Escolar Documentos
Profissional Documentos
Cultura Documentos
Paint School
1
Paint School
2
95 % of all coating failures result from Poor surface preparation Poor application
85 % of all failures appear within 1-2 years This fits in well with our own experience
Paint School
3
Steel preparation
Weld spatter
B
Paint School
5
Pre-blasting preparation
Steel
Paint School
6
Cd-4932-21 Steel
Paint School
7
Cd-4932-20
Steel
Paint School
8
Grinding of sharp edges, welds etc. Disc sander and disc grinder
Sander for removing mill scale, paint and rust
Paint School
9
Cd-4930-46
Paint School
10
Cd-4932-12
Paint School
11
Cd-4930-48
Paint School
12
Cd-4930-42
NOTE: Such defects may be difficult to find during inspection
Paint School
13
Cd-4930-78
Paint School
14
Cd-4932-16
Paint School
15
Cd-4930-71
Paint School
16
Cd-4930-72
Paint School
17
Cd-4930-45
Cd-4932-04
Paint School
19
Pre-blasting preparation
Undercut
Undercuts exceeding classification ruling should be repaired by welding and grinding.
Paint School
20
Cd-4930-39
Paint School
21
Paint on a very poor weld. Pinholes and holidays visible after second stripe coating
Neither rewelding nor grinding have been carried out prior to application Remedial Actions: Reblasting, rewelding, grinding and blast -cleaning: COSTLY
Cd-4930-41
Paint School
22
Paint applied on a very poor weld. Pinholes and holidays visible after application
Neither rewelding nor grinding have been carried out prior to application Remedial Actions: Reblasting, rewelding, grinding and blast -cleaning: COSTLY
Cd-4930-40
Paint School
23
Cd-4930-36
Paint School
24
Cd-4930-37
Paint School
25
Construction newly painted Exposed to humid atmosphere Corrosion initiates after a short period of time on weak areas: Sharp edges, crevices and spot welds
Cd-4930-38
Paint School
26
Paint School
27