DAY 1
P
M
T
O
P
PMTOP
DAY 2
P
M
T
O
P
DATE
TOPICS
TIME
RESOURCE PERSON
8:30-10:00
FJ CHAN
10:00-12:00
EY CHUA
DAY 2
LUNCH BREAK
12:00-1:00
1:00-2:00
EY CHUA
2:00-5:30
EE CRISTI
P
M
T
O
P
P
M
T
O
P
PROJECT EXECUTION
PROJECT MANAGEMENT TEAM
PM
FIELD
STAFF
Consolidated Reports
DTRs and EDTRs
PLANNING
CM
SUPTS
AFC Drawings
L5 Schedule
Quantities to Install
Manhours Allocations
Bill of Materials and Consumables
Procurement Schedule
Subcontract Packages
Equipment and Tools Schedule
Manpower Requirement
Methodologies
QCIP / Test Procedures
Test Pack
Work Permits / Pre-Task Plan
Risk Management
Field Supervisor
Field Foreman
P
M
T
O
P
FIELD ENGINEERING
CLIENT
5
1
Drawing List
Piping Drawings
- FI / FR Drawings
- AFC Drawings
Test Pack List
AFC Drawings
- ISO Drawings
- Spool Drawings
- Weld Mapping
- PS Drawings
SUPERINTENDENT
2
14
CMS
Drawing Status
ISO Drawings
Bill of Materials
ISO Drawings
Spool Drawings
Weld Mapping
PS Drawings
EEI DOCUMENT
CONTROL SECTION
Used Drawings
Superceded
Drawings
16
Used Drawings
Superceded
Drawings
Used Drawings
Superceded
Drawings
SUPERVISOR
13
12
11
9
15
ISO Drawings
Spool Drawings
Weld Mapping
PS Drawings
FOREMAN
10
P
M
T
O
P
CLIENT
16
9
12
FOREMAN
13
SUPERVISOR
10
6
15
3
7
SAFETY ENGINEER
Work Permit
Pre-Task Plan
With attached
L5 Schedule
14
OK to Apply Work
Permit with
attached PTP
5
P
M
T
O
P
SCHEDULE
RESOURCES
ALLOCATION
FIELD CHANGE
Site Instructions
Field Change Notice (FCN)
CLIENT
1
FOREMAN
14
4
13
15
CN / CO
3
CN / CO
APPROVED
6
ACCOMPLISHMENT
REPORT
SUPERVISOR
16
FIELD
ENGINEERING
12
17
CN / CO
APPROVED
SCHEDULE
RESOURCES
ALLOCATION
ACCOMPLISHMENT
REPORT
11
18
PCG
8
Labor Distribution
- Manhours per
activity
- Labor cost
Productivity
ABC
P6
SCHEDULE
RESOURCES
ALLOCATION
SUPERINTENDENT
10
Progress
Quantity Installed
Manhours per activity
Productivity
P
M
T
O
P
FIELD CHANGE
19
Verbal instruction
Advance S.I.
Advance F.C.N.
CLIENT
1
8
ACCOMPLISHMENT
REPORT
FOREMAN
2
18
3
CN / CO
APPROVED
FIELD
CHANGE
SCHEDULE
RESOURCES
ALLOCATION
17
10
CN / CO
7
FIELD
ENGINEERING
FIELD
CHANGE
6
SUPERVISOR
5
16
11
CN / CO
APPROVED
SUPERINTENDENT
15
14
12
PCG
13
SCHEDULE
RESOURCES
ALLOCATION
SCHEDULE
RESOURCES
ALLOCATION
P
M
T
O
P
Document Control
Section
DTRs (Official)
SITE ACCOUNTING
EDTRs A / S
ERG
5
Used Drawings
Superceded Drawings
DTRs (Official)
EDTRs A / S
EQUIPMENT
TOOL PACKS
PCG
Used Drawings
Superceded Drawings
MP Crew of Completed
Works
SUPERVISOR
3
2
8
SUPERINTENDENT
Work Permits of
Completed Work
EDTRs
CLIENT
CONSTRUCTION WORK PACKAGE
AFC Drawings (ISO dwgs, SPOOL dwgs,
WELD mapping, PS dwgs.)
