Check method
1Rebound instrument 2check the delivery inspection report 3Check the records for the concealed project Visual measurement Tape measurement
Fence
1The spray paintcoating dont meet with the requirements 2No grounding
1The coating of the Fence component complies with the design and specifications requirements 2The spray paint of the Fence component complies with the design and specifications requirements
Huawei Confidential Page 2
Huawei Confidential
Page 3
Suggestion: 1.Test the strength of the base; 2.If the strength meets the requirement, repair the base, otherwise rework.
Huawei Confidential
Page 4
Huawei Confidential
Page 5
Huawei Confidential
Page 6
Suggestion: 1.Repair 2.Pay attention to the curing duration 3. The step should be under the eave according with the design
Huawei Confidential
Page 7
Huawei Confidential
Page 8
Huawei Confidential
Page 9
Design of civil work The support of ladder dont meet with requirements
Suggestion: Make a concrete base. Problem: The base is unstable.
Huawei Confidential
Page 10
Design of civil work The cable trough dont meet with requirements
Problem: The support of the trough is unstable.
Huawei Confidential
Page 11
Fence installation The spray paint of the Fence component dont meet with the requirements
Problem: The paint comes unglued.
Huawei Confidential
Page 12
A B B B
The dimensions of tower base section should meet the design requirements, and the tolerance should be +15/-10mm
Check the smoothness of the tower base surface. The deviation should be 5mm Check the appearance of the base: No concave, spongy surface, crack (crack on the surface 1mm), defects of appearance, etc. The intensity of the concrete should meet the design requirements. The intensity after 28day maintenance should not be less than C20.
Huawei Confidential
Page 13
Check Item
The examination records for the concealed project are completeinclude The pit (ditch) examination records for the groundwork are complete The concrete records are complete Check the appearance of the base of the equipment room: No concave, spongy surface, crack (crack on the surface 1mm), defects of appearance, etc. The dimensions of base section of the equipment room should meet the design requirements, and the tolerance should be +15/-10mm Check the smoothness of the base surface of the equipment room. The deviation should be 5mm
A B
Huawei Confidential
Page 14
Check Item
Huawei Confidential
Page 15
Check Item
The concrete records are complete and correct
For the cement base on the floor: The distance to the floor, the intensity of the base and the level deviation should conform to the design requirements. The level deviation of the base should be no more than 3mm/m; For the overhead cement base:Check whether the installation holes match the equipment against the construction drawings. The level deviation of the platform should be no more than 3mm/m
The coating of the Fence component complies with the design and specifications requirements The spray paint of the Fence component complies with the design and specifications requirements