube strength 400 kg/cm 2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801 Reinforced concrete for flat roofs F Reinforced light weight sloped concrete for flat roof slab 120 mm thickness, density 1200 kg/m3 as shown on Detail 3 drawing CFC/ECG/CR007/SB/DRG/000209 Reinforced concrete for retaining wall H Reinforced concrete for retaining wall RW1 300 mm thick, Grade A with average concrete cube strength 400 kg/cm 2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802 Reinforced concrete for core walls I Reinforced concrete for core walls WR1 250/300 mm thick, Grade A with average concrete cube strength 400 kg/cm 2 as shown on drawing CFC/ECG/CR007/SB/DRG/000801

1,101

280

227

854

2,791

205

280

28

m Carried forward -

C-Concrete Work

50

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward A Reinforced concrete for core walls WR2 200 mm thick, Grade A with average concrete cube strength 400 kg/cm 2 as shown drawing CFC/ECG/CR007/SB/DRG/000801 Reinforced concrete for columns B Reinforced concrete for columns, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for Beams C Reinforced concrete for beams, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for stairs D Reinforced concrete for stairs160 mm thick, Grade A with average concrete cube strength 400 kg/cm 2 Utilities Building Reinforced concrete for isolated footing E Reinforced concrete for isolated footing Grade A with minimum concrete cube strength 400 kg/cm 2 Reinforced concrete for slab on grade F Reinforced concrete for slab on grade 200 mm thickness, indoor slab concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing Reinforced concrete for solid slabs H Reinforced concrete for suspended slab 160 mm thickness, Grade A with average concrete cube strength 400 kg/cm 2 39 Reinforced concrete for roof Reinforced light weight sloped concrete, density 900 kg/m3 I for roof slab 200 mm thickness, strength 40 Kg/cm 2 Reinforced concrete for tie beams J Reinforced concrete for tie beams, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for columns K Reinforced concrete for columns, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for Beams L Reinforced concrete for beams, Grade A with average concrete cube strength 400 kg/cm2 Reinforced concrete for Parapet M Reinforced concrete for parapet, Grade A with average concrete cube strength 400 kg/cm2 m

32

233

97

71

19

48

48

27

20

30

11

m Carried forward -

C-Concrete Work

51

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward Reinforced concrete for Electrical Trench walls and floors A Reinforced concrete walls and floors; 200 mm thickness, concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801 Water tank Supply, placing, finishing curing and testing of reinforced concrete for water structure, Grade B, minimum cement content 250 kg/cm3, average compressive strength 400 kg/cm2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification B Reinforced concrete for foundation 600 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 C Reinforced concrete for foundation 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 D Reinforced concrete for tank walls 500 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 E Reinforced concrete for tank walls 400 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 F Reinforced concrete for tank walls 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 F Reinforced concrete for tank roof slab 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207 G Reinforced concrete for tank walls 250 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207

15

153

198

76

35

Carried to Collection

C-Concrete Work

52

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP)

C3 - Reinforcement Main Building High yield deformed bars according to the ASTM 625 with a manumit proof stress of 4000 Kg/cm2 F Steel reinforcement for footings Y16-Y25 H Steel reinforcement for tie beams I Steel reinforcement for slab on grade J Steel reinforcement for suspended slabs K Steel reinforcement for flat roof A Steel reinforcement for columns B Steel reinforcement for retaining wall RW1 C Steel reinforcement for core walls D Steel reinforcement for beams E Steel reinforcement for stairs F Mesh reinforcement for flat roof B785 Utilities Building H Steel reinforcement for footings I Steel reinforcement for slab on grade and duct walls J Steel reinforcement for tie beams K Steel reinforcement for solid slabs L Steel reinforcement for columns M Steel reinforcement for beams N Steel reinforcement for parapet 1.17 16.60 3.24 5.23 3.00 3.59 0.69 t t t t t t t Carried forward 97 27 42.70 535 40 51 28 9 14 7 t t t t t t t t t t t -

13.01

C-Concrete Work

53

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward External Works Water tank A Steel reinforcement for raft foundation B Steel reinforcement for roof slab C Steel reinforcement for walls 15.14 10.35 30.00 t t t

