(Brick Laying Study) Taylor Time Study or Work Measurement (Pig Iron Study) 2
3 Make life easier and more comfortable Get job done completely and faultless Get people achieve higher level of living standard 4 Problem Solving Process Analysis Operation Analysis Micromotion Study Time Study (Work Measurement) etc.. such as Applied Statistics 5 Knowledge dealing with the systematic determination of a preferable work method with the time required for the uses of human and equipment to perform such work as well as a development of material & tools to make the established method and time practical 6 Procedure to describe, systematic analyze and improve work method Thus consider Work process Raw materials Design of the output Workplace, tools, equipment at each step of the work process Human activities Method Engineering 7
8 Scope of Work Study 9 Process Analysis Operation Analysis (Micro) Motion Study Time Study Work Instruction Establishing 10 Process Analysis Process Chart Flow Diagram Gang Process Chart Effectively collect information about the work Operation Analysis Man-Machine Chart Operation Chart Layout of work place 11 Operation Inspection Storage Delay Transportation Transportation 12 Separately constructed for Man - Machine - Material Flows Process Chart and Flow Diagram are complementary Always complete all chart headings & summary table 13 Process Chart (Flow Process Chart) Flow Process Chart Page of Chart type: Operator Material Machine Summary Present Proposed Savings Method: Present Proposed Operation Date: Transport ation Activity: Inspection Location: Delay Operator Name / No. Storage Department: Total time (min) Analyst: Distance (m. / feet) Event Description Symbol Time Distance Recommendation 14 Flow Diagram 15 Gang Process Chart 16 Record motions of Left - Right hands Only in-work and in-move No time recorded 17 Operation Chart 18 Man-Machine Chart Man - Machine Chart Page of Operation / Part Summary Man Machine Operator Name / No. Working Time Anal yst Idle Time Date Cycle Time Method: Present Proposed Utilization ratio Man Time Machine Time 19 Layout of Workplace 20 21 What are revealed information? time consumed transportation distance required man-hour What Next ? 22 How to develop a better method Graphic Tools for the analysis 5W + 1H Questions ECRS Checklists More details: Micromotion study 23 What is done? Who does the work? Where is the work done? When is the work done? How is the work done? ? Why does she do it ? Why should it be done ? Why should it be done here ? Why is it be done this way Why should it be done this time ? 24 Output of the questionss Objectives of the work Creativity: Could any other people do this work better in other place, at other time, using other method? 25 Along with 5W1H, TRY US! E eliminate all unnecessary work C combine operations (elements of work) R rearrange sequence of operations S simplify the necessary operations 26 Operation Improve the equipment performance Is current production lot size too large or too small? & at each operation !!! 27 Transportation Create and Change the layout to eliminate distance Increase the lot size per trip Do the loading & unloading time take too long? Improve transportation equipment & at each transportation !!! 28 Inspection Create Improve inspection method Are the quality inspections and volume inspections being done at separate processes? Try to combine the two at the same process & at each inspection !!! 29 and Can we create to eliminate temporary storage? Can retention times be shorten? & And Finally! 30 Materials Material handling Tools Jigs Fixtures Machines Operators Working conditions 31 Specialist / External Consultant
IE / IM
Line Supervisor
Front-line Operator 32 Cross functional Cooperation Planning and Control Maintenance Quality Inspection Laws and Regulations Safety Labor Relation Quality / Productivity 33 Expenses & Benefit of Study Extensiveness of task Life of the task Labor consideration Investment 34 Value Engineering
Ergonomic
Achieve the economy of time, materials, human effort and money