Guided by:
Mr. DHARMENDRA PATEL
AGM. ES-MHS DEPARTMENT
SUBMITTED BY:
VIPUL M.PATIL
B.E.MECHNICAL at SAL INSTITUTE OF TECHNOLOGY & ENGINEERING RESEARCH, AHMEDABAD
A globally competitive, India focused, technology driven, Port Company, offering cost effective logistics solutions to the delight of customers and stakeholders.
INDEX
SR.NO
1.
CONTENT
INTRODUCTION 1.1 Adani Group of Companies 1.2 Strength of Mundra Port 1.3 Location of Mundra Port Preface Acknowledgement Conveyer System 4.1 Introduction 4.2 Conveyer System Line Diagram 4.3 Equipment of the conveyer system 4.4 PCS & ZSS. 4.5 Belt Design 4.6 Belt Joining Process Import Conveyer System of COAL, FCC & FRM Control room Cargo Handling facilities Goliath:Maint- MHS Conclution
PAGE NO.
1
2. 3. 4.
5. 6. 7. 8. 9.
DATE
18.06.2012
TIME
9.00 TO 1.00 PM 2.00 TO 4.00 PM 4.00 TO 7.15 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 1.00 PM 2.00 TO 6.00 PM 9.00 TO 4.00 PM
SCHEDULE/LOCATION
ADANI House(Mr.Gaurav Pujari) ES-Dept.(Mr.Dharmendra Patel) MHS-Dept.(Mr.Kalpesh Panchal) MHS-Dept.(Mr.Kalpesh Panchal) FCC-Dept.(Mr.Jitendra Zala) FCC-Dept.(Mr.Jitendra Zala) FRM-Dept.(Mr.Jitendra Zala) MHS-Dept.(Mr.Kalpesh Panchal) CONTROL ROOM(Mr.Ashwin DherIya) CONTROL ROOM(Mr.Dinesh ) MHS-Dept.(Mr.Harsh) Begging(Mr.Gohil Kaka)
19.06.2012
20.06.2012
21.06.2012
22.06.2012
25.06.2012
26.06.2012
27.06.2012
28.06.2012
29.06.2012
1.INTRODUCTION:
Adani Ports and Special Economic Zone Limited (APSEZ), India's largest private port and special economic zone, was incorporated as Gujarat Adani Port Limited (GAPL) in 1998 to develop a private port at Mundra, on the west coast of India. The company commenced commercial operations in October 2001. Mundra Special Economic Zone Limited (MSEZL) was incorporated in November 2003, to set up an SEZ at Mundra. MSEZL was merged with GAPL in April 2006 and the company was renamed as Mundra Port and Special Economic Zone Limited, to reflect the nature of business. The board of MPSEZL on Nov 21,2011 has approved a proposal to change the company's name to Adani Ports and Special Economic Zone Ltd. and this change in name from MPSEZL to APSEZL has come into effect from Jan.6,2012. WE WERE INCORPORATED AS GUJARAT ADANI PORT LIMITED ON MAY 26, 1998, AND COMMENCED PHASED OPERATIONS AT MUNDRA PORT IN OCTOBER 1998 WITH COMMERCIAL OPERATIONS BEGINNING IN OCTOBER 2001. WE WERE INITIALLY PROMOTED BY ADANI PORT LIMITED AND GUJARAT PORT INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED, AN UNDERTAKING OF THE GOVERNMENT OF GUJARAT.
1.1 ADANI GROUP OF COMPNIES: The various companies under the group are:
1. Adani Gas Limited 2. Adani Enterprises 3. Adani Power 4. Adani Retail 5. Adani Wilmar 6. Adani Mining 7. Gujarat Adani Port 8. iCall India 9. Adani Ports & SEZ Limited 10.Adani Agri Logistics 11.Adani Agri Fresh 12.Adani Properties 13.Adani Welspun
1.2 STRENTH OF MUNDRA PORT Long water front & no maintenance dredging.
One of the closest Port to the entire and well developed northern hinterland with pipeline connectivity passing through sparsely populated areas, no problems in Row.
Mundra Port is committed to sustainable development with all efforts towards maintenance and improvement of ecological balance.
Port is already playing a catalytic role for the socio-economic growth of the Kutchh region of Gujarat.