3-Weeks Schedule, L5
Materials and Consumables Allocation
Equipment Allocation
Manpower Allocation
Tool Packs Allocation
FOREMAN
7
1/2
P
M
T
O
P
ACTION PARTY
SOFTWARE
SUPERINTENDENT
SUPERVISOR
MP Crew
Equipment
Tool Packs
DTRs ( Official ) - Accomplishment Reports
EDTRs - A / S ( Acknowledge and Signed )
Work Permits of completed works
Used Drawings
Superceded Drawings
MP Crew of completed works
Equipment of completed works
Tool Packs of completed works
FOREMAN
TIMELINE
HARDWARE
2/2
P
M
T
O
P
LOGISTIC
Flow of Materials
Manpower Crew
Construction Equipment
Tool Packs
P
M
T
O
P
Deliver Materials
from
L4 Schedule
6
Delivery From
Procurement Plan
SITE
WAREHOUSE
4
RDS from
L5 Schedule
and Material
Allocation List
SUPERVISOR
10
7
3
A
Consolidated
DTRs
(QTY. Installed)
PMRR
GATE PASS
JMIF
IMS
B
C
ABC
D
COST OF INVENTORY
COST OF MATERIAL
WITHDRAWN PER ACTIVITY
RDS from L5
Schedule
PCG
13
Progress
Quantity Installed
Manhours per
activity
Productivity
FOREMAN
2
14
11
12
INVENTORY
WITHDRAWAL
Materials
from
L5 Schedule
15
P6
DTRs
( QTY. Installed )
P
M
T
O
P
RAW MATERIALS
FOR ISOS and
PIPE SUPPORTS
WAREHOUSE
FIELD-ROUTED
& INSTALLING
MATERIALS
IMS
FIELD
SUPERVISOR
PIPE SHOP
SUPERVISOR
DELIVERY TO
SHOP FOREMAN
ISO SPOOLS
and
PIPE SUPPORTS
FABRICATION
SHOP
SPOOLS and
PIPE SUPPORTS
INVENTORY
INSTALLING MATLS
SPOOLS
PIPE SUPPORTS
SPOOL YARD
ERECT
FOREMAN
P
M
T
O
P
MP CREW
From
MOB PLAN
MP Crew for
Re-assignment
or Demob
Billeting
EEI Orientation
Client Orientation
SITE HR
2
14
MP Crew for
Re-assignment
or Demob
MP Crew
SUPERVISOR
10
MP Crew
Assignment
13
SUPERINTENDENT
MP Mob documents
LH MP Contracts
MP Re-assignment
Demob MP Crew
11
12
FOREMAN
PERSIS
B
C
DTR
ACCOUNTING
D
Labor Cost
Payroll
ABC
F
MP Crew assignment
from L5 Schedule
P
M
T
O
P
EQUIPMENT
3
4
Mobilization from
Equipment Plan
LOGISTICS
ERG
EQUIPMENT
request from
L5 Schedule
SUPERVISOR
1
8
5
10
17
DR
Gate Pass
EDTRs
Return
Equipment
EDTRs
Approved
EQUIPMENT
9
EDTRs
16
11
FOREMAN
PCG
14
EMS
15
Inventory
Equipment
Utilization
ABC
12
EDTRs
Acknowledged /
Approved
13
7
Equipment Hour
per activity
Fuel Consumption
P
M
T
O
P
SITE
LOGISTICS
Delivery From
E & T Plan
TOOL ROOM
10
TOOL PACKS
from L5 Schedule
BTS FOR
TOOL PACKS
from L5 Schedule
SUPERVISOR
1
TOOL PACKS
RETURN
PMRR
GATE PASS
BTS
TOOL PACKS RETURN
TOOL PACKS
FOREMAN
6
INVENTORY
and Cost
CTRIS
TOOL PACKS
Return After
Works Completed
P
M
T
O
P
Test Packages
Contents of Test Pack
Contents of the QC Plan
P
M
T
O
P
FIELD
ENGINEERING
TEST PACKS
WENDS
INSPECTION POINT
QUALITY CONTROL
PIPING
SUPERINTENDENT
TP LINE
COMPLETION
OK
TP
HYDROTEST
OK
TP
RESTORATION
OK
ERECTION
SUPV
HYDROTEST
SUPV
RESTORATION
SUPV
TEST PACK
TEST PACK
TEST PACK
FOREMAN
FOREMAN
FOREMAN
TEST PACK
LINE COMPLETION
TP HYDROTEST
TP RESTORATION
P
M
T
O
P
PIPING SUPT