Carried to Collection

C-Concrete Work

54

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP)

C4 - Shuttering Main Building A Shuttering to sides of plain concrete foundations 500 mm thickness B Shuttering to sides of reinforced concrete foundations 600 1100 mm high

771

1,023

C Shuttering to sides of slab on grade plain concrete 50 mm high D Shuttering to sides of slab on grade reinforced concrete 150 mm high E Shuttering to sides of plain concrete footings for retaining wall RW1 500 mm high F Shuttering to sides of reinforced concrete footings for retaining wall RW1 600 mm high G Shuttering to sides of reinforced concrete for retaining wall RW1 6100 mm high H Shuttering to sides of reinforced concrete for core walls I Shuttering to soffits and sides of ground beams plain concrete 100 mm high J Shuttering to sides of ground beams reinforced concrete 800 100 mm high K Shuttering to soffits and sides of beams 300-1200 mm high L Shuttering to sides of columns reinforced concrete M Shuttering to soffits and sides of upper ground slab 400 mm high N Shuttering to soffits and sides of flat roof slabs 120 mm high O Shuttering to soffits and sides of stairs flat roof slabs 200 mm high P Shuttering to soffits and sides of core flat roof slabs 200 mm high Q Shuttering to soffits and sides of stairs

20

61

117

154

1,867 828

m m

213

1,142 740 1,372

m m m

5,846 1,738 117

m m m

9 199

m m

Carried forward

C-Concrete Work

55

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward Utilities Building A Shuttering to sides of plain concrete foundations 300 mm high B Shuttering to sides of reinforced concrete foundations 500 mm high C Shuttering to sides of slab on grade plain concrete 100 mm high D Shuttering to sides of slab on grade reinforced concrete 200 mm high E Shuttering to soffits and sides of ground beams plain concrete 100 mm high F Shuttering to sides of ground beams reinforced concrete 500 800 mm high G Shuttering to soffits and sides of beams reinforced concrete 500 - 800 mm high H Shuttering to sides of columns reinforced concrete 5950 mm high I Shuttering to soffits and sides of solid slabs 160 mm high J Shuttering to soffits and sides of solid slabs 200 mm high K Shuttering to sides of parapet L Shuttering to sides of electrical trench wall Water Tank M Shuttering to sides of plain concrete foundations 100 mm high 38 m

57

14

58 190

m m

223 131 0 255 113 96

m m m m m m -

N Shuttering for reinforced concrete raft 500 mm high O Shuttering to reinforced concrete for tank walls P Shuttering for reinforced concrete tank roof slab 300 mm high

35 1,398 201

m m m

Q Pre-Cast Concrete removable units 200mm thick over pump room

nr -

Carried to Collection

C-Concrete Work

56

KIDZANIA AFRED - Cairo Festival City


Item Section D - Masonry D1 - Generally D2 - Walls and piers Main Building A Concrete hollow block wall 200 mm thick B Concrete solid block wall 100 mm thick C Concrete solid block wall 100 mm thick, fire rated 2 hour D Concrete solid block wall 200 mm thick, fire rated 1hour E Concrete solid block wall 100 mm thick, fire rated 1 hour Utilities Building F Concrete hollow block wall 200 mm thick G Fluted external brick wall H 200mm blockwork internal partitions I 300mm blockwork cavity wall (100mm cavity) J Gypsum moveable partition 0 m 178 m 114 m 37 m 7 m 270 m 550 m 480 m 26 m 500 m Qty Unit Rate Total (EGP)

D-Masonry

57

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Carried to Collection

D-Masonry

58

KIDZANIA AFRED - Cairo Festival City


Item E1 - Metal Work General Generally; This bill is to be read in conjunction with all other tender/contract documents; A The contractor shall submit all design calculations and details for all connections of steel members, detailed shop drawings prepared by specialized company for steel construction. Qty Unit Rate Total (EGP)

B Structural steel members shall be standard grade ST 37 conforming to Egyptian standard No. 260 unless notes otherwise

C All bolts material shall be standard grade ST 37 conforming to Egyptian standard No. 205, 2001 unless notes otherwise

D All space frame steel structure should be fire rated for 1 hour E Fabricate ladders for locations shown, with dimensions, spacings, details, and anchorages as indicated. Comply with ANSI A14.3, unless otherwise indicated

F Fabricate handrails and railings to comply with requirements


indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.