Mundra Port and Special Economic Zone Ltd has informed that the Board of Directors of the Company at its meeting held on May 20, 2009, inter alia, has appointed Dr. Malay Mahadevia as an Additional Director and Whole Time Director on the Board of the Company with immediate effect.
2. PREFACE:
Training is one of the most enriching opportunities, which the engineering students get to upgrade their skill and apply the theoretical knowledge attained in the class room in the practical world. Trainings are an occasion to learn and experiment with the theoretical input that one has gained in the course of class room participation. Hence, Trainings are ones knowledge and information to the fullest capabilities.
Training on ES-MHS Department is the most important in its respect and regarding the whole maintenance. The experience at ADANI PORT & SEZ. Ltd. ,Mundra was very fruitful and it has added an extra feather to our career for the days ahead.
3. ACKNOWLEDEMENT:
Its a great pleasure to acknowledge those people who have contributed to the successful completion of my training project. The proposed training on ESMHS has been made possible through the direct & indirect co-operation of various people, towards whom I would like to express my application and heartfelt gratitude. I extremely thankful to the management of ADANI PORT & SPECIAL ECONOMIC ZONE Ltd. , Mundra(APSEZ) foe giving me the opportunity to undergo my organization. I would like to express my sincere thank to my training guide Mr.Dharmendra Patel for permitting me to training to undergo training in his department. His guidance and inspiration from time to time is invaluable advice and faithful suggestion at crucial stages of the training, enable to successful competition of my training and let me learn a lot. At last but not the least I expressed my heartfelt gratitude towards all fitter grades & foreman grades employees of MHS-Department, who in spite of their busy and stressful schedule gave me their valuable time, which went a long way in the proper completion of my training.
3. CONVEYER SYSTEM:
4.1 INTRODUCTION:
A conveyor system is a common piece of mechanical handling equipment that moves materials from one location to another. Conveyors are especially useful in applications involving the transportation of heavy or bulky materials. Conveyor systems allow quick and efficient transportation for a wide variety of materials, which make them very popular in the material handling and packaging industries.
Mr.Kalpesh Panchal is explained me the whole conveyer system work at port. These system has been divided into three parts like COAL, FCC & FRM. Mr.Panchal is also explained me to see the different part with neat sketch.
4.3 EQUIPMENT OF THE CONVEYER SYSTEM: There are different equipment of the use in the conveyer system. Here we have used the belt conveyer system. Naturally, these equipments are generally used in belt conveyer system: MOTOR FRICTION COUPLING GEAR BOX GEAR COUPLING DRI PULLEY SNUB PULLY BAND PULLY TAKE UP PULLY PCS ZSS SCRAPER CHUTE etc.
The fig. shows the various layer are used made of the belt. The capacity of these belt is used in the plant is 1500 TPH.
4.6 BELT JOINT PROCESS: There are the two types of belt joint process:
4) Solution used for joint Thejo T4451 Black Three times cording on belt. 5)Insulation compound laying on joint area 6) Belt over lap after solution condition ready, 7) Belt Rolling or Hammering start from joint area 8)Channel filling.
9) Use machine for joint water jacket pressures adjust up to 6 kg/cm2 10) Machine temperature increase up to 145 degree & temperature maintain ( 1mm belt thick = 3 min )
4) Solution used for joint Thejo TC-310 Three times cording on belt. [Thick, low, v. low) (check for expire date.) 5) Belt over lap after solution condition ready. 6) Belt Hammering start from joint area 7) Wait 1.5 hrs for better joint (currying time)
BC 6I
1500
1400
3.0
75 LT
COAL
BC 5I
1237
1500
1400
3.0
2x200 HT
COAL
BC 4I
461
1500
1400
3.0
160 HT
COAL
BC- C2
6.0
1500
1400
3.0
22 LT
COAL
BC C1
70
1500
1400
3.0
75 LT
COAL
COVVEYOR
SPEED (M /SEC )
MOTOR RATING ( KW )
MATERIAL HALDLED
BC 6I
1500
1400
3.0
75 LT
FRM
BC 5I
1237
1500
1400
3.0
2x200 HT 160 HT
FRM
BC 4I
461
1500
1400
3.0
FRM
BC 3I
453
1500
1400
3.0
132 LT
FRM
BC- 2I
340
1500
1400
3.0
200 HT
FRM
BC 8I
353
1500
1400
3.0
2x110 LT
FRM
OVER VIEW OF THE FACILITY: The system is integrated with existing Import Conveyor system at TT-8. The system is going to integrate with Ground hopper system at OSY-2 by newly installation of F1 Conveyor from OSY-2 to TT-8A. (Phase-2). The existing system of 2I belt conveyor has been modified for the installation of Vplough feeder which feeds the material to newly constructed F2 conveyor as well as 8I Conveyor. The V-plough is working on 0% and 100% basis in Auto mode. i.e. either 100% material diverts to F2 conveyor and 0% material on 8I conveyor or 0 % to F2 and 100% to 8I conveyor. This V-plough can be manually adjusted to any range 0-100% for feeding to F2 conveyor. However performances need to be evaluated. The F2 conveyor is equipped with Belt weigher which can give indications of flow rate on F2 conveyor.