PIPING
Schedule, L5
Piping SUPV
Consolidated
FIT-UP Reports
Consolidated
Production
WELD Reports
Piping FM
FIT-UP
PRODUCTION WELD
Daily
Schedule
Welding SUPV
FIT-UP Reports
Consolidated
Production
WELD Reports
Welder
Daily FIT-UP
Reports
Consolidated
FIT-UP Reports
TEST PACK
Welding SUPT
3-Weeks
Schedule, L5
Welding FM
Daily
Production
WELD Reports
Fitter
Crew
FIT-UP
INSPECTION POINT
P
M
T
O
P
SUPT
PIPING
Schedule, L5
Piping SUPV
Consolidated
FIT-UP Reports
TEST PACK
Consolidated
Production
WELD Reports
Daily FIT-UP
Reports
Piping FM
Daily
Schedule
Welding SUPV
FIT-UP Reports
Welder
3-Weeks
Schedule, L5
FIT-UP
PRODUCTION WELD
Welding FM
Daily
Production
WELD Reports
Fitter
Crew
FIT-UP
INSPECTION POINT
P
M
T
O
P
JOINT STATUS
Fit-up
Weld
NDT
PIPING
SUPERINTENDENT
CONSOLIDATED
FIT-UP REPORTS
( Inspected / Approved )
PIPING
SUPERVISOR
WENDS
3
FIELD
ENGINEERING
16
Consolidated
FIT-UP
Reports
20
QC
18
19
14
15
Consolidated
PRODUCTION
WELD Reports
NDT
REPORTS
WELDING SUPERINTENDENT
Consolidated
FIT-UP
Reports
WELDING
SUPERVISOR
13
12
17
9
JOINT STATUS
Fit-up
Weld
NDT
WELDING
FOREMAN
FIT-UP
REPORTS
10
WELD
REPORTS
11
P
M
T
O
P
P
M
T
O
P
QUALITY CONTROL
INSPECTION PLAN
( QCIP )
1/24
P
M
T
O
P
EVP
SVP
QC GROUPMANAGER
QC MANAGER
QC MANAGER
QC MANAGER
STEELFAB SHOP
QCs IN-CHARGE
QCs IN-CHARGE
QCs IN-CHARGE
PROJECTS
PROJECTS
PROJECTS
HOMEBASE
PROJECT/JOB SITE
NOTE:
Quality Control team OF THE SITE PMT FUNCTIONALLY REPORTS TO
THE HOMEBASE QC MANAGER AND ADMINISTRATIVELY under THE
JOBSITE PROJECT MANAGER.
2/24
P
M
T
O
P
WHAT IS QUALITY ?
Quality means satisfying our
customers every time we deal with
them.
HOW ?
By doing things right at the first
time and all the time and by doing
them better and better.
3/24
P
M
T
O
P
P
M
T
O
P
Project Owner
Storage
Turn-Over
In-process Fabrication,
Erection &Construction
P
M
T
O
P
P
M
T
O
P
7/24
P
M
T
O
P
8/24
P
M
T
O
P
9/24
P
M
T
O
P
10/24
P
M
T
O
P
11/24
P
M
T
O
P
12/24
P
M
T
O
P
QC INSPECTION ACTIVITIES
Review of Records
Witnessing of Tests by Third Parties
Attendance to Hold Points
Conduct Specified Tests
Activity Documentation
In-process and Final Inspection
13/24
P
M
T
O
P
P
M
T
O
P
P
M
T
O
P
P
M
T
O
P
17/24
P
M
T
O
P
RESPONSIBILITY
Project assigned QC In-charge consolidate and issue
22/24
P
M
T
O
P
CLIENT INSPECTOR
Approve
the
QCIP
and
monitor
compliance of the Construction Activities
and QC Inspection performed as per the
plan. Attend to the inspection if required.
18/24
P
M
T
O
P
NON-CONFORMANCE
P
M
T
O
P
NON-CONFORMANCE
QC Inspection Report (QCIR)
A report on any ACCEPTANCE or Nonconformances (usually minor findings)
Non-Conformance Report (NCR)
P
M
T
O
P
21/24
P
M
T
O
P
P
M
T
O
P
Remember this.
The cost of repair and / or
rejection comes directly out
of profit.
24/24
P
M
T
O
P
of Day 2