Abhay Kumar, HVDC, IVAa Seminarium om vrldens strsta elavbrottMeeting, 2012-09-10

The Royal Swedish Academy of Engineering Sciences, IVA (avd II)


ABB Group Slide 1 PowDoc id

Indian Power System Recent Disturbance

Indian Power System Recent Disturbance


Sequence Today

India Large System Disturbance Workshop Paris, 27 August 2012


Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID

Own reflection as Individual


(not as an Power System Expert) (subject to change/discussion)

(May be wrong/incorrect missing info perspective)


Not official

For official version Please check with authorities

ABB Group Slide 2 PowDoc id

Indian Power System Recent Disturbance


India

Population

2011 census

1,210,193,422

States

comprising 28 states and 7 union territories. 3,287,263 km2

installed capacity of 205.34 GW as of June 2012

ABB Group Slide 3 PowDoc id

http://en.wikipedia.org/wiki/Electricity_sector_in_India Sept 1, 2012

Indian Power System Recent Disturbance


National Electricity Policy

12th February 2005 Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. Recognizing that electricity is one of the key drivers for rapid economic growth and poverty alleviation, the nation has set itself the target of providing access to all households in next five years. As per Census 2001, about 44% of the households do not have access to electricity. Section 3 of the Electricity Act 2003 requires the Central Government to formulate & revise, the National Electricity Policy in consultation with Central Electricity Authority (CEA) and State Governments.

2010
56% = 678Million

ABB Group Slide 4 PowDoc id

http://powermin.nic.in/JSP_SERVLETS/internal.jsp Sept 1, 2012

Indian Power System Recent Disturbance


Government of India

The Ministry of Power has set a goal

Mission 2012: Power for All.

ABB Group Slide 5 PowDoc id

http://powermin.nic.in/JSP_SERVLETS/internal.jsp Sept 1, 2012

Indian Power System Recent Disturbance


National Electricity Policy

AIMS & OBJECTIVES


Available for all households in next five years Availability of Power - Demand to be fully met by 2012. Energy and peaking shortages to be overcome and adequate spinning reserve to be available. March 2012

Supply of Reliable and Quality Power of specified standards in an efficient manner and at reasonable rates.
Per capita availability of electricity to be increased to over 1000 units by 2012. Minimum lifeline consumption of 1 unit/household/day as a merit good by year 2012.
http://powermin.nic.in/JSP_SERVLETS/internal.jsp Sept 1, 2012

Mission 2012

ABB Group Slide 6 PowDoc id

Indian Power System Recent Disturbance


Prespective

The per capita average annual domestic electricity consumption in India in 2009 was 96 kWh in rural areas and 288 kWh in urban areas for those with access to electricity, in contrast to the worldwide per capita annual Sweden average of 2600 kWh and 6200 kWh in the European 15000 kWh Union.[7] India's total domestic, agricultural and industrial per capita energy consumption estimate vary depending on the source. Two sources place it between 400 to 700 kWh in 20082009.[8][9] As of January 2012, one report found the per capita total consumption in India to be 778 kWh.[5]

ABB Group Slide 7 PowDoc id

http://en.wikipedia.org/wiki/Electricity_sector_in_India Sept 1, 2012

Indian Power System Recent Disturbance


Sequence Today

India Large System Disturbance Workshop Paris, 27 August 2012


Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID

Own reflection as Individual


(not as an Power System Expert) (subject to change/discussion)

(May be wrong/incorrect missing info perspective)


Not official

For official version Please check with authorities

ABB Group Slide 8 PowDoc id

Indian Power System Recent Disturbance


Summary of Large System Disturbance Workshop

ABB Group Slide 9 PowDoc id

Indian Power System Recent Disturbance


Summary of Large System Disturbance Workshop
India 2012 The Indian blackouts of 30th and 31st of July were the latest and largest blackouts which occurred so far. Nearly 700 million people were effected by the blackout. It was the largest blackout in global history in terms of the number of people effected, nearly 10 % of the world population. Due to heavy weather and large unscheduled flows three of the five country's electricity grids failed. Starting with the northern grid a cascading effected caused the blackout of the north-eastern and the eastern grid as well. The blackout on July the 30th caused a loss of 36 GW of generation while on July the 31st even 48 GW were lost. To prevent future blackout several high capacity lines will be built to better connect generation with the load centres.

ABB Group Slide 10 PowDoc id

Indian Power System Recent Disturbance


Sequence Today

India Large System Disturbance Workshop Paris, 27 August 2012


Summary by Cigr SC C2 (System Operation & Control) Presentation used there for Introduction Presentation made there by POWERGRID

Own reflection as Individual


(not as an Power System Expert) (subject to change/discussion)

(May be wrong/incorrect missing info perspective)


Not official

For official version Please check with authorities

ABB Group Slide 11 PowDoc id

Indian Power System Recent Disturbance


REPORT OF THE ENQUIRY COMMITTEE
http://www.powermin.nic.in/pdf/GRID_ENQ_REP_16_8_12.pdf

ABB Group Slide 12 PowDoc id

Indian Power System Recent Disturbance


Reflection

Number Game

100 - 44% = 56% = 678 Million has access to electricity NR has 56 GW generation, 36 GW was affected on 30 July 56/205 = 27%; 185 Million : 36/205=17%; 119 Million NEW has 84 GW generation, 48 GW was affected on 31 July

84/205 = 41%; 279 Million : 48/205=23%; 158 Million

ABB Group Slide 13 PowDoc id

Indian Power System Recent Disturbance


Reflection

Perspective and Perception of Effect of an disturbance

From Outside

22 Years Not once 12 years Few times

From Inside

Regular shortage
Several times in a day For short duration and long duration

ABB Group Slide 14 PowDoc id

Indian Power System Recent Disturbance


Reflection

Limited Investment/Resources Priority Not easy job Political Issue, State v/s Centre

However most of it can be achieved with minimal investment


Discipline Planning

Isolation schemes
Despatching Under-frequency

ABB Group Slide 15 PowDoc id

ABB Group Slide 17 PowDoc id