6. CONTROL ROOM:
In control room, Mr. Ashwin Dheriya and Mr. Dinesh is explained me the how we can handle the operation philosophy of the FCC. This is fully computerized system. Thus we can use the program the screen is known as the SCADA. There are three mode of the operation: 1. Auto mode 2. Manual or Semi auto mode 3. Local mode 1. Auto mode: In auto mode you have to satisfy following condition before starting the conveyer in AUTO MODE. a) Hopper feeding values. b) Conveyer checks. c) Motor feeder status. d) Field discussed healthy checks. e) Initial setting to start with AUTO MODE. 2. Manual Mode: In manual mode we can run individual conveyer with their individual safety. So first of all check the initial status(SAFETY STATUS) of the safety from Home Screen. 3. Local Mode: In local mode we can run the individual conveyer from the LCS panel from the field. There are two buttons at each LCS panel Start and Emergency switch.
Model HMK 300E 2 Nos. Commissioned in 2000 Model HMK 330EG 2 Nos. Commissioned in 2005
MOBILE HARBOR CRANE SPECIFICATION o o o o o o o o o o o o Length of chassis with stabilizer pads : 22 M Width of chassis without stabilizer Pads : 8.7 M Boom length : 50.5 M Max. Out Reach : 50 M Min. Out Reach : 11 M Lifting height above quay : 33 M at 11~45 M Radius 22 M at 50 M radius Lifting height below quay : -12 M Total Weight of Crane : 430 Ton Main Drive : Diesel - Electric Diesel engine : Cummins-QST-30 970 KW at 1500 RPM Heavy lift capacity : 100 Ton Grab operation : 50 Ton ALLIED ATTACHMENT TO MHC FOR HANDLING DIFFERENT CARGO
GRAB 2 Nos. CAMSHELL , CAPACITY 27M3 FOR BULK CARGO 2 Nos. CAMSHELL , CAPACITY 35M3 FOR BULK CARGO 2 Nos. ORANGE PEEL , CAPACITY -21M3 FOR BREAK BULK CARGO BALANCED C HOOK CAPACITY 32 MT. FOR HANDLING HRCOILS. DIFFERENT TYPE OF SPREADERS FOR HANDLING 20 FT & 40 FT CONTAINER , MS PLATES, MS PIPE & JUMBO BAGS
RAIL MOUNTED MOBILE HOPPERS 02 NOS. To Suit the MHC Loading & connectivity to Import Conveyor System Hopper Capacity - 95M3 Grab Loading cycle - 1.3 Min/Cycle to 2.0 Min/Cycle Material Handled - Steam coal/Coking coal / Fertilizer Feeding Capacity - 750 MT/HR
o o o o o o
8. GOLIATH MAIN.(MHS):
In goliath, the in charge engineer is Mr. Diva Suthar. He has a 11 years experience of these field. He has a good knowledge about his field. He has work by daily planning, this is spatiality I like most. He has explain the introduction of the equipments are used in his field. His assistant Mr. Prate Goswami is a diploma mech-engeer. He is explain me the operation procedure of cargo handling techniques. Mr.Suthar Sir has also detail about the material handling: a) b) c) d) e) f) Cranes Fore lift Rich stacker Mobile hoppers Jetty fender Earthmover type crane(KALMAR)
9. CONCLUTION: The purpose of these training is the how we can work the actual in the induries.. As a part of curriculum I have take these training. In these ten days I have a getting idea abut industries as well field. I really enjoy the every moment of these days. And last thank to all of you who has in spite me for completed my training report. I also thanks those people who has giving me knowledge about the whole system.