PROJECT MANAGEMENT TEAM ORIENTATION PROGRAM

DAY 1

P
M
T
O
P

THE CONSTRUCTION PHASE


SUPPORTING THE FOREMAN

PMTOP
DAY 2

P
M
T
O
P

PMT ORIENTATION PROGRAM


PROGRAM SCHEDULE - DAY 2

DATE

TOPICS

THE EXECUTION / CONSTRUCTION PHASE


Supporting the Foreman
Generating AFC Drawings
Securing the Work Permits
Field Change (CO / CN)
Deliverables and Time Log
Crewing the Foreman
Flow of Materials to the Foreman

TIME

RESOURCE PERSON

8:30-10:00

FJ CHAN

10:00-12:00

EY CHUA

DAY 2
LUNCH BREAK

Supplying the Construction Equipment


Supplying the Tool Packs
Test Packages
Contents of Test Pack
Contents of the QC Plan

12:00-1:00

1:00-2:00

EY CHUA

2:00-5:30

EE CRISTI

P
M
T
O
P

THE CONSTRUCTION PHASE


SUPPORTING THE FOREMAN

Generating AFC Drawings


Securing the Work Permits
Field Change (CO / CN)
Deliverables and Time Log

P
M
T
O
P

PROJECT LIFE CYCLE


THE CONSTRUCTION PHASE

PROJECT EXECUTION
PROJECT MANAGEMENT TEAM
PM
FIELD
STAFF

Consolidated Reports
DTRs and EDTRs

PLANNING
CM
SUPTS

AFC Drawings
L5 Schedule
Quantities to Install
Manhours Allocations
Bill of Materials and Consumables
Procurement Schedule
Subcontract Packages
Equipment and Tools Schedule
Manpower Requirement
Methodologies
QCIP / Test Procedures
Test Pack
Work Permits / Pre-Task Plan
Risk Management

Field Supervisor

Construction Work Package


AFC Drawings
L5 3-Weeks Schedule
Manpower
Materials
Materials
Consumables
Equipment
Tool Packs
Material Allocation List
Work Permits / PTP

Field Foreman

DTRs and EDTRs


Reports

P
M
T
O
P

THE CONSTRUCTION PHASE


AFC PIPING DRAWINS FLOW CHART
Piping Drawings
- FI / FR Drawings
Test Pack List

FIELD ENGINEERING
CLIENT

5
1

Drawing List
Piping Drawings
- FI / FR Drawings
- AFC Drawings
Test Pack List

Records and Issue


Drawing List
Piping Drawings
- FI / FR Drawings
- AFC Drawings
Test Pack List

AFC Drawings
- ISO Drawings
- Spool Drawings
- Weld Mapping
- PS Drawings

SUPERINTENDENT
2

14

CMS

Drawing Status
ISO Drawings
Bill of Materials

ISO Drawings
Spool Drawings
Weld Mapping
PS Drawings

EEI DOCUMENT
CONTROL SECTION

Used Drawings
Superceded
Drawings

16

Used Drawings
Superceded
Drawings

Used Drawings
Superceded
Drawings

SUPERVISOR
13

12

11

9
15

ISO Drawings
Spool Drawings
Weld Mapping
PS Drawings

FOREMAN
10

P
M
T
O
P

THE CONSTRUCTION PHASE


WORK PERMIT FLOW CHART

CLIENT

16
9

Approved Work Permit


11 with attached PTP

Work Permit Forms


Hot Work
Cold Work
Excavation Work
Confined Space Work
Road Block
Vehicle Entry

12

FOREMAN

Approved Work Permit


with attached PTP

13

Work Permit Activity


Completed

SUPERVISOR
10
6

15

Apply Work Permit


with attached PTP

3
7

SAFETY ENGINEER

Work Permit
Pre-Task Plan
With attached
L5 Schedule

14

Work Permit Activity


Completed

OK to Apply Work
Permit with
attached PTP
5

P
M
T
O
P

THE CONSTRUCTION PHASE


FIELD CHANGE FLOW CHART - CASE 1

SCHEDULE
RESOURCES
ALLOCATION

FIELD CHANGE
Site Instructions
Field Change Notice (FCN)

