LEYENDA PARAMETROS DE VOLADURA

PRECORTE FECHA DISPARO TONELADAS PROMEDIO ( TM ) PROF. PROM ( m ) N


BROCA 11" 13.50
BROCA 9"
BROCA 7+7/8 "
ESTERIL MINERAL
DESMONTE PRIMARIO
n/a n/a
ACT FG
PA CG
DAC R
OX
ENCAPADO TO
ROCA
n/a
HFS

60 61 62 63 64 65
13.6 m 13.4 m 13.3 m 13.4 m 66 67 68 69 70
13.5 m 13.4 m 13.3 m 13.4 m 13.4 m 71 72 73 74 75
13.2 m 13.2 m 13.4 m 13.5 m 76 77
13.3 m 13.3 m 13.3 m 13.3 m 13.3 m

94 93 92 91 90 89
13.5 m 13.3 m 13.4 m 13.4 m 88 87 86 85 84
13.4 m 13.5 m 13.3 m 13.3 m 13.3 m 83 82 81 80 79
13.2 m 13.3 m 13.5 m 13.5 m 78
13.5 m 13.5 m 13.4 m 13.3 m

103 104 105 106 107


13.4 m 13.4 m 108 109 110 111 112
13.4 m 13.4 m 13.4 m 13.3 m 13.3 m 113 114 115 116 117
13.2 m 13.1 m 13.3 m 13.4 m 13.6 m 13.8 m 118
13.8 m 13.6 m 13.6 m

Contractor: SAN MARTIN CONTRATISTAS GENERALES S.A. PARAMETROS DE PERFORACION CLIENT: SHOUNGAN HIERRO PERU S.A.A.
EQUIPO Ø MALLA ( m ) SP ( m ) Nº taladro Proyect: DESARROLLO MINA 2-3
EP 15 / EP 31 11" 7.0 X 8.0 1.5 51 Title: MALLA DE PERFORACION
EP 15 / EP 31 11" 5.3 X 6.0 1.0 0 Dibujado por: NELSON HUAMAN R. Numero: 677-11 REVISION :
Revisado por: NELSON HUAMAN R. Dia: 29.03.2018 HORA: 18:57 pm

Path: S:\05 MINA 2_2017\03 MINESIGHT M2_2017\02 PERFORACION M2\NIVEL 677\_msresources


Aprobado por: J. CAMONES Escala: 1/500 Hoja: Custom 02