Carried to Collection

E-Metalworks

59

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP)

E2 - Structural Metalwork Generally; This bill is to be read in conjunction with all other tender/contract documents; Main Building rate includes fabrication, shipping, custom duties, and erection on steel Grade 43 (S275) Structural site A Structural steel columns B Portal frame (roof) C Flat roof frame (roof) D Elevation steel work E Elevation cladding steel work F Feature tower steel work G Base plates H Edge plates Structural steel Grade 52 (S355) I Structural steel columns J Flat roof frame (roof) K Elevation cladding steel work L Feature tower steel work M Structural steel for connection, high strength bolts grade 10.9, ordinary bolts steel Grade 37, Anchor bolts steel Grade 52, splices an alike. N Purlin type P1, Multi beam 200/160 at inclined roof O Intumescent paint for exposed steel structure which is not concealed 79.79 89.13 60.48 9.62 26.67 5.54 3.70 2.10 t t t t t t t t -

18.25 26.70 0.86 3.43

t t t t

16.31

2,694 326.27

m t

Carried forward

E-Metalworks

60

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP) -

Brought forward A Aluminum box section 100X200 mm at elevation B Aluminum box section 150X600 mm at elevation - PPC C Aluminum composite cladding at elevations D Stainless steel cladding over structure steel at elevations E Stainless steel handrail height 1000 mm F Corrugated sheets for flat concrete roof as shown on Detail 3 drawing CFC/ECG/CR007/SB/DRG/000209 G Sandwich panels 100 mm thick including fixation to steel substructure and any other required item to finish the work, at elevations H Structural glazing system all as specified and as shown on drawings - Glass type GL01 I Structural glazing system all as specified and as shown on drawings - Glass type GL02 J Structural glazing system all as specified and as shown on drawings - Glass type GL02 - horizontal L Sandwich panels 100 mm thick, for roofing including steel sub-structure, fixations & any other required item to finish the work M Metal flashing with stiffeners on elevation fixed to external walls block work as per drawing no (CFC\ECG\CR007\AE\DRG\00301) N Galvanized steel flashing for roof 0.7 mm thick, sheets shall be secured to horizontal or vertical surfaces and any other required items needed to accomplish the work Utilities Building K Supply and install painted galvanized steel vertical fixed ladder 5300 mm high ,including steel side rails,floor and side brackets,extruded steel treads,anchors and connectors and any other required items needed to accomplish the work as per dwg. No. (DA-5512) L Checkered plate cover 800 mm width the thickness shall not be less than 6 mm. Raised lugs shall be diamond shaped and shall have an angled and opposed pattern. M Galvanized steel flashing for roof 0.7 mm thick, sheets shall be secured to horizontal or vertical surfaces and any other required items needed to accomplish the work 105 119 1,015 105 125.00 1,708 m m m m m m

5,285

312

47

12

4,060

160

340

nr

40

71

Carried to Collection E-Metalworks

61

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate Total (EGP)

E3 - Non-Structural Metalwork Generally; This bill is to be read in conjunction with all other tender/contract documents; Utilities Building A Steel louvers type (1) , size (2800X1000) , Sand trap movable louvers B Steel louvers type (2) , size (1800X1000) ,Sand trap with motorized damper C Steel louvers type (3) , size (1200X1000) ,Sand trap with motorized damper Steel louvers type (4) , size (600X1000) ,Sand trap with motorized damper Steel louvers type (5) , size (800X1000) ,Sand trap with motorized damper Steel louvers type (6) , size (2400X1000) ,Sand trap with motorized damper Water Tank G Access hatches 800 x 800mm H SS Ship Ladder 5600mm high I SS Ship Ladder 4550mm high J Galvanised steel ship ladder 1700mm high 6 3 2 1 nr nr nr nr 1 nr -

nr

nr

nr

nr

nr

Carried to Collection

E-Metalworks

62

KIDZANIA AFRED - Cairo Festival City


Item R2 - MAIN CIRCUITS Generally; This bill is to be read in conjunction with all other tender/contract documents; Qty Unit Rate