CLIENT
1

FOREMAN
14

4
13
15

CN / CO
3

CN / CO
APPROVED
6

ACCOMPLISHMENT
REPORT

SUPERVISOR
16

FIELD
ENGINEERING

12

17

CN / CO
APPROVED

SCHEDULE
RESOURCES
ALLOCATION

ACCOMPLISHMENT
REPORT

11
18

PCG
8

Labor Distribution
- Manhours per
activity
- Labor cost
Productivity

ABC
P6

SCHEDULE
RESOURCES
ALLOCATION

SUPERINTENDENT
10

Progress
Quantity Installed
Manhours per activity
Productivity

P
M
T
O
P

THE CONSTRUCTION PHASE


FIELD CHANGE FLOW CHART - CASE 2

FIELD CHANGE

19

Verbal instruction
Advance S.I.
Advance F.C.N.

CLIENT
1
8

ACCOMPLISHMENT
REPORT

FOREMAN
2

18
3

CN / CO
APPROVED

FIELD
CHANGE

SCHEDULE
RESOURCES
ALLOCATION
17

10

CN / CO
7

FIELD
ENGINEERING

FIELD
CHANGE
6

SUPERVISOR
5
16

11

CN / CO
APPROVED

SUPERINTENDENT
15
14

12

PCG
13

SCHEDULE
RESOURCES
ALLOCATION

SCHEDULE
RESOURCES
ALLOCATION

P
M
T
O
P

Document Control
Section

THE CONSTRUCTION PHASE


DELIVERABLES - SUPT / SUPV / FOREMAN

DTRs (Official)

SITE ACCOUNTING

EDTRs A / S

ERG
5

Used Drawings
Superceded Drawings

DTRs (Official)
EDTRs A / S

EQUIPMENT
TOOL PACKS

PCG

Used Drawings
Superceded Drawings
MP Crew of Completed
Works

SUPERVISOR
3

2
8

SUPERINTENDENT

Work Permits of
Completed Work

EDTRs

CONSTRUCTION WORK PACKAGE


AFC Drawings (ISO dwgs, SPOOL
dwgs, WELD mapping, PS dwgs.)
3-Weeks Schedule, L5
DTRs ( Temporary and Official )
Work Permits / PTP
Materials and Consumables from
3-Weeks Schedule, L5
MP Crew from 3-Weeks Schedule, L5
Equipment from 3-Weeks Schedule, L5
Tool Packs from 3-Weeks Schedule, L5

CLIENT
CONSTRUCTION WORK PACKAGE
AFC Drawings (ISO dwgs, SPOOL dwgs,
WELD mapping, PS dwgs.)
3-Weeks Schedule, L5
Materials and Consumables Allocation
Equipment Allocation
Manpower Allocation
Tool Packs Allocation

DTRs (Official) Accomplishment Reports


EDTRs A / S (Acknowledged and Signed)
MP Crew of Completed Works
Equipment of Completed Works
Tool Packs of Completed Works
Work Permits of Completed Works
Used Drawings
Superceded Drawings

FOREMAN
7

1/2

P
M
T
O
P

THE CONSTRUCTION PHASE


TIMELINE for the DELIVERABLES
DELIVERABLES

ACTION PARTY

SOFTWARE

SUPERINTENDENT

CONSTRUCTION WORK PACKAGE


AFC Drawings ( ISO Drawings, Spool
Drawings, Weld Mapping, PS Drawings
3 - Weeks Schedule, L5
Materials and Consumables Allocation
Manpower Allocation
Equipment Allocation
Tool Packs Allocation

Every Saturday at 9:00 AM and


immediate when changes occurs.

