Escolar Documentos
Profissional Documentos
Cultura Documentos
Media Teleconference:
ARES I UPPER STAGE CONTRACT AWARD
Speakers:
DOUG COOKE, Deputy Associate Administrator,
Exploration Systems Mission Directorate
JEFFREY HANLEY, Constellation Program Manager
STEPHEN A. COOK, Ares Project Manager
DANNY DAVIS, Ares I upper stage Element Manager
P R O C E D I N G S
stage.
Mississippi.
hydrogen engine.
moon.
manager.
vehicle, with the vehicle that will take people into space
the Ares V.
calendar year.
space.
August 13.
industry teams who developed the proposals, who put all the
build the upper stage. I also want to thank the NASA team
industry teams. There were two teams. One was Team Ares
led by ATK, and they had as major subs, Lockheed Martin and
respect for these industry teams and the work that they
important.
Bickley who led the costing, Tim Vaughn who led the
technical aspects of it, Keith Lane who led the Safety and
the board.
point.
the ground and mission systems that will support that first
the lunar lander. The way that this procurement was run is
by Steve Cook.
Steve?
graphic.
work with us, and we are using that both in the upper stage
the very complex curves for the domes, and the common
stage.
a lot of progress.
test stand is being readied for the testing that will begin
in October.
bulkhead from the liquid oxygen tank on the aft end. That
six times larger of any upper stage that flies today, but
join our numbers. We last shared our design back last fall
team and finalize this design with the expertise from the
manufacturable as possible.
manufacturing process.
streamlined.
Steve?
Constellation Program.
Mars and will owe their success in great part to the Gulf
travel.
Melissa?
this pretty historic moment. You can see the models here
requirements have held very firm and very stable for these
astronauts to orbit.
Thanks, Melissa.
Brian?
and what set the Boeing proposal apart and caused you to
select it?
Rocketdyne was on the other team, how does that work out?
and Danny can probably tell you exactly what the components
are.
$325 million.
$1.25 billion.
composite interstage?
there.
at Headquarters?
[No response.]
little bit of a word picture about the launch and the point
or the altitude where the second stage takes over and then
where it takes the Orion and then what happens to the upper
like that.
the Orion and the service module will separate. The Orion
the same location in the Indian Ocean, and that was the
discarded.
the year I guess for the avionics -- you have really got
Thanks.
stage, and the Orion last year at this time, and the
Florida Today.
whether any of the work and how many jobs might be created
done there.
stage perspective.
point.
Marshall?
Huntsville Times.
worked on?
have 700 on the NASA design team if you include the other
centers.
Center, and then we will transfer our work down there and
Brian?
Danny Davis.
upper stage and then maybe kind of pull out and tell us how
like you are about 1,000 people, just for the upper stage.
Brian?
with me for the total, but we can get that for you later.
MODERATOR: Frank?
stage production.
Steve can talk a little bit more about what is unique about
think Steve should talk a little bit more about the unique
aspects.
design, and we will own the design throughout the life, but
will allow us in the long term -- our goal here in the long
evaluation?
on that.
manufacturing flow.
with us today.
- - -