Você está na página 1de 3

ABHIK PANDIT

abhikpandit@ymail.com Ph No: 033-2644-7214 (R) 9674213978/8361045551

Career Objective: To learn gainfully by working in a real time environment and utilize those experiences, skills and abilities gained to get value addition and integrating the values of the corporate house in me in order to achieve mutual growth. Education Details Bachelor of Technology (B.Tech) in Computer Science & Engineering from Calcutta Institute of Technology under West Bengal University of Technology securing 7.3 %(out of 10) at the year 2009 . 10+2 from Shibpur S.S.P.S Vidyalaya, Shibpur under WBCHSE board securing 59.10% at the year of 2005. Class X from Howrah Zilla School, Howrah under WBBSE board securing 82.30% at the year of 2003. Academic Projects Done: Project 1 V-Sat & Database Maintenance Description West Bengal State Electricity Distribution Company Limited (WBSEDCL), Kolkata, INDIA Handled bulky data bases using SQL, passing though query in the database to search the datas. Undergone hands-on training on Very Small Aperture Terminal (VSAT) and Network Systems of the above mentioned company. I have seen how they set up the V-sat, how the connection has been created and how they maintain the network mainframe from their office. TECHNICAL COMPETENCY: C , C++, SQL Proficient in DBMS, Networking.

Personal Details: Date of Birth 04 th March 1987 Gender Male Nationality- Indian Marital Status Unmarried Pan Card No:-BUVPP0650B PASSPORT NO:- H1202187 Permanent Address: Flat No-B-2,Niharika Apartment Vivekananda Nagar, Podra Howrah-711109

Professional Details PROJECT: 1 Customer : Company Name : Duration : Role :

Huwaei (Docomo, Uninor Project). The 3 Guys Network Pvt.Ltd. Jan 2011 to November 2011 RF CO-ORDINATOR

Role and Responsibility: Co-ordination of drive test project. Co-ordination of SCFT of sites using Genex Probe1.53 Co-ordination of Drive test and walk Test includes for 2G network. Co-ordination of drive test for 2G Clusters, Highway drives, major road. Co-ordination of 2G Drive & Analyzing drive logs, GPRS Drive, Cluster Drive, and Analysis of 2G Drive Logs.

Attending customer complaints for Call Drops, Coverage Issues, etc. Optimization of Antenna height & Tilt on the basis of OMCR reports & drive test. Co-ordination of Complete drive test analysis & report analysis using MapInfo 8.5&9.0, and Genex Assistant 1.51,1.53. Co-ordination of Analysis of Drive Test Data and taking necessary corrective measures, like neighbour list addition and Interference analysis. Co-ordination of Carrying out Physical optimization including coverage optimization which includes suggesting Antenna re-orientation, antenna height change, change in tilt,etc. Successfully submission of the project in the due time ,and taking care of upto billing.

PROJECT: 2

Customer : Company Name : Duration : Role : Location : Role and Responsibility:

Idea Bihar, The 3 Guys Network Pvt.Ltd. September 2010 to December 2010 (4 month). Project Coordinator. Gaya, Bihar.

Coordinated with teams for the successful completion of 196 sites EMC Survey within a span of 1 month. Provide Site Plans on daily basis to teams. Coordinate the report generation of the surveyed sites and delivering those to customer. Coordinate with customer regarding status of the project. Successfully submission of the project in the due time ,and taking care of up to billing

PROJECT: 3 Customer : Company Name : Duration : Role : Location : Nokia Siemens Networks The 3 Guys Network Pvt.Ltd. November 2009 to September 2010. Project Engineer. Kolkata, West Bengal.

Role and Responsibility: Commissioning and Integration of cell sites. Lead teams for effective and timely completion of the installation or rectification work undertaken. Ascertain and diagnose various faults and alarms of BTS, Microwave transmission equipments. Supervise and carry out Acceptance testing of cell sites for successful handover to customer. Conduct Site Survey; prepare survey reports prior to Telecom Implementation process. Develop performance standards, evaluation systems and incentive programs. Segmentation of 900 and 1800 band GSM Technologies with exposure to implementation of Cabinet Expansion (CABEX), Sector Addition along with ESMA to ESEA conversion in existing NSN FLEXI sites. Part of the project ,which had been successfully submitted of in the due time .

I hereby affirm that the information furnished in this form is true and correct to the best of my knowledge.

Place: Kolkata

Signature: (Abhik Pandit)

Você também pode gostar