MP Crew of completed works


( for re-assignment or Demob)
CONSTRUCTION WORK PACKAGE
AFC Drawings ( ISO Drawings, Spool
Drawings, Weld Mapping, PS Drawings
3 - Weeks Schedule, L5
DTRs ( Temporary and Official )

Immediate Re-assignment of MP Crew


Demob MP Crew if not needed
Every Saturday at 10:00 AM and
immediate when changes occurs.

EDTRs ( from ERG )


Work Permits / PTP
Materials and Consumables

SUPERVISOR
MP Crew
Equipment
Tool Packs
DTRs ( Official ) - Accomplishment Reports
EDTRs - A / S ( Acknowledge and Signed )
Work Permits of completed works
Used Drawings
Superceded Drawings
MP Crew of completed works
Equipment of completed works
Tool Packs of completed works

FOREMAN

TIMELINE

HARDWARE

DTRs ( Official ) - Accomplishment Reports


EDTRs - A / S ( Acknowledge and Signed )
Work Permits of completed works
Used Drawings
Superceded Drawings
MP Crew of completed works
Equipment of completed works
Tool Packs of completed works

Temporary DTRs for 1 week and


daily for official DTRs
Daily
Daily when required
Deliver to site 2 or 3 days before the
need date from schedule. Materials are
good for 3 days work when pssible.
Deliver to site 1 hr before the need date
from schedule.
Submit daily at 9:00 AM
Submit daily at 9:00 AM
Submit to CLIENT daily
Return to Superintendent immediately
Return to Superintendent immediately
Advised Superintendent and ERG
3-days before the completion of the
works.
Submit the following day at 9:00 AM
Submit the following day at 9:00 AM
Submit daily
Return to Supervisor immediately
Return to Supervisor immediately
Advised Supervisor 3-days before
the completion of the works.

2/2

P
M
T
O
P

THE CONSTRUCTION PHASE


SUPPORTING THE FOREMAN

LOGISTIC
Flow of Materials
Manpower Crew
Construction Equipment
Tool Packs

P
M
T
O
P

THE CONSTRUCTION PHASE


MATERIAL CONTROL FLOW CHART

Deliver Materials
from
L4 Schedule
6

Delivery From
Procurement Plan

SITE
WAREHOUSE
4

RDS from
L5 Schedule
and Material
Allocation List

SUPERVISOR
10
7

3
A

Consolidated
DTRs
(QTY. Installed)

PMRR
GATE PASS
JMIF

IMS
B
C

ABC
D

COST OF INVENTORY
COST OF MATERIAL
WITHDRAWN PER ACTIVITY

RDS from L5
Schedule

PCG
13

Progress
Quantity Installed
Manhours per
activity
Productivity

FOREMAN

2
14

11

12

INVENTORY
WITHDRAWAL

Materials
from
L5 Schedule

15

P6

DTRs
( QTY. Installed )

