Escolar Documentos
Profissional Documentos
Cultura Documentos
Following are the Indias atomic power stations operating as on today:S.NO. 1. 2. 3. 4. 5. 6. 7. PLACE TAPS (1 & 2) TAPS ( 3 & 4) RAPS (1 ) RAPS (2) RAPS ( 3 & 4) RAPS ( 5 & 6) MAPS ( 1 & 2) CAPACITY 2X160MWe 2X540MWe 1x100 MWe 1X200MWe 2X220MWe 2X220MWe 2X220MWe
8.
9. 10. 11.
NAPS( 1 & 2)
KAPS ( 1 & 2) KGS ( 1 & 2) KGS ( 3 & 4)
2X220MWe
2X220MWe 2X220MWe 2X220MWe
PLACE
RAPS (7 & 8 ) KAPS ( 3 & 4 ) KK ( 1& 2 )
CAPACITY
2X700 MWe 2X700 MWe 2X1000 MWe
Contents/Index
S NO. TOPIC INTRODUCTION TO NAPS TECHNICAL SPECIFICATIONS IMPORTANT DATES OF NAPS UNITS POWER GENERATION PROCESS IN NAPS CONTROL MAINTENANCE SECTION STUDY OF INSTRUMENTATION IN NAPS EQUIPMENTS IN CALIBRATION LAB INSTRUMENTS AT NAPS STANDRADIZATION OF SIGNALS NAPS CONTROL ROOM SYSTEMS IN NAPS FLOW OF STEAM & BOILER FEED WATER TURBINE ROTOR ASSEMBLY COMMUNICATION SYSTEM AT NAPS SECURITY SYSTEM AT NAPS PAGE NO. 1 2 3 4 8 9 12 14 19 20 21 27 29 30 30
2
3 4 5 6 7 8 9 10 11 12 13
14
15
ACKNOWLEDGEMENT I wish to express my profound sense of respect and gratitude to Shri S.K.Sharma, Station Director , Narora Atomic Power Station, Narora to kindly allow me to carry out vocational training at NAPS.I also express my gratefulness to Shri Ramesh Chandra, Training Supdt., Shri K.C.Rakesh,SO/E, Trg. Officer, NAPS Narora for constant inspiration, motivation and invaluable support I got from them. I am thankful to the Engineers in mechanical Section of NAPS Name of Section Head, Engineers and other officers whose co-operation and valuable interaction helped me a lot in completing the project. Finally I thank to security, administration and other staff of the station for their valuable co-operation during the training period enabling me to achieve the goal. Name Year & Branch Institute name
fission
92U235 + on1 38Sr94 + 54Xe140 +2 0n1 + gamma(energy)
1.
Transmission Lines
220KV Narora-Moradabad 220KV Narora-Atrauli 220KV Narora-Shimboli 220KV Narora-Khurja
Five
Single Line Single Line Single Line Double Line 142 Meters 128 Meters 58 Meters 107 Meters 53 Meters 1314 Tonnes/hour 12700 Tonnes/hour 48-40 kg/cm2 87.0 kg/cm2 39000 Tonnes/hour 306 12 15 kgs 680 mm of hg 1.25 kg/cm2 18-20 MWe 220 MWe 220 KV
2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.
Stack Height NDCT Height NDCT Top Dia. NDCT Base Dia. NDCT Throat Dia. Steam Flow PHT Flow Steam Pressure PHT Pressure CCW Flow Coolant Tubes No. of Fuel Bundles in one channel Fuel Bundle Weight Condenser Pressure RB Design Pressure Station Load Generator Power Grid Voltage
BUS-D BUS-H
BUS-E
BUS-F
BUS-G BUS-R
BUS K1 BUS-J
BUS K
BUS L
BUS M
BUS P
BUS -Q
BUS-Q1 DG 2 BUS-T
ACVR 1
PMG 1
P MG 2
ACVR 2
BUS-U2
BUS-U3
BUS-V3
BUS-V1