Escolar Documentos
Profissional Documentos
Cultura Documentos
f. Floating Cranes
g. Suspended Personnel Platforms
Operating Engineers National Hazmat Program
1926.551
HELICOPTORS
1926.552
1926.553
1926.554
OVERHEAD HOISTS
1926.555
CONVEYORS
1926.556
AERIAL LIFTS
Operating Engineers National Hazmat Program
Powerline contact
Swing radius crushing
Structural failure
Rigging failure
Tipover
Operating Engineers National Hazmat Program
Improper setup
Inadequate outrigger cribbing
Unstable ground (Utilities, uncompacted
soil, etc.)
Unlevel crane (Reduction in capacities upto
50%)
Inspection failure - damaged components
Operating Engineers National Hazmat Program
Overload
Mechanical failure
Hydraulic failure
Impact loading
Side loading
Wind
Operating Engineers National Hazmat Program
Prohibited Zone
Upto 50 kV
50 to 200 kV
10 ft.
15 ft.
200 to 350 kV
20 ft.
350 to 500 kV
25 ft.
500 to 750 kV
35 ft.
750 to 1000 kV
45 ft.
Standing Rope
More than 2 broken wires in one lay
(beyond end connections)
More than 1 at the end connection
500 lbs..
500 lbs..
600
600
450
1000
1000
450
1000
300
1000
0
30lbs..
1000
Shackle use
Use only the proper pin, never replace with
a bolt.
One lay
Wire rope
Mechanical splice
END
This publication was made possible
by grant numbers 5 U45 ES06182-13
AND 5 U45 ES09763-13 from the
National Institute of Environmental
Health Sciences (NIEHS), NIH. Its
contents are solely the responsibility
of the authors and do not necessarily
represent the official views of the
NIEHS, NIH.
Operating Engineers National Hazmat Program