MCE INSPECTION POINT

P
M
T
O
P

THE CONSTRUCTION PHASE


PIPING MATERIALS FLOW CHART

RAW MATERIALS
FOR ISOS and
PIPE SUPPORTS

WAREHOUSE

FIELD-ROUTED
& INSTALLING
MATERIALS

IMS
FIELD
SUPERVISOR

PIPE SHOP
SUPERVISOR

DELIVERY TO
SHOP FOREMAN

ISO SPOOLS
and
PIPE SUPPORTS

FABRICATION
SHOP

SPOOLS and
PIPE SUPPORTS

INVENTORY
INSTALLING MATLS
SPOOLS
PIPE SUPPORTS

SPOOL YARD

ERECT

FOREMAN

MCE CONTROL POINT

P
M
T
O
P

THE CONSTRUCTION PHASE


MANPOWER CONTROL FLOW CHART

MP CREW
From
MOB PLAN

MP Crew for
Re-assignment
or Demob
Billeting
EEI Orientation
Client Orientation

SITE HR
2
14

MP Crew for
Re-assignment
or Demob

MP Crew

SUPERVISOR

10

MP Crew
Assignment

13

SUPERINTENDENT

MP Mob documents
LH MP Contracts
MP Re-assignment
Demob MP Crew

11

12

FOREMAN
PERSIS

B
C

DTR

ACCOUNTING
D

Labor Cost
Payroll

ABC
F

MP Crew assignment
from L5 Schedule

MP Crew reduce or MP Crew


For Re-assignment after
Works completed

SUPV. INSPECTION POINT

P
M
T
O
P

THE CONSTRUCTION PHASE


EQUIPMENT CONTROL FLOW CHART

EQUIPMENT
3
4

Mobilization from
Equipment Plan

LOGISTICS

ERG

EQUIPMENT
request from
L5 Schedule

SUPERVISOR
1

8
5

10
17

DR
Gate Pass
EDTRs

Return
Equipment

EDTRs
Approved

EQUIPMENT
9

EDTRs

16

11

FOREMAN

PCG
14

EMS
15

Inventory
Equipment
Utilization

ABC

12

EDTRs
Acknowledged /
Approved

13
7

Equipment Hour
per activity
Fuel Consumption

Return Equipment After


Work Completion

SUPV. INSPECTION POINT

P
M
T
O
P

THE CONSTRUCTION PHASE


TOOLS CONTROL FLOW CHART

SITE
LOGISTICS
Delivery From
E & T Plan

TOOL ROOM
10

TOOL PACKS
from L5 Schedule

BTS FOR
TOOL PACKS
from L5 Schedule

SUPERVISOR
1

TOOL PACKS
RETURN

PMRR
GATE PASS
BTS
TOOL PACKS RETURN

TOOL PACKS

FOREMAN
6

INVENTORY
and Cost

CTRIS

TOOL PACKS
Return After
Works Completed

P
M
T
O
P

THE CONSTRUCTION PHASE


THE TEST PACKS and QUALITY CONTROL

Test Packages
Contents of Test Pack
Contents of the QC Plan

P
M
T
O
P

FIELD
ENGINEERING

THE CONSTRUCTION PHASE


TEST PACK FLOW CHART

TEST PACKS

WENDS

INSPECTION POINT

QUALITY CONTROL

PIPING
SUPERINTENDENT

TP LINE
COMPLETION
OK

TP
HYDROTEST
OK

TP
RESTORATION
OK

SYSTEMS TEST PACK SCHEDULE

ERECTION
SUPV

HYDROTEST
SUPV

RESTORATION
SUPV

TEST PACK

TEST PACK

TEST PACK

FOREMAN

FOREMAN

FOREMAN

TEST PACK
LINE COMPLETION

TP HYDROTEST

TP RESTORATION

P
M
T
O
P

PIPING SUPT

THE CONSTRUCTION PHASE


FIT-UP and PRODUCTION WELD FLOW CHART

PIPING
Schedule, L5

Piping SUPV

Consolidated
FIT-UP Reports

Consolidated
Production
WELD Reports

Piping FM

FIT-UP

PRODUCTION WELD

Daily
Schedule

Welding SUPV

FIT-UP Reports

Consolidated
Production
WELD Reports

Welder

Daily FIT-UP
Reports
Consolidated
FIT-UP Reports

TEST PACK

Welding SUPT

3-Weeks
Schedule, L5

Welding FM

Daily
Production
WELD Reports

Fitter
Crew

FIT-UP

INSPECTION POINT

P
M
T
O
P

SUPT

THE CONSTRUCTION PHASE


PRODUCTION WELD FLOW CHART

PIPING
Schedule, L5

Piping SUPV

Consolidated
FIT-UP Reports

TEST PACK

Consolidated
Production
WELD Reports

Daily FIT-UP
Reports

Piping FM

Daily
Schedule

Welding SUPV

FIT-UP Reports

Welder

3-Weeks
Schedule, L5

FIT-UP

PRODUCTION WELD

Welding FM

Daily
Production
WELD Reports

Fitter
Crew

FIT-UP

INSPECTION POINT

P
M
T
O
