and pushes to the delivery line. Both the cylinders do this function
alternately. The pumping operation is achieved mainly with two of gate
valves.
Rock valve
Flat gate valve
Rock valve
In this, a conduit is pivoted inside the hopper in such away that the
cylinder is always connected with the feeding hopper and the
pushing cylinder with the delivery line.
Contd.
Contd.
slowly close throttle valve on control block until gate valve hits
gently against limit switch.If impact of gate valve is too hard, slightly
open both throttle valve.
OPERATING PROCEDURES
Contd.
Under all circumstance keep a safe distance from obstacles such as
masts, scaffolds, buildings, etc.
The placing boom may be operated only up to max wind force 8
(wind velocity = 77 km/hr).
The placing boom must never be used as a crane for lifting loads.
Un-authorised persons in the working areas of the concreting pump
and the placing boom is prohibited.
OPERATING PROCEDURES
Contd.
The vehicle must not travel with boom unfolded.
The rubber end hose at the placing boom must not exceed the
length as specified. It should not be linked during pumping
operations. The safety rope for the end hose must be available and
fixed.
Connections of delivery pipelines must not be opened under
OPERATING PROCEDURES
Contd.
When blowing out the placing boom pipeline, the end hose must
be removed and the trap basket attached. It must also be ensured
that no persons are standing at the pipeline end in blowing out
direction.
Do not allow the hopper to be pumped completely empty. This
may cause trouble due to air locks (concrete analyzing due to
compressed air in the cylinder ) and running the pistons
dry
OPERATING PROCEDURES
Contd.
If the flushing agent is excessively contaminated, it should be changed.
Where it is absolutely necessary to change the sealing set for the gate
valve rods after Concreting operation. If stones have jammed the
agitating arms in the agitator, engage the agitator reverse for a short
time.
OPERATING PROCEDURES
Contd.
A well cleaned delivery pipeline helps prevent blockages.
If blockages occur (concrete pump stops working, safety pressure
has been reached), switch over to trouble (reverse pumping ) for a
few strokes by means of switching lever. If blockages has not been
cured after switching back the concrete pump to operation, the
concrete pump has to switched off.Then establish where the blockage
is normally the blockage occur in the area of the reduction pipes or the
end hose.
The support
The
concrete in the pipeline together with the ball will be sucked back
into the hopper.
paper plug followed by a soft rubber sponge ball can be pushed in into
the reduction pipe. Connect cleaning head and connect the water pump
hose. Engage water pump. When discharge of paper and rubber ball
occurs at the end of the pipeline, turn-off the water pump flush the
siamese, pipe bend and hopper
Contd.
This method is similar to pumping out the pipeline method; but instead
of water line air line to be connected to the cleaning head, and connect a
trap basket at the end of pipeline.
3. Flushing of pipeline :
By flushing the pipeline remaining of concrete are removed from the pipe
walls.
For this purpose push the rubber ball about 1 m into the reduction pipe,
sprinkle water into the reduction pipe and close the pipe with another
rubber ball, so that there are a few litres of water between these two
rubber balls. Attach cleaning head. Now push the two balls with the
water cushion through the pipeline with compressed air.
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
The concrete pump
Mounting
It is possible on various truck chassis with a minimum admissible total
weight of 14t by means of fitted sub-frame
Drive unit
Truck engine drives via flexibility suspended intermediate gearbox changeable to pumping or travelling operations - the constant axial
piston
pumps
for
concrete-pump,placing-
boom
&
auxiliary
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Control system
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Optional equipment
A) air compressor
B) oil cooler
C) lateral outlet
Operating data
Theoritical output
Concrete pressure
Number of strokes
Pumping cylinder
Stroke volume
Hopper capacity
Drive power
Weight
52 cum / hr (max)
55 bar (max)
28 per min (max)
180 x 1200 mm
61 ltrs (2 cylinders)
460 ltrs
130 hp (min)
3280 kg
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
The placing boom
Boom construction Boom made of high quality, fine grained steel in
box. Type construction, providing low weight and high safety in
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Delivery pipeline
material uniform pipe lengths & bends thus equal on all boom sections
All articulated joints, also on boom end , consists of pipe bend.
Standard 90 deg bends are thick walled and wear resistant.