Utilities Building 22KV, Equipment A 22 kV Ring main unit (RMU) B Medium voltage cables, AL/XLPE/STA/PVC, 22kV, 3x240mm2 , + 150 mm pvc conduit Low Voltage Switchboards C Main distribution board (MDB) D Main distribution board (EMDB) External Works Electrical Work In Connection With Irrigation System E Cabling outside including pull boxes, power supply cables and cabling between solenoids and controller Low Voltage Switchboards F Distribution board (DB-SI) G Distribution board (DB-PAR) H Distribution board (EDB-PAR) 1 1 1 nr nr nr 1 nr 1 1 nr nr 1 nr

Carried to Collection

R-Electrical Eng Installations

63

KIDZANIA AFRED - Cairo Festival City


Item R3-Sub-main circuits Main Building Low Voltage Switchboards A Sub main distribution board (SMDB-R) B Sub main distribution board (DBS-S1) C Distribution board (DB-S) D Distribution board (EDB-S) E Distribution board (UP-S) Enclosed Bus Assemblies F 1000A copper feeder busway system for connection between SMDB-R and Retails. G 600A copper feeder busway system for connection between SMDB-R and Retails. H 400A copper feeder busway system for connection between SMDB-R and Retails. I 320A copper feeder busway system for connection between SMDB-R and Retails. J 200A copper feeder busway system for connection between SMDB-R and Retails. K 125A copper feeder busway system for connection between SMDB-R and Retails. L 100A copper feeder busway system for connection between SMDB-R and Retails. M 80A copper feeder busway system for connection between SMDB-R and Retails. N 63A copper feeder busway system for connection between SMDB-R and Retails. O 40A copper feeder busway system for connection between SMDB-R and Retails. Qty Unit Rate

1 1 2 1 1

nr nr nr nr nr

18

18

13

12

16

Carried forward

R-Electrical Eng Installations

64

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward Utilities Building L.V. Cables 600/1000 V, multi core copper conductor, PVC/PVC, cables sizes as the following: A (3x95 + 50) mm2 B (3x120 + 70)mm2 600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following: C 1x70mm2 D 1x95mm2 Enclosed Bus Assemblies E 3200A, 380V,55kA, copper feeder busway system for connection between transformer and MDB. F ACB; 40 air circuit breaker motorized 3200A

57 42

m m

42 57

m m

6 1

m nr

Carried to Collection R-Electrical Eng Installations

65

KIDZANIA AFRED - Cairo Festival City


Item R4-Final sub-circuits and auxiliary installations Main Building Wiring for Lighting A Wiring for one interior lighting outlet including wires 3(1x3) mm 2, conduits, junction boxes from panel to lighting fixtures and switches outlet Lighting Fixtures Lighting fixtures completely installed : B Type F1 C Type F2 D Type F2, equipped with 3 hours battery E Type F3 F Type F4 G Type F4, equipped with 3 hours battery H Type F5 I Type F6 J Type F7 K Type F9 L Type F11 M Type F13 N Type F23 O Type F24 Wiring of Power Outlets P Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet Q For power socket outlet For SSR R For hand dryer outlet S For FCU unit outlet T For camera unit outlet U For WI-FI unit outlet Qty Unit Rate

297

nr

13 19 1 31 138 13 19 5 5 12 25 6 7 3

nr nr nr nr nr nr nr nr nr nr nr nr nr nr

58 1 3 5 9 3

nr nr nr nr nr nr Carried forward

R-Electrical Eng Installations

66

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward A Ditto, but using 3(1x6mm2) wires for IT rack outlet Power Outlets Fittings Socket Outlets B Socket type SO1 C Socket type SO2 D Socket type SO3 E Socket type SO4 F Socket type SO5 G Socket type SO6 H Socket type SO7 I Connect to Hand dryer L.V. Cables 600/1000 V, multi core copper conductor, PVC/PVC, cables sizes as the following: J 4x16mm2 K 4x25mm2 L (3x50 + 25) mm2 600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following: M (3x35 + 16) mm2 N (3x70 + 35) mm2 O (3x240 + 120) mm2 P 4x25mm2 600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following: Q 1x16mm2 R 1x25mm2 600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following: S 1x16mm2 T 1x35mm2 U 1x240mm2 9 nr

