Endeavour's liquid oxygen and liquid hydrogen storage tanks are filled. Mating of the orbiter midbody umbilical unit is complete. The orbiter boom sensor system has been removed and inspected. A firm date for launch is not yet known.
Endeavour's liquid oxygen and liquid hydrogen storage tanks are filled. Mating of the orbiter midbody umbilical unit is complete. The orbiter boom sensor system has been removed and inspected. A firm date for launch is not yet known.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
Endeavour's liquid oxygen and liquid hydrogen storage tanks are filled. Mating of the orbiter midbody umbilical unit is complete. The orbiter boom sensor system has been removed and inspected. A firm date for launch is not yet known.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
Endeavour gets ready on pad, Phoenix on launch pad,
other orbiters closer to flight Dawn returns to Astrotech Shuttle Up- ELV Update: Phoenix was mated date: Loading of to the upper-stage booster July 17. STS-118 Mission Briefing — hypergolic propel- Spacecraft engineers installed the heat All KSC and CCAFS employees are lants on Endeavour shield onto the cruise stage July 19. This invited to attend an STS-118 mission began Monday. was the last major milestone in spacecraft briefing. The presentation will be These propellants processing before going to the launch held in the KSC Training Auditorium will power the solid pad. at 2 p.m. Thursday. Seating will be rocket booster hy- Technicians installed the integrated on a first-come, first-served basis. draulic power units and orbital maneuver- Phoenix payload into the payload trans- ing system, forward reaction control sys- portation canister July 20. Phoenix was tem and auxiliary power units. transported to Pad 17-A for mating to the Bruce Willis Concert and 'Arma- Workers continue filling the liquid Delta II Monday. geddon' On Location at KSC Aug. 2 — oxygen and liquid hydrogen storage tanks Dawn was removed from the Delta Kennedy Space Center Visitor Complex at the pad. This fuel will be transferred to II launch vehicle on Saturday and re- and NetFlix are hosting a concert Aug. 2 the external tank shortly before launch. turned to the Astrotech payload process- featuring Bruce Willis and his Blues Mating of the orbiter midbody umbilical ing facility near NASA's Kennedy Space Band followed by a special outdoor unit, the connection point that allows for Center. showing of "Armageddon" in the Rocket servicing of the orbiter's fuel cells, was A firm date for launch is still being Garden. completed July 20. determined based on the launch window The concert will begin at 7 p.m. fol- Discovery's main engines No. 1 and for the science of the mission, the avail- lowed by the movie at 9 p.m. There are 2 have been installed, as have the heat ability of the Eastern Range and the nec- 1,000 free limited-admission tickets shields for those engines. Engine cutoff essary tracking, data and telemetry available for badged KSC/CCAFS em- sensor system and payload premate test- support. The launch opportunity extends ployees, along with an opportunity to ing is complete. Rigging of the latching from Sept. 7 to Oct. 15. purchase additional tickets at $12 each mechanism for the orbiter boom sensor (limit five per employee). These tickets system is complete and the system has Open Forum RehabWorks Educa- are good for admission after 4 p.m. Em- been installed for flight. tional Lecture Series on Knee and ployee tickets are available at Exchange Stacking of the STS-120 solid rocket Shoulder Pain — Are you suffering Stores on a first-come, first-served basis. boosters in the Vehicle Assembly Build- from knee or shoulder pain? Are you fa- Tickets will be available at the HQ and ing began last week, with the left aft miliar with conservative treatments that OSB I Exchange Stores only. General booster and left aft center segments de- can alleviate most of your common knee public tickets are available online at livered and mated to the mobile launch and shoulder pains? Is surgery in your www.kennedyspacecenter.com. Small platform. future? Do you know what to expect? In lawn chairs and blankets are permitted. Atlantis' dome heat shields and this open forum you will learn about the common injuries of the knee and shoul- Countdown is published every Tuesday & Thurs- main engines have been removed. The day for NASA KSC employees. Deadlines are checkout of the forward reaction control der. The forum will be held from 10 to 11 a.m. Thursday in the OSB II, Room 10 a.m. Mondays & Wednesdays. E-mail news to system is complete. Windows No. 5 and anita.barrett@jbosc.ksc.nasa.gov. For questions or 6 were removed and replaced. The orbiter 3124. If you have a question that you would like to have addressed during this information, e-mail or call 321-867-2815. You can boom sensor system has been removed also find Countdown on the Web at forum, please send it in an e-mail to and inspected, with reinstallation set for nasa.gov/centers/kennedy/news/countdown/co this week. Mary.K.Kirkland@nasa.gov. untdown-toc.html.