:-
range down to a water / cement ratio of 0.4 max. Aggregate size upto
63mm depending on delivery pipeline diameter
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Operating data
Pipeline dia
12 DN
Vertical reach
27.7 mtr
Horizontal reach
24 mtr
from
Slew axis center
Height of folding points (in mtr)
3.7 - 12.25 -
20.3
Articulated points three
Hoisting angle
104 deg
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
The concrete pump
Mounting
Mounting is possible on various truck chassis with a minimum
admissible total weight of 22t by means of a fitted sub-frame
Drive unit
Truck engine drives via auxiliary drive or a flexible suspended
intermediate gear box - changeable to pumping or travelling operations
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Control system
Gate valve
:-
Single
rod
gate
valve
with
automatic
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Optional equipment
a) air compressor
b) oil cooler
b) lateral outlet
d) vibrator
Operating data
Theoritical output
(max)
60 cum / hr
Concrete pressure
70 bar (max)
Number of strokes
(max)
31 per min
Pumping cylinder
180 x 1400mm
Stroke volume
cylinders)
72 ltrs (2
Hopper capacity
500 ltrs
Drive power
130 hp (min)
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
THE PLACING BOOM
Boom construction
Boom made of high quality, fine- grained steel in Box - type construction,
providing low weight and High safety in vertical plane 3 times foldable,
Mounted on a slew able base column with robust Slewing drive.Folding
angle of flyer of 220 deg
Jacking system
4 hydraulically telescopable support feet, Front- feet at laterally slewable &
telescopable
Outriggers , rear feet at laterally extractable, Jacking exclusively effected
via support feet
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Delivery pipeline
Dn125mm dia. Made of highly wear resistant Material uniform pipe lengths
& bends. Thus Equal on all boom sections.
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Operating data
Pipeline dia
125 DN
Vertical reach
27.7 mtr
Horizontal reach
Axis center
Height of folding
Three
Hoisting angle
104 degree
Slewing range
360 deg
Weight
5900 kg
Schwing BPL580-18/KVM28-24
concrete placing pump and boom
Approx.480
Approx.500
L
Capacity of water tank
L
Capacity of charching hopper :
L
Approx.500
units
bar
801 (r)
280
900 hdr
280
1200hdr
300
Max.Hydraulic pressure
(Agitator)
bar
100(200)
200
200
Pumping cylinder,diamm
200 * 1400
200 * 1600
Required power
74
74
74
31(33)
30 17 *
26 16 *
57 (61)
60 08 *
57 96 *
kw
Design
:- The pump is
thereby pushing forward the concrete mix inside the hose into the
conveying line vacuum within pump chamber ensures that pumping
hose regains its former cross section immediately behind rollers &
enables the concrete to be sucked in from the feeding hopper at a
high volumetric efficiency
Design
4-arm, zr
Construction
The boom arms of high quality fine grained steel in box type design. All
the arms are positively & hydraulically operated. The pivot joints with
optimum angle range & slewing gar provide excellent flexibility and slip
characteristics.The extendable diagonal legs at front in conjunction with
rear pump support & axle locking provide necessary stability, support
legs are all hydraulically operated
Others
A) Water pump
pump ( optional)
B) Air compressor
Delivery line
The boom is equipped with a DN 125 ih delivery line. Pipe sections are
connected by clamp couplings. End hose is suitable for operating pressure
of upto 85bar
Boom control module
All boom movements are made by hydraulics and can be carried out
simultaneously .Safety valves mounted directly on arm cylinders serve as
protective device in case of hose rupture and over loading. Hydraulic
control block (mbc) is mounted on boom pedestal and fitted with large
hand levers for emergency operation.
Max. Theoritical
hr
Concrete output
80cum /
150lpm
125mm
280 bar
Max. Theoritical
Concrete pressure
25 bar
400ltrs
19.6 mtr
23.2 mtr
14.6mt
4.0mtr
125mm
360 0
0.61 rpm
113 kn
300 bar
24 volts
Angle
Arm 1
6.370 mtr
a 110 deg
Arm 2
4.380 mtr
b 180 deg
Arm 3
4.452 mtr
c 245 deg
range
8
9
10
11
12
13
14
15
o
o
o
o
o
o
o
o
2000 HRS.
1000 HRS.
500 HRS.
Contd
MONTHLY
ACTIVITY
WEEKLY
ITEM
DAILY
Maintenance schedule
16
17
18
19
20
21
22
23
24
25
o
o
o
o
o
o
o
o
2000 HRS.
1000 HRS.
500 HRS.
MONTHLY
ACTIVITY
Contd
WEEKLY
ITEM
DAILY
Maintenance schedule
Maintenance schedule
26
27
28
29
2000 HRS.
1000 HRS.
500 HRS.
MONTHLY
ACTIVITY
WEEKLY
ITEM
DAILY
Contd
o
o
o
o
REMARKS
For concrete pumps with flat gate valves the items 23,24,25,26,and 27 are not applicable
The Rock valve pumps the items 28 and 29 are not applicable.