13 15 3 8 1 5 10 3

nr nr nr nr nr nr nr nr

300 200 16

m m m

339 359 972 172

m m m m

500 16

m m

511 359 256

m m m Carried forward

R-Electrical Eng Installations

67

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward

Data Networking Active Components Modular Multi-layer Stackable Data switch including: A - 24x10/100/1000 BaseTX - 2x1000 Base - LX Modules upgradable to 10GbE (without changing the switch) - Redundant power supply - Stacking Cables B WI-FI access point C IT operation workstation c/w 19" LCD D Local Printer Structured Cabling and switching Network System E RJ45 cat 6 outlet for data including cables, cabling, conduits, pipes, cable trays, pulling boxes, etc F RJ45 cat 6 outlet for telephone including cables, cabling, conduits, pipes, cable trays, pulling boxes, etc G RJ45 cat 6 outlet for wall mounted IP telephone including cables, cabling, conduits, pipes, cable trays, pulling boxes, etc

3 3 1 1

nr nr nr nr

nr

nr

2 H RJ45 cat 6 outlet for camera including cables, cabling, conduits, pipes, cable trays, pulling boxes, etc I RJ45 cat 6 outlet for WIFI including cables, cabling, conduits, pipes, cable trays, pulling boxes, etc J ATM data outlet K Patch panel UTP cat 6, 24 port L Consolidation point box 4 port RJ45 UTP Cat 6 M Wall mounted Fiber Optic enclosure (4 Cores) N Patch cord UTP cat 6, 3 m length for the workstation P Patch cord UTP cat 6, 1.8m Q Patch cord UTP cat 6, 2.7m R Fiber optic 24 cores patch panel LC type (loaded) S Fiber optic 48 cores patch panel LC type (loaded) T Single mode Fiber optic cables (4 cores)

nr

nr

3 1 3 7 13 8 21 42 4 1 560

nr nr nr nr nr nr nr nr nr nr m Carried forward

R-Electrical Eng Installations

68

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward A Single mode Fiber optic cables (12 cores) B Patch cord fiber optic single mode duplex connector LC to LC 3 m length C Racks D Connection with outdoor network External Works Wiring for Lighting E Wiring for one external lighting outlet including wires 3(1x6)mm2, conduits, junction boxes from panel to lighting fixtures 372 F Wiring for one external lighting outlet including wires 5(1x10)mm2, conduits, junction boxes from panel to lighting fixtures Lighting Fixtures Lighting fixtures completely installed : G Type F12 H Type F14 I Type F15 J Type F19 K Type F20 L Type F21 M Type F22 N Type F** L.V. Cables 600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following: O (4x16) mm2 P (4x25) mm2 600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following: Q 1x16mm2 nr 20 m

nr

1 item 1 item

67

nr

180 109 9 6 3 25 30 12

nr nr nr nr nr nr nr nr

164 164

m m

328

Carried forward R-Electrical Eng Installations

69

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward Grounding System A Complete earthing system including main earthing networks (power , lightning and clean earth) equipotential bars, cables, taps, bonding,pits, boxes, clamps, rods, covers, cadwelds, exothermic connections, etc & all necessary earthing accessories as per drawings & specs. Utilities Building B Structured cabling and switching Network System RJ45 cat 6 outlet for camera including all cables, cabling conduits, pipes, cable trays, pulling boxes etc C RJ45 cat 6 outlet for telephone including all cables, cabling conduits, pipes, cable trays, pulling boxes etc Water Tank Wiring for Lighting D Wiring for one interior lighting outlet including wires 3(1x3) mm2, conduits, junction boxes from panel to lighting fixtures and switches outlet Lighting Fixtures Lighting fixtures completely installed : E Type F1 L.V. Cables 600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following: F (4x16) mm2 600/1000 V, multi core copper conductor, MICA/XLPE/STA/LSHF, cables sizes as the following: G 4 x 16 mm2 H (3x240 + 120) mm2 600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following: I 1x16mm2 600/1000 V, single core copper conductor, MICA/XLPE/STA/LSUF, cables sizes as the following: J 1x16mm2 K 1x120mm2 Structured cabling and switching Network System L RJ45 cat 6 outlet for telephone including all cables, cabling conduits, pipes, cable trays, pulling boxes etc

