Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID
Population
2011 census
1,210,193,422
States
12th February 2005 Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. Recognizing that electricity is one of the key drivers for rapid economic growth and poverty alleviation, the nation has set itself the target of providing access to all households in next five years. As per Census 2001, about 44% of the households do not have access to electricity. Section 3 of the Electricity Act 2003 requires the Central Government to formulate & revise, the National Electricity Policy in consultation with Central Electricity Authority (CEA) and State Governments.
2010
56% = 678Million
Available for all households in next five years Availability of Power - Demand to be fully met by 2012. Energy and peaking shortages to be overcome and adequate spinning reserve to be available. March 2012
Supply of Reliable and Quality Power of specified standards in an efficient manner and at reasonable rates.
Per capita availability of electricity to be increased to over 1000 units by 2012. Minimum lifeline consumption of 1 unit/household/day as a merit good by year 2012.
http://powermin.nic.in/JSP_SERVLETS/internal.jsp Sept 1, 2012
Mission 2012
The per capita average annual domestic electricity consumption in India in 2009 was 96 kWh in rural areas and 288 kWh in urban areas for those with access to electricity, in contrast to the worldwide per capita annual Sweden average of 2600 kWh and 6200 kWh in the European 15000 kWh Union.[7] India's total domestic, agricultural and industrial per capita energy consumption estimate vary depending on the source. Two sources place it between 400 to 700 kWh in 20082009.[8][9] As of January 2012, one report found the per capita total consumption in India to be 778 kWh.[5]
Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID
Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID
Number Game
100 - 44% = 56% = 678 Million has access to electricity NR has 56 GW generation, 36 GW was affected on 30 July 56/205 = 27%; 185 Million : 36/205=17%; 119 Million NEW has 84 GW generation, 48 GW was affected on 31 July
From Outside
From Inside
Regular shortage
Several times in a day For short duration and long duration
Limited Investment/Resources Priority Not easy job Political Issue, State v/s Centre
Discipline Planning
Isolation schemes
Despatching Under-frequency