4 -26-2008 Mohamed Khalaf 1

Oil Flow Diagram


Primary separation on platform ( off
shore).
Oil come from platform separator
through 12 pipeline to onshore
(4bar & 42c) with length 4300m.
Oil pass through heat exchanger
(E1)to give output temp.( 56c).
4 -26-2008 Mohamed Khalaf 2
Oil Flow Diagram (Cont.)
Oil enter onshore separator(3bar) to
separate liquid from gas.
Gas from top goes to gas lift stream.
Liquid pass to flow tank to perform
better separation(1bar).
Gas exit from the top of the flow
tank to low flare.
Oil exit to 3 feed pumps (only one
pump works) giving (20 bar).

4 -26-2008 Mohamed Khalaf 3
Oil Flow Diagram (Cont.)
Oilywater from flow tank pass
through pump (output 4bar)to
W.W.T.P.
Oil exit from pump pass through
heat exchanger(E2)but its out of
service.
Oil enter the heater with (58c &
20bar) to raise its temp. to (90c
&19bar).
4 -26-2008 Mohamed Khalaf 4
Oil Flow Diagram (Cont.)
There are two chemical pumps but it
standby for pumps on off shore.
Oil then enters desalting unit(1
st
&
2
nd
desalter).
Each desalter has three transformers
on its top (electrical mechanism).
Fresh water pump (output 23bar)
discharges fresh water to the 2
nd
desalter.

4 -26-2008 Mohamed Khalaf 5
Oil Flow Diagram (Cont.)
1
st
desalter (90c &18bar).
2
nd
desalter (80c&17bar).
Oil exit from the 2
nd
desalter from its
top with(80c&10bar).
0il then pass again to heat
exchanger (E2)but its out of service.
Oil pass through heat exchanger
(E1)to cool oil coming from off shore.







4 -26-2008 Mohamed Khalaf 6
Oil Flow Diagram (Cont.)
Oil then pass to TRIM COOLER (input
60c & 5bar..output 40c & 5bar).
Finally oil enter the storage tank
(250,000 bbl)
Using blow down drum to adjust the
pressure in the system.
4 -26-2008 Mohamed Khalaf 7
10-V-1
11-V-2 11-V-1
12 Oil to Shore Line
Onshore
Separator
Oil Heaters
Electrostatic Desalters
Storage
Tanks
Trim
Cooler
To gas
system
To Flare
Heat Exchanger
2nd Heat
Exchanger
Sea Water
Crude Processing
20-S-1/5
To PPC
40c
11-F-1/2
10-S-1/2
Desalter Feed Pumps
42c&4bar
5
6

c

90c
4 -26-2008 Mohamed Khalaf 8
Gas Flow Diagram
Gas comes from production platform
through 20 pipeline(4 bar).
Gas pass through slug catcher to
separate condensate from it.
Condensate goes to the flow tank to
increase API of oil.
Then gas enter the gas scrubber(10-
v-3) to separate condensate from it.

4 -26-2008 Mohamed Khalaf 9
Gas Flow Diagram (Cont.)
Gas passes through four gas
compressors.
Each compressor pass through loop.
First (gas) enter vessel1 (v1) 3bar &
25.5c to separate condensate from
it.
Then gas enter first stage
compression (input 2.8bar& 25c ).
Gas exit with (14.3bar & 123c ).
4 -26-2008 Mohamed Khalaf 10
Gas Flow Diagram (Cont.)
Then cool through cooler (EA1)giving
output 13.7 bar & 55c.
Then enter V2 to separate
condensate (output 13.4 bar&53.8c)
Then enter the second stage
compression to give output (41.4bar
& 125c)
Then cool through cooler (EA2)giving
output 40.7 bar & 55c.

4 -26-2008 Mohamed Khalaf 11
Gas Flow Diagram (Cont.)
Then enter V3 to separate
condensate (output 40.2 bar&42.8c)
Gas coming from V3 go to glycol unit
to remove water from gas.
Blow down header is used for
emergencies.


4 -26-2008 Mohamed Khalaf 12
Gas Flow Diagram (Cont.)
Then enter the third stage
compression to give output (92bar &
104c).
Then cool through cooler (EA3)giving
output 91.6 bar & 55c.
Condensate separated from each
vessel, collected & go to flow tank.
4 -26-2008 Mohamed Khalaf 13
Gas from
Offshore
Slug
Catcher
Gas K.O.D
To Flare
To Power
Generators
To Gas Lift
Station
Suction K.O.D
1st Stage
(2.8 - 14.35 )bar
2nd Stage
(13.4 41.4) bar
3rd Stage
(39.2 - 92 )bar
Air
Cooler
Air
Cooler
Air
Cooler
Gas to
Wells
K.O.D
K.O.D
K.O.D
Gas / Glycol
Contactor
To Oil Sep.
Gas Lift Compressors
10-V-3
10-V-5
4 -26-2008 Mohamed Khalaf 14
Water Injection Plant
Sea water intake through pump
(24c & 11bar)
The sea water go to electro
chlorination to remove bacteria, then
pump it (3bar) to 3 filters to filter
water from impurities.
Two filters work & the other under
back washing every 8 hrs.
4 -26-2008 Mohamed Khalaf 15
Water Injection Plant (Cont.)
Inject biocide (anti bacteria).
Inject polymer electrolyte to
coalescence the impurities & settle it
down.
Water out from the bottom of filters.
Antifoam is injected to sea water line
before water entrance to vacuum
tower.



4 -26-2008 Mohamed Khalaf 16
Water Injection Plant (Cont.)
Water enter the vacuum tower from
top.
Inject Oxygen scavenger.
Two vacuum pumps used for vapour
suction from two stages.
Use separator & water tank beside
vacuum pumps.
4 -26-2008 Mohamed Khalaf 17
Water Injection Plant (Cont.)
Water exit from vacuum bottom
(-0.3bar) to booster pumps (5.8bar).
Inject biocide ,corrosion & scale
inhibitor before booster pumps.
Then booster pumps deliver water to
main injection pumps (180bar).
Inject water to wells in offshore
(175bar) through 12 pipeline.

4 -26-2008 Mohamed Khalaf 18
Booster / Main
Injection Pumps
Multi - media
Filters
De-aeration
Tower
To Vacuum Package
First Stage
Second Stage
To Injectors
From S.W.I. basin
Water Injection Plant
4 -26-2008 Mohamed Khalaf 19