1 item

nr

nr

nr

nr

141

138 67

m m

141

138 67

m m

nr

Carried to Collection R-Electrical Eng Installations

70

KIDZANIA AFRED - Cairo Festival City


Item R5-Accessories Main Building Lighting Switches A Switch type S1 B Switch type S2 C Switch type S4 Load Break Switch D TYPE LS1 (40A) E TYPE LS1 (63A) F Ditto, as above but (80A) G Ditto, as above but (100A) H Ditto, as above but (125A) I Ditto, as above but (160A) J Ditto, as above but (200A) K Ditto, as above but (320A) L Ditto, as above but (2500A) M TYPE IS2 (63A) N TYPE IS3 (20A) O 63A 3P Utilities Building Wiring for Lighting P Wiring for one interior lighting outlet including wires 3(1x3) mm2, conduits, junction boxes from panel to lighting fixtures and switches outlet Lighting Fixtures Lighting fixtures completely installed : Q Type F1 Lighting Switches R Switch type S2 D Switch type S3 Qty Unit Rate

9 16 12

nr nr nr

1 1 2 1 2 1 1 1 1 1 6 1

nr nr nr nr nr nr nr nr nr nr nr nr

30

nr

30

nr

3 4

nr nr

Carried forward

R-Electrical Eng Installations

71

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward Wiring of Power Outlets A Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet Power Outlets Fittings Socket Outlets B Socket type SO2 C Socket type SO4 Water Tank Lighting Switches D Switch type S2 Wiring of Power Outlets E Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet F Ditto, but for industrial power socket outlet wires 5(1x4mm2) G Ditto, but for LBS outlet for overhead crane wires 5(1x4mm2) Power Outlets Fittings Socket Outlets H Socket type SO2 I Socket type SO8

13

nr

12 1

nr nr

nr

nr

1 1

nr nr

5 1

nr nr

Carried to Collection R-Electrical Eng Installations

72

KIDZANIA AFRED - Cairo Festival City


Item R6-Control Gear Generally; This bill is to be read in conjunction with all other tender/contract documents; Main Building Lighting Control Panels A (LCP) Equipped with 29 push buttons (ON-OFF) & indication lamps to control 1 nr and with cover Fire Alarm System B Intelligent addressable Fire alarm control panel (3 loops) C System printer D Automatic telephone dialer E Addressable smoke detector F Monitor module connected to fire lighting flow switch G Monitor module connected to fire lighting flow per suite H Fire alarm interface unit I Addressable manual station J Siren K Strobe light L Control module M Ditto but weatherproof N Monitor module O Addressable smoke detector above false ceiling P Ditto but weatherproof Q Signal control Module R Fault isolation module S Connection with outdoor network Spare parts T Addressable smoke detector U Addressable manual station V Siren Qty Unit Rate

1 item 1 1 23 10 10 6 6 6 6 9 3 3 12 6 3 nr nr nr nr nr nr nr nr nr nr nr nr nr nr nr

1 item 1 item

3 1 1

nr nr nr Carried forward

R-Electrical Eng Installations

73

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward A Strobe light B Control module C Monitor module D Signal control Module Building Management System (BMS) E Main BMS redundant hot standby servers c/w all hardware, software, protocol interfaces and all necessary accessories F Computer workstation c/w 19" LCD, keyboard, mouse, interfaces and all necessary accessories 1 1 1 1 nr nr nr nr

1 item

2 1 1

nr nr nr

G Dot matrix printer H A4 laser printer I Direct Digital Controller (DDC) and local (Automatic) control panel c/w interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule J Gateway c/w integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule K Integration/interface with third party systems as per specifications and system architecture L Field devices as per input/output data summary point schedules M Connection with outdoor network Utilities Building Automatic Transfer Switch N 380V,4P, 400A, ATS Fire Alarm System O Addressable smoke detector P Weatherproof Addressable manual station Q Weatherproof Siren R Weatherproof Strobe light D Control module T Monitor module U Signal control Module

