ON INDUSTRIAL TRAINING
ABOUT NTPC
ABOUT NTPC
NTPC
The
only PSU to have achieved excellent rating in respect of MOU targets signed with Govt. of India each year.
Lighting
NTPC Dadri is model project of NTPC. Best project of NTPC also known as NCPS (National Capital Power Station). installed capacity of 2639 MW of power. Capital cost of power production is 8cr.-12cr./mw.
THERMAL PLANT
THERMAL PLANT
THERMAL PLANT
To achieve efficient conversion of heat energy into electric energy, a variety of auxiliary equipments are needed.
The auxiliary equipments in a thermal plant are so much that they overshadow the main equipments.
Coal supply
Coal pulverizer
Boiler Precipitators and stack Turbine and generator Condensers and cooling water system
Water purification
Ash systems Transformer and transmission lines
Relay
Resistance thermometers
Thermistors thermometers
Bimetallic Acoustic
pyrometers.
automatic feeding of coal to the boiler furnace. Coal is weighed and led to a hopper through a conveyer mechanism. Coal entry is above or below the air entry. Enough storage of coal to last for 15 days or so.
Water vapor
Fly ash
ASH MOUND
The 550-acre ash mound acts as an ecosystem for both flora and fauna.
AFTER PRODUCTION
ADVANTAGES
The fuel used is quite cheap. Less initial cost as compared to other generating plants. It can be installed at any place irrespective of the existence of coal. It require less space as compared to Hydro power plants. Cost of generation is less than that of diesel power plants.
DISADVANTAGES
It pollutes the atmosphere due to production of large amount of smoke and fumes.
Thank you