P

THE CONSTRUCTION PHASE


DAILY FIT-UP / WELD REPORTS FLOW CHART

JOINT STATUS
Fit-up
Weld
NDT

PIPING
SUPERINTENDENT

CONSOLIDATED
FIT-UP REPORTS
( Inspected / Approved )

PIPING
SUPERVISOR

WENDS
3

FIELD
ENGINEERING
16

Consolidated
FIT-UP
Reports

20

QC
18

19

14
15

Consolidated
PRODUCTION
WELD Reports

NDT
REPORTS

WELDING SUPERINTENDENT

Consolidated
FIT-UP
Reports

WELDING
SUPERVISOR

13

12

17
9

JOINT STATUS
Fit-up
Weld
NDT

WELDING
FOREMAN

FIT-UP
REPORTS
10

WELD
REPORTS
11

P
M
T
O
P

THE CONSTRUCTION PHASE


TEST PACK

Contents of Test Pack

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL

QUALITY CONTROL
INSPECTION PLAN
( QCIP )
1/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL ORGANIZATION

EVP
SVP
QC GROUPMANAGER

QC MANAGER

QC MANAGER

QC MANAGER

BLDGS & INFRA

ELECTROMECH & INDL

STEELFAB SHOP

QCs IN-CHARGE

QCs IN-CHARGE

QCs IN-CHARGE

PROJECTS

PROJECTS

PROJECTS

HOMEBASE
PROJECT/JOB SITE

NOTE:
Quality Control team OF THE SITE PMT FUNCTIONALLY REPORTS TO
THE HOMEBASE QC MANAGER AND ADMINISTRATIVELY under THE
JOBSITE PROJECT MANAGER.
2/24

P
M
T
O
P

THE CONSTRUCTION PHASE


INTRODUCTION TO QUALITY

WHAT IS QUALITY ?
Quality means satisfying our
customers every time we deal with
them.

HOW ?
By doing things right at the first
time and all the time and by doing
them better and better.
3/24

P
M
T
O
P

THE CONSTRUCTION PHASE


INTRODUCTION TO QUALITY

BENEFITS OF GOOD QUALITY


Higher productivity
Less rework
Less waste
Lower overall cost
Greater customer satisfaction

Higher project team morale


Credible & competitive company image.
4/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL PROCESS MAP

QUALITY CONTROL PROCESS MAP


Materials Receiving
& Inspection

Project Owner

Storage

Turn-Over

In-process Fabrication,
Erection &Construction

Inspection & Final Test


&
Documentations

Materials identification through all stages of


fabrication/construction where appropriate
traceability to specified requirements.
5/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

QUALITY CONTROL INSPECTION PLAN


The QCIP is essentially a schedule of
HOLD POINTS on work
activities that require
inspection or specified
test procedures, before
succeeding activities are
allowed to continue.
6/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP

Sequential activities based on


L5 WBS identifying work items
or critical parts that will be
subject to inspection or tests.

7/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP


Critical parts checked partially,
progressively,
or
at
activity
completion to comply with inspection
requirements.

8/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP


Test methods and or inspection
techniques to be applied in order to
verify
compliance
to
quality
standards.

9/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP


Extent of test and inspection defined
by project specifications, codes, and
standards (ie: 100%, 20%, 10%, 5%,
Random Sampling).

10/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP


References for work acceptance where
information on tests and inspection are
applied,
like project specifications,
codes, manufacturing manuals, or AFC
drawings (This includes tolerances in
measurements).

