STS-118 crew at kennedy for training activities in terminal countdown demonstration test. Education and Wellness Program topic covers heat-related illnesses and prevention. New oxygen generation system tested between July 11 and 14 aboard ISS.
STS-118 crew at kennedy for training activities in terminal countdown demonstration test. Education and Wellness Program topic covers heat-related illnesses and prevention. New oxygen generation system tested between July 11 and 14 aboard ISS.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
STS-118 crew at kennedy for training activities in terminal countdown demonstration test. Education and Wellness Program topic covers heat-related illnesses and prevention. New oxygen generation system tested between July 11 and 14 aboard ISS.
Direitos autorais:
Attribution Non-Commercial (BY-NC)
Formatos disponíveis
Baixe no formato PDF, TXT ou leia online no Scribd
for launch in 3-day TCDT oxygen generation system Shuttle Update: The STS-118 to augment the Russian Elektron oxygen Education and Wellness Program topic crew is at Kennedy for training activities generator. With the increased capability covers heat-related illnesses and preven- in the terminal countdown demonstration to produce oxygen, the station can better tion. The monthly health education table test, or TCDT, from M-113 driving on support six crew members as they work will be set up from 11 a.m. to 1 p.m. to- Tuesday (see Mission Specialist Alvin and live aboard the outpost. day in the SSPF cafeteria so that the Drew, below) to the simulated launch During normal operations, the new program's staff can distribute the July countdown today. To keep up with their system will generate about 12 pounds of packet on heat-related illnesses and other activities, visit the photo Web site at oxygen per day, enough for six people. heat safety information. Hardcopies of http://mediaarchive.ksc.nasa.gov/searc However, it can provide as much as 20 the packet will also be available at all h.cfm?cat=81. pounds of oxygen per day, enough for as medical and fitness facilities. If you or many as 11 people. It is designed to re- your department or organization would place oxygen consumed through breath- like to be added to the monthly packet ing or lost during experiment use and hardcopy distribution list, please e-mail airlock depressurization. During last or call Kris Calderon at 867-3414. The week’s test, which started Wednesday and packet is also available online at the pro- ended Saturday, the system generated ap- gram's Web site, proximately 10 pounds of oxygen. http://hewp.ksc.nasa.gov, under Currently, oxygen on the station “Monthly Health Topics.” comes from four sources: the Russian- built Elektron system, Russian supply NASA Science — Accelerating from 0 to 60 mph, then slowing down for a vehicles, storage tanks in the U.S. Quest ISS Update: A new oxygen gen- airlock and solid fuel oxygen generators stoplight is no problem for an ordinary eration system tested between July 11 and called candles. automobile. But piloting a rocketship 14 aboard the International Space Station The new oxygen generation system wouldn't be so easy. Most rocket engines will allow the orbiting laboratory's crew in the U.S. Destiny laboratory is one of are designed to burn full-on (liftoff!) or size to increase in 2009. The hardware is full-off (coasting through space) with no two primary components in the station's part of the station's environmental control regenerative environmental control and in-between. And that can be a problem -- and life support system and will be used namely, how do you land this thing? life support system. The other compo- nent, the water recovery system, is Learn how engineers are developing planned to be installed on the space sta- technology for throttling the next- Did You Know? You can go to the Web tion in 2008. Periodically, NASA will ac- generation lunar landers at Web site site http://spaceflight.nasa.gov/ for in- tivate and operate the new oxygen http://science.nasa.gov/headlines/y2007 formation on the ISS crew's activities generator to ensure the system remains /16jul_cece.htm?list29875. aboard the space station, future launch ready for its integration with the water dates, as well as station sighting oppor- recovery system. Countdown is published every Tuesday & Thurs- tunities from anywhere on Earth. Details day for NASA KSC employees. Deadlines are on station science operations can be July Health Education Informa- 10 a.m. Mondays & Wednesdays. E-mail news to found at http://scipoc.msfc.nasa.gov/, tion Table — Summer is here with its anita.barrett@jbosc.ksc.nasa.gov. For questions or a site administered by the Payload Op- hot temperatures during work and play! information, e-mail or call 321-867-2815. You can also find Countdown on the Web at erations Center at NASA’s Marshall Especially in Florida, everyone must be careful not to let a heat-related illness nasa.gov/centers/kennedy/news/countdown/co Space Flight Center in Huntsville, Ala. untdown-toc.html. catch you by surprise. The July Health