Abstract
Reasons for (PD) monitoring of transformers Partial Discharge Detection principles Electrical PD diagnostic techniques
PD measuring circuits according to IEC 60270
Detection Methods
Optical
HV
Acoustic
Mechanical
Opto-acoustic
Heat
[Knig, 1993]
Components: AC voltage source U, optional blocking impedance Z, coupling capacitor CK, measuring impedance Zm, a measuring instrument M and generalized test object Ca.
Weight: 2 kg
Special feature for continuous PD monitoring (IP 68)
10
Performance Check
1,0
normalized amplitude
output path
0,8
0,6
0,4
input path
0,2
0,0 0,00
0,25
0,50
0,75
1,00
1,25
frequency / GHz
Functional check of the whole measuring path including sensors and partial discharge (PD) acquisition system through injection of high-frequency test impulses single-port solutions are possible the Performance Check controls e.g. the effect of a contact to grounded elements within the oil valve.
12
Performance Check
Drain valve
Transformer
14
380/220kV, 200 MVA singlephase transformer and position of the gate-valve UHF-sensor
30
amplitude (V)
0.6 0.5
time (ns)
amplitude (Vs)
0.25
0.50
0.75
1.00
1.25
1.50
frequency (GHz)
17
amplitude (mV)
50 0 -50
-250
250
500
750
1000
time (ns)
Application benefit:
12 10
amplitude (Vs)
8 6 4 2 0 0.00
0.25
0.50
0.75
1.00
gas-in-oil hydrogen indication useless due to active hot spot customer wanted to test for PD and check a potential load dependency of PD full in-service sensor application and measurement
frequency (GHz)
18
Egypt Kairo
Colombia Bogota
19
21
Application benefit:
Tested measurements have been performed using non-conventional decoupling methods taking advantage of electromagnetic field coupling PD measurements on the power transformers have been functioned on the drain valves of the 3- phase 110/225kV power transformers with the help of the UHF probe DN 50 Three transformers found with minor PD activity, one transformer with clear PD
22
Drain Valve
23
Louth
The measurements on both valves showed PD activity from inside the transformer.
T2xxx
Not any critical PD levels above the detection sensitivity have been measured in
24
25
Measuring Instrument:
UHF Probe DN50 Calibrator LDC-6/UHF PD measurement instrument LDS-6/UHF Drain Valve Power Transformer
26
Application benefit:
For examination and diagnostics of the insulation quality of high voltage apparatus the measurement of PD is accomplished by sensitive UHF method on-site UHF probe applied in full operation of transformer, no outage needed
27
Conclusion
sensitive UHF PD measurement with UHF probes applicable in service provide advantageous robust and easy PD decoupling PD location - especially in transformers of great importance is possible in mixed and all-acoustic way significant diagnostic information are derived from advanced tools for PD monitoring valuable application benefits e.g. on-line quick start of PD monitoring, enabling time-based maintenance, diagnostic double checks, etc. are at hand
Doble Lemke GmbH Kesselsdorf/Dresden,Germany Tel.: +49 35204 3900 0 www.ldic.de Doble Lemke AG Rheinfelden, Switzerland Tel.: +41 61 836 8000 www.ldic.ch