11/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

CONTENTS OF THE QCIP


Organization of the Project Inspection
Team
composed of
the FOG
Foremen/ Supervisor, QC Inspector,
Clients inspectors or at times, thirdparty inspectors.

12/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

QC INSPECTION ACTIVITIES
Review of Records
Witnessing of Tests by Third Parties
Attendance to Hold Points
Conduct Specified Tests
Activity Documentation
In-process and Final Inspection

13/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL INSPECTION PLAN

HOLD POINTS are effective tools

in preventing escalation of nonconformances,


as next activity
cannot start
unless the
preceding work is cleared and
accepted.
14/24

P
M
T
O
P

THE CONSTRUCTION PHASE


ROLE OF THE FOG in QC ACTIVITIES

DUTIES and RESPONSIBILITIES


CONSTRUCTION TEAM
Foremen, Supervisor and Superintendent
Perform its quality line function by ensuring
compliance
of the work to Client
specifications, plans, drawings, applicable
codes, and workmanship standards (Do it
right the first time and everytime and doing
it better and better).
15/24

P
M
T
O
P

THE CONSTRUCTION PHASE


ROLE OF THE FOG in QC ACTIVITIES

DUTIES and RESPONSIBILITIES


CONSTRUCTION TEAM
Foremen, Supervisor and Superintendent
Plan and schedule work inspection aligned
to their work activity schedule to avoid
delays, prepare and submit request for
inspection (RFI) to QC at least 12 hours
before requested time of inspection.
16/24

P
M
T
O
P

THE CONSTRUCTION PHASE


ROLE OF THE QC ENGINEER

DUTIES and RESPONSIBILITIES


QC INSPECTOR
Prepare, orient the FOG, and implement
the approved QCIP to ensure that the
quality requirements of the project are
achieved per plan.

17/24

P
M
T
O
P

THE CONSTRUCTION PHASE


ROLE OF THE QC ENGINEER

RESPONSIBILITY
Project assigned QC In-charge consolidate and issue

the monthly OPQR to the homebase unit for the QC


Head and Officers information and must be concurred
by the Project Manager or Project In-Charge. The PM or

PIC Shall respond positively and do action if the target


benchmark of 95% rating is not achieved.

22/24

P
M
T
O
P

THE CONSTRUCTION PHASE


ROLE OF THE CLIENT in QC ACTIVITIES

DUTIES and RESPONSIBILITIES

CLIENT INSPECTOR
Approve
the
QCIP
and
monitor
compliance of the Construction Activities
and QC Inspection performed as per the
plan. Attend to the inspection if required.

18/24

P
M
T
O
P

THE CONSTRUCTION PHASE


NON CONFORMANCE

NON-CONFORMANCE

Any work deviation from the


reference specification, codes,
standards, sound engineering
practice and approved material.
19/24

P
M
T
O
P

THE CONSTRUCTION PHASE


NON CONFORMANCE

NON-CONFORMANCE
QC Inspection Report (QCIR)
A report on any ACCEPTANCE or Nonconformances (usually minor findings)
Non-Conformance Report (NCR)

A report on any NON-CONFORMANCE or


deviation. (usually major findings that may
have greater impact to project quality)
20/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL RATING

OPERATION PROJECT QUALITY RATING


Projects Quality Status are monitored /
reported monthly by the quality control
as a management tool to give indicator
for actions of the PMT to avoid or
minimize the lost of profit due to poor
quality of works and excessive repairs.

21/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL MESSAGE

A FINAL WORD ON QUALITY WORK

Increased quality is likely to be


associated with
project whose
team members
display pride,
commitment and an interest in
workmanship.
23/24

P
M
T
O
P

THE CONSTRUCTION PHASE


QUALITY CONTROL MESSAGE

Remember this.
The cost of repair and / or
rejection comes directly out
of profit.

24/24

P
M
T
O
P

PROJECT MANAGEMENT TEAM ORIENTATION PROGRAM

of Day 2