1 item

1 item

1 item 1 item 1 item

nr

4 1 1 1 2 7 1

nr nr nr nr nr nr nr Carried forward

R-Electrical Eng Installations

74

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward A Fault isolation module B Connection with outdoor network Spare parts C Addressable smoke detector Building Management System (BMS) D Direct Digital Controller (DDC) and local (Automatic) control panel with interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule E Gate Way with integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule F Integration/interface with third party systems as per specifications and system architecture G Field devices as per input/output data summary point schedules External Work Fire Alarm System J Concrete duct bank including No. of (4 x 55mm) UPVC conduits directly buried encased with reinforced concrete for road crossings including warning taps, spacers and all related civil works (excavation, refilling..etc) K 4 x 55mm for utility entrance L (6x55mm) UPVC conduits for building entrance directly buried including warning taps, spacers and all related civil works (excavation, refilling..etc) M 2 x 110 UPVC ducts N 3 x 110 UPVC ducts O Hand holes P Single Mode Fiber Optic cable (24 Cores - outdoor type) Q Single Mode Fiber Optic cable (4 Core - outdoor type) Main Building R Utilities Building S ditto of item 4 except 3x55 Irrigation Programme Controller T 12 Stations 1 item 1 item

nr

1 item

1 item

1 item 1 item

17

126 100 10 450 280

m m nr m m

110 12

m m

nr Carried forward

R-Electrical Eng Installations

75

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward Water Tank Load Break Switch A TYPECS1 (20A) B TYPELS2 (20A) 30v 3phase Fire Alarm System B Addressable Smoke Detector C Weatherproof Monitor module D Weatherproof control module E Fault isolation module F Connection with outdoor network Building Management System (BMS) J Direct Digital Controller (DDC) and local (Automatic) control panel with interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule H Gate Way with integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule I Integration/interface with third party systems as per specifications and system architecture J Water Tank

1 1

nr nr

2 24 3

nr nr

1 item 1 item

1 item

1 item

1 item 1 item

Carried to Collection R-Electrical Eng Installations

76

KIDZANIA AFRED - Cairo Festival City


Item R7-Equipment Main Building UPS System A 30 kVA, 380/380V, 15 minutes, with sealed lead acid IP Closed Circuit Television System (IP-CCTV) B CCTV management server C Network Video Recorder unit/server D Workstation c/w 19" LCD E Local Printer F Indoor fixed IPCCTV camera (wall mounted type) G Outdoor fixed dome IPCCTV camera Spare parts H Indoor fixed IPCCTV camera (wall mounted type) Public Address System I Audio Mixer (8x1) J Paging microphone (1 zone) K Surveillance and automatic changeover unit L Digital Message recorder M Monitor panel (1 zone) N Power amplifier 240 watt O CD player (5 Discs) P FM/AM tuner Q Ceiling speaker (6 watt), fire rated R Rack Spare parts S Ceiling speaker (6 watt), fire rated Utilities Building Distribution Transformer T Dry type, Dyn11, 22/0.4kV. 2000 KVA Qty Unit Rate

nr

1 item 1 item 2 1 8 1 nr nr nr nr

nr

1 item 1 1 1 1 2 1 1 25 nr nr nr nr nr nr nr nr

1 item

nr

nr

Carried forward

R-Electrical Eng Installations

77

KIDZANIA AFRED - Cairo Festival City


Item Qty Unit Rate

Brought forward Packaged Engine Generator A Stand by diesel generator system 50HZ, 380V, 200 KVA , 1500 rpm IP Closed Circuit Television System (IP-CCTV) B Outdoor fixed dome IPCCTV camera

nr

nr

Carried to Collection R-Electrical Eng Installations

78

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

79

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

80

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations


81

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

82

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations


83

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

84

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

85

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

86

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

87

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

88

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

89

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

90

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations

91

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations


92

KIDZANIA AFRED - Cairo Festival City


Total (EGP)

R-Electrical Eng Installations

93

KIDZANIA AFRED - Cairo Festival City


Total (EGP) -

R-Electrical Eng Installations


